{"metadata":{"authority":"Bangladesh Water Development Board (BWDB)","document":"BWDB Standard Schedule of Rates 2022 [With revised rate of 4 (Four) basic materials]","revision_label":"February-2023","dataset_name":"BWDB_SOR_2022_Revised_Feb_2023_AI_FINAL","dataset_version":"1.0.0","purpose":"AI-ready BWDB dataset for BOQ description/code matching, Zone A-D rate selection, rate analysis, user correction and reviewed autofill.","source_scope":{"basic_element_rates":"PDF pages 11-29 / Schedule pages 1-19","item_rates":"PDF pages 30-132 / Schedule pages 20-122","inaccessible_area_modifiers":"PDF page 133 / Schedule page 123"},"zones":{"zone_a":{"label":"Zone-A","bwdb_jurisdiction":["Central Zone"],"districts":["Dhaka","Narayanganj","Manikganj","Narshingdi","Gazipur","Mymensingh","Munsiganj","Kishoreganj","Tangail","Jamalpur","Sherpur","Netrakona"]},"zone_b":{"label":"Zone-B","bwdb_jurisdiction":["South-Eastern Zone","North-Eastern Zone"],"districts_by_jurisdiction":{"South-Eastern Zone":["Chattogram","Rangamati","Khagrachori","Cox's Bazar","Bandarban"],"North-Eastern Zone":["Sylhet","Sunamganj","Hobiganj","Moulvibazar"]}},"zone_c":{"label":"Zone-C","bwdb_jurisdiction":["South-Western Zone","Southern Zone","Western Zone","Eastern Zone"],"districts_by_jurisdiction":{"South-Western Zone":["Khulna","Satkhira","Bagerhat","Jashore","Norail"],"Southern Zone":["Barishal","Jhalkathi","Pirojpur","Patuakhali","Barguna","Bhola"],"Western Zone":["Faridpur","Rajbari","Madaripur","Shariatpur","Gopalganj","Kushtia","Chuadanga","Meherpur","Magura","Jhenaidah"],"Eastern Zone":["Cumilla","Brahmanbaria","Chandpur","Feni","Noakhali","Lakshmipur"]}},"zone_d":{"label":"Zone-D","bwdb_jurisdiction":["Northern Zone","North-Western Zone"],"districts_by_jurisdiction":{"Northern Zone":["Rangpur","Kurigram","Gaibandha","Lalmonirhat","Niphamari","Thakurgaon","Panchaghar","Dinajpur"],"North-Western Zone":["Rajshahi","Naogaon","Nawabganj","Natore","Bogura","Jaipurhat","Sirajganj","Pabna"]}}},"counts":{"basic_element_rates":503,"item_rate_records":979,"inaccessible_area_modifier_rows":31},"autofill_safety":"Use item_rate.autofill_eligible as a hard gate. Always allow user review/correction before final BOQ write."},"markups":[{"code":"A","item":"Contractor's Profit","rates_percent":{"zone_a":10.0,"zone_b":10.0,"zone_c":10.0,"zone_d":10.0},"source_pdf_page":11,"source_schedule_page":1,"validation_status":"source_image_verified"},{"code":"B","item":"Contractor's Overhead and establishment","rates_percent":{"zone_a":3.5,"zone_b":3.5,"zone_c":3.5,"zone_d":3.5},"source_pdf_page":11,"source_schedule_page":1,"validation_status":"source_image_verified"},{"code":"C","item":"Vat","rates_percent":{"zone_a":7.5,"zone_b":7.5,"zone_c":7.5,"zone_d":7.5},"source_pdf_page":11,"source_schedule_page":1,"validation_status":"source_image_verified"}],"element_group_titles":{"10":"Materials: Concrete","20":"Materials: Misc.","30":"Wood Work","40":"Metal Work","50":"Plumbing Work","60":"Electrical Work","70":"Equipment, Tools","80":"Labour"},"basic_element_rates":[{"record_type":"basic_element_rate","serial_no":1,"element_code":"10-040","element_group":"10","element_group_title":"Materials: Concrete","description":"Bricks: 1st Class","unit":"1000 No.","normalized_unit":"per_1000","rates":{"zone_a":13000.0,"zone_b":13000.0,"zone_c":12500.0,"zone_d":12500.0},"source_raw_ocr_text":"1 10-040 | Bricks: 1st Class 1000 | 13000.00 | 13000.00 | 12500.00 | 12500.00","source_pdf_page":11,"source_schedule_page":1,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-040 Bricks: 1st Class 1000 No. Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":2,"element_code":"10-055","element_group":"10","element_group_title":"Materials: Concrete","description":"Bricks: Picked Jhama","unit":"1000 No.","normalized_unit":"per_1000","rates":{"zone_a":13000.0,"zone_b":13000.0,"zone_c":12500.0,"zone_d":12500.0},"source_raw_ocr_text":"2 | 10-055 | Bricks: Picked Jhama ...... ......... 1000 | 13000.00 | 13000.00 | 12500.00 | 12500.00","source_pdf_page":11,"source_schedule_page":1,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-055 Bricks: Picked Jhama 1000 No. Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":3,"element_code":"10-100","element_group":"10","element_group_title":"Materials: Concrete","description":"Ordinary Portland Cement, BDS-EN - 197-1-CEM-I ,52.5N (52.5MPa) / ASTM C-150 Type-I, 50 kg bag","unit":"kg","normalized_unit":"kg","rates":{"zone_a":10.4,"zone_b":10.4,"zone_c":10.4,"zone_d":10.4},"source_raw_ocr_text":"3 10-100 | Ordinary Portland Cement, BDS-EN | kg 10.40 10.40 10.40 10.40 - 197-1-CEM-I ,52.5N (52.5MPa) / ASTM C-150 Type-I, 50 kg bag","source_pdf_page":11,"source_schedule_page":1,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-100 Ordinary Portland Cement, BDS-EN - 197-1-CEM-I ,52.5N (52.5MPa) / ASTM C-150 Type-I, 50 kg bag kg Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":4,"element_code":"10-205","element_group":"10","element_group_title":"Materials: Concrete","description":"Lime, Slaked wo","unit":"kg","normalized_unit":"kg","rates":{"zone_a":25.0,"zone_b":25.0,"zone_c":25.0,"zone_d":25.0},"source_raw_ocr_text":"4 10-205 | Lime, Slaked wo... ee ee ee kg 25.00 25.00 25.00 25.00","source_pdf_page":11,"source_schedule_page":1,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-205 Lime, Slaked wo kg Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":5,"element_code":"10-350","element_group":"10","element_group_title":"Materials: Concrete","description":"Local sand free from silt and clay","unit":"cum","normalized_unit":"cum","rates":{"zone_a":250.0,"zone_b":250.0,"zone_c":250.0,"zone_d":250.0},"source_raw_ocr_text":"5 10-350 | Local sand free from silt and clay cum 250.00 250.00 250.00 250.00","source_pdf_page":11,"source_schedule_page":1,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-350 Local sand free from silt and clay cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":6,"element_code":"10-360","element_group":"10","element_group_title":"Materials: Concrete","description":"Sand, FM >= 0.5 20.","unit":"cum","normalized_unit":"cum","rates":{"zone_a":540.0,"zone_b":545.0,"zone_c":540.0,"zone_d":540.0},"source_raw_ocr_text":"6 10-360 | Sand, FM >= 0.5 20. oe ee eee oe cum $40.00 545.00 540.00 540.00","source_pdf_page":11,"source_schedule_page":1,"rate_validation_status":"source_image_manually_corrected","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-360 Sand, FM >= 0.5 20. cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":7,"element_code":"10-365","element_group":"10","element_group_title":"Materials: Concrete","description":"Sand, FM >= 0.8 we ce","unit":"cum","normalized_unit":"cum","rates":{"zone_a":590.0,"zone_b":593.0,"zone_c":568.0,"zone_d":568.0},"source_raw_ocr_text":"7 10-365 | Sand, FM >= 0.8 we ce ee cee cee cum 590.00 593.00 568.00 568.00","source_pdf_page":11,"source_schedule_page":1,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-365 Sand, FM >= 0.8 we ce cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":8,"element_code":"10-370","element_group":"10","element_group_title":"Materials: Concrete","description":"Sand, FM >= 1.0.0","unit":"cum","normalized_unit":"cum","rates":{"zone_a":750.0,"zone_b":756.0,"zone_c":731.0,"zone_d":731.0},"source_raw_ocr_text":"8 10-370 | Sand, FM >= 1.0.0... ee cum 750.00 756.00 731.00 731.00","source_pdf_page":11,"source_schedule_page":1,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-370 Sand, FM >= 1.0.0 cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":9,"element_code":"10-372","element_group":"10","element_group_title":"Materials: Concrete","description":"Sand (dry) and minimum 80% sand must be retained on sieve no 100","unit":"cum","normalized_unit":"cum","rates":{"zone_a":780.0,"zone_b":786.0,"zone_c":760.0,"zone_d":750.0},"source_raw_ocr_text":"9 10-372 | Sand (dry) and minimum 80% sand | cum 780.00 786.00 760.00 750.00 must be retained on sieve no 100","source_pdf_page":11,"source_schedule_page":1,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-372 Sand (dry) and minimum 80% sand must be retained on sieve no 100 cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":10,"element_code":"10-375","element_group":"10","element_group_title":"Materials: Concrete","description":"Sand, FM >= 1.3 oc. ce","unit":"cum","normalized_unit":"cum","rates":{"zone_a":850.0,"zone_b":830.0,"zone_c":835.0,"zone_d":820.0},"source_raw_ocr_text":"10 10-375 | Sand, FM >= 1.3... oc. ce cee cee cee cum 850.00 830.00 835.00 820.00","source_pdf_page":11,"source_schedule_page":1,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-375 Sand, FM >= 1.3 oc. ce cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":11,"element_code":"10-380","element_group":"10","element_group_title":"Materials: Concrete","description":"Sand, FM >= 1.5","unit":"cum","normalized_unit":"cum","rates":{"zone_a":1100.0,"zone_b":1050.0,"zone_c":1075.0,"zone_d":1060.0},"source_raw_ocr_text":"11 10-380 | Sand, FM >= 1.5... ee ee cum 1100.00 1050.00 1075.00 1060.00","source_pdf_page":11,"source_schedule_page":1,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-380 Sand, FM >= 1.5 cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":12,"element_code":"10-385","element_group":"10","element_group_title":"Materials: Concrete","description":"Sand, FM >= 2.0 0 ce ce","unit":"cum","normalized_unit":"cum","rates":{"zone_a":1800.0,"zone_b":1736.0,"zone_c":1761.0,"zone_d":1740.0},"source_raw_ocr_text":"12 10-385 | Sand, FM >= 2.0 0... ce ce eee eee cum 1800.00 1736.00 1761.00 1740.00","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-385 Sand, FM >= 2.0 0 ce ce cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":13,"element_code":"10-390","element_group":"10","element_group_title":"Materials: Concrete","description":"13. 10-390) Sand, FM >= 2.5 1. see ees","unit":"cum","normalized_unit":"cum","rates":{"zone_a":1900.0,"zone_b":1836.0,"zone_c":1861.0,"zone_d":1840.0},"source_raw_ocr_text":"13. | 10-390) | Sand, FM >= 2.5 1. oe ee eee see ees cum 1900.00 1836.00 1861.00 1840.00","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-390 13. 10-390) Sand, FM >= 2.5 1. see ees cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":14,"element_code":"10-395","element_group":"10","element_group_title":"Materials: Concrete","description":"Sand; FM => 3.0 ce","unit":"cum","normalized_unit":"cum","rates":{"zone_a":2000.0,"zone_b":1936.0,"zone_c":1961.0,"zone_d":1940.0},"source_raw_ocr_text":"14 10-395 Sand; FM => 3.0... ce ee ee eee cum 2000.00 1936.00 1961.00 1940.00","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-395 Sand; FM => 3.0 ce cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":15,"element_code":"10-397","element_group":"10","element_group_title":"Materials: Concrete","description":"Local Hard Rock: 60cm and above (Madhyapara, Dinajpur)","unit":"cum","normalized_unit":"cum","rates":{"zone_a":7100.0,"zone_b":8200.0,"zone_c":8200.0,"zone_d":6200.0},"source_raw_ocr_text":"15 10-397. | Local Hard Rock: 60cm and above cum 7100.00 8200.00 8200.00 6200.00 (Madhyapara, Dinajpur)","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-397 Local Hard Rock: 60cm and above (Madhyapara, Dinajpur) cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":16,"element_code":"10-400","element_group":"10","element_group_title":"Materials: Concrete","description":"Local Hard Rock: 45cm to 60cm (Madhyapara, Dinajpur)","unit":"cum","normalized_unit":"cum","rates":{"zone_a":7200.0,"zone_b":8300.0,"zone_c":8300.0,"zone_d":6300.0},"source_raw_ocr_text":"16 10-400 | Local Hard Rock: 45cm to 60cm cum 7200.00 8300.00 8300.00 6300.00 (Madhyapara, Dinajpur)","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-400 Local Hard Rock: 45cm to 60cm (Madhyapara, Dinajpur) cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":17,"element_code":"10-405","element_group":"10","element_group_title":"Materials: Concrete","description":"Local Hard Rock: 30cm to 45cm (Madhyapara, Dinajpur)","unit":"cum","normalized_unit":"cum","rates":{"zone_a":7200.0,"zone_b":8300.0,"zone_c":8300.0,"zone_d":6300.0},"source_raw_ocr_text":"17 10-405 Local Hard Rock: 30cm to 45cm cum 7200.00 8300.00 8300.00 6300.00 (Madhyapara, Dinajpur)","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-405 Local Hard Rock: 30cm to 45cm (Madhyapara, Dinajpur) cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":18,"element_code":"10-410","element_group":"10","element_group_title":"Materials: Concrete","description":"Local Hard Rock: 22cm to 30cm (Madhyapara, Dinajpur)","unit":"cum","normalized_unit":"cum","rates":{"zone_a":7200.0,"zone_b":8300.0,"zone_c":8300.0,"zone_d":6300.0},"source_raw_ocr_text":"18 10-410 | Local Hard Rock: 22cm to 30cm cum 7200.00 8300.00 8300.00 6300.00 (Madhyapara, Dinajpur)","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-410 Local Hard Rock: 22cm to 30cm (Madhyapara, Dinajpur) cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":19,"element_code":"10-415","element_group":"10","element_group_title":"Materials: Concrete","description":"Local Hard Rock: 15cm to 22cm (Madhyapara, Dinajpur)","unit":"cum","normalized_unit":"cum","rates":{"zone_a":7200.0,"zone_b":8300.0,"zone_c":8300.0,"zone_d":6300.0},"source_raw_ocr_text":"19 10-415 | Local Hard Rock: 15cm to 22cm cum | 7200.00 8300.00 8300.00 6300.00 (Madhyapara, Dinajpur)","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-415 Local Hard Rock: 15cm to 22cm (Madhyapara, Dinajpur) cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":20,"element_code":"10-420","element_group":"10","element_group_title":"Materials: Concrete","description":"Local Hard Rock: 10cm to 15cm (Madhyapara, Dinajpur)","unit":"cum","normalized_unit":"cum","rates":{"zone_a":7200.0,"zone_b":8300.0,"zone_c":8300.0,"zone_d":6300.0},"source_raw_ocr_text":"20 10-420 | Local Hard Rock: 10cm to 15cm cum 7200.00 8300.00 8300.00 6300.00 (Madhyapara, Dinajpur)","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-420 Local Hard Rock: 10cm to 15cm (Madhyapara, Dinajpur) cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":21,"element_code":"10-440","element_group":"10","element_group_title":"Materials: Concrete","description":"Stone Boulders: 45cm and above.","unit":"cum","normalized_unit":"cum","rates":{"zone_a":5800.0,"zone_b":6400.0,"zone_c":4900.0,"zone_d":4900.0},"source_raw_ocr_text":"21 | 10-440 | Stone Boulders: 45cm and cum 5800.00 6400.00 4900.00 4900.00 | above. ... ...","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-440 Stone Boulders: 45cm and above. cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":22,"element_code":"10-445","element_group":"10","element_group_title":"Materials: Concrete","description":"Stone Boulders: 30cm to","unit":"cum","normalized_unit":"cum","rates":{"zone_a":5700.0,"zone_b":6300.0,"zone_c":4800.0,"zone_d":4800.0},"source_raw_ocr_text":"22 10-445 | Stone Boulders: 30cm to cum 5700.00 6300.00 4800.00 4800.00","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-445 Stone Boulders: 30cm to cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":23,"element_code":"10-450","element_group":"10","element_group_title":"Materials: Concrete","description":"Stone, Boulders: 22cm to","unit":"cum","normalized_unit":"cum","rates":{"zone_a":5700.0,"zone_b":6300.0,"zone_c":4800.0,"zone_d":4800.0},"source_raw_ocr_text":"23 10-450 | Stone, Boulders: 22cm to cum 5700.00 6300.00 4800.00 4800.00","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-450 Stone, Boulders: 22cm to cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":24,"element_code":"10-455","element_group":"10","element_group_title":"Materials: Concrete","description":"Stone, Boulders: 15cm to 22cm. =","unit":"cum","normalized_unit":"cum","rates":{"zone_a":5600.0,"zone_b":6200.0,"zone_c":4700.0,"zone_d":4700.0},"source_raw_ocr_text":"24 10-455 | Stone, Boulders: 15cm to 22cm. =| cum 5600.00 6200.00 4700.00 4700.00","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-455 Stone, Boulders: 15cm to 22cm. = cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":25,"element_code":"10-460","element_group":"10","element_group_title":"Materials: Concrete","description":"Stone, Boulders: 10cm to 15cm","unit":"cum","normalized_unit":"cum","rates":{"zone_a":5600.0,"zone_b":6200.0,"zone_c":4700.0,"zone_d":4700.0},"source_raw_ocr_text":"25 10-460 | Stone, Boulders: 10cm to 15cm... cum 5600.00 6200.00 4700.00 4700.00","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-460 Stone, Boulders: 10cm to 15cm cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":26,"element_code":"10-463","element_group":"10","element_group_title":"Materials: Concrete","description":"12 mm (1/2\") down grade stone chips","unit":"cum","normalized_unit":"cum","rates":{"zone_a":6300.0,"zone_b":6350.0,"zone_c":6000.0,"zone_d":5830.0},"source_raw_ocr_text":"26 10-463 | 12 mm (1/2\") down grade stone cum 6300.00 6350.00 6000.00 | 5830.00 chips","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-463 12 mm (1/2\") down grade stone chips cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":27,"element_code":"10-465","element_group":"10","element_group_title":"Materials: Concrete","description":"19 mm (3/4\") down grade crushed stone chips","unit":"cum","normalized_unit":"cum","rates":{"zone_a":7700.0,"zone_b":7900.0,"zone_c":7050.0,"zone_d":6700.0},"source_raw_ocr_text":"27 10-465 | 19 mm (3/4\") down grade crushed | cum 7700.00 7900.00 | 7050.00 | 6700.00 stone chips","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-465 19 mm (3/4\") down grade crushed stone chips cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":28,"element_code":"10-475","element_group":"10","element_group_title":"Materials: Concrete","description":"Stone, Chips: 40mm down — graded","unit":"cum","normalized_unit":"cum","rates":{"zone_a":7650.0,"zone_b":7850.0,"zone_c":7000.0,"zone_d":6650.0},"source_raw_ocr_text":"28 | 10-475 | Stone, Chips: 40mm down cum | 7650.00 | 7850.00 | 7000.00 | 6650.00 — | graded ... ....","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-475 Stone, Chips: 40mm down — graded cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":29,"element_code":"10-478","element_group":"10","element_group_title":"Materials: Concrete","description":"Stone, Chips: 40mm to 20mm, well graded","unit":"cum","normalized_unit":"cum","rates":{"zone_a":7500.0,"zone_b":7700.0,"zone_c":7050.0,"zone_d":6700.0},"source_raw_ocr_text":"29 10-478 | Stone, Chips: 40mm to 20mm, well | cum 7500.00 7700.00 7050.00 6700.00 graded","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-478 Stone, Chips: 40mm to 20mm, well graded cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":30,"element_code":"10-480","element_group":"10","element_group_title":"Materials: Concrete","description":"Stone, Chips: 50mm to 20mm, well graded","unit":"cum","normalized_unit":"cum","rates":{"zone_a":7500.0,"zone_b":7700.0,"zone_c":7050.0,"zone_d":6700.0},"source_raw_ocr_text":"30 | 10-480 Stone, Chips: 50mm to 20mm, well | cum 7500.00 7700.00 7050.00. 6700.00 graded","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-480 Stone, Chips: 50mm to 20mm, well graded cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":31,"element_code":"10-495","element_group":"10","element_group_title":"Materials: Concrete","description":"Stone, Pea Gravel: 6mm down graded","unit":"cum","normalized_unit":"cum","rates":{"zone_a":3300.0,"zone_b":3500.0,"zone_c":3000.0,"zone_d":3000.0},"source_raw_ocr_text":"31 | 10-495 | Stone, Pea Gravel: 6mm down cum 3300.00 | 3500.00 3000.00 3000.00 graded ....","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-495 Stone, Pea Gravel: 6mm down graded cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":32,"element_code":"10-500","element_group":"10","element_group_title":"Materials: Concrete","description":"Stone, Shingles: 20mm down graded","unit":"cum","normalized_unit":"cum","rates":{"zone_a":5900.0,"zone_b":6500.0,"zone_c":5000.0,"zone_d":5000.0},"source_raw_ocr_text":"' 32 10-500 | Stone, Shingles: 20mm down cum 5900.00 6500.00 5000.00 5000.00 | graded .... |","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-500 Stone, Shingles: 20mm down graded cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":33,"element_code":"10-505","element_group":"10","element_group_title":"Materials: Concrete","description":"Stone, Shingles: 40mm down graded","unit":"cum","normalized_unit":"cum","rates":{"zone_a":5900.0,"zone_b":6500.0,"zone_c":5000.0,"zone_d":5000.0},"source_raw_ocr_text":"33 10-505 | Stone, Shingles: 40mm down cum 5900.00 6500.00 5000.00 5000.00 | graded .....","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-505 Stone, Shingles: 40mm down graded cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":34,"element_code":"10-512","element_group":"10","element_group_title":"Materials: Concrete","description":"Stone, Gravels : 40mm to 20mm, well graded","unit":"cum","normalized_unit":"cum","rates":{"zone_a":4700.0,"zone_b":5300.0,"zone_c":3800.0,"zone_d":3800.0},"source_raw_ocr_text":"| 34 | 10-512 Stone, Gravels : 40mm to 20mm, cum 4700.00 $300.00 3800.00 3800.00 well graded","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_manually_corrected","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-512 Stone, Gravels : 40mm to 20mm, well graded cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":35,"element_code":"10-515","element_group":"10","element_group_title":"Materials: Concrete","description":"Stone, Gravels: 50mm to 20mm, well graded “","unit":"cum","normalized_unit":"cum","rates":{"zone_a":4700.0,"zone_b":5300.0,"zone_c":3800.0,"zone_d":3800.0},"source_raw_ocr_text":"35 | 10-515 | Stone, Gravels: 50mm to 20mm, cum 4700.00 5300.00 3800.00 3800.00 well graded “20. Materials: Misc.","source_pdf_page":12,"source_schedule_page":2,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"10-515 Stone, Gravels: 50mm to 20mm, well graded “ cum Materials: Concrete"},{"record_type":"basic_element_rate","serial_no":36,"element_code":"20-049","element_group":"20","element_group_title":"Materials: Misc.","description":"Kerosene","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":109.0,"zone_b":109.0,"zone_c":109.0,"zone_d":109.0},"source_raw_ocr_text":"36 20-049 | Kerosene ltr 109.00 109.00 109.00 109.00","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-049 Kerosene ltr Materials: Misc."},{"record_type":"basic_element_rate","serial_no":37,"element_code":"20-050","element_group":"20","element_group_title":"Materials: Misc.","description":"Water reducing and retarding admixture in concrete: Type - D","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":210.0,"zone_b":210.0,"zone_c":210.0,"zone_d":210.0},"source_raw_ocr_text":"37 20-050 | Water reducing and retarding ltr 210.00 210.00 210.00 210.00 admixture in concrete: Type - D","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-050 Water reducing and retarding admixture in concrete: Type - D ltr Materials: Misc."},{"record_type":"basic_element_rate","serial_no":38,"element_code":"20-055","element_group":"20","element_group_title":"Materials: Misc.","description":"Bags, Gunny: 2nd Hand (50","unit":"100 No.","normalized_unit":"per_100","rates":{"zone_a":2750.0,"zone_b":2750.0,"zone_c":2750.0,"zone_d":2750.0},"source_raw_ocr_text":"38 20-055 | Bags, Gunny: 2nd Hand (50 kg) 100 2750.00 2750.00 2750.00 2750.00","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-055 Bags, Gunny: 2nd Hand (50 100 No. Materials: Misc."},{"record_type":"basic_element_rate","serial_no":39,"element_code":"20-060","element_group":"20","element_group_title":"Materials: Misc.","description":"Bags, Gunny: 2nd Hand (75","unit":"100 No.","normalized_unit":"per_100","rates":{"zone_a":3520.0,"zone_b":3520.0,"zone_c":3520.0,"zone_d":3520.0},"source_raw_ocr_text":"39 20-060 | Bags, Gunny: 2nd Hand (75 100 3520.00 3520.00 3520.00 3520.00","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-060 Bags, Gunny: 2nd Hand (75 100 No. Materials: Misc."},{"record_type":"basic_element_rate","serial_no":40,"element_code":"20-065","element_group":"20","element_group_title":"Materials: Misc.","description":"Bags, Gunny: New (50 kg)","unit":"100 No.","normalized_unit":"per_100","rates":{"zone_a":4500.0,"zone_b":4500.0,"zone_c":4500.0,"zone_d":4500.0},"source_raw_ocr_text":"40 20-065 | Bags, Gunny: New (50 kg) ... 100 4500.00 4500.00 4500.00 4500.00","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-065 Bags, Gunny: New (50 kg) 100 No. Materials: Misc."},{"record_type":"basic_element_rate","serial_no":41,"element_code":"20-075","element_group":"20","element_group_title":"Materials: Misc.","description":"4] 20-075 Bags, Gunny: New (75 kg)","unit":"100 No.","normalized_unit":"per_100","rates":{"zone_a":5100.0,"zone_b":5100.0,"zone_c":5100.0,"zone_d":5100.0},"source_raw_ocr_text":"4] 20-075 | Bags, Gunny: New (75 kg) .......... | 100 5100.00 5100.00 5100.00 5100.00","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-075 4] 20-075 Bags, Gunny: New (75 kg) 100 No. Materials: Misc.","ocr_serial_no":4,"serial_note":"OCR misread the printed serial; serial_no uses the verified source order."},{"record_type":"basic_element_rate","serial_no":42,"element_code":"20-080","element_group":"20","element_group_title":"Materials: Misc.","description":"Bags: Synthetic (50","unit":"100 No.","normalized_unit":"per_100","rates":{"zone_a":1900.0,"zone_b":1900.0,"zone_c":1900.0,"zone_d":1900.0},"source_raw_ocr_text":"42 20-080 | Bags: Synthetic (50 kg) 100 1900.00 1900.00 1900.00 1900.00","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-080 Bags: Synthetic (50 100 No. Materials: Misc."},{"record_type":"basic_element_rate","serial_no":43,"element_code":"20-085","element_group":"20","element_group_title":"Materials: Misc.","description":"Bags: Synthetic (75 kg)","unit":"100 No.","normalized_unit":"per_100","rates":{"zone_a":2400.0,"zone_b":2400.0,"zone_c":2400.0,"zone_d":2400.0},"source_raw_ocr_text":"43 20-085 | Bags: Synthetic (75 kg).. ........ 100 2400.00 2400.00 2400.00 2400.00","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-085 Bags: Synthetic (75 kg) 100 No. Materials: Misc."},{"record_type":"basic_element_rate","serial_no":44,"element_code":"20-090","element_group":"20","element_group_title":"Materials: Misc.","description":"Hessian cloth","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":25.0,"zone_b":25.0,"zone_c":25.0,"zone_d":25.0},"source_raw_ocr_text":"44 20-090 | Hessian cloth ... 0... eee cee sqm 25.00 25.00 25.00 25.00","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-090 Hessian cloth sqm Materials: Misc."},{"record_type":"basic_element_rate","serial_no":45,"element_code":"20-125","element_group":"20","element_group_title":"Materials: Misc.","description":"Bitumen: 80/100","unit":"kg","normalized_unit":"kg","rates":{"zone_a":87.0,"zone_b":87.0,"zone_c":88.0,"zone_d":88.0},"source_raw_ocr_text":"45 20-125 | Bitumen: 80/100 ... .. ee kg 87.00 87.00 88.00 88.00","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-125 Bitumen: 80/100 kg Materials: Misc."},{"record_type":"basic_element_rate","serial_no":46,"element_code":"20-200","element_group":"20","element_group_title":"Materials: Misc.","description":"Coal Tar 0. ce ce oes","unit":"kg","normalized_unit":"kg","rates":{"zone_a":70.0,"zone_b":70.0,"zone_c":70.0,"zone_d":70.0},"source_raw_ocr_text":"46 20-200 | Coal Tar... 0. ce ce cee cee oes kg 70.00 70.00 70.00 70.00","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-200 Coal Tar 0. ce ce oes kg Materials: Misc."},{"record_type":"basic_element_rate","serial_no":47,"element_code":"20-205","element_group":"20","element_group_title":"Materials: Misc.","description":"Coal Tar: Epoxy 0 ce ce","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":450.0,"zone_b":450.0,"zone_c":450.0,"zone_d":450.0},"source_raw_ocr_text":"47 20-205 | Coal Tar: Epoxy... 0 ce ce ee ee oe ltr 450.00 450.00 450.00 450.00","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-205 Coal Tar: Epoxy 0 ce ce ltr Materials: Misc."},{"record_type":"basic_element_rate","serial_no":48,"element_code":"20-220","element_group":"20","element_group_title":"Materials: Misc.","description":"Coconut Plant (1.0m height","unit":"100 No.","normalized_unit":"per_100","rates":{"zone_a":13000.0,"zone_b":13000.0,"zone_c":13000.0,"zone_d":13000.0},"source_raw_ocr_text":"48 20-220 | Coconut Plant (1.0m height... ... 100 13000.00 | 13000.00 | 13000.00 | 13000.00","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-220 Coconut Plant (1.0m height 100 No. Materials: Misc."},{"record_type":"basic_element_rate","serial_no":49,"element_code":"20-230","element_group":"20","element_group_title":"Materials: Misc.","description":"Cow dung","unit":"kg","normalized_unit":"kg","rates":{"zone_a":1.5,"zone_b":1.5,"zone_c":1.5,"zone_d":1.5},"source_raw_ocr_text":"49 20-230 | Cow dung 0... ee ee ee eee ee oe kg 1.50 1.50 1.50 1.50","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-230 Cow dung kg Materials: Misc."},{"record_type":"basic_element_rate","serial_no":50,"element_code":"20-240","element_group":"20","element_group_title":"Materials: Misc.","description":"Daow 0. see ne","unit":"No.","normalized_unit":"number","rates":{"zone_a":300.0,"zone_b":300.0,"zone_c":300.0,"zone_d":300.0},"source_raw_ocr_text":"50 20-240 | Daow 0. eee ee cee see ee eee ne eee No. 300.00 300.00 300.00 300.00","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-240 Daow 0. see ne No. Materials: Misc."},{"record_type":"basic_element_rate","serial_no":51,"element_code":"20-241","element_group":"20","element_group_title":"Materials: Misc.","description":"Engiene Oil","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":435.0,"zone_b":435.0,"zone_c":435.0,"zone_d":435.0},"source_raw_ocr_text":"51 20-241 | Engiene Oil ltr 435.00 435.00 435.00 435.00","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-241 Engiene Oil ltr Materials: Misc."},{"record_type":"basic_element_rate","serial_no":52,"element_code":"20-242","element_group":"20","element_group_title":"Materials: Misc.","description":"Hydraulic Oil","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":315.0,"zone_b":315.0,"zone_c":315.0,"zone_d":315.0},"source_raw_ocr_text":"52 20-242 | Hydraulic Oil ltr 315.00 315.00 315.00 315.00","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-242 Hydraulic Oil ltr Materials: Misc."},{"record_type":"basic_element_rate","serial_no":53,"element_code":"20-243","element_group":"20","element_group_title":"Materials: Misc.","description":"Gear Oil","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":360.0,"zone_b":360.0,"zone_c":360.0,"zone_d":360.0},"source_raw_ocr_text":"53 20-243 | Gear Oil Itr 360.00 360.00 360.00 360.00","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-243 Gear Oil Materials: Misc.","unit_validation_status":"source_image_manually_verified"},{"record_type":"basic_element_rate","serial_no":54,"element_code":"20-244","element_group":"20","element_group_title":"Materials: Misc.","description":"Grease Oil","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":750.0,"zone_b":750.0,"zone_c":750.0,"zone_d":750.0},"source_raw_ocr_text":"54 20-244 | Grease Oil ltr 750.00 750.00 750.00 750.00","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-244 Grease Oil ltr Materials: Misc."},{"record_type":"basic_element_rate","serial_no":55,"element_code":"20-245","element_group":"20","element_group_title":"Materials: Misc.","description":"Diesel/ Fuel 0","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":109.0,"zone_b":109.0,"zone_c":109.0,"zone_d":109.0},"source_raw_ocr_text":"55 20-245 | Diesel/ Fuel 0... 0. ee cee oe eee ltr 109.00 109.00 109.00 109.00","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-245 Diesel/ Fuel 0 ltr Materials: Misc."},{"record_type":"basic_element_rate","serial_no":56,"element_code":"20-246","element_group":"20","element_group_title":"Materials: Misc.","description":"Earth Of) 2","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":55.0,"zone_b":55.0,"zone_c":55.0,"zone_d":55.0},"source_raw_ocr_text":"56 20-246 | Earth Of) 2... cee cee cee cee ltr 55.00 55.00 55.00 | 55.00","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-246 Earth Of) 2 ltr Materials: Misc."},{"record_type":"basic_element_rate","serial_no":57,"element_code":"20-247","element_group":"20","element_group_title":"Materials: Misc.","description":"Cardium Compound","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":306.0,"zone_b":306.0,"zone_c":306.0,"zone_d":306.0},"source_raw_ocr_text":"57 20-247 | Cardium Compound Itr 306.00 306.00 306.00 306.00","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-247 Cardium Compound ltr Materials: Misc."},{"record_type":"basic_element_rate","serial_no":58,"element_code":"20-248","element_group":"20","element_group_title":"Materials: Misc.","description":"Octane/Fuel","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":130.0,"zone_b":130.0,"zone_c":130.0,"zone_d":130.0},"source_raw_ocr_text":"58 20-248 | Octane/Fuel ltr 130.00 130.00 130.00 130.00","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-248 Octane/Fuel ltr Materials: Misc."},{"record_type":"basic_element_rate","serial_no":59,"element_code":"20-249","element_group":"20","element_group_title":"Materials: Misc.","description":"Petrol/Fuel","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":125.0,"zone_b":125.0,"zone_c":125.0,"zone_d":125.0},"source_raw_ocr_text":"59 20-249 | Petrol/Fuel Itr 125.00 125.00 125.00 125.00","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-249 Petrol/Fuel Materials: Misc.","unit_validation_status":"source_image_manually_verified"},{"record_type":"basic_element_rate","serial_no":60,"element_code":"20-265","element_group":"20","element_group_title":"Materials: Misc.","description":"Gas, Acetylene","unit":"cum","normalized_unit":"cum","rates":{"zone_a":661.18,"zone_b":661.18,"zone_c":661.18,"zone_d":661.18},"source_raw_ocr_text":"60 20-265 | Gas, Acetylene ... 0. ee ee cum 661.18 661.18 661.18 661.18","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-265 Gas, Acetylene cum Materials: Misc."},{"record_type":"basic_element_rate","serial_no":61,"element_code":"20-266","element_group":"20","element_group_title":"Materials: Misc.","description":"Gas, OXYeM . ce oes","unit":"cum","normalized_unit":"cum","rates":{"zone_a":35.65,"zone_b":35.65,"zone_c":35.65,"zone_d":35.65},"source_raw_ocr_text":"61 20-266 | Gas, OXYeM oe. ce cee cee cee oes cum 35.65 35.65 35.65 35.65","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-266 Gas, OXYeM . ce oes cum Materials: Misc."},{"record_type":"basic_element_rate","serial_no":62,"element_code":"20-270","element_group":"20","element_group_title":"Materials: Misc.","description":"Grinding Disc (6mmx180mm)","unit":"No.","normalized_unit":"number","rates":{"zone_a":120.0,"zone_b":120.0,"zone_c":120.0,"zone_d":120.0},"source_raw_ocr_text":"62 20-270 | Grinding Disc No. 120.00 120.00 120.00 120.00 (6mmx180mm) ... ... .. ...","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-270 Grinding Disc (6mmx180mm) No. Materials: Misc."},{"record_type":"basic_element_rate","serial_no":63,"element_code":"20-275","element_group":"20","element_group_title":"Materials: Misc.","description":"Golpata coe ce ce tee","unit":"No.","normalized_unit":"number","rates":{"zone_a":8.8,"zone_b":8.8,"zone_c":8.8,"zone_d":8.8},"source_raw_ocr_text":"63 20-275 | Golpata .. coe ce ce cee tee oe No. 8.80 8.80 8.80 8.80","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-275 Golpata coe ce ce tee No. Materials: Misc."},{"record_type":"basic_element_rate","serial_no":64,"element_code":"20-276","element_group":"20","element_group_title":"Materials: Misc.","description":"Geotex. Filter (Polyester) : thick>=4.0mm; mass>550 gm/m?","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":110.0,"zone_b":110.0,"zone_c":110.0,"zone_d":110.0},"source_raw_ocr_text":"64 20-276 | Geotex. Filter (Polyester) : sqm 110.00 110.00 110.00 110.00 thick>=4.0mm; mass>550 gm/m?","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-276 Geotex. Filter (Polyester) : thick>=4.0mm; mass>550 gm/m? sqm Materials: Misc."},{"record_type":"basic_element_rate","serial_no":65,"element_code":"20-277","element_group":"20","element_group_title":"Materials: Misc.","description":"Geotex. Filter (Polyester) : thick>=3.0mm; mass>400 gm/m?","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":90.0,"zone_b":90.0,"zone_c":90.0,"zone_d":90.0},"source_raw_ocr_text":"65 20-277 | Geotex. Filter (Polyester) : sqm 90.00 90.00 90.00 90.00 thick>=3.0mm; mass>400 gm/m?","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-277 Geotex. Filter (Polyester) : thick>=3.0mm; mass>400 gm/m? sqm Materials: Misc."},{"record_type":"basic_element_rate","serial_no":66,"element_code":"20-278","element_group":"20","element_group_title":"Materials: Misc.","description":"Geotex. Filter : thick>=1.5mm;","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":75.0,"zone_b":75.0,"zone_c":75.0,"zone_d":75.0},"source_raw_ocr_text":"66 20-278 | Geotex. Filter : thick>=1.5mm; | sqm 75.00 75.00 75.00 75.00 |","source_pdf_page":13,"source_schedule_page":3,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-278 Geotex. Filter : thick>=1.5mm; sqm Materials: Misc."},{"record_type":"basic_element_rate","serial_no":67,"element_code":"20-280","element_group":"20","element_group_title":"Materials: Misc.","description":"Geotex. Filter : thick>=2.0mm; sqm 102.00 mm","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":102.0,"zone_b":102.0,"zone_c":102.0,"zone_d":102.0},"source_raw_ocr_text":"67 20-280 | Geotex. Filter : thick>=2.0mm; sqm 102.00 102.00 102.00 102.00 mass>300 gm/m?; EoS <=0.11 mm","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-280 Geotex. Filter : thick>=2.0mm; sqm 102.00 mm Materials: Misc.","unit_validation_status":"source_image_manually_verified"},{"record_type":"basic_element_rate","serial_no":68,"element_code":"20-281","element_group":"20","element_group_title":"Materials: Misc.","description":"Geotex. Filter : thick>=2.5mm;","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":115.0,"zone_b":115.0,"zone_c":115.0,"zone_d":115.0},"source_raw_ocr_text":"68 20-281 | Geotex. Filter : thick>=2.5mm; sqm 115.00 © 115.00 115.00 115.00","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-281 Geotex. Filter : thick>=2.5mm; sqm Materials: Misc."},{"record_type":"basic_element_rate","serial_no":69,"element_code":"20-282","element_group":"20","element_group_title":"Materials: Misc.","description":"Geotex. Filter : thick>=3.0mm; mass>400 gm/m?; EOS<-0. 075 mm","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":125.0,"zone_b":125.0,"zone_c":125.0,"zone_d":125.0},"source_raw_ocr_text":"69 20-282 | Geotex. Filter : thick>=3.0mm; sqm 125.00 125.00 125.00 125,00 mass>400 gm/m?; EOS<-0. 075 mm","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-282 Geotex. Filter : thick>=3.0mm; mass>400 gm/m?; EOS<-0. 075 mm sqm Materials: Misc."},{"record_type":"basic_element_rate","serial_no":70,"element_code":"20-283","element_group":"20","element_group_title":"Materials: Misc.","description":"Geotex. Filter : thick>=4mm;","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":160.0,"zone_b":160.0,"zone_c":160.0,"zone_d":160.0},"source_raw_ocr_text":"70 | 20-283 | Geotex. Filter : thick>=4mm; sqm 160.00 160.00 160.00 160.00","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-283 Geotex. Filter : thick>=4mm; sqm Materials: Misc."},{"record_type":"basic_element_rate","serial_no":71,"element_code":"20-284","element_group":"20","element_group_title":"Materials: Misc.","description":"Geotex. Filter (Polyester) : thick>=2.0mm; mass>300 gm/m?","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":80.0,"zone_b":80.0,"zone_c":80.0,"zone_d":80.0},"source_raw_ocr_text":"71 | 20-284 | Geotex. Filter (Polyester) : sqm 80.00 80.00 80.00 80.00 thick>=2.0mm; mass>300 gm/m?","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-284 Geotex. Filter (Polyester) : thick>=2.0mm; mass>300 gm/m? sqm Materials: Misc."},{"record_type":"basic_element_rate","serial_no":72,"element_code":"20-285","element_group":"20","element_group_title":"Materials: Misc.","description":"Jute Geotextile : mass >= 627 sqm 108.90 mm","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":108.9,"zone_b":108.9,"zone_c":108.9,"zone_d":108.9},"source_raw_ocr_text":"72 | 20-285 | Jute Geotextile : mass >= 627 sqm 108.90 108.90 108.90 108.90 gm/m?; thickness >= 2.00 mm","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-285 Jute Geotextile : mass >= 627 sqm 108.90 mm Materials: Misc.","unit_validation_status":"source_image_manually_verified"},{"record_type":"basic_element_rate","serial_no":73,"element_code":"20-286","element_group":"20","element_group_title":"Materials: Misc.","description":"Geotex. Filter : thick>=4.5mm;","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":180.0,"zone_b":180.0,"zone_c":180.0,"zone_d":180.0},"source_raw_ocr_text":"| 73 20-286 | Geotex. Filter : thick>=4.5mm; sqm 180.00 180.00 180.00 180.00","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-286 Geotex. Filter : thick>=4.5mm; sqm Materials: Misc."},{"record_type":"basic_element_rate","serial_no":74,"element_code":"20-287","element_group":"20","element_group_title":"Materials: Misc.","description":"Geotex. Filter (Polyester) : thick>=4.5mm; mass>600 gm/m?","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":120.0,"zone_b":120.0,"zone_c":120.0,"zone_d":120.0},"source_raw_ocr_text":"74 | 20-287 | Geotex. Filter (Polyester) : | sqm 120.00 120.00 120.00 120.00 thick>=4.5mm; mass>600 gm/m?","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-287 Geotex. Filter (Polyester) : thick>=4.5mm; mass>600 gm/m? sqm Materials: Misc."},{"record_type":"basic_element_rate","serial_no":75,"element_code":"20-288","element_group":"20","element_group_title":"Materials: Misc.","description":"Geotube: Woven fabric with non- woven liner","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":530.0,"zone_b":530.0,"zone_c":530.0,"zone_d":530.0},"source_raw_ocr_text":"75 20-288 | Geotube: Woven fabric with non- sqm $30.00 530.00 530.00 \"530.00 woven liner","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_manually_corrected","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-288 Geotube: Woven fabric with non- woven liner sqm Materials: Misc."},{"record_type":"basic_element_rate","serial_no":76,"element_code":"20-290","element_group":"20","element_group_title":"Materials: Misc.","description":"Thread Tape i","unit":"m","normalized_unit":"m","rates":{"zone_a":25.0,"zone_b":25.0,"zone_c":25.0,"zone_d":25.0},"source_raw_ocr_text":"76 | 20-290 | Thread Tape ... i m 25.00 25.00 25.00 25.00","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-290 Thread Tape i m Materials: Misc."},{"record_type":"basic_element_rate","serial_no":77,"element_code":"20-295","element_group":"20","element_group_title":"Materials: Misc.","description":"Thread, Red & White (Thread","unit":"100 m","normalized_unit":"per_100_m","rates":{"zone_a":50.0,"zone_b":50.0,"zone_c":50.0,"zone_d":50.0},"source_raw_ocr_text":"77 20-295 | Thread, Red & White (Thread 100 50.00 50.00 50.00 50.00","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-295 Thread, Red & White (Thread 100 m Materials: Misc."},{"record_type":"basic_element_rate","serial_no":78,"element_code":"20-300","element_group":"20","element_group_title":"Materials: Misc.","description":"Linseed Oil oc ae","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":120.0,"zone_b":120.0,"zone_c":120.0,"zone_d":120.0},"source_raw_ocr_text":"78 | 20-300 | Linseed Oil.. oc eee ae itr 120.00 120.00 120.00 | 120.00","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-300 Linseed Oil oc ae Materials: Misc.","unit_validation_status":"source_image_manually_verified"},{"record_type":"basic_element_rate","serial_no":79,"element_code":"20-305","element_group":"20","element_group_title":"Materials: Misc.","description":"Hydraulic Oil: best st quality (Higher grade)","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":400.0,"zone_b":400.0,"zone_c":400.0,"zone_d":400.0},"source_raw_ocr_text":"' 79 | 20-305 | Hydraulic Oil: best st quality (Higher | ltr 400.00 | 400.00 | 400.00 | 400.00 | grade)","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-305 Hydraulic Oil: best st quality (Higher grade) ltr Materials: Misc."},{"record_type":"basic_element_rate","serial_no":80,"element_code":"20-310","element_group":"20","element_group_title":"Materials: Misc.","description":"Lubricant (Higher Grade of viscosity), Best Quality","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":500.0,"zone_b":500.0,"zone_c":500.0,"zone_d":500.0},"source_raw_ocr_text":"30 | 20-310 | Lubricant (Higher Grade of ltr 500.00 500.00 500.00 500.00 viscosity), Best Quality |","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-310 Lubricant (Higher Grade of viscosity), Best Quality ltr Materials: Misc.","ocr_serial_no":30,"serial_note":"OCR misread the printed serial; serial_no uses the verified source order."},{"record_type":"basic_element_rate","serial_no":81,"element_code":"20-315","element_group":"20","element_group_title":"Materials: Misc.","description":"Grease, best quality (Higher grade)","unit":"kg","normalized_unit":"kg","rates":{"zone_a":660.0,"zone_b":660.0,"zone_c":660.0,"zone_d":660.0},"source_raw_ocr_text":"81 | 20-315 | Grease, best quality (Higher grade) | kg 660.00 660.00 660.00 660.00","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-315 Grease, best quality (Higher grade) kg Materials: Misc."},{"record_type":"basic_element_rate","serial_no":82,"element_code":"20-325","element_group":"20","element_group_title":"Materials: Misc.","description":"Mehogani/ Fruit plant (1.00m height) No.","unit":"100 No.","normalized_unit":"per_100","rates":{"zone_a":2160.0,"zone_b":2160.0,"zone_c":2160.0,"zone_d":2160.0},"source_raw_ocr_text":"82 | 20-325 | Mehogani/ Fruit plant (1.00m 100 | 2160.00 | 2160.00 | 2160.00 | 2160.00 | height) ... No.","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-325 Mehogani/ Fruit plant (1.00m height) No. 100 No. Materials: Misc."},{"record_type":"basic_element_rate","serial_no":83,"element_code":"20-330","element_group":"20","element_group_title":"Materials: Misc.","description":"Nira ce ce coon","unit":"No.","normalized_unit":"number","rates":{"zone_a":150.0,"zone_b":150.0,"zone_c":150.0,"zone_d":150.0},"source_raw_ocr_text":"83 | 20-330 | Nira... ce ce cee cee cee coon No. 150.00 150.00 | 150.00 150.00","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-330 Nira ce ce coon No. Materials: Misc."},{"record_type":"basic_element_rate","serial_no":84,"element_code":"20-375","element_group":"20","element_group_title":"Materials: Misc.","description":"Anti corrosive epoxy paint","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":950.0,"zone_b":950.0,"zone_c":950.0,"zone_d":950.0},"source_raw_ocr_text":"84 20-375 | Anti corrosive epoxy paint ltr 950.00 950.00 950.00 950.00","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-375 Anti corrosive epoxy paint ltr Materials: Misc."},{"record_type":"basic_element_rate","serial_no":85,"element_code":"20-380","element_group":"20","element_group_title":"Materials: Misc.","description":"Paint: Zinc Phposphate Primer","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":580.0,"zone_b":580.0,"zone_c":580.0,"zone_d":580.0},"source_raw_ocr_text":"85 | 20-380 | Paint: Zinc Phposphate Primer ltr 580.00 580.00 580.00 580.00","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-380 Paint: Zinc Phposphate Primer ltr Materials: Misc."},{"record_type":"basic_element_rate","serial_no":86,"element_code":"20-417","element_group":"20","element_group_title":"Materials: Misc.","description":"Paint; Ready Mixed 0c","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":270.0,"zone_b":270.0,"zone_c":270.0,"zone_d":270.0},"source_raw_ocr_text":"86 | 20-417 | Paint; Ready Mixed... 0c... | ltr 270.00 270.00 270.00 | 270.00","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-417 Paint; Ready Mixed 0c ltr Materials: Misc."},{"record_type":"basic_element_rate","serial_no":87,"element_code":"20-420","element_group":"20","element_group_title":"Materials: Misc.","description":"Anti corrosive red oxide paint","unit":"kg","normalized_unit":"kg","rates":{"zone_a":180.0,"zone_b":180.0,"zone_c":180.0,"zone_d":180.0},"source_raw_ocr_text":"87 20-420 | Anti corrosive red oxide paint _ kg ~ 180.00 180.00 180.00 180.00","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-420 Anti corrosive red oxide paint kg Materials: Misc."},{"record_type":"basic_element_rate","serial_no":88,"element_code":"20-425","element_group":"20","element_group_title":"Materials: Misc.","description":"Paint: Snow Cem","unit":"kg","normalized_unit":"kg","rates":{"zone_a":90.0,"zone_b":90.0,"zone_c":90.0,"zone_d":90.0},"source_raw_ocr_text":"88 | 20-425 | Paint: Snow Cem ............ kg 90.00 90.00 90.00 90.00","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-425 Paint: Snow Cem kg Materials: Misc."},{"record_type":"basic_element_rate","serial_no":89,"element_code":"20-430","element_group":"20","element_group_title":"Materials: Misc.","description":"Spirit : Polish/ Varnish/ French itr Polish.","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":240.0,"zone_b":240.0,"zone_c":240.0,"zone_d":240.0},"source_raw_ocr_text":"' 89 | 20-430 | Spirit : Polish/ Varnish/ French itr 240.00 240.00 240.00 240.00 Polish.","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-430 Spirit : Polish/ Varnish/ French itr Polish. Materials: Misc.","unit_validation_status":"source_image_manually_verified"},{"record_type":"basic_element_rate","serial_no":90,"element_code":"20-435","element_group":"20","element_group_title":"Materials: Misc.","description":"Paint: Synthetic Enamel","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":220.0,"zone_b":220.0,"zone_c":220.0,"zone_d":220.0},"source_raw_ocr_text":"~ 90 | 20-435 | Paint: Synthetic Enamel .......... | ltr 220.00 220.00 220.00 220.00","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-435 Paint: Synthetic Enamel ltr Materials: Misc."},{"record_type":"basic_element_rate","serial_no":91,"element_code":"20-440","element_group":"20","element_group_title":"Materials: Misc.","description":"Paint : terpentine (terpin)","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":130.0,"zone_b":130.0,"zone_c":130.0,"zone_d":130.0},"source_raw_ocr_text":"91 | 20-440 | Paint : terpentine (terpin) ... ... ... itr 130.00 130.00 130.00 130.00","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-440 Paint : terpentine (terpin) ltr Materials: Misc."},{"record_type":"basic_element_rate","serial_no":92,"element_code":"20-445","element_group":"20","element_group_title":"Materials: Misc.","description":"Paint: Thinner 00","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":208.0,"zone_b":208.0,"zone_c":208.0,"zone_d":208.0},"source_raw_ocr_text":"92 | 20-445 | Paint: Thinner... 00... 0... itr 208.00 208.00 208.00 208.00 |","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-445 Paint: Thinner 00 Materials: Misc.","unit_validation_status":"source_image_manually_verified"},{"record_type":"basic_element_rate","serial_no":93,"element_code":"20-448","element_group":"20","element_group_title":"Materials: Misc.","description":"Paint: Thinner, Epoxy","unit":"ltr","normalized_unit":"liter","rates":{"zone_a":300.0,"zone_b":300.0,"zone_c":300.0,"zone_d":300.0},"source_raw_ocr_text":"93 | 20-448 | Paint: Thinner, Epoxy ... .......... ltr 300.00 300.00 300.00 300.00","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-448 Paint: Thinner, Epoxy ltr Materials: Misc."},{"record_type":"basic_element_rate","serial_no":94,"element_code":"20-455","element_group":"20","element_group_title":"Materials: Misc.","description":"Power Consumption.","unit":"KWH","normalized_unit":"kwh","rates":{"zone_a":11.0,"zone_b":11.0,"zone_c":11.0,"zone_d":11.0},"source_raw_ocr_text":"94 | 20-455 | Power Consumption. ... ... ...... KWH | 11.00 11.00 11.00 11.00","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-455 Power Consumption. KWH Materials: Misc."},{"record_type":"basic_element_rate","serial_no":95,"element_code":"20-495","element_group":"20","element_group_title":"Materials: Misc.","description":"Polythene Sheet : (1.0 ke per 6.50","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":30.0,"zone_b":30.0,"zone_c":30.0,"zone_d":30.0},"source_raw_ocr_text":"95 20-495 | Polythene Sheet : (1.0 ke per 6.50 sqm 30.00 30.00 | 30.00 | 30.00","source_pdf_page":14,"source_schedule_page":4,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-495 Polythene Sheet : (1.0 ke per 6.50 sqm Materials: Misc."},{"record_type":"basic_element_rate","serial_no":96,"element_code":"20-500","element_group":"20","element_group_title":"Materials: Misc.","description":"Polythene Sheet : (1.0 kg per 16.00","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":20.0,"zone_b":20.0,"zone_c":20.0,"zone_d":20.0},"source_raw_ocr_text":"96 20-500 | Polythene Sheet : (1.0 kg per 16.00 | sqm 20.00 20.00 20.00 20.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-500 Polythene Sheet : (1.0 kg per 16.00 sqm Materials: Misc."},{"record_type":"basic_element_rate","serial_no":97,"element_code":"20-505","element_group":"20","element_group_title":"Materials: Misc.","description":"Putty seneee","unit":"kg","normalized_unit":"kg","rates":{"zone_a":107.0,"zone_b":107.0,"zone_c":107.0,"zone_d":107.0},"source_raw_ocr_text":"97 20-505 | Putty .. seneee kg 107.00 107.00 107.00 107.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-505 Putty seneee kg Materials: Misc."},{"record_type":"basic_element_rate","serial_no":98,"element_code":"20-512","element_group":"20","element_group_title":"Materials: Misc.","description":"Rubber Seal : W=75mm, T=12mm,","unit":"m","normalized_unit":"m","rates":{"zone_a":450.0,"zone_b":450.0,"zone_c":450.0,"zone_d":450.0},"source_raw_ocr_text":"98 20-512 | Rubber Seal : W=75mm, T=12mm, | m 450.00 450.00 450.00 450.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-512 Rubber Seal : W=75mm, T=12mm, m Materials: Misc."},{"record_type":"basic_element_rate","serial_no":99,"element_code":"20-514","element_group":"20","element_group_title":"Materials: Misc.","description":"Rubber Seal : W=100mm, T=l6mm,","unit":"m","normalized_unit":"m","rates":{"zone_a":500.0,"zone_b":500.0,"zone_c":500.0,"zone_d":500.0},"source_raw_ocr_text":"99 20-514 | Rubber Seal : W=100mm, T=l6mm, | m | 500.00 500.00 500.00 500.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-514 Rubber Seal : W=100mm, T=l6mm, m Materials: Misc."},{"record_type":"basic_element_rate","serial_no":100,"element_code":"20-516","element_group":"20","element_group_title":"Materials: Misc.","description":"Rubber Seal : P-type (28mm x","unit":"m","normalized_unit":"m","rates":{"zone_a":400.0,"zone_b":400.0,"zone_c":400.0,"zone_d":400.0},"source_raw_ocr_text":"100 | 20-516 | Rubber Seal : P-type (28mm x m 400.00 400.00 400.00 400.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-516 Rubber Seal : P-type (28mm x m Materials: Misc."},{"record_type":"basic_element_rate","serial_no":101,"element_code":"20-519","element_group":"20","element_group_title":"Materials: Misc.","description":"Rubber Seal : U-type (25mm x","unit":"m","normalized_unit":"m","rates":{"zone_a":430.0,"zone_b":430.0,"zone_c":430.0,"zone_d":430.0},"source_raw_ocr_text":"“101 | 20-519 | Rubber Seal : U-type (25mm x m 430.00 430.00 430.00 430.00 |","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-519 Rubber Seal : U-type (25mm x m Materials: Misc."},{"record_type":"basic_element_rate","serial_no":102,"element_code":"20-525","element_group":"20","element_group_title":"Materials: Misc.","description":"Rope: Coir String 0.0","unit":"kg","normalized_unit":"kg","rates":{"zone_a":96.0,"zone_b":96.0,"zone_c":96.0,"zone_d":96.0},"source_raw_ocr_text":"102 | 20-525 | Rope: Coir String ... 0.0... kg 96.00 96.00 96.00 96.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-525 Rope: Coir String 0.0 kg Materials: Misc."},{"record_type":"basic_element_rate","serial_no":103,"element_code":"20-530","element_group":"20","element_group_title":"Materials: Misc.","description":"Rope: Jute","unit":"kg","normalized_unit":"kg","rates":{"zone_a":55.0,"zone_b":55.0,"zone_c":55.0,"zone_d":55.0},"source_raw_ocr_text":"103 20-530 | Rope: Jute ... ee eee kg ‘| 55,00 $5.00 55.00 55.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_manually_corrected","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-530 Rope: Jute kg Materials: Misc."},{"record_type":"basic_element_rate","serial_no":104,"element_code":"20-535","element_group":"20","element_group_title":"Materials: Misc.","description":"Rope: Jute String","unit":"kg","normalized_unit":"kg","rates":{"zone_a":80.0,"zone_b":80.0,"zone_c":80.0,"zone_d":80.0},"source_raw_ocr_text":"104 | 20-535 | Rope: Jute String ... 0... ee kg 80.00 80.00 80.00 80.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-535 Rope: Jute String kg Materials: Misc."},{"record_type":"basic_element_rate","serial_no":105,"element_code":"20-540","element_group":"20","element_group_title":"Materials: Misc.","description":"Polypropylene/ Nylon thread","unit":"100 m","normalized_unit":"per_100_m","rates":{"zone_a":30.0,"zone_b":30.0,"zone_c":30.0,"zone_d":30.0},"source_raw_ocr_text":"105 | 20-540 | Polypropylene/ Nylon thread 100 30.00 30.00 30.00 30.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-540 Polypropylene/ Nylon thread 100 m Materials: Misc."},{"record_type":"basic_element_rate","serial_no":106,"element_code":"20-545","element_group":"20","element_group_title":"Materials: Misc.","description":"Rope, Nylon","unit":"kg","normalized_unit":"kg","rates":{"zone_a":154.0,"zone_b":154.0,"zone_c":154.0,"zone_d":154.0},"source_raw_ocr_text":"106 20-545 | Rope, Nylon ............ kg 154.00 154.00 154.00 154.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-545 Rope, Nylon kg Materials: Misc."},{"record_type":"basic_element_rate","serial_no":107,"element_code":"20-550","element_group":"20","element_group_title":"Materials: Misc.","description":"Rope, Nylon: 10 mm dia, 7 am","unit":"kg","normalized_unit":"kg","rates":{"zone_a":165.0,"zone_b":165.0,"zone_c":165.0,"zone_d":165.0},"source_raw_ocr_text":"107 | 20-550 | Rope, Nylon: 10 mm dia, 7 am kg 165.00 165.00 165.00 165.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-550 Rope, Nylon: 10 mm dia, 7 am kg Materials: Misc."},{"record_type":"basic_element_rate","serial_no":108,"element_code":"20-556","element_group":"20","element_group_title":"Materials: Misc.","description":"Rope, Nylon: 6mm dia ke","unit":"kg","normalized_unit":"kg","rates":{"zone_a":154.0,"zone_b":154.0,"zone_c":154.0,"zone_d":154.0},"source_raw_ocr_text":"108 | 20-556 | Rope, Nylon: 6mm dia ... ... ... .... ke 154.00 154.00 154.00 154.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-556 Rope, Nylon: 6mm dia ke Materials: Misc.","unit_validation_status":"source_image_manually_verified"},{"record_type":"basic_element_rate","serial_no":109,"element_code":"20-557","element_group":"20","element_group_title":"Materials: Misc.","description":"Rope, Nylon: 12mm dia","unit":"100 m","normalized_unit":"per_100_m","rates":{"zone_a":420.0,"zone_b":420.0,"zone_c":420.0,"zone_d":420.0},"source_raw_ocr_text":"\"109 | 20-557 | Rope, Nylon: 12mm dia ...... ... ... 100 420.00 | 420.00 420.00 | 420.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-557 Rope, Nylon: 12mm dia 100 m Materials: Misc."},{"record_type":"basic_element_rate","serial_no":110,"element_code":"20-560","element_group":"20","element_group_title":"Materials: Misc.","description":"Royalty of Earth","unit":"cum","normalized_unit":"cum","rates":{"zone_a":18.0,"zone_b":18.0,"zone_c":18.0,"zone_d":18.0},"source_raw_ocr_text":"110 | 20-560 | Royalty of Earth .. 0... cum 18.00 18.00 18.00 | 18.00 |","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-560 Royalty of Earth cum Materials: Misc."},{"record_type":"basic_element_rate","serial_no":111,"element_code":"20-562","element_group":"20","element_group_title":"Materials: Misc.","description":"TurfingSod c.c.0 =","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":10.0,"zone_b":10.0,"zone_c":10.0,"zone_d":10.0},"source_raw_ocr_text":"111 | 20-562 | TurfingSod.....c.c.0 = | sqm-—|~—«10.00 10.00 10.00 10.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-562 TurfingSod c.c.0 = sqm Materials: Misc."},{"record_type":"basic_element_rate","serial_no":112,"element_code":"20-563","element_group":"20","element_group_title":"Materials: Misc.","description":"Dholkalmi","unit":"100 Nos","normalized_unit":"per_100","rates":{"zone_a":13.0,"zone_b":13.0,"zone_c":13.0,"zone_d":13.0},"source_raw_ocr_text":"112 | 20-563 | Dholkalmi..........0. | 100 13.00 | 13.00 13.00 13.00 |","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-563 Dholkalmi 100 Nos Materials: Misc."},{"record_type":"basic_element_rate","serial_no":113,"element_code":"20-564","element_group":"20","element_group_title":"Materials: Misc.","description":"Vetiver/Napier/Hogla/Chhon Grass Tiller","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":12.0,"zone_b":12.0,"zone_c":12.0,"zone_d":12.0},"source_raw_ocr_text":"113 | 20-564 | Vetiver/Napier/Hogla/Chhon Grass | sqm | 12.00 12.00 12.00 12.00 Tiller......","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-564 Vetiver/Napier/Hogla/Chhon Grass Tiller sqm Materials: Misc."},{"record_type":"basic_element_rate","serial_no":114,"element_code":"20-590","element_group":"20","element_group_title":"Materials: Misc.","description":"Emery Paper kee vee eens","unit":"No.","normalized_unit":"number","rates":{"zone_a":25.0,"zone_b":25.0,"zone_c":25.0,"zone_d":25.0},"source_raw_ocr_text":"114 | 20-590 | Emery Paper ... kee vee eee eens No. 25.00 25.00 25.00 25.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-590 Emery Paper kee vee eens No. Materials: Misc."},{"record_type":"basic_element_rate","serial_no":115,"element_code":"20-600","element_group":"20","element_group_title":"Materials: Misc.","description":"Sand Paper dete tee cents","unit":"No.","normalized_unit":"number","rates":{"zone_a":16.0,"zone_b":16.0,"zone_c":16.0,"zone_d":16.0},"source_raw_ocr_text":"115 | 20-600 | Sand Paper ... dete tee cents No. 16.00 16.00 16.00 16.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-600 Sand Paper dete tee cents No. Materials: Misc."},{"record_type":"basic_element_rate","serial_no":116,"element_code":"20-605","element_group":"20","element_group_title":"Materials: Misc.","description":"Printing : Black & & White","unit":"day","normalized_unit":"day","rates":{"zone_a":5.0,"zone_b":5.0,"zone_c":5.0,"zone_d":5.0},"source_raw_ocr_text":"116 | 20-605 | Printing : Black & & White day 5.00 5.00 5.00 5.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-605 Printing : Black & & White day Materials: Misc."},{"record_type":"basic_element_rate","serial_no":117,"element_code":"20-610","element_group":"20","element_group_title":"Materials: Misc.","description":"Salt . feneee","unit":"kg","normalized_unit":"kg","rates":{"zone_a":35.0,"zone_b":35.0,"zone_c":35.0,"zone_d":35.0},"source_raw_ocr_text":"117 20-610 | Salt . feneee kg | 35.00 35.00 35.00 35.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-610 Salt . feneee kg Materials: Misc."},{"record_type":"basic_element_rate","serial_no":118,"element_code":"20-612","element_group":"20","element_group_title":"Materials: Misc.","description":"Straw: 0.9m ndia, 1.20m atone bundle","unit":"bnd","normalized_unit":"bundle","rates":{"zone_a":100.0,"zone_b":100.0,"zone_c":100.0,"zone_d":100.0},"source_raw_ocr_text":"118 20-612 | Straw: 0.9m ndia, 1.20m atone bundle | bnd 100.00 100.00 100.00 100.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-612 Straw: 0.9m ndia, 1.20m atone bundle bnd Materials: Misc."},{"record_type":"basic_element_rate","serial_no":119,"element_code":"20-615","element_group":"20","element_group_title":"Materials: Misc.","description":"Urea fertilizer","unit":"kg","normalized_unit":"kg","rates":{"zone_a":25.0,"zone_b":25.0,"zone_c":25.0,"zone_d":25.0},"source_raw_ocr_text":"/ 119 | 20-615 | Urea fertilizer kg 25.00 25.00 25.00 25.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-615 Urea fertilizer kg Materials: Misc."},{"record_type":"basic_element_rate","serial_no":120,"element_code":"20-620","element_group":"20","element_group_title":"Materials: Misc.","description":"PVC water stopper (with centre bulb)","unit":"m","normalized_unit":"m","rates":{"zone_a":590.0,"zone_b":590.0,"zone_c":590.0,"zone_d":590.0},"source_raw_ocr_text":"/ 120 | 20-620 | PVC water stopper (with centre bulb) | m 590.00 590.00 590.00 590.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-620 PVC water stopper (with centre bulb) m Materials: Misc."},{"record_type":"basic_element_rate","serial_no":121,"element_code":"20-625","element_group":"20","element_group_title":"Materials: Misc.","description":"Water stop, PVC: 230mm, Corrugated with central bulb","unit":"m","normalized_unit":"m","rates":{"zone_a":590.0,"zone_b":590.0,"zone_c":590.0,"zone_d":590.0},"source_raw_ocr_text":"121 20-625 | Water stop, PVC: 230mm, m 590.00 590.00 590.00 590.00 Corrugated with central bulb....","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-625 Water stop, PVC: 230mm, Corrugated with central bulb m Materials: Misc."},{"record_type":"basic_element_rate","serial_no":122,"element_code":"20-630","element_group":"20","element_group_title":"Materials: Misc.","description":"Water Sprayer bee tee tee ones","unit":"No.","normalized_unit":"number","rates":{"zone_a":180.0,"zone_b":180.0,"zone_c":180.0,"zone_d":180.0},"source_raw_ocr_text":"122 | 20-630 | Water Sprayer bee tee cee tee eee ones No. | 180.00 180.00 180.00 180.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-630 Water Sprayer bee tee tee ones No. Materials: Misc."},{"record_type":"basic_element_rate","serial_no":123,"element_code":"20-655","element_group":"20","element_group_title":"Materials: Misc.","description":"Kerosene Tin: Empty 2 +","unit":"No.","normalized_unit":"number","rates":{"zone_a":66.0,"zone_b":66.0,"zone_c":66.0,"zone_d":66.0},"source_raw_ocr_text":"123 | 20-655 | Kerosene Tin: Empty... ... 2... + No. 66.00 66.00 66.00 66.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-655 Kerosene Tin: Empty 2 + No. Materials: Misc."},{"record_type":"basic_element_rate","serial_no":124,"element_code":"20-660","element_group":"20","element_group_title":"Materials: Misc.","description":"Cork/Polysterene Sheet: 25mm thick","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":88.0,"zone_b":88.0,"zone_c":88.0,"zone_d":88.0},"source_raw_ocr_text":"124 | 20-660 | Cork/Polysterene Sheet: 25mm thick | sqm 88.00 88.00 88.00 88.00","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-660 Cork/Polysterene Sheet: 25mm thick sqm Materials: Misc."},{"record_type":"basic_element_rate","serial_no":125,"element_code":"20-665","element_group":"20","element_group_title":"Materials: Misc.","description":"Cork /Polysterene Sheet : 20mm thick","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":71.0,"zone_b":71.0,"zone_c":71.0,"zone_d":71.0},"source_raw_ocr_text":"125 | 20-665 | Cork /Polysterene Sheet : 20mm sqm 71.00 71.00 71.00 71.00 thick ...","source_pdf_page":15,"source_schedule_page":5,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"20-665 Cork /Polysterene Sheet : 20mm thick sqm Materials: Misc."},{"record_type":"basic_element_rate","serial_no":126,"element_code":"30-003","element_group":"30","element_group_title":"Wood Work","description":"Bamboo Piece: 2m long, 50 mm dia","unit":"No","normalized_unit":"number","rates":{"zone_a":95.0,"zone_b":85.0,"zone_c":85.0,"zone_d":90.0},"source_raw_ocr_text":"126 | 30-003 | Bamboo Piece: 2m long, 50 mm dia_| No 95.00 85.00 85.00 90.00","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-003 Bamboo Piece: 2m long, 50 mm dia No Wood Work"},{"record_type":"basic_element_rate","serial_no":127,"element_code":"30-005","element_group":"30","element_group_title":"Wood Work","description":"Bamboo, Barrack : 6m long, 51","unit":"100 No.","normalized_unit":"per_100","rates":{"zone_a":23500.0,"zone_b":21500.0,"zone_c":21500.0,"zone_d":22500.0},"source_raw_ocr_text":"127 | 30-005 | Bamboo, Barrack : 6m long, 51- 100 | 23500.00 | 21500.00 | 21500.00 | 22500.00","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-005 Bamboo, Barrack : 6m long, 51 100 No. Wood Work"},{"record_type":"basic_element_rate","serial_no":128,"element_code":"30-015","element_group":"30","element_group_title":"Wood Work","description":"Bamboo, Barrack : 6m long, >","unit":"100 No.","normalized_unit":"per_100","rates":{"zone_a":27500.0,"zone_b":25000.0,"zone_c":25000.0,"zone_d":26500.0},"source_raw_ocr_text":"' 128 | 30-015 | Bamboo, Barrack : 6m long, > 100 | 27500.00 | 25000.00 | 25000.00 | 26500.00","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-015 Bamboo, Barrack : 6m long, > 100 No. Wood Work"},{"record_type":"basic_element_rate","serial_no":129,"element_code":"30-025","element_group":"30","element_group_title":"Wood Work","description":"Bamboo, Barrack: 7.5m long, 80","unit":"100 No.","normalized_unit":"per_100","rates":{"zone_a":32000.0,"zone_b":28500.0,"zone_c":28500.0,"zone_d":30500.0},"source_raw_ocr_text":"129 | 30-025 | Bamboo, Barrack: 7.5m long, 80- 100 32000.00 | 28500.00 | 28500.00 | 30500.00","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-025 Bamboo, Barrack: 7.5m long, 80 100 No. Wood Work"},{"record_type":"basic_element_rate","serial_no":130,"element_code":"30-030","element_group":"30","element_group_title":"Wood Work","description":"Bamboo, Barrack : 7.5m long, >","unit":"100 No.","normalized_unit":"per_100","rates":{"zone_a":36000.0,"zone_b":32500.0,"zone_c":32500.0,"zone_d":34500.0},"source_raw_ocr_text":"130 | 30-030 | Bamboo, Barrack : 7.5m long, > 100 | 36000.00 | 32500.00 | 32500.00 | 34500.00 |","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-030 Bamboo, Barrack : 7.5m long, > 100 No. Wood Work"},{"record_type":"basic_element_rate","serial_no":131,"element_code":"30-150","element_group":"30","element_group_title":"Wood Work","description":"Bullah, Local Hard Wood: 100mm","unit":"m","normalized_unit":"m","rates":{"zone_a":195.0,"zone_b":175.0,"zone_c":175.0,"zone_d":185.0},"source_raw_ocr_text":"' 431 | 30-150 | Bullah, Local Hard Wood: 100mm | m 195.00 | 175.00 175.00 185.00","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-150 Bullah, Local Hard Wood: 100mm m Wood Work","ocr_serial_no":431,"serial_note":"OCR misread the printed serial; serial_no uses the verified source order."},{"record_type":"basic_element_rate","serial_no":132,"element_code":"30-155","element_group":"30","element_group_title":"Wood Work","description":"Bullah, Local Hard Wood: 125mm .","unit":"m","normalized_unit":"m","rates":{"zone_a":230.0,"zone_b":210.0,"zone_c":210.0,"zone_d":220.0},"source_raw_ocr_text":"132 | 30-155 Bullah, Local Hard Wood: 125mm _ | m 230.00 210.00 210.00 220.00.","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-155 Bullah, Local Hard Wood: 125mm . m Wood Work"},{"record_type":"basic_element_rate","serial_no":133,"element_code":"30-160","element_group":"30","element_group_title":"Wood Work","description":"Bullah, Local Hard Wood: 150mm","unit":"m","normalized_unit":"m","rates":{"zone_a":262.0,"zone_b":262.0,"zone_c":262.0,"zone_d":262.0},"source_raw_ocr_text":"133 | 30-160 | Bullah, Local Hard Wood: 150mm | m 262.00 262.00 | 262.00 262.00","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-160 Bullah, Local Hard Wood: 150mm m Wood Work"},{"record_type":"basic_element_rate","serial_no":134,"element_code":"30-165","element_group":"30","element_group_title":"Wood Work","description":"Bullah, Local Hard Wood: 175mm","unit":"m","normalized_unit":"m","rates":{"zone_a":310.0,"zone_b":280.0,"zone_c":280.0,"zone_d":300.0},"source_raw_ocr_text":"' 134 | 30-165 | Bullah, Local Hard Wood: 175mm |m | 310.00 280.00 280.00 300.00","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-165 Bullah, Local Hard Wood: 175mm m Wood Work"},{"record_type":"basic_element_rate","serial_no":135,"element_code":"30-170","element_group":"30","element_group_title":"Wood Work","description":"Bullah, Local Hard Wood: 200mm","unit":"m","normalized_unit":"m","rates":{"zone_a":350.0,"zone_b":315.0,"zone_c":315.0,"zone_d":330.0},"source_raw_ocr_text":"' 135 | 30-170 | Bullah, Local Hard Wood: 200mm | m 350.00 315.00 315.00 330.00","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-170 Bullah, Local Hard Wood: 200mm m Wood Work"},{"record_type":"basic_element_rate","serial_no":136,"element_code":"30-175","element_group":"30","element_group_title":"Wood Work","description":"Bullah, Local Hard Wood: 225mm","unit":"m","normalized_unit":"m","rates":{"zone_a":430.0,"zone_b":385.0,"zone_c":385.0,"zone_d":410.0},"source_raw_ocr_text":"136 | 30-175 | Bullah, Local Hard Wood: 225mm | m 430.00 385.00 385.00 410.00 |","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-175 Bullah, Local Hard Wood: 225mm m Wood Work"},{"record_type":"basic_element_rate","serial_no":137,"element_code":"30-180","element_group":"30","element_group_title":"Wood Work","description":"Bullah, Local Hard Wood:250mm","unit":"m","normalized_unit":"m","rates":{"zone_a":440.0,"zone_b":400.0,"zone_c":400.0,"zone_d":420.0},"source_raw_ocr_text":"137 | 30-180 | Bullah, Local Hard Wood:250mm |m | 440.00 400.00 400.00 420.00","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-180 Bullah, Local Hard Wood:250mm m Wood Work"},{"record_type":"basic_element_rate","serial_no":138,"element_code":"30-230","element_group":"30","element_group_title":"Wood Work","description":"Brush Wo0d oo se sae cos","unit":"cum","normalized_unit":"cum","rates":{"zone_a":120.0,"zone_b":120.0,"zone_c":120.0,"zone_d":120.0},"source_raw_ocr_text":"138 | 30-230 | Brush Wo0d oo... cee se sae cos eee cum 120.00 120.00 | 120.00 120.00","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-230 Brush Wo0d oo se sae cos cum Wood Work"},{"record_type":"basic_element_rate","serial_no":139,"element_code":"30-340","element_group":"30","element_group_title":"Wood Work","description":"Peg, Wooden : 50mmx50mmx300mm size","unit":"No.","normalized_unit":"number","rates":{"zone_a":12.0,"zone_b":12.0,"zone_c":12.0,"zone_d":12.0},"source_raw_ocr_text":"139 | 30-340 | Peg, Wooden : No. 12.00 12.00 12.00 12.00 50mmx50mmx300mm size .....","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-340 Peg, Wooden : 50mmx50mmx300mm size No. Wood Work"},{"record_type":"basic_element_rate","serial_no":140,"element_code":"30-350","element_group":"30","element_group_title":"Wood Work","description":"Survey Flag","unit":"day","normalized_unit":"day","rates":{"zone_a":50.0,"zone_b":50.0,"zone_c":50.0,"zone_d":50.0},"source_raw_ocr_text":"140 | 30-350 | Survey Flag | day 50.00 50.00 50.00 50.00","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-350 Survey Flag day Wood Work"},{"record_type":"basic_element_rate","serial_no":141,"element_code":"30-400","element_group":"30","element_group_title":"Wood Work","description":"Tarjah, Double ses es eeee","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":180.0,"zone_b":180.0,"zone_c":180.0,"zone_d":180.0},"source_raw_ocr_text":"141 | 30-400 | Tarjah, Double .. ses es eeee sqm 180.00 180.00 180.00 180.00","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-400 Tarjah, Double ses es eeee sqm Wood Work"},{"record_type":"basic_element_rate","serial_no":142,"element_code":"30-425","element_group":"30","element_group_title":"Wood Work","description":"Wood, Fire","unit":"kg","normalized_unit":"kg","rates":{"zone_a":5.9,"zone_b":5.9,"zone_c":5.9,"zone_d":5.9},"source_raw_ocr_text":"142 | 30-425 | Wood, Fire .. _ kg 5.90 5.90 5.90 5.90","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-425 Wood, Fire kg Wood Work"},{"record_type":"basic_element_rate","serial_no":143,"element_code":"30-430","element_group":"30","element_group_title":"Wood Work","description":"Wood: Garjan/Tam/local Sal","unit":"cum","normalized_unit":"cum","rates":{"zone_a":77600.0,"zone_b":74100.0,"zone_c":74100.0,"zone_d":79400.0},"source_raw_ocr_text":"143 | 30-430 | Wood: Garjan/Tam/local Sal cum | 77600.00 | 74100.00 | 74100.00 | 79400.00","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-430 Wood: Garjan/Tam/local Sal cum Wood Work"},{"record_type":"basic_element_rate","serial_no":144,"element_code":"30-440","element_group":"30","element_group_title":"Wood Work","description":"Wood, Seasoned & Sawn, Chittagong Teak","unit":"cum","normalized_unit":"cum","rates":{"zone_a":155300.0,"zone_b":151800.0,"zone_c":151800.0,"zone_d":162300.0},"source_raw_ocr_text":"144 | 30-440 | Wood, Seasoned & Sawn, cum 155300.00 | 151800.00 | 151800.00 | 162300.00 Chittagong Teak..","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-440 Wood, Seasoned & Sawn, Chittagong Teak cum Wood Work"},{"record_type":"basic_element_rate","serial_no":145,"element_code":"30-445","element_group":"30","element_group_title":"Wood Work","description":"Wood, Seasoned & Sawn, Garjan","unit":"cum","normalized_unit":"cum","rates":{"zone_a":77600.0,"zone_b":74100.0,"zone_c":74100.0,"zone_d":79400.0},"source_raw_ocr_text":"145 | 30-445 | Wood, Seasoned & Sawn, cum | 77600.00 | 74100.00 | 74100.00 | 79400.00 Garjan ........","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-445 Wood, Seasoned & Sawn, Garjan cum Wood Work"},{"record_type":"basic_element_rate","serial_no":146,"element_code":"30-460","element_group":"30","element_group_title":"Wood Work","description":"Wood, Seasoned & Sawn,","unit":"cum","normalized_unit":"cum","rates":{"zone_a":77600.0,"zone_b":74100.0,"zone_c":74100.0,"zone_d":79400.0},"source_raw_ocr_text":"“146 | 30-460 | Wood, Seasoned & Sawn, cum | 77600.00 | 74100.00 | 74100.00 | 79400.00","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-460 Wood, Seasoned & Sawn, cum Wood Work"},{"record_type":"basic_element_rate","serial_no":147,"element_code":"30-500","element_group":"30","element_group_title":"Wood Work","description":"Wood, Seasoned & Sawn, Shil Karai","unit":"cum","normalized_unit":"cum","rates":{"zone_a":88200.0,"zone_b":88200.0,"zone_c":88200.0,"zone_d":88200.0},"source_raw_ocr_text":"147 | 30-500 | Wood, Seasoned & Sawn, Shil cum | 88200.00 | 88200.00 | 88200.00 | 88200.00 Karai .....","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-500 Wood, Seasoned & Sawn, Shil Karai cum Wood Work"},{"record_type":"basic_element_rate","serial_no":148,"element_code":"30-525","element_group":"30","element_group_title":"Wood Work","description":"Wooden Plank and Batten (Mango)","unit":"cum","normalized_unit":"cum","rates":{"zone_a":24700.0,"zone_b":24700.0,"zone_c":24700.0,"zone_d":24700.0},"source_raw_ocr_text":"148 | 30-525 | Wooden Plank and Batten (Mango) | cum 24700.00 | 24700.00 | 24700.00 | 24700.00 40. Metal Work","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"30-525 Wooden Plank and Batten (Mango) cum Wood Work"},{"record_type":"basic_element_rate","serial_no":149,"element_code":"40-020","element_group":"40","element_group_title":"Metal Work","description":"Angle, M.S ce cts","unit":"kg","normalized_unit":"kg","rates":{"zone_a":76.0,"zone_b":76.0,"zone_c":76.0,"zone_d":76.0},"source_raw_ocr_text":"149 | 40-020 | Angle, M.S... ce cts ee ee ee kg 76.00 76.00 76.00 76.00","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-020 Angle, M.S ce cts kg Metal Work"},{"record_type":"basic_element_rate","serial_no":150,"element_code":"40-030","element_group":"40","element_group_title":"Metal Work","description":"Bar, Flat, M.S 1.0 ce one","unit":"kg","normalized_unit":"kg","rates":{"zone_a":70.0,"zone_b":70.0,"zone_c":70.0,"zone_d":70.0},"source_raw_ocr_text":"150 | 40-030 | Bar, Flat, M.S... 1.0 ce cee eee one kg 70.00 70.00 70.00 70.00","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-030 Bar, Flat, M.S 1.0 ce one kg Metal Work"},{"record_type":"basic_element_rate","serial_no":151,"element_code":"40-122","element_group":"40","element_group_title":"Metal Work","description":"Drum Sheet 0. ce ce","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":260.0,"zone_b":260.0,"zone_c":260.0,"zone_d":260.0},"source_raw_ocr_text":"151 | 40-122. | Drum Sheet... 0. ce ce cee cee sqm | 260.00 260.00 260.00 260.00","source_pdf_page":16,"source_schedule_page":6,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-122 Drum Sheet 0. ce ce sqm Metal Work"},{"record_type":"basic_element_rate","serial_no":152,"element_code":"40-130","element_group":"40","element_group_title":"Metal Work","description":"Electrode MS, Vortic Marine,","unit":"pkt","normalized_unit":"packet","rates":{"zone_a":720.0,"zone_b":720.0,"zone_c":720.0,"zone_d":720.0},"source_raw_ocr_text":"/ 152 | 40-130 | Electrode MS, Vortic Marine, pkt 720.00 720.00 720.00 720.00","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-130 Electrode MS, Vortic Marine, pkt Metal Work"},{"record_type":"basic_element_rate","serial_no":153,"element_code":"40-135","element_group":"40","element_group_title":"Metal Work","description":"Electrode MS, Vortic Marine, 4mm","unit":"pkt","normalized_unit":"packet","rates":{"zone_a":750.0,"zone_b":750.0,"zone_c":750.0,"zone_d":750.0},"source_raw_ocr_text":"153 | 40-135 | Electrode MS, Vortic Marine, 4mm _ | pkt 750.00 750.00 750.00 750.00","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-135 Electrode MS, Vortic Marine, 4mm pkt Metal Work"},{"record_type":"basic_element_rate","serial_no":154,"element_code":"40-200","element_group":"40","element_group_title":"Metal Work","description":"Gazal, all Sizes 2. ce see","unit":"kg","normalized_unit":"kg","rates":{"zone_a":150.0,"zone_b":150.0,"zone_c":150.0,"zone_d":150.0},"source_raw_ocr_text":"154 | 40-200 | Gazal, all Sizes... 2. ves ce see oe kg 150.00 150.00 150.00 150.00","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-200 Gazal, all Sizes 2. ce see kg Metal Work"},{"record_type":"basic_element_rate","serial_no":155,"element_code":"40-222","element_group":"40","element_group_title":"Metal Work","description":"Hinge Hook, Steel, 460mm","unit":"No.","normalized_unit":"number","rates":{"zone_a":190.0,"zone_b":190.0,"zone_c":190.0,"zone_d":190.0},"source_raw_ocr_text":"155 | 40-222 | Hinge Hook, Steel, 460mm No. 190.00 190.00 190.00 190.00","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-222 Hinge Hook, Steel, 460mm No. Metal Work"},{"record_type":"basic_element_rate","serial_no":156,"element_code":"40-230","element_group":"40","element_group_title":"Metal Work","description":"Iron Clamp, 450mm x 50mm x","unit":"No.","normalized_unit":"number","rates":{"zone_a":84.0,"zone_b":84.0,"zone_c":84.0,"zone_d":84.0},"source_raw_ocr_text":"156 | 40-230 | Iron Clamp, 450mm x 50mm x No. 84.00 84.00 84.00 84.00","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-230 Iron Clamp, 450mm x 50mm x No. Metal Work"},{"record_type":"basic_element_rate","serial_no":157,"element_code":"40-252","element_group":"40","element_group_title":"Metal Work","description":"Lead Plate 0. ces ce sao","unit":"kg","normalized_unit":"kg","rates":{"zone_a":200.0,"zone_b":200.0,"zone_c":200.0,"zone_d":200.0},"source_raw_ocr_text":"157 | 40-252 | Lead Plate... 0. cee ces eee ce sao kg | 200.00 200.00 200.00 200.00","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-252 Lead Plate 0. ces ce sao kg Metal Work"},{"record_type":"basic_element_rate","serial_no":158,"element_code":"40-300","element_group":"40","element_group_title":"Metal Work","description":"Nails, all Sizes","unit":"kg","normalized_unit":"kg","rates":{"zone_a":160.0,"zone_b":160.0,"zone_c":160.0,"zone_d":160.0},"source_raw_ocr_text":"158 | 40-300 | Nails, all Sizes... 0... kg 160.00 160.00 160.00 160.00","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-300 Nails, all Sizes kg Metal Work"},{"record_type":"basic_element_rate","serial_no":159,"element_code":"40-305","element_group":"40","element_group_title":"Metal Work","description":"Nails; 125mm to","unit":"kg","normalized_unit":"kg","rates":{"zone_a":160.0,"zone_b":160.0,"zone_c":160.0,"zone_d":160.0},"source_raw_ocr_text":"159 | 40-305 | Nails; 125mm to kg 160.00 160.00 160.00 160.00","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-305 Nails; 125mm to kg Metal Work"},{"record_type":"basic_element_rate","serial_no":160,"element_code":"40-310","element_group":"40","element_group_title":"Metal Work","description":"Nails; 37mm to 125mm","unit":"kg","normalized_unit":"kg","rates":{"zone_a":160.0,"zone_b":160.0,"zone_c":160.0,"zone_d":160.0},"source_raw_ocr_text":"160 | 40-310 | Nails; 37mm to 125mm.............. | kg 160.00 160.00 160.00 160.00","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-310 Nails; 37mm to 125mm kg Metal Work"},{"record_type":"basic_element_rate","serial_no":161,"element_code":"40-362","element_group":"40","element_group_title":"Metal Work","description":"Nuts & Bolts, M.S., 25mm","unit":"kg","normalized_unit":"kg","rates":{"zone_a":160.0,"zone_b":160.0,"zone_c":160.0,"zone_d":160.0},"source_raw_ocr_text":"161 | 40-362 | Nuts & Bolts, M.S., 25mm kg 160.00 160.00 160.00 160.00","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-362 Nuts & Bolts, M.S., 25mm kg Metal Work"},{"record_type":"basic_element_rate","serial_no":162,"element_code":"40-365","element_group":"40","element_group_title":"Metal Work","description":"Nuts & Bolts, 13mm and below","unit":"kg","normalized_unit":"kg","rates":{"zone_a":160.0,"zone_b":160.0,"zone_c":160.0,"zone_d":160.0},"source_raw_ocr_text":"162 | 40-365 | Nuts & Bolts, 13mm and kg 160.00 160.00 160.00 160.00 below ... ... ...","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-365 Nuts & Bolts, 13mm and below kg Metal Work"},{"record_type":"basic_element_rate","serial_no":163,"element_code":"40-370","element_group":"40","element_group_title":"Metal Work","description":"Nuts & Bolts, above","unit":"kg","normalized_unit":"kg","rates":{"zone_a":160.0,"zone_b":160.0,"zone_c":160.0,"zone_d":160.0},"source_raw_ocr_text":"163 | 40-370 | Nuts & Bolts, above kg 160.00 160.00 160.00 160.00","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-370 Nuts & Bolts, above kg Metal Work"},{"record_type":"basic_element_rate","serial_no":164,"element_code":"40-371","element_group":"40","element_group_title":"Metal Work","description":"Nuts & Bolts, SS, above 13mm","unit":"kg","normalized_unit":"kg","rates":{"zone_a":450.0,"zone_b":450.0,"zone_c":450.0,"zone_d":450.0},"source_raw_ocr_text":"164 | 40-371 | Nuts & Bolts, SS, above 13mm kg 450.00 450.00 450.00 450.00","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-371 Nuts & Bolts, SS, above 13mm kg Metal Work"},{"record_type":"basic_element_rate","serial_no":165,"element_code":"40-372","element_group":"40","element_group_title":"Metal Work","description":"Nuts & Hinge Pin, Hex Head SS,","unit":"No.","normalized_unit":"number","rates":{"zone_a":120.0,"zone_b":120.0,"zone_c":120.0,"zone_d":120.0},"source_raw_ocr_text":"165 | 40-372 | Nuts & Hinge Pin, Hex Head SS, No. 120.00 120.00 120.00 | 120.00","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-372 Nuts & Hinge Pin, Hex Head SS, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":166,"element_code":"40-373","element_group":"40","element_group_title":"Metal Work","description":"Nuts & Bolts, Counter Sink MS,","unit":"No.","normalized_unit":"number","rates":{"zone_a":18.0,"zone_b":18.0,"zone_c":18.0,"zone_d":18.0},"source_raw_ocr_text":"166 | 40-373 | Nuts & Bolts, Counter Sink MS, No. | 18.00 18.00 18.00 18.00 |","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-373 Nuts & Bolts, Counter Sink MS, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":167,"element_code":"40-374","element_group":"40","element_group_title":"Metal Work","description":"Nuts & Bolts, Counter Shank SS,","unit":"No.","normalized_unit":"number","rates":{"zone_a":30.0,"zone_b":30.0,"zone_c":30.0,"zone_d":30.0},"source_raw_ocr_text":"167 | 40-374 | Nuts & Bolts, Counter Shank SS, No. 30.00 30.00 30.00 30.00","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-374 Nuts & Bolts, Counter Shank SS, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":168,"element_code":"40-375","element_group":"40","element_group_title":"Metal Work","description":"Nuts & Bolts; 610mm x 51mm x","unit":"kg","normalized_unit":"kg","rates":{"zone_a":160.0,"zone_b":160.0,"zone_c":160.0,"zone_d":160.0},"source_raw_ocr_text":"168 | 40-375 | Nuts & Bolts; 610mm x 51mm x kg | 160.00 160.00 160.00 160.00","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-375 Nuts & Bolts; 610mm x 51mm x kg Metal Work"},{"record_type":"basic_element_rate","serial_no":169,"element_code":"40-377","element_group":"40","element_group_title":"Metal Work","description":"Nuts & Hinge Pin, Hex Head SS, @","unit":"No.","normalized_unit":"number","rates":{"zone_a":510.0,"zone_b":510.0,"zone_c":510.0,"zone_d":510.0},"source_raw_ocr_text":"169 | 40-377 | Nuts & Hinge Pin, Hex Head SS, @ | No. 510.00 510.00 510.00 510.00","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-377 Nuts & Hinge Pin, Hex Head SS, @ No. Metal Work"},{"record_type":"basic_element_rate","serial_no":170,"element_code":"40-380","element_group":"40","element_group_title":"Metal Work","description":"Pipe, M.S. 6mm thick, 400mm","unit":"m","normalized_unit":"m","rates":{"zone_a":7854.0,"zone_b":7854.0,"zone_c":7854.0,"zone_d":7854.0},"source_raw_ocr_text":"170 | 40-380 | Pipe, M.S. 6mm thick, 400mm m | 7854.00 | 7854.00 | 7854.00 | 7854.00 |","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-380 Pipe, M.S. 6mm thick, 400mm m Metal Work"},{"record_type":"basic_element_rate","serial_no":171,"element_code":"40-390","element_group":"40","element_group_title":"Metal Work","description":"Pipe, M.S. 6mm thick, 500mm","unit":"m","normalized_unit":"m","rates":{"zone_a":9800.0,"zone_b":9800.0,"zone_c":9800.0,"zone_d":9800.0},"source_raw_ocr_text":"171 | 40-390 | Pipe, M.S. 6mm thick, 500mm m 9800.00 | 9800.00 | 9800.00 | 9800.00","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-390 Pipe, M.S. 6mm thick, 500mm m Metal Work"},{"record_type":"basic_element_rate","serial_no":172,"element_code":"40-395","element_group":"40","element_group_title":"Metal Work","description":"Pipe, M.S. 6mm thick, 600mm","unit":"m","normalized_unit":"m","rates":{"zone_a":11760.0,"zone_b":11760.0,"zone_c":11760.0,"zone_d":11760.0},"source_raw_ocr_text":"172 | 40-395 | Pipe, M.S. 6mm thick, 600mm m 11760.00 | 11760.00 | 11760.00 | 11760.00","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-395 Pipe, M.S. 6mm thick, 600mm m Metal Work"},{"record_type":"basic_element_rate","serial_no":173,"element_code":"40-398","element_group":"40","element_group_title":"Metal Work","description":"Pipe, M.S. 6mm thick, 700mm","unit":"m","normalized_unit":"m","rates":{"zone_a":13720.0,"zone_b":13720.0,"zone_c":13720.0,"zone_d":13720.0},"source_raw_ocr_text":"173 | 40-398 | Pipe, M.S. 6mm thick, 700mm m 13720.00 | 13720.00 | 13720.00 | 13720.00","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-398 Pipe, M.S. 6mm thick, 700mm m Metal Work"},{"record_type":"basic_element_rate","serial_no":174,"element_code":"40-400","element_group":"40","element_group_title":"Metal Work","description":"Pipe, M.S. 6mm thick, 800mm","unit":"m","normalized_unit":"m","rates":{"zone_a":15680.0,"zone_b":15680.0,"zone_c":15680.0,"zone_d":15680.0},"source_raw_ocr_text":"174 | 40-400 | Pipe, M.S. 6mm thick, 800mm m 15680.00 | 15680.00 | 15680.00 | 15680.00","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-400 Pipe, M.S. 6mm thick, 800mm m Metal Work"},{"record_type":"basic_element_rate","serial_no":175,"element_code":"40-405","element_group":"40","element_group_title":"Metal Work","description":"Pipe, M.S. 6mm thick, 900mm","unit":"m","normalized_unit":"m","rates":{"zone_a":17640.0,"zone_b":17640.0,"zone_c":17640.0,"zone_d":17640.0},"source_raw_ocr_text":"175 | 40-405 | Pipe, M.S. 6mm thick, 900mm m 17640.00 | 17640.00 | 17640.00 | 17640.00","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-405 Pipe, M.S. 6mm thick, 900mm m Metal Work"},{"record_type":"basic_element_rate","serial_no":176,"element_code":"40-406","element_group":"40","element_group_title":"Metal Work","description":"Pipe, M.S. 6mm thick, 250mm dia","unit":"m","normalized_unit":"m","rates":{"zone_a":4900.0,"zone_b":4900.0,"zone_c":4900.0,"zone_d":4900.0},"source_raw_ocr_text":"176 | 40-406 | Pipe, M.S. 6mm thick, 250mm dia_|m | 4900.00 | 4900.00 | 4900.00 | 4900.00","source_pdf_page":17,"source_schedule_page":7,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-406 Pipe, M.S. 6mm thick, 250mm dia m Metal Work"},{"record_type":"basic_element_rate","serial_no":177,"element_code":"40-407","element_group":"40","element_group_title":"Metal Work","description":"Pipe, M.S. 6mm thick, 200mm dia","unit":"m","normalized_unit":"m","rates":{"zone_a":4010.0,"zone_b":4010.0,"zone_c":4010.0,"zone_d":4010.0},"source_raw_ocr_text":"177 | 40-407 | Pipe, M.S. 6mm thick, 200mm dia | m 4010.00 | 4010.00 | 4010.00 | 4010.00","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-407 Pipe, M.S. 6mm thick, 200mm dia m Metal Work"},{"record_type":"basic_element_rate","serial_no":178,"element_code":"40-415","element_group":"40","element_group_title":"Metal Work","description":"Plate, S.S. 15mm. (SUS-304)","unit":"kg","normalized_unit":"kg","rates":{"zone_a":450.0,"zone_b":450.0,"zone_c":450.0,"zone_d":450.0},"source_raw_ocr_text":"178 | 40-415 | Plate, S.S. 15mm. (SUS-304) kg 450.00 450.00 450.00 450.00","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-415 Plate, S.S. 15mm. (SUS-304) kg Metal Work"},{"record_type":"basic_element_rate","serial_no":179,"element_code":"40-420","element_group":"40","element_group_title":"Metal Work","description":"Plate, S.S. 6mm ((SUS-304)","unit":"kg","normalized_unit":"kg","rates":{"zone_a":450.0,"zone_b":450.0,"zone_c":450.0,"zone_d":450.0},"source_raw_ocr_text":"179 | 40-420 | Plate, S.S. 6mm ((SUS-304) kg 450.00 450.00 450.00 450.00","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-420 Plate, S.S. 6mm ((SUS-304) kg Metal Work"},{"record_type":"basic_element_rate","serial_no":180,"element_code":"40-425","element_group":"40","element_group_title":"Metal Work","description":"Plate, M.S. 20mm (345 Mpa)","unit":"kg","normalized_unit":"kg","rates":{"zone_a":77.0,"zone_b":77.0,"zone_c":77.0,"zone_d":77.0},"source_raw_ocr_text":"180 | 40-425 | Plate, M.S. 20mm (345 Mpa) kg 77.00 77.00 77.00 77.00","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-425 Plate, M.S. 20mm (345 Mpa) kg Metal Work"},{"record_type":"basic_element_rate","serial_no":181,"element_code":"40-426","element_group":"40","element_group_title":"Metal Work","description":"Plate, M.S. 16mm (345 Mpa)","unit":"kg","normalized_unit":"kg","rates":{"zone_a":77.0,"zone_b":77.0,"zone_c":77.0,"zone_d":77.0},"source_raw_ocr_text":"181 | 40-426 | Plate, M.S. 16mm (345 Mpa) kg 77.00 77.00 77.00 77.00","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-426 Plate, M.S. 16mm (345 Mpa) kg Metal Work"},{"record_type":"basic_element_rate","serial_no":182,"element_code":"40-427","element_group":"40","element_group_title":"Metal Work","description":"Plate, M.S. 10mm(345 Mpa)","unit":"kg","normalized_unit":"kg","rates":{"zone_a":77.0,"zone_b":77.0,"zone_c":77.0,"zone_d":77.0},"source_raw_ocr_text":"182 | 40-427 | Plate, M.S. 10mm(345 Mpa) kg 77.00 77.00 77.00 77.00","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-427 Plate, M.S. 10mm(345 Mpa) kg Metal Work"},{"record_type":"basic_element_rate","serial_no":183,"element_code":"40-428","element_group":"40","element_group_title":"Metal Work","description":"Plate, M.S. 12mm(345 Mpa)","unit":"kg","normalized_unit":"kg","rates":{"zone_a":77.0,"zone_b":77.0,"zone_c":77.0,"zone_d":77.0},"source_raw_ocr_text":"183 | 40-428 | Plate, M.S. 12mm(345 Mpa) kg 77.00 77.00 77.00 77.00","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-428 Plate, M.S. 12mm(345 Mpa) kg Metal Work"},{"record_type":"basic_element_rate","serial_no":184,"element_code":"40-429","element_group":"40","element_group_title":"Metal Work","description":"Plate, M.S. 9mm(345 Mpa)","unit":"kg","normalized_unit":"kg","rates":{"zone_a":77.0,"zone_b":77.0,"zone_c":77.0,"zone_d":77.0},"source_raw_ocr_text":"184 | 40-429 | Plate, M.S. 9mm(345 Mpa) kg 77.00 77.00 77.00 77.00","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-429 Plate, M.S. 9mm(345 Mpa) kg Metal Work"},{"record_type":"basic_element_rate","serial_no":185,"element_code":"40-430","element_group":"40","element_group_title":"Metal Work","description":"Plate, M.S., 8mm(345 Mpa)","unit":"kg","normalized_unit":"kg","rates":{"zone_a":77.0,"zone_b":77.0,"zone_c":77.0,"zone_d":77.0},"source_raw_ocr_text":"| 185 | 40-430 | Plate, M.S., 8mm(345 Mpa) kg 77.00 77.00 77.00 77.00","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-430 Plate, M.S., 8mm(345 Mpa) kg Metal Work"},{"record_type":"basic_element_rate","serial_no":186,"element_code":"40-435","element_group":"40","element_group_title":"Metal Work","description":"Plate, M.S. 6mm(345 Mpa)","unit":"kg","normalized_unit":"kg","rates":{"zone_a":77.0,"zone_b":77.0,"zone_c":77.0,"zone_d":77.0},"source_raw_ocr_text":"/ 186 | 40-435 | Plate, M.S. 6mm(345 Mpa) | kg 77.00 77.00 77.00 77.00","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-435 Plate, M.S. 6mm(345 Mpa) kg Metal Work"},{"record_type":"basic_element_rate","serial_no":187,"element_code":"40-445","element_group":"40","element_group_title":"Metal Work","description":"MS. Threaded Shaft, dia=63mm,","unit":"No.","normalized_unit":"number","rates":{"zone_a":15967.6,"zone_b":15967.6,"zone_c":15967.6,"zone_d":15967.6},"source_raw_ocr_text":"187 | 40-445 | MS. Threaded Shaft, dia=63mm, —_| No. 15967.60 | 15967.60 | 15967.60 | 15967.60","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-445 MS. Threaded Shaft, dia=63mm, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":188,"element_code":"40-446","element_group":"40","element_group_title":"Metal Work","description":"Lift Nut (Bronze) D=146mm,","unit":"No.","normalized_unit":"number","rates":{"zone_a":11000.0,"zone_b":11000.0,"zone_c":11000.0,"zone_d":11000.0},"source_raw_ocr_text":"188 | 40-446 | Lift Nut (Bronze) D=146mm, No. 11000.00 | 11000.00 | 11000.00 | 11000.00","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-446 Lift Nut (Bronze) D=146mm, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":189,"element_code":"40-447","element_group":"40","element_group_title":"Metal Work","description":"Beval Gear, 315 BHN Steel,","unit":"No.","normalized_unit":"number","rates":{"zone_a":5800.0,"zone_b":5800.0,"zone_c":5800.0,"zone_d":5800.0},"source_raw_ocr_text":"189 | 40-447 | Beval Gear, 315 BHN Steel, No. 5800.00 | 5800.00 | 5800.00 | 5800.00","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-447 Beval Gear, 315 BHN Steel, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":190,"element_code":"40-448","element_group":"40","element_group_title":"Metal Work","description":"Thrust Bearing Out D=184mm,","unit":"No.","normalized_unit":"number","rates":{"zone_a":2800.0,"zone_b":2800.0,"zone_c":2800.0,"zone_d":2800.0},"source_raw_ocr_text":"190 | 40-448 | Thrust Bearing Out D=184mm, No. 2800.00 | 2800.00 | 2800.00 | 2800.00","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-448 Thrust Bearing Out D=184mm, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":191,"element_code":"40-449","element_group":"40","element_group_title":"Metal Work","description":"Rein Shield (Cast Iron)","unit":"No.","normalized_unit":"number","rates":{"zone_a":375.0,"zone_b":375.0,"zone_c":375.0,"zone_d":375.0},"source_raw_ocr_text":"191 | 40-449 | Rein Shield (Cast Iron) No. | 375.00 375.00 375.00 | 375.00","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-449 Rein Shield (Cast Iron) No. Metal Work"},{"record_type":"basic_element_rate","serial_no":192,"element_code":"40-450","element_group":"40","element_group_title":"Metal Work","description":"MS. Hex. Stop Nut, Dia=63mm.","unit":"No.","normalized_unit":"number","rates":{"zone_a":1050.0,"zone_b":1050.0,"zone_c":1050.0,"zone_d":1050.0},"source_raw_ocr_text":"192 | 40-450 | MS. Hex. Stop Nut, No. 1050.00 | 1050.00 | 1050.00 | 1050.00 Dia=63mm. ... .. ...","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-450 MS. Hex. Stop Nut, Dia=63mm. No. Metal Work"},{"record_type":"basic_element_rate","serial_no":193,"element_code":"40-451","element_group":"40","element_group_title":"Metal Work","description":"193. 40-451 MS. Bevel Pinion & Shaft,","unit":"No.","normalized_unit":"number","rates":{"zone_a":3000.0,"zone_b":3000.0,"zone_c":3000.0,"zone_d":3000.0},"source_raw_ocr_text":"193. 40-451 | MS. Bevel Pinion & Shaft, No. 3000.00 | 3000.00 | 3000.00 | 3000.00 |","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-451 193. 40-451 MS. Bevel Pinion & Shaft, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":194,"element_code":"40-452","element_group":"40","element_group_title":"Metal Work","description":"C1. Spur Gear D=300mm, 60T. essen","unit":"No.","normalized_unit":"number","rates":{"zone_a":3800.0,"zone_b":3800.0,"zone_c":3800.0,"zone_d":3800.0},"source_raw_ocr_text":"194 | 40-452 | C1. Spur Gear D=300mm, No. 3800.00 | 3800.00 | 3800.00 | 3800.00 60T. oe essen","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-452 C1. Spur Gear D=300mm, 60T. essen No. Metal Work"},{"record_type":"basic_element_rate","serial_no":195,"element_code":"40-453","element_group":"40","element_group_title":"Metal Work","description":"MS. Spur Pinion, D=300mm,","unit":"No.","normalized_unit":"number","rates":{"zone_a":1500.0,"zone_b":1500.0,"zone_c":1500.0,"zone_d":1500.0},"source_raw_ocr_text":"195 | 40-453 | MS. Spur Pinion, D=300mm, No. 1500.00 | 1500.00 | 1500.00 | 1500.00","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-453 MS. Spur Pinion, D=300mm, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":196,"element_code":"40-454","element_group":"40","element_group_title":"Metal Work","description":"MS. Spur Pinion Shaft, D=40mm,","unit":"No.","normalized_unit":"number","rates":{"zone_a":840.0,"zone_b":840.0,"zone_c":840.0,"zone_d":840.0},"source_raw_ocr_text":"196 | 40-454 | MS. Spur Pinion Shaft, D=40mm, | No. 840.00 840.00 840.00 840.00","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-454 MS. Spur Pinion Shaft, D=40mm, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":197,"element_code":"40-455","element_group":"40","element_group_title":"Metal Work","description":"Cl. Gear Cover, D=381mm,","unit":"No.","normalized_unit":"number","rates":{"zone_a":2000.0,"zone_b":2000.0,"zone_c":2000.0,"zone_d":2000.0},"source_raw_ocr_text":"197 | 40-455 | Cl. Gear Cover, D=381mm, No. 2000.00 | 2000.00 | 2000.00 | 2000.00","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-455 Cl. Gear Cover, D=381mm, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":198,"element_code":"40-456","element_group":"40","element_group_title":"Metal Work","description":"CI. Bowl, D=419mm 04","unit":"No.","normalized_unit":"number","rates":{"zone_a":10963.7,"zone_b":10963.7,"zone_c":10963.7,"zone_d":10963.7},"source_raw_ocr_text":"198 | 40-456 | CI. Bowl, D=419mm..... 04... | No. 10963.70 | 10963.70 | 10963.70 | 10963.70","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-456 CI. Bowl, D=419mm 04 No. Metal Work"},{"record_type":"basic_element_rate","serial_no":199,"element_code":"40-457","element_group":"40","element_group_title":"Metal Work","description":"Grease Fittings. 1 0. ose a","unit":"No.","normalized_unit":"number","rates":{"zone_a":36.0,"zone_b":36.0,"zone_c":36.0,"zone_d":36.0},"source_raw_ocr_text":"199 | 40-457 | Grease Fittings. ... 1... 0. ose a No. 36.00 36.00 36.00 36.00","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-457 Grease Fittings. 1 0. ose a No. Metal Work"},{"record_type":"basic_element_rate","serial_no":200,"element_code":"40-458","element_group":"40","element_group_title":"Metal Work","description":"Bronze Bushing, D=54mm, L=85.7mm","unit":"No.","normalized_unit":"number","rates":{"zone_a":650.0,"zone_b":650.0,"zone_c":650.0,"zone_d":650.0},"source_raw_ocr_text":"200 | 40-458 | Bronze Bushing, D=54mm, No. 650.00 650.00 650.00 650.00 L=85.7mm ... ... |","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-458 Bronze Bushing, D=54mm, L=85.7mm No. Metal Work"},{"record_type":"basic_element_rate","serial_no":201,"element_code":"40-459","element_group":"40","element_group_title":"Metal Work","description":"Bronze Bushing, D=42.8mm,","unit":"No.","normalized_unit":"number","rates":{"zone_a":430.0,"zone_b":430.0,"zone_c":430.0,"zone_d":430.0},"source_raw_ocr_text":"201 | 40-459 | Bronze Bushing, D=42.8mm, _| No. 430.00 430.00 | 430.00 430.00","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-459 Bronze Bushing, D=42.8mm, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":202,"element_code":"40-460","element_group":"40","element_group_title":"Metal Work","description":"Bronze Bushing, D=54mm,","unit":"No.","normalized_unit":"number","rates":{"zone_a":380.0,"zone_b":380.0,"zone_c":380.0,"zone_d":380.0},"source_raw_ocr_text":"/ 202 | 40-460 | Bronze Bushing, D=54mm, No. 380.00 380.00 380.00 380.00","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-460 Bronze Bushing, D=54mm, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":203,"element_code":"40-461","element_group":"40","element_group_title":"Metal Work","description":"MS. Key, X38MM, oo. vee","unit":"No.","normalized_unit":"number","rates":{"zone_a":60.0,"zone_b":60.0,"zone_c":60.0,"zone_d":60.0},"source_raw_ocr_text":"203 | 40-461 | MS. Key, No. 60.00 60.00 60.00 60.00 | 6X4.76X38MM, oo. ee oe vee -","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-461 MS. Key, X38MM, oo. vee No. Metal Work"},{"record_type":"basic_element_rate","serial_no":204,"element_code":"40-462","element_group":"40","element_group_title":"Metal Work","description":"MS. Key, 25x14x47.6mm.","unit":"No.","normalized_unit":"number","rates":{"zone_a":120.0,"zone_b":120.0,"zone_c":120.0,"zone_d":120.0},"source_raw_ocr_text":"204 | 40-462 | MS. Key, No. 120.00 120.00 120.00 120.00 25x14x47.6mm. ... ... 0...","source_pdf_page":18,"source_schedule_page":8,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-462 MS. Key, 25x14x47.6mm. No. Metal Work"},{"record_type":"basic_element_rate","serial_no":205,"element_code":"40-463","element_group":"40","element_group_title":"Metal Work","description":"M.S. Cap Screw, Hex. Head,","unit":"No.","normalized_unit":"number","rates":{"zone_a":25.0,"zone_b":25.0,"zone_c":25.0,"zone_d":25.0},"source_raw_ocr_text":"205 40-463 | M.S. Cap Screw, Hex. Head, No. 25.00 25.00 25.00 25.00","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-463 M.S. Cap Screw, Hex. Head, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":206,"element_code":"40-464","element_group":"40","element_group_title":"Metal Work","description":"MS. Set Screw, Allen Head","unit":"No.","normalized_unit":"number","rates":{"zone_a":27.0,"zone_b":27.0,"zone_c":27.0,"zone_d":27.0},"source_raw_ocr_text":"206 | 40-464 | MS. Set Screw, Allen Head No. 27.00 27.00 27.00 27.00","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-464 MS. Set Screw, Allen Head No. Metal Work"},{"record_type":"basic_element_rate","serial_no":207,"element_code":"40-465","element_group":"40","element_group_title":"Metal Work","description":"M.S. Cap Screw, Hex. Head","unit":"No.","normalized_unit":"number","rates":{"zone_a":22.0,"zone_b":22.0,"zone_c":22.0,"zone_d":22.0},"source_raw_ocr_text":"207 40-465 | M.S. Cap Screw, Hex. Head No. 22.00 22.00 22.00 22.00","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-465 M.S. Cap Screw, Hex. Head No. Metal Work"},{"record_type":"basic_element_rate","serial_no":208,"element_code":"40-466","element_group":"40","element_group_title":"Metal Work","description":"M.S. Cap Screw, Hex. Head","unit":"No.","normalized_unit":"number","rates":{"zone_a":23.0,"zone_b":23.0,"zone_c":23.0,"zone_d":23.0},"source_raw_ocr_text":"208 40-466 | M.S. Cap Screw, Hex. Head No. 23.00 23.00 23.00 23.00","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-466 M.S. Cap Screw, Hex. Head No. Metal Work"},{"record_type":"basic_element_rate","serial_no":209,"element_code":"40-467","element_group":"40","element_group_title":"Metal Work","description":"M.S. Set Screw, Sq. Head D=9.5,","unit":"No.","normalized_unit":"number","rates":{"zone_a":25.0,"zone_b":25.0,"zone_c":25.0,"zone_d":25.0},"source_raw_ocr_text":"209 | 40-467 | M.S. Set Screw, Sq. Head D=9.5, No. 25.00 25.00 25.00 25.00","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-467 M.S. Set Screw, Sq. Head D=9.5, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":210,"element_code":"40-468","element_group":"40","element_group_title":"Metal Work","description":"MSS. Set Screw, Sq. Head D=9.5,","unit":"No.","normalized_unit":"number","rates":{"zone_a":35.0,"zone_b":35.0,"zone_c":35.0,"zone_d":35.0},"source_raw_ocr_text":"210 | 40-468 | MSS. Set Screw, Sq. Head D=9.5, No. 35.00 35.00 35.00 35.00","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-468 MSS. Set Screw, Sq. Head D=9.5, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":211,"element_code":"40-469","element_group":"40","element_group_title":"Metal Work","description":"M.S. Cap Screw, D=9.5,","unit":"No.","normalized_unit":"number","rates":{"zone_a":35.0,"zone_b":35.0,"zone_c":35.0,"zone_d":35.0},"source_raw_ocr_text":"211 40-469 | M.S. Cap Screw, D=9.5, No. 35.00 35.00 35.00 35.00","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-469 M.S. Cap Screw, D=9.5, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":212,"element_code":"40-470","element_group":"40","element_group_title":"Metal Work","description":"M.S. Cap Screw, Flat Head D=6,","unit":"No.","normalized_unit":"number","rates":{"zone_a":30.0,"zone_b":30.0,"zone_c":30.0,"zone_d":30.0},"source_raw_ocr_text":"212 | 40-470 | M.S. Cap Screw, Flat Head D=6, No. 30.00 30.00 30.00 30.00","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-470 M.S. Cap Screw, Flat Head D=6, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":213,"element_code":"40-471","element_group":"40","element_group_title":"Metal Work","description":"M.S. Lock Washer, D=40mm,","unit":"No.","normalized_unit":"number","rates":{"zone_a":40.0,"zone_b":40.0,"zone_c":40.0,"zone_d":40.0},"source_raw_ocr_text":"213 40-471 | M.S. Lock Washer, D=40mm, No. 40.00 40.00 40.00 40.00","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-471 M.S. Lock Washer, D=40mm, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":214,"element_code":"40-472","element_group":"40","element_group_title":"Metal Work","description":"Bronze Lock Washer, D=73mm,","unit":"No.","normalized_unit":"number","rates":{"zone_a":231.0,"zone_b":231.0,"zone_c":231.0,"zone_d":231.0},"source_raw_ocr_text":"| 214 40-472 | Bronze Lock Washer, D=73mm, No. 231.00 231.00 231.00 231.00","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-472 Bronze Lock Washer, D=73mm, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":215,"element_code":"40-473","element_group":"40","element_group_title":"Metal Work","description":"Crank, M.S. 0 ce","unit":"No.","normalized_unit":"number","rates":{"zone_a":1432.2,"zone_b":1432.2,"zone_c":1432.2,"zone_d":1432.2},"source_raw_ocr_text":"215 40-473 | Crank, M.S. ... 0... ce ee ee eee No. 1432.20 1432.20 1432.20 1432.20","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-473 Crank, M.S. 0 ce No. Metal Work"},{"record_type":"basic_element_rate","serial_no":216,"element_code":"40-474","element_group":"40","element_group_title":"Metal Work","description":"Pedestal, M.S. D=200/250mm,","unit":"No.","normalized_unit":"number","rates":{"zone_a":8913.3,"zone_b":8913.3,"zone_c":8913.3,"zone_d":8913.3},"source_raw_ocr_text":"216 40-474 | Pedestal, M.S. D=200/250mm, No. 8913.30 8913.30 8913.30 8913.30","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-474 Pedestal, M.S. D=200/250mm, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":217,"element_code":"40-475","element_group":"40","element_group_title":"Metal Work","description":"M.S. Bolt & Nut D=16mm,","unit":"No.","normalized_unit":"number","rates":{"zone_a":16.0,"zone_b":16.0,"zone_c":16.0,"zone_d":16.0},"source_raw_ocr_text":"217 40-475 | M.S. Bolt & Nut D=16mm, No. 16.00 16.00 16.00 16.00","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-475 M.S. Bolt & Nut D=16mm, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":218,"element_code":"40-476","element_group":"40","element_group_title":"Metal Work","description":"C.I. Wall Bracket. 0.0","unit":"No.","normalized_unit":"number","rates":{"zone_a":2000.0,"zone_b":2000.0,"zone_c":2000.0,"zone_d":2000.0},"source_raw_ocr_text":"218 40-476 | C.I. Wall Bracket. ... 0.0... 0. No. 2000.00 2000.00 2000.00 2000.00","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-476 C.I. Wall Bracket. 0.0 No. Metal Work"},{"record_type":"basic_element_rate","serial_no":219,"element_code":"40-477","element_group":"40","element_group_title":"Metal Work","description":"C.I. Guide Valve. 0. ce","unit":"No.","normalized_unit":"number","rates":{"zone_a":840.0,"zone_b":840.0,"zone_c":840.0,"zone_d":840.0},"source_raw_ocr_text":"219 40-477 | C.I. Guide Valve. ... 0. ce ee No. 840.00 840.00 840.00 840.00","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-477 C.I. Guide Valve. 0. ce No. Metal Work"},{"record_type":"basic_element_rate","serial_no":220,"element_code":"40-480","element_group":"40","element_group_title":"Metal Work","description":"Hand Wheel, C.J. Out D=","unit":"No.","normalized_unit":"number","rates":{"zone_a":4000.0,"zone_b":4000.0,"zone_c":4000.0,"zone_d":4000.0},"source_raw_ocr_text":"220 | 40-480 | Hand Wheel, C.J. Out D= No. 4000.00 4000.00 4000.00 4000.00","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-480 Hand Wheel, C.J. Out D= No. Metal Work"},{"record_type":"basic_element_rate","serial_no":221,"element_code":"40-481","element_group":"40","element_group_title":"Metal Work","description":"B. Cover Top, C.I. D=190, T=21,","unit":"No.","normalized_unit":"number","rates":{"zone_a":4700.0,"zone_b":4700.0,"zone_c":4700.0,"zone_d":4700.0},"source_raw_ocr_text":"221 40-481 | B. Cover Top, C.I. D=190, T=21, No. 4700.00 4700.00 4700.00 4700.00","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-481 B. Cover Top, C.I. D=190, T=21, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":222,"element_code":"40-482","element_group":"40","element_group_title":"Metal Work","description":"Lift Nut, Bronze, Sq.T, D=108,","unit":"No.","normalized_unit":"number","rates":{"zone_a":9000.0,"zone_b":9000.0,"zone_c":9000.0,"zone_d":9000.0},"source_raw_ocr_text":"222 40-482 | Lift Nut, Bronze, Sq.T, D=108, No. 9000.00 9000.00 9000.00 9000.00","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-482 Lift Nut, Bronze, Sq.T, D=108, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":223,"element_code":"40-483","element_group":"40","element_group_title":"Metal Work","description":"Lift Screw M.S. Sq.T, D=38,","unit":"No.","normalized_unit":"number","rates":{"zone_a":2400.0,"zone_b":2400.0,"zone_c":2400.0,"zone_d":2400.0},"source_raw_ocr_text":"223 40-483 | Lift Screw M.S. Sq.T, D=38, No. 2400.00 2400.00 2400.00 2400.00","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-483 Lift Screw M.S. Sq.T, D=38, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":224,"element_code":"40-484","element_group":"40","element_group_title":"Metal Work","description":"Padestal Welded MS. D=140,","unit":"No.","normalized_unit":"number","rates":{"zone_a":1500.0,"zone_b":1500.0,"zone_c":1500.0,"zone_d":1500.0},"source_raw_ocr_text":"224 40-484 | Padestal Welded MS. D=140, No. 1500.00 1500.00 1500.00 1500.00","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-484 Padestal Welded MS. D=140, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":225,"element_code":"40-490","element_group":"40","element_group_title":"Metal Work","description":"Bronze Bushing, D=35mm,","unit":"kg","normalized_unit":"kg","rates":{"zone_a":150.0,"zone_b":150.0,"zone_c":150.0,"zone_d":150.0},"source_raw_ocr_text":"225 40-490 | Bronze Bushing, D=35mm, kg 150.00 150.00 150.00 150.00","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-490 Bronze Bushing, D=35mm, kg Metal Work"},{"record_type":"basic_element_rate","serial_no":226,"element_code":"40-495","element_group":"40","element_group_title":"Metal Work","description":"Lifting Hock, SS, @ 20mm Bar, Length 250 mm","unit":"No.","normalized_unit":"number","rates":{"zone_a":605.0,"zone_b":605.0,"zone_c":605.0,"zone_d":605.0},"source_raw_ocr_text":"226 40-495 | Lifting Hock, SS, @ 20mm Bar, No. 605.00 605.00 605.00 605.00 Length 250 mm","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-495 Lifting Hock, SS, @ 20mm Bar, Length 250 mm No. Metal Work"},{"record_type":"basic_element_rate","serial_no":227,"element_code":"40-530","element_group":"40","element_group_title":"Metal Work","description":"M.S. Ribbed/ Deformed Bar (Grade 300): Above 30mm [Bulk]","unit":"kg","normalized_unit":"kg","rates":{"zone_a":80.0,"zone_b":80.0,"zone_c":80.0,"zone_d":80.0},"source_raw_ocr_text":"227 40-530 | M.S. Ribbed/ Deformed Bar (Grade | kg 80.00 80.00 80.00 80.00 300): Above 30mm [Bulk]","source_pdf_page":19,"source_schedule_page":9,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-530 M.S. Ribbed/ Deformed Bar (Grade 300): Above 30mm [Bulk] kg Metal Work"},{"record_type":"basic_element_rate","serial_no":228,"element_code":"40-535","element_group":"40","element_group_title":"Metal Work","description":"M.S. Ribbed/ Deformed Bar (Grade 300): 9mm to 30mm [Bulk]","unit":"kg","normalized_unit":"kg","rates":{"zone_a":80.0,"zone_b":80.0,"zone_c":80.0,"zone_d":80.0},"source_raw_ocr_text":"228 | 40-535 | M.S. Ribbed/ Deformed Bar (Grade | kg 80.00 80.00 80.00 | 80.00 300): 9mm to 30mm [Bulk]","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-535 M.S. Ribbed/ Deformed Bar (Grade 300): 9mm to 30mm [Bulk] kg Metal Work"},{"record_type":"basic_element_rate","serial_no":229,"element_code":"40-540","element_group":"40","element_group_title":"Metal Work","description":"M.S. Ribbed/ Deformed Bar (Grade 300): 6mm dia [Bulk]","unit":"kg","normalized_unit":"kg","rates":{"zone_a":80.0,"zone_b":80.0,"zone_c":80.0,"zone_d":80.0},"source_raw_ocr_text":"229 | 40-540 | M.S. Ribbed/ Deformed Bar (Grade | kg 80.00 80.00 80.00 80.00 300): 6mm dia [Bulk]","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-540 M.S. Ribbed/ Deformed Bar (Grade 300): 6mm dia [Bulk] kg Metal Work"},{"record_type":"basic_element_rate","serial_no":230,"element_code":"40-585","element_group":"40","element_group_title":"Metal Work","description":"Screw, 25mm (MS. nee dz","unit":"dzn","normalized_unit":"dozen","rates":{"zone_a":9.0,"zone_b":9.0,"zone_c":9.0,"zone_d":9.0},"source_raw_ocr_text":"230 | 40-585 | Screw, 25mm (MS. ... nee | dz 9.00 9.00 9.00 9.00","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-585 Screw, 25mm (MS. nee dz dzn Metal Work"},{"record_type":"basic_element_rate","serial_no":231,"element_code":"40-590","element_group":"40","element_group_title":"Metal Work","description":"Screw, 37mm (MS) -.0.","unit":"dzn","normalized_unit":"dozen","rates":{"zone_a":8.6,"zone_b":8.6,"zone_c":8.6,"zone_d":8.6},"source_raw_ocr_text":"231 | 40-590 | Screw, 37mm (MS).........-.0. | dzn 8.60 8.60 8.60 8.60","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-590 Screw, 37mm (MS) -.0. dzn Metal Work"},{"record_type":"basic_element_rate","serial_no":232,"element_code":"40-645","element_group":"40","element_group_title":"Metal Work","description":"Sheet, Plain, G.I. 16 BWG","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":800.0,"zone_b":800.0,"zone_c":800.0,"zone_d":800.0},"source_raw_ocr_text":"232 | 40-645 | Sheet, Plain, G.I. 16 BWG............ | sqm 800.00 800.00 800.00 800.00","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-645 Sheet, Plain, G.I. 16 BWG sqm Metal Work"},{"record_type":"basic_element_rate","serial_no":233,"element_code":"40-675","element_group":"40","element_group_title":"Metal Work","description":"Sheet, Plain, G.I.28BWG","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":175.0,"zone_b":175.0,"zone_c":175.0,"zone_d":175.0},"source_raw_ocr_text":"233 | 40-675 | Sheet, Plain, G.I.28BWG.......... | sqm 175.00 175.00 175.00 175.00","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-675 Sheet, Plain, G.I.28BWG sqm Metal Work"},{"record_type":"basic_element_rate","serial_no":234,"element_code":"40-680","element_group":"40","element_group_title":"Metal Work","description":"U-shape hot rolled steel sheet pile","unit":"m.t","normalized_unit":"metric_ton","rates":{"zone_a":95000.0,"zone_b":95000.0,"zone_c":95000.0,"zone_d":95000.0},"source_raw_ocr_text":"234 | 40-680 | U-shape hot rolled steel sheet pile | m.t | 95000.00 | 95000.00 | 95000.00 | 95000.00","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-680 U-shape hot rolled steel sheet pile m.t Metal Work"},{"record_type":"basic_element_rate","serial_no":235,"element_code":"40-681","element_group":"40","element_group_title":"Metal Work","description":"Plastic sheet pile, Thickness>=9.0","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":9800.0,"zone_b":9800.0,"zone_c":9800.0,"zone_d":9800.0},"source_raw_ocr_text":"235 | 40-681 | Plastic sheet pile, Thickness>=9.0 sqm 9800.00 | 9800.00 9800.00 9800.00","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-681 Plastic sheet pile, Thickness>=9.0 sqm Metal Work"},{"record_type":"basic_element_rate","serial_no":236,"element_code":"40-715","element_group":"40","element_group_title":"Metal Work","description":"Steel Brush","unit":"No.","normalized_unit":"number","rates":{"zone_a":48.0,"zone_b":48.0,"zone_c":48.0,"zone_d":48.0},"source_raw_ocr_text":"236 | 40-715 | Steel Brush... 0... ee oe No. 48.00 48.00 48.00 48.00","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-715 Steel Brush No. Metal Work"},{"record_type":"basic_element_rate","serial_no":237,"element_code":"40-740","element_group":"40","element_group_title":"Metal Work","description":"Welding Are","unit":"100 pnt","normalized_unit":"per_100_point","rates":{"zone_a":300.0,"zone_b":300.0,"zone_c":300.0,"zone_d":300.0},"source_raw_ocr_text":"237 | 40-740 | Welding Are... ee ee 100 300.00 300.00 300.00 300.00","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-740 Welding Are 100 pnt Metal Work"},{"record_type":"basic_element_rate","serial_no":238,"element_code":"40-742","element_group":"40","element_group_title":"Metal Work","description":"Welding Arc. 0 ce","unit":"m","normalized_unit":"m","rates":{"zone_a":180.0,"zone_b":180.0,"zone_c":180.0,"zone_d":180.0},"source_raw_ocr_text":"238 | 40-742 Welding Arc. 0... ee ce cee cee eee m 180.00 | 180.00 180.00 180.00","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-742 Welding Arc. 0 ce m Metal Work"},{"record_type":"basic_element_rate","serial_no":239,"element_code":"40-755","element_group":"40","element_group_title":"Metal Work","description":"Wire, G.I, 12 BWG","unit":"kg","normalized_unit":"kg","rates":{"zone_a":120.0,"zone_b":120.0,"zone_c":120.0,"zone_d":120.0},"source_raw_ocr_text":"239 | 40-755 | Wire, G.I, 12 BWG.. kg 120.00 | 120.00 120.00 120.00","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-755 Wire, G.I, 12 BWG kg Metal Work"},{"record_type":"basic_element_rate","serial_no":240,"element_code":"40-760","element_group":"40","element_group_title":"Metal Work","description":"Wire, GJ. 14/16 BWG a","unit":"kg","normalized_unit":"kg","rates":{"zone_a":120.0,"zone_b":120.0,"zone_c":120.0,"zone_d":120.0},"source_raw_ocr_text":"240 | 40-760 | Wire, GJ. 14/16 BWG... a | kg 120.00 120.00 120.00 120.00","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-760 Wire, GJ. 14/16 BWG a kg Metal Work"},{"record_type":"basic_element_rate","serial_no":241,"element_code":"40-775","element_group":"40","element_group_title":"Metal Work","description":"Wire, G.I. 24 BWG uw.","unit":"kg","normalized_unit":"kg","rates":{"zone_a":120.0,"zone_b":120.0,"zone_c":120.0,"zone_d":120.0},"source_raw_ocr_text":"241 | 40-775 | Wire, G.I. 24 BWG uw. kg 120.00 120.00 120.00 120.00","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-775 Wire, G.I. 24 BWG uw. kg Metal Work"},{"record_type":"basic_element_rate","serial_no":242,"element_code":"40-800","element_group":"40","element_group_title":"Metal Work","description":"Rubber Gasket for Shore Pipe of 26\" Dredger: Inner Dia - 650 mm, Outer Dia - 800mm and Thickness","unit":"No","normalized_unit":"number","rates":{"zone_a":700.0,"zone_b":700.0,"zone_c":700.0,"zone_d":700.0},"source_raw_ocr_text":"242 | 40-800 | Rubber Gasket for Shore Pipe of 26\" | No 700.00 700.00 700.00 700.00 Dredger: Inner Dia - 650 mm, Outer Dia - 800mm and Thickness -","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-800 Rubber Gasket for Shore Pipe of 26\" Dredger: Inner Dia - 650 mm, Outer Dia - 800mm and Thickness No Metal Work"},{"record_type":"basic_element_rate","serial_no":243,"element_code":"40-801","element_group":"40","element_group_title":"Metal Work","description":"Rubber Gasket for Shore Pipe of 20\" Dredger: Inner Dia - 500 mm, Outer Dia - 650mm and Thickness","unit":"No","normalized_unit":"number","rates":{"zone_a":500.0,"zone_b":500.0,"zone_c":500.0,"zone_d":500.0},"source_raw_ocr_text":"243 | 40-801 | Rubber Gasket for Shore Pipe of 20\" No 500.00 500.00 500.00 500.00 Dredger: Inner Dia - 500 mm, Outer Dia - 650mm and Thickness -","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-801 Rubber Gasket for Shore Pipe of 20\" Dredger: Inner Dia - 500 mm, Outer Dia - 650mm and Thickness No Metal Work"},{"record_type":"basic_element_rate","serial_no":244,"element_code":"40-802","element_group":"40","element_group_title":"Metal Work","description":"Rubber Gasket for Shore Pipe of 18\" Dredger: Inner Dia - 450 mm, Outer Dia - 600mm and Thickness - 6mm","unit":"No","normalized_unit":"number","rates":{"zone_a":400.0,"zone_b":400.0,"zone_c":400.0,"zone_d":400.0},"source_raw_ocr_text":"244 | 40-802 | Rubber Gasket for Shore Pipe of 18\" | No 400.00 400.00 400.00 400.00 Dredger: Inner Dia - 450 mm, Outer Dia - 600mm and Thickness - 6mm","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-802 Rubber Gasket for Shore Pipe of 18\" Dredger: Inner Dia - 450 mm, Outer Dia - 600mm and Thickness - 6mm No Metal Work"},{"record_type":"basic_element_rate","serial_no":245,"element_code":"40-805","element_group":"40","element_group_title":"Metal Work","description":"Rubber Gasket for Shore Pipe of 12\" Dredger: Inner Dia - 300 mm, Outer Dia - 420mm and Thickness","unit":"No","normalized_unit":"number","rates":{"zone_a":300.0,"zone_b":300.0,"zone_c":300.0,"zone_d":300.0},"source_raw_ocr_text":"245 40-805 | Rubber Gasket for Shore Pipe of 12\" | No 300.00 300.00 300.00 300.00 Dredger: Inner Dia - 300 mm, Outer Dia - 420mm and Thickness -","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-805 Rubber Gasket for Shore Pipe of 12\" Dredger: Inner Dia - 300 mm, Outer Dia - 420mm and Thickness No Metal Work"},{"record_type":"basic_element_rate","serial_no":246,"element_code":"40-810","element_group":"40","element_group_title":"Metal Work","description":"Nut-bolt for Shore Pipe of 26\" Dredger, Dia 25 mm, L=115","unit":"kg","normalized_unit":"kg","rates":{"zone_a":160.0,"zone_b":160.0,"zone_c":160.0,"zone_d":160.0},"source_raw_ocr_text":"246 | 40-810 | Nut-bolt for Shore Pipe of 26\" kg 160.00 160.00 160.00 160.00 Dredger, Dia 25 mm, L=115","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-810 Nut-bolt for Shore Pipe of 26\" Dredger, Dia 25 mm, L=115 kg Metal Work"},{"record_type":"basic_element_rate","serial_no":247,"element_code":"40-811","element_group":"40","element_group_title":"Metal Work","description":"Nut-bolt for Shore Pipe of 20\" Dredger, Dia 20 mm, L=100","unit":"kg","normalized_unit":"kg","rates":{"zone_a":160.0,"zone_b":160.0,"zone_c":160.0,"zone_d":160.0},"source_raw_ocr_text":"247 | 40-811 | Nut-bolt for Shore Pipe of 20\" kg 160.00 160.00 160.00 160.00 Dredger, Dia 20 mm, L=100","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-811 Nut-bolt for Shore Pipe of 20\" Dredger, Dia 20 mm, L=100 kg Metal Work"},{"record_type":"basic_element_rate","serial_no":248,"element_code":"40-812","element_group":"40","element_group_title":"Metal Work","description":"Nut-bolt for Shore Pipe of 18\" Dredger, Dia 16 mm, L=100 mm.","unit":"kg","normalized_unit":"kg","rates":{"zone_a":160.0,"zone_b":160.0,"zone_c":160.0,"zone_d":160.0},"source_raw_ocr_text":"248 | 40-812 | Nut-bolt for Shore Pipe of 18\" kg 160.00 160.00 160.00. 160.00 Dredger, Dia 16 mm, L=100 mm.","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-812 Nut-bolt for Shore Pipe of 18\" Dredger, Dia 16 mm, L=100 mm. kg Metal Work"},{"record_type":"basic_element_rate","serial_no":249,"element_code":"40-815","element_group":"40","element_group_title":"Metal Work","description":"Nut-bolt for Shore Pipe of 12\" Dredger, Dia 12 mm, L=100","unit":"kg","normalized_unit":"kg","rates":{"zone_a":160.0,"zone_b":160.0,"zone_c":160.0,"zone_d":160.0},"source_raw_ocr_text":"249 | 40-815 | Nut-bolt for Shore Pipe of 12\" kg 160.00 160.00 160.00 160.00 Dredger, Dia 12 mm, L=100","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-815 Nut-bolt for Shore Pipe of 12\" Dredger, Dia 12 mm, L=100 kg Metal Work"},{"record_type":"basic_element_rate","serial_no":250,"element_code":"40-855","element_group":"40","element_group_title":"Metal Work","description":"Wire Mesh, 20mm, 18BWG","unit":"sqm","normalized_unit":"sqm","rates":{"zone_a":215.0,"zone_b":215.0,"zone_c":215.0,"zone_d":215.0},"source_raw_ocr_text":"250 | 40-855 | Wire Mesh, 20mm, 18BWG sqm 215.00 215.00 215.00 215.00","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-855 Wire Mesh, 20mm, 18BWG sqm Metal Work"},{"record_type":"basic_element_rate","serial_no":251,"element_code":"40-951","element_group":"40","element_group_title":"Metal Work","description":"Bearing Plate (MS)","unit":"kg","normalized_unit":"kg","rates":{"zone_a":100.0,"zone_b":100.0,"zone_c":100.0,"zone_d":100.0},"source_raw_ocr_text":"251 40-951 | Bearing Plate (MS)... 0... | kg 100.00 100.00 100.00 100.00","source_pdf_page":20,"source_schedule_page":10,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-951 Bearing Plate (MS) kg Metal Work"},{"record_type":"basic_element_rate","serial_no":252,"element_code":"40-952","element_group":"40","element_group_title":"Metal Work","description":"Hinge Bars (MS)","unit":"kg","normalized_unit":"kg","rates":{"zone_a":160.0,"zone_b":160.0,"zone_c":160.0,"zone_d":160.0},"source_raw_ocr_text":"252 40-952 | Hinge Bars (MS)... 0. eee eee | kg 160.00 160.00 160.00 160.00","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-952 Hinge Bars (MS) kg Metal Work"},{"record_type":"basic_element_rate","serial_no":253,"element_code":"40-955","element_group":"40","element_group_title":"Metal Work","description":"M.S.Key; 13mm x 9mm x","unit":"No.","normalized_unit":"number","rates":{"zone_a":120.0,"zone_b":120.0,"zone_c":120.0,"zone_d":120.0},"source_raw_ocr_text":"253 40-955 | M.S.Key; 13mm x 9mm x - No. 120.00 120.00 120.00 120.00","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-955 M.S.Key; 13mm x 9mm x No. Metal Work"},{"record_type":"basic_element_rate","serial_no":254,"element_code":"40-970","element_group":"40","element_group_title":"Metal Work","description":"Square Head Slotted Bolt, 9mm","unit":"No.","normalized_unit":"number","rates":{"zone_a":11.5,"zone_b":11.5,"zone_c":11.5,"zone_d":11.5},"source_raw_ocr_text":"254 | 40-970 Square Head Slotted Bolt, 9mm No. 11.50 11.50 11.50 11.50","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-970 Square Head Slotted Bolt, 9mm No. Metal Work"},{"record_type":"basic_element_rate","serial_no":255,"element_code":"40-985","element_group":"40","element_group_title":"Metal Work","description":"Cast Iron Bearing Plate, 267mm dia,","unit":"No.","normalized_unit":"number","rates":{"zone_a":1200.0,"zone_b":1200.0,"zone_c":1200.0,"zone_d":1200.0},"source_raw_ocr_text":"255 | 40-985 | Cast Iron Bearing Plate, 267mm dia, | No. 1200.00 | 1200.00 | 1200.00 | 1200.00","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-985 Cast Iron Bearing Plate, 267mm dia, No. Metal Work"},{"record_type":"basic_element_rate","serial_no":256,"element_code":"40-990","element_group":"40","element_group_title":"Metal Work","description":"Tapered Roller Bearing, SKF No.","unit":"No.","normalized_unit":"number","rates":{"zone_a":1000.0,"zone_b":1000.0,"zone_c":1000.0,"zone_d":1000.0},"source_raw_ocr_text":"256 | 40-990 | Tapered Roller Bearing, SKF No. | No. | 1000.00 | 1000.00 | 1000.00 | 1000.00","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-990 Tapered Roller Bearing, SKF No. No. Metal Work"},{"record_type":"basic_element_rate","serial_no":257,"element_code":"40-995","element_group":"40","element_group_title":"Metal Work","description":"MLS. Pin, 6mm dia","unit":"No.","normalized_unit":"number","rates":{"zone_a":10.0,"zone_b":10.0,"zone_c":10.0,"zone_d":10.0},"source_raw_ocr_text":"257 40-995 | MLS. Pin, 6mm dia... ee ee No. 10.00 10.00 10.00 | 10.00","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-995 MLS. Pin, 6mm dia No. Metal Work"},{"record_type":"basic_element_rate","serial_no":258,"element_code":"40-996","element_group":"40","element_group_title":"Metal Work","description":"Split Pin, S.S., 6mm dia, Length=25","unit":"No.","normalized_unit":"number","rates":{"zone_a":15.0,"zone_b":15.0,"zone_c":15.0,"zone_d":15.0},"source_raw_ocr_text":"258 40-996 | Split Pin, S.S., 6mm dia, Length=25 | No. | 15.00 15.00 15.00 15.00","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-996 Split Pin, S.S., 6mm dia, Length=25 No. Metal Work"},{"record_type":"basic_element_rate","serial_no":259,"element_code":"40-997","element_group":"40","element_group_title":"Metal Work","description":"M.S, Luck Baro see oon","unit":"kg","normalized_unit":"kg","rates":{"zone_a":72.0,"zone_b":72.0,"zone_c":72.0,"zone_d":72.0},"source_raw_ocr_text":"259 | 40-997 | M.S, Luck Baro... cee oe see oon kg | 72.00 72.00 72.00 72.00 50. Plumbing Work","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"40-997 M.S, Luck Baro see oon kg Metal Work"},{"record_type":"basic_element_rate","serial_no":260,"element_code":"50-370","element_group":"50","element_group_title":"Plumbing Work","description":"Cover, G.I, 38mm dia.","unit":"No.","normalized_unit":"number","rates":{"zone_a":120.0,"zone_b":120.0,"zone_c":120.0,"zone_d":120.0},"source_raw_ocr_text":"260 50-370 Cover, G.I, 38mm dia. ... 0... No. 120.00 120.00 | 120.00 120.00","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"50-370 Cover, G.I, 38mm dia. No. Plumbing Work"},{"record_type":"basic_element_rate","serial_no":261,"element_code":"50-410","element_group":"50","element_group_title":"Plumbing Work","description":"Pipe, G.L, 38mm dia","unit":"m","normalized_unit":"m","rates":{"zone_a":650.0,"zone_b":650.0,"zone_c":650.0,"zone_d":650.0},"source_raw_ocr_text":"261 50-410 | Pipe, G.L, 38mm dia... m 650.00 650.00 650.00 650.00","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"50-410 Pipe, G.L, 38mm dia m Plumbing Work"},{"record_type":"basic_element_rate","serial_no":262,"element_code":"50-429","element_group":"50","element_group_title":"Plumbing Work","description":"Pipe, M.S., 38mm dia","unit":"m","normalized_unit":"m","rates":{"zone_a":440.0,"zone_b":440.0,"zone_c":440.0,"zone_d":440.0},"source_raw_ocr_text":"262 50-429 Pipe, M.S., 38mm dia... ... ee oe m 440.00 440.00 | 440.00 440.00","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"50-429 Pipe, M.S., 38mm dia m Plumbing Work"},{"record_type":"basic_element_rate","serial_no":263,"element_code":"50-441","element_group":"50","element_group_title":"Plumbing Work","description":"Pipe, P.V.C., 38mm dia","unit":"m","normalized_unit":"m","rates":{"zone_a":110.0,"zone_b":110.0,"zone_c":110.0,"zone_d":110.0},"source_raw_ocr_text":"263 50-441 | Pipe, P.V.C., 38mm dia ............ | m ~~ 110.00 110.00 110.00 110.00","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"50-441 Pipe, P.V.C., 38mm dia m Plumbing Work"},{"record_type":"basic_element_rate","serial_no":264,"element_code":"50-496","element_group":"50","element_group_title":"Plumbing Work","description":"Socket, G.I, 38mm dia 02","unit":"No.","normalized_unit":"number","rates":{"zone_a":90.0,"zone_b":90.0,"zone_c":90.0,"zone_d":90.0},"source_raw_ocr_text":"| 264 | 50-496 | Socket, G.I, 38mm dia... 02... No. 90.00 90.00 90.00 90.00","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"50-496 Socket, G.I, 38mm dia 02 No. Plumbing Work"},{"record_type":"basic_element_rate","serial_no":265,"element_code":"50-778","element_group":"50","element_group_title":"Plumbing Work","description":"Tube Well, Pump No. 6","unit":"No.","normalized_unit":"number","rates":{"zone_a":2500.0,"zone_b":2500.0,"zone_c":2500.0,"zone_d":2500.0},"source_raw_ocr_text":"265 50-778 | Tube Well, Pump No. 6............ | No. 2500.00 2500.00 2500.00 2500.00","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"50-778 Tube Well, Pump No. 6 No. Plumbing Work"},{"record_type":"basic_element_rate","serial_no":266,"element_code":"50-784","element_group":"50","element_group_title":"Plumbing Work","description":"Tube Well, Strainer, Brass , 38mm","unit":"No.","normalized_unit":"number","rates":{"zone_a":500.0,"zone_b":500.0,"zone_c":500.0,"zone_d":500.0},"source_raw_ocr_text":"266 50-784 | Tube Well, Strainer, Brass , 38mm No. 500.00 500.00 500.00 500.00","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"50-784 Tube Well, Strainer, Brass , 38mm No. Plumbing Work"},{"record_type":"basic_element_rate","serial_no":267,"element_code":"50-785","element_group":"50","element_group_title":"Plumbing Work","description":"Tube Well, Strainer, P.V.C., 38mm 7 dia (Slot: 15%)","unit":"No.","normalized_unit":"number","rates":{"zone_a":400.0,"zone_b":400.0,"zone_c":400.0,"zone_d":400.0},"source_raw_ocr_text":"267 50-785 | Tube Well, Strainer, P.V.C., 38mm _ | No. 400.00 | 400.00 | 400.00 400.00 | 7 | dia (Slot: 15%) | | 60. Electrical Work","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"50-785 Tube Well, Strainer, P.V.C., 38mm 7 dia (Slot: 15%) No. Plumbing Work"},{"record_type":"basic_element_rate","serial_no":268,"element_code":"60-290","element_group":"60","element_group_title":"Electrical Work","description":"Electrode (Copper) 2. se sss","unit":"No.","normalized_unit":"number","rates":{"zone_a":30.0,"zone_b":30.0,"zone_c":30.0,"zone_d":30.0},"source_raw_ocr_text":"268 | 60-290 | Electrode (Copper) ... 2. se sss ee No. 30.00 30.00 30.00 | 30.00","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"60-290 Electrode (Copper) 2. se sss No. Electrical Work"},{"record_type":"basic_element_rate","serial_no":269,"element_code":"60-925","element_group":"60","element_group_title":"Electrical Work","description":"Wire, PVC; 3C;3x16mm?;250/400V(East.BYM) m","unit":"100 m","normalized_unit":"per_100_m","rates":{"zone_a":84000.0,"zone_b":84000.0,"zone_c":84000.0,"zone_d":84000.0},"source_raw_ocr_text":"| 269 60-925 | Wire, PVC; 100 84000.00 | 84000.00 | 84000.00 | 84000.00 3C;3x16mm?;250/400V(East.BYM) | m","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"60-925 Wire, PVC; 3C;3x16mm?;250/400V(East.BYM) m 100 m Electrical Work"},{"record_type":"basic_element_rate","serial_no":270,"element_code":"60-930","element_group":"60","element_group_title":"Electrical Work","description":"Wooden Round Block","unit":"dzn","normalized_unit":"dozen","rates":{"zone_a":240.0,"zone_b":240.0,"zone_c":240.0,"zone_d":240.0},"source_raw_ocr_text":"270 | 60-930 | Wooden Round Block .... 0... dzn 240.00 240.00 240.00 240.00 | 70, Equipment, Tools","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"60-930 Wooden Round Block dzn Electrical Work"},{"record_type":"basic_element_rate","serial_no":271,"element_code":"70-008","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Bulkhead Dredger","unit":"day","normalized_unit":"day","rates":{"zone_a":28000.0,"zone_b":28000.0,"zone_c":28000.0,"zone_d":28000.0},"source_raw_ocr_text":"271 | 70-008 | Hire charge of Bulkhead Dredger | day 28000.00 | 28000.00 | 28000.00 | 28000.00","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-008 Hire charge of Bulkhead Dredger day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":272,"element_code":"70-009","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Bulkhead Dredger (150cum/hr) with 1 km Delivery","unit":"day","normalized_unit":"day","rates":{"zone_a":45000.0,"zone_b":45000.0,"zone_c":45000.0,"zone_d":45000.0},"source_raw_ocr_text":"272 | 70-009 | Hire charge of Bulkhead Dredger day 45000.00 | 45000.00 | 45000.00 | 45000.00 (150cum/hr) with 1 km Delivery","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-009 Hire charge of Bulkhead Dredger (150cum/hr) with 1 km Delivery day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":273,"element_code":"70-010","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of 26\" Dredger with all accessories","unit":"day","normalized_unit":"day","rates":{"zone_a":490000.0,"zone_b":490000.0,"zone_c":490000.0,"zone_d":490000.0},"source_raw_ocr_text":"273 | 70-010 | Hire charge of 26\" Dredger with all | day 490000.00 | 490000.00 | 490000.00 | 490000.00 accessories","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-010 Hire charge of 26\" Dredger with all accessories day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":274,"element_code":"70-011","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of 20\" Dredger with all accessories","unit":"day","normalized_unit":"day","rates":{"zone_a":330000.0,"zone_b":330000.0,"zone_c":330000.0,"zone_d":330000.0},"source_raw_ocr_text":"274 | 70-011 | Hire charge of 20\" Dredger with all | day 330000.00 | 330000.00 | 330000.00 | 330000.00 accessories","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-011 Hire charge of 20\" Dredger with all accessories day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":275,"element_code":"70-012","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of 18\" Dredger with all accessories","unit":"day","normalized_unit":"day","rates":{"zone_a":220000.0,"zone_b":220000.0,"zone_c":220000.0,"zone_d":220000.0},"source_raw_ocr_text":"275 | 70-012 | Hire charge of 18\" Dredger with all | day | 220000.00 | 220000.00 | 220000.00 | 220000.00 accessories","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-012 Hire charge of 18\" Dredger with all accessories day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":276,"element_code":"70-014","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of 12\" Dredger with all accessories","unit":"day","normalized_unit":"day","rates":{"zone_a":94500.0,"zone_b":94500.0,"zone_c":94500.0,"zone_d":94500.0},"source_raw_ocr_text":"276 | 70-014 | Hire charge of 12\" Dredger with all | day 94500.00 | 94500.00 | 94500.00 | 94500.00 accessories","source_pdf_page":21,"source_schedule_page":11,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-014 Hire charge of 12\" Dredger with all accessories day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":277,"element_code":"70-016","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of House Boat for 26\" dredger","unit":"day","normalized_unit":"day","rates":{"zone_a":16800.0,"zone_b":16800.0,"zone_c":16800.0,"zone_d":16800.0},"source_raw_ocr_text":"277 | 70-016 | Hire charge of House Boat for 26\" day 16800.00 | 16800.00 | 16800.00 | 16800.00 dredger","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-016 Hire charge of House Boat for 26\" dredger day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":278,"element_code":"70-017","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of House Boat for 20\" dredger","unit":"day","normalized_unit":"day","rates":{"zone_a":11500.0,"zone_b":11500.0,"zone_c":11500.0,"zone_d":11500.0},"source_raw_ocr_text":"278 | 70-017 | Hire charge of House Boat for 20\" day 11500.00 | 11500.00 | 11500.00 | 11500.00 dredger","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-017 Hire charge of House Boat for 20\" dredger day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":279,"element_code":"70-018","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of House Boat for 18\" dredger","unit":"day","normalized_unit":"day","rates":{"zone_a":5300.0,"zone_b":5300.0,"zone_c":5300.0,"zone_d":5300.0},"source_raw_ocr_text":"279 | 70-018 | Hire charge of House Boat for 18\" day | 5300.00 5300.00 5300.00 5300.00 dredger","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-018 Hire charge of House Boat for 18\" dredger day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":280,"element_code":"70-025","element_group":"70","element_group_title":"Equipment, Tools","description":"Basket, Bamboo, 500mm to 600 ‘","unit":"No.","normalized_unit":"number","rates":{"zone_a":120.0,"zone_b":120.0,"zone_c":120.0,"zone_d":120.0},"source_raw_ocr_text":"280 | 70-025 | Basket, Bamboo, 500mm to 600 ‘| No. 120.00 | 120.00 | 120.00 | 120.00","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-025 Basket, Bamboo, 500mm to 600 ‘ No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":281,"element_code":"70-030","element_group":"70","element_group_title":"Equipment, Tools","description":"Bucket (Balti), Plastic 0","unit":"No.","normalized_unit":"number","rates":{"zone_a":250.0,"zone_b":250.0,"zone_c":250.0,"zone_d":250.0},"source_raw_ocr_text":"281 70-030 | Bucket (Balti), Plastic... 0... 0. No. 250.00 250.00 250.00 ~ 250.00","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-030 Bucket (Balti), Plastic 0 No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":282,"element_code":"70-035","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Tug boat/Work Boat","unit":"day","normalized_unit":"day","rates":{"zone_a":27300.0,"zone_b":27300.0,"zone_c":27300.0,"zone_d":27300.0},"source_raw_ocr_text":"282 | 70-035 | Hire charge of Tug boat/Work Boat | day 27300.00 | 27300.00 | 27300.00 | 27300.00","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-035 Hire charge of Tug boat/Work Boat day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":283,"element_code":"70-036","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Tug boat/Work Boat","unit":"day","normalized_unit":"day","rates":{"zone_a":15700.0,"zone_b":15700.0,"zone_c":15700.0,"zone_d":15700.0},"source_raw_ocr_text":"283 | 70-036 | Hire charge of Tug boat/Work Boat | day | 15700.00 | 15700.00 | 15700.00 | 15700.00","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-036 Hire charge of Tug boat/Work Boat day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":284,"element_code":"70-037","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Tug boat/Work Boat","unit":"day","normalized_unit":"day","rates":{"zone_a":11500.0,"zone_b":11500.0,"zone_c":11500.0,"zone_d":11500.0},"source_raw_ocr_text":"284 | 70-037 | Hire charge of Tug boat/Work Boat | day 11500.00 | 11500.00 | 11500.00 | 11500.00","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-037 Hire charge of Tug boat/Work Boat day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":285,"element_code":"70-045","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of B.dozer/S.F.roiler/V.compactor :","unit":"day","normalized_unit":"day","rates":{"zone_a":6900.0,"zone_b":6900.0,"zone_c":6900.0,"zone_d":6900.0},"source_raw_ocr_text":"285 70-045 | Hire charge of | day 6900.00 6900.00 6900.00 6900.00 B.dozer/S.F.roiler/V.compactor :","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-045 Hire charge of B.dozer/S.F.roiler/V.compactor : day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":286,"element_code":"70-047","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Pay Lodder","unit":"day","normalized_unit":"day","rates":{"zone_a":6900.0,"zone_b":6900.0,"zone_c":6900.0,"zone_d":6900.0},"source_raw_ocr_text":"286 | 70-047 | Hire charge of Pay Lodder Day 6900.00 6900.00 | 6900.00 6900.00","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-047 Hire charge of Pay Lodder day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":287,"element_code":"70-052","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Chain Pulley : 1.5 m.ton Capacity","unit":"day","normalized_unit":"day","rates":{"zone_a":500.0,"zone_b":500.0,"zone_c":500.0,"zone_d":500.0},"source_raw_ocr_text":"287 | 70-052 | Hire charge of Chain Pulley : 1.5 day 500.00 500.00 500.00 500.00 m.ton Capacity","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-052 Hire charge of Chain Pulley : 1.5 m.ton Capacity day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":288,"element_code":"70-055","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Chain Hoist,3 tons","unit":"day","normalized_unit":"day","rates":{"zone_a":1000.0,"zone_b":1000.0,"zone_c":1000.0,"zone_d":1000.0},"source_raw_ocr_text":"288 | 70-055 | Hire charge of Chain Hoist,3 tons | day | 1000.00 | 1000.00 | 1000.00 | 1000.00","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-055 Hire charge of Chain Hoist,3 tons day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":289,"element_code":"70-056","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Excavator (Combatsu)","unit":"day","normalized_unit":"day","rates":{"zone_a":8100.0,"zone_b":8100.0,"zone_c":8100.0,"zone_d":8100.0},"source_raw_ocr_text":"289 | 70-056 | Hire charge of Excavator day 8100.00 8100.00 8100.00 8100.00 | | (Combatsu) _","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-056 Hire charge of Excavator (Combatsu) day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":290,"element_code":"70-057","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Excavator Long","unit":"day","normalized_unit":"day","rates":{"zone_a":14600.0,"zone_b":14600.0,"zone_c":14600.0,"zone_d":14600.0},"source_raw_ocr_text":"290 | 70-057 | Hire charge of Excavator Long day 14600.00 | 14600.00 | 14600.00 | 14600.00","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-057 Hire charge of Excavator Long day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":291,"element_code":"70-058","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Amphibious Excavator","unit":"day","normalized_unit":"day","rates":{"zone_a":19500.0,"zone_b":19500.0,"zone_c":19500.0,"zone_d":19500.0},"source_raw_ocr_text":"291 70-058 | Hire charge of Amphibious day 19500.00 | 19500.00 | 19500.00 | 19500.00 Excavator","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-058 Hire charge of Amphibious Excavator day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":292,"element_code":"70-060","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Cargo Truck","unit":"day","normalized_unit":"day","rates":{"zone_a":5800.0,"zone_b":5800.0,"zone_c":5800.0,"zone_d":5800.0},"source_raw_ocr_text":"292 | 70-060 | Hire charge of Cargo Truck day 5800.00 5800.00 5800.00 5800.00","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-060 Hire charge of Cargo Truck day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":293,"element_code":"70-065","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Cargo Truck with Crane","unit":"day","normalized_unit":"day","rates":{"zone_a":7500.0,"zone_b":7500.0,"zone_c":7500.0,"zone_d":7500.0},"source_raw_ocr_text":"293 | 70-065 | Hire charge of Cargo Truck with day 7500.00 7500.00 7500.00 7500.00 Crane","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-065 Hire charge of Cargo Truck with Crane day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":294,"element_code":"70-067","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Barge with guided dumping arrangement (minimum 30mx11m,with fuel & lubricant)","unit":"day","normalized_unit":"day","rates":{"zone_a":41000.0,"zone_b":41000.0,"zone_c":41000.0,"zone_d":41000.0},"source_raw_ocr_text":"294 | 70-067 | Hire charge of Barge with guided day 41000.00 | 41000.00 | 41000.00 | 41000.00 dumping arrangement (minimum 30mx11m,with fuel & lubricant)","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-067 Hire charge of Barge with guided dumping arrangement (minimum 30mx11m,with fuel & lubricant) day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":295,"element_code":"70-068","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Flat Top Engine Boat, 40 tonne Capacity","unit":"day","normalized_unit":"day","rates":{"zone_a":4600.0,"zone_b":4600.0,"zone_c":4600.0,"zone_d":4600.0},"source_raw_ocr_text":"295 | 70-068 | Hire charge of Flat Top Engine day 4600.00 4600.00 4600.00 4600.00 Boat, 40 tonne Capacity","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-068 Hire charge of Flat Top Engine Boat, 40 tonne Capacity day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":296,"element_code":"70-070","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Crane, 10 ton capacity ;","unit":"day","normalized_unit":"day","rates":{"zone_a":6400.0,"zone_b":6400.0,"zone_c":6400.0,"zone_d":6400.0},"source_raw_ocr_text":"296 | 70-070 | Hire charge of Crane, 10 ton day 6400.00 6400.00 6400.00 6400.00 capacity _ _ ;","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-070 Hire charge of Crane, 10 ton capacity ; day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":297,"element_code":"70-071","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Tug boat: 200-500","unit":"day","normalized_unit":"day","rates":{"zone_a":5800.0,"zone_b":5800.0,"zone_c":5800.0,"zone_d":5800.0},"source_raw_ocr_text":"297 | 70-071 | Hire charge of Tug boat: 200-500 day 5800.00 5800.00 5800.00 5800.00","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-071 Hire charge of Tug boat: 200-500 day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":298,"element_code":"70-072","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Double Drum Mooring Winch, mobilize, demobilize","unit":"day","normalized_unit":"day","rates":{"zone_a":4750.0,"zone_b":4750.0,"zone_c":4750.0,"zone_d":4750.0},"source_raw_ocr_text":"298 | 70-072 | Hire charge of Double Drum day 4750.00 4750.00 4750.00 4750.00 Mooring Winch, mobilize, | | | demobilize |","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-072 Hire charge of Double Drum Mooring Winch, mobilize, demobilize day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":299,"element_code":"70-073","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Anchor & Wire Rope, mobilize, demobilize","unit":"day","normalized_unit":"day","rates":{"zone_a":3000.0,"zone_b":3000.0,"zone_c":3000.0,"zone_d":3000.0},"source_raw_ocr_text":"299 | 70-073 | Hire charge of Anchor & Wire | day 3000.00 3000.00 3000.00 3000.00 | Rope, mobilize, demobilize","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-073 Hire charge of Anchor & Wire Rope, mobilize, demobilize day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":300,"element_code":"70-074","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Generator","unit":"day","normalized_unit":"day","rates":{"zone_a":3500.0,"zone_b":3500.0,"zone_c":3500.0,"zone_d":3500.0},"source_raw_ocr_text":"300 | 70-074 | Hire charge of Generator | day 3500.00 3500.00 3500.00 3500.00","source_pdf_page":22,"source_schedule_page":12,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-074 Hire charge of Generator day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":301,"element_code":"70-075","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Barge/Pontoon (with Fuel & Lubricant)","unit":"day","normalized_unit":"day","rates":{"zone_a":8400.0,"zone_b":8400.0,"zone_c":8400.0,"zone_d":8400.0},"source_raw_ocr_text":"301 | 70-075 | Hire charge of Barge/Pontoon (with | day 8400.00 8400.00 8400.00 8400.00 Fuel & Lubricant)","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-075 Hire charge of Barge/Pontoon (with Fuel & Lubricant) day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":302,"element_code":"70-076","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Flat Top Barge/Pontoon (minim 30mx11m,with Fuel & Lubricant)","unit":"day","normalized_unit":"day","rates":{"zone_a":19500.0,"zone_b":19500.0,"zone_c":19500.0,"zone_d":19500.0},"source_raw_ocr_text":"302 | 70-076 | Hire charge of Flat Top day | 19500.00 | 19500.00 | 19500.00 | 19500.00 | | Barge/Pontoon (minim | 30mx11m,with Fuel & Lubricant)","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-076 Hire charge of Flat Top Barge/Pontoon (minim 30mx11m,with Fuel & Lubricant) day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":303,"element_code":"70-077","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Engine Boat (40 ton Capacity) with roof cover","unit":"day","normalized_unit":"day","rates":{"zone_a":5200.0,"zone_b":5200.0,"zone_c":5200.0,"zone_d":5200.0},"source_raw_ocr_text":"303 | 70-077 | Hire charge of Engine Boat (40 ton | day 5200.00 | 5200.00 | 5200.00 | 5200.00 Capacity) with roof cover","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-077 Hire charge of Engine Boat (40 ton Capacity) with roof cover day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":304,"element_code":"70-078","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Total Station","unit":"day","normalized_unit":"day","rates":{"zone_a":2300.0,"zone_b":2300.0,"zone_c":2300.0,"zone_d":2300.0},"source_raw_ocr_text":"304 | 70-078 | Hire charge of Total Station day 2300.00 2300.00 2300.00 2300.00","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-078 Hire charge of Total Station day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":305,"element_code":"70-079","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Barge (200 Ton, mobilize, demobilize)","unit":"day","normalized_unit":"day","rates":{"zone_a":5800.0,"zone_b":5800.0,"zone_c":5800.0,"zone_d":5800.0},"source_raw_ocr_text":"305 | 70-079 | Hire charge of Barge (200 Ton, day 5800.00 5800.00 5800.00 5800.00 mobilize, demobilize)","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-079 Hire charge of Barge (200 Ton, mobilize, demobilize) day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":306,"element_code":"70-080","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Concrete Mix Machine 0.2 cum","unit":"day","normalized_unit":"day","rates":{"zone_a":1200.0,"zone_b":1200.0,"zone_c":1200.0,"zone_d":1200.0},"source_raw_ocr_text":"306 | 70-080 | Hire charge of Concrete Mix day | 1200.00 1200.00 1200.00 1200.00 Machine 0.2 cum","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-080 Hire charge of Concrete Mix Machine 0.2 cum day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":307,"element_code":"70-081","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Echo-Sounder","unit":"day","normalized_unit":"day","rates":{"zone_a":1210.0,"zone_b":1210.0,"zone_c":1210.0,"zone_d":1210.0},"source_raw_ocr_text":"307 | 70-081 | Hire charge of Echo-Sounder day 1210.00 1210.00 1210.00 1210.00","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-081 Hire charge of Echo-Sounder day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":308,"element_code":"70-082","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of 12V battery","unit":"day","normalized_unit":"day","rates":{"zone_a":105.0,"zone_b":105.0,"zone_c":105.0,"zone_d":105.0},"source_raw_ocr_text":"308 | 70-082. | Hire charge of 12V battery day 105.00 105.00 105.00 105.00","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-082 Hire charge of 12V battery day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":309,"element_code":"70-083","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Hand GPS","unit":"day","normalized_unit":"day","rates":{"zone_a":105.0,"zone_b":105.0,"zone_c":105.0,"zone_d":105.0},"source_raw_ocr_text":"309 | 70-083 | Hire charge of Hand GPS day 105.00 105.00 105,00 105.00","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-083 Hire charge of Hand GPS day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":310,"element_code":"70-084","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of DGPS","unit":"day","normalized_unit":"day","rates":{"zone_a":420.0,"zone_b":420.0,"zone_c":420.0,"zone_d":420.0},"source_raw_ocr_text":"310 | 70-084 | Hire charge of DGPS day 420.00 420.00 420.00 420.00","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-084 Hire charge of DGPS day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":311,"element_code":"70-086","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Level Machine","unit":"day","normalized_unit":"day","rates":{"zone_a":525.0,"zone_b":525.0,"zone_c":525.0,"zone_d":525.0},"source_raw_ocr_text":"311 | 70-086 | Hire charge of Level Machine day 525.00 525.00 525.00 525.00","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-086 Hire charge of Level Machine day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":312,"element_code":"70-087","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Booster Pump (with delivery pipe)","unit":"day","normalized_unit":"day","rates":{"zone_a":23100.0,"zone_b":23100.0,"zone_c":23100.0,"zone_d":23100.0},"source_raw_ocr_text":"312 | 70-087 | Hire charge of Booster Pump (with | day 23100.00 | 23100.00 | 23100.00 | 23100.00 delivery pipe)","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-087 Hire charge of Booster Pump (with delivery pipe) day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":313,"element_code":"70-088","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of concrete vibrator","unit":"day","normalized_unit":"day","rates":{"zone_a":550.0,"zone_b":500.0,"zone_c":540.0,"zone_d":500.0},"source_raw_ocr_text":"313 | 70-088 | Hire charge of concrete vibrator day 550.00 500.00 $40.00 500.00","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_manually_corrected","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-088 Hire charge of concrete vibrator day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":314,"element_code":"70-096","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Laptop with necessary survey software","unit":"day","normalized_unit":"day","rates":{"zone_a":1050.0,"zone_b":1050.0,"zone_c":1050.0,"zone_d":1050.0},"source_raw_ocr_text":"314 | 70-096 | Hire charge of Laptop with day 1050.00 1050.00 1050.00 1050.00 necessary survey software","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-096 Hire charge of Laptop with necessary survey software day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":315,"element_code":"70-100","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of 26\" DHDPE Floating Pipe with Floater.","unit":"m/day","normalized_unit":"m_per_day","rates":{"zone_a":85.5,"zone_b":85.5,"zone_c":85.5,"zone_d":85.5},"source_raw_ocr_text":"315 | 70-100 | Hire charge of 26\" DHDPE Floating | m/day 85.50 _ 85.50 85.50 85.50 Pipe with Floater.","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-100 Hire charge of 26\" DHDPE Floating Pipe with Floater. m/day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":316,"element_code":"70-102","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of 20\" DHDPE Floating Pipe with Floater.","unit":"m/day","normalized_unit":"m_per_day","rates":{"zone_a":51.5,"zone_b":51.5,"zone_c":51.5,"zone_d":51.5},"source_raw_ocr_text":"316 | 70-102 | Hire charge of 20\" DHDPE Floating | m/day 51.50 51.50 51.50 51.50 | Pipe with Floater.","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-102 Hire charge of 20\" DHDPE Floating Pipe with Floater. m/day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":317,"element_code":"70-104","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of 18\" DHDPE Floating Pipe with Floater.","unit":"m/day","normalized_unit":"m_per_day","rates":{"zone_a":37.5,"zone_b":37.5,"zone_c":37.5,"zone_d":37.5},"source_raw_ocr_text":"317 | 70-104 | Hire charge of 18\" DHDPE Floating | m/day 37.50 37.50 37.50 37.50 Pipe with Floater.","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-104 Hire charge of 18\" DHDPE Floating Pipe with Floater. m/day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":318,"element_code":"70-110","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of 26\" Shore Pipe.","unit":"m/day","normalized_unit":"m_per_day","rates":{"zone_a":26.0,"zone_b":26.0,"zone_c":26.0,"zone_d":26.0},"source_raw_ocr_text":"318 | 70-110 | Hire charge of 26\" Shore Pipe. m/day 26.00 26.00 | 26.00 26.00 |","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-110 Hire charge of 26\" Shore Pipe. m/day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":319,"element_code":"70-112","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of 20\" Shore Pipe.","unit":"m/day","normalized_unit":"m_per_day","rates":{"zone_a":14.0,"zone_b":14.0,"zone_c":14.0,"zone_d":14.0},"source_raw_ocr_text":"319 | 70-112 | Hire charge of 20\" Shore Pipe. m/day 14.00 14.00 14.00 14.00","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-112 Hire charge of 20\" Shore Pipe. m/day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":320,"element_code":"70-114","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of 18\" Shore Pipe.","unit":"m/day","normalized_unit":"m_per_day","rates":{"zone_a":13.0,"zone_b":13.0,"zone_c":13.0,"zone_d":13.0},"source_raw_ocr_text":"320 | 70-114 | Hire charge of 18\" Shore Pipe. m/day 13.00 13.00 13.00 13.00","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-114 Hire charge of 18\" Shore Pipe. m/day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":321,"element_code":"70-135","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Casing, 225 to 300mm dia, 3m long (S/pile)","unit":"day","normalized_unit":"day","rates":{"zone_a":81.0,"zone_b":81.0,"zone_c":81.0,"zone_d":81.0},"source_raw_ocr_text":"321 | 70-135 | Hire charge of Casing, 225 to day 81.00 81.00 81.00 81.00 300mm dia, 3m long (S/pile)","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-135 Hire charge of Casing, 225 to 300mm dia, 3m long (S/pile) day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":322,"element_code":"70-140","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Percussion Drilling","unit":"day","normalized_unit":"day","rates":{"zone_a":139.0,"zone_b":139.0,"zone_c":139.0,"zone_d":139.0},"source_raw_ocr_text":"322 | 70-140 | Hire charge of Percussion Drilling day 139.00 139.00 139.00 139.00","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-140 Hire charge of Percussion Drilling day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":323,"element_code":"70-150","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Drilling Rig","unit":"day","normalized_unit":"day","rates":{"zone_a":4500.0,"zone_b":4500.0,"zone_c":4500.0,"zone_d":4500.0},"source_raw_ocr_text":"323 | 70-150 | Hire charge of Drilling Rig day 4500.00 4500.00 4500.00 4500.00","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-150 Hire charge of Drilling Rig day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":324,"element_code":"70-160","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Electric Drill","unit":"day","normalized_unit":"day","rates":{"zone_a":415.0,"zone_b":415.0,"zone_c":415.0,"zone_d":415.0},"source_raw_ocr_text":"324 | 70-160 | Hire charge of Electric Drill day _ 415.00 415.00 415.00 415.00","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-160 Hire charge of Electric Drill day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":325,"element_code":"70-165","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Tripod Drilling Set. (Complete.)","unit":"day","normalized_unit":"day","rates":{"zone_a":5500.0,"zone_b":5500.0,"zone_c":5500.0,"zone_d":5500.0},"source_raw_ocr_text":"325 | 70-165 | Hire charge of Tripod Drilling Set. | day 5500.00 5500.00 $500.00 $500.00 (Complete.)","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_manually_corrected","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-165 Hire charge of Tripod Drilling Set. (Complete.) day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":326,"element_code":"70-170","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Tripod Stand with Winch (sand pile)","unit":"day","normalized_unit":"day","rates":{"zone_a":2770.0,"zone_b":2770.0,"zone_c":2770.0,"zone_d":2770.0},"source_raw_ocr_text":"326 | 70-170 | Hire charge of Tripod Stand with day 2770.00 2770.00 2770.00 2770.00 Winch (sand pile)","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-170 Hire charge of Tripod Stand with Winch (sand pile) day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":327,"element_code":"70-175","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Tripod Stand","unit":"day","normalized_unit":"day","rates":{"zone_a":400.0,"zone_b":400.0,"zone_c":400.0,"zone_d":400.0},"source_raw_ocr_text":"327 | 70-175 | Hire charge of Tripod Stand day 400.00 400.00 400.00 400.00","source_pdf_page":23,"source_schedule_page":13,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-175 Hire charge of Tripod Stand day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":328,"element_code":"70-198","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of HDPE Hydraulic Pipe Jointing Machine","unit":"day","normalized_unit":"day","rates":{"zone_a":1500.0,"zone_b":1500.0,"zone_c":1500.0,"zone_d":1500.0},"source_raw_ocr_text":"328 | 70-198 | Hire charge of HDPE Hydraulic day 1500.00 | 1500.00 | 1500.00 | 1500.00 Pipe Jointing Machine","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-198 Hire charge of HDPE Hydraulic Pipe Jointing Machine day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":329,"element_code":"70-200","element_group":"70","element_group_title":"Equipment, Tools","description":"Pipe, HDPE, 100 mm dia","unit":"m","normalized_unit":"m","rates":{"zone_a":700.0,"zone_b":700.0,"zone_c":700.0,"zone_d":700.0},"source_raw_ocr_text":"329 | 70-200 | Pipe, HDPE, 100 mm dia m 700.00 700.00 | 700.00 700.00","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-200 Pipe, HDPE, 100 mm dia m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":330,"element_code":"70-202","element_group":"70","element_group_title":"Equipment, Tools","description":"Pipe, HDPE, 150 mm dia","unit":"m","normalized_unit":"m","rates":{"zone_a":1300.0,"zone_b":1300.0,"zone_c":1300.0,"zone_d":1300.0},"source_raw_ocr_text":"| 330 | 70-202 | Pipe, HDPE, 150 mm dia m 1300.00 | 1300.00 | 1300.00 | 1300.00","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-202 Pipe, HDPE, 150 mm dia m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":331,"element_code":"70-204","element_group":"70","element_group_title":"Equipment, Tools","description":"Pipe, HDPE, 225 mm dia","unit":"m","normalized_unit":"m","rates":{"zone_a":2900.0,"zone_b":2900.0,"zone_c":2900.0,"zone_d":2900.0},"source_raw_ocr_text":"331 | 70-204 | Pipe, HDPE, 225 mm dia m 2900.00 | 2900.00 | 2900.00 | 2900.00","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-204 Pipe, HDPE, 225 mm dia m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":332,"element_code":"70-206","element_group":"70","element_group_title":"Equipment, Tools","description":"Pipe, HDPE, 300 mm dia","unit":"m","normalized_unit":"m","rates":{"zone_a":5300.0,"zone_b":5300.0,"zone_c":5300.0,"zone_d":5300.0},"source_raw_ocr_text":"332 | 70-206 | Pipe, HDPE, 300 mm dia m 5300.00 | 5300.00 | 5300.00 | 5300.00","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-206 Pipe, HDPE, 300 mm dia m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":333,"element_code":"70-208","element_group":"70","element_group_title":"Equipment, Tools","description":"Pipe, HDPE, 450 mm dia","unit":"m","normalized_unit":"m","rates":{"zone_a":12200.0,"zone_b":12200.0,"zone_c":12200.0,"zone_d":12200.0},"source_raw_ocr_text":"333 | 70-208 | Pipe, HDPE, 450 mm dia m | 12200.00 | 12200.00 | 12200.00 | 12200.00","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-208 Pipe, HDPE, 450 mm dia m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":334,"element_code":"70-210","element_group":"70","element_group_title":"Equipment, Tools","description":"Pipe, HDPE, 500 mm dia “im","unit":"m","normalized_unit":"m","rates":{"zone_a":15000.0,"zone_b":15000.0,"zone_c":15000.0,"zone_d":15000.0},"source_raw_ocr_text":"334 | 70-210 | Pipe, HDPE, 500 mm dia “im | 15000.00 | 15000.00 | 15000.00 | 15000.00","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-210 Pipe, HDPE, 500 mm dia “im m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":335,"element_code":"70-212","element_group":"70","element_group_title":"Equipment, Tools","description":"Pipe, HDPE, 600 mm dia","unit":"m","normalized_unit":"m","rates":{"zone_a":21300.0,"zone_b":21300.0,"zone_c":21300.0,"zone_d":21300.0},"source_raw_ocr_text":"/ 335 | 70-212 | Pipe, HDPE, 600 mm dia m 21300.00 | 21300.00 | 21300.00 | 21300.00","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-212 Pipe, HDPE, 600 mm dia m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":336,"element_code":"70-214","element_group":"70","element_group_title":"Equipment, Tools","description":"Pipe, HDPE, 750 mm dia /","unit":"m","normalized_unit":"m","rates":{"zone_a":32200.0,"zone_b":32200.0,"zone_c":32200.0,"zone_d":32200.0},"source_raw_ocr_text":"336 | 70-214 | Pipe, HDPE, 750 mm dia /m 32200.00 | 3200.00 | 32200.00 | 32200.00 |","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_manually_corrected","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-214 Pipe, HDPE, 750 mm dia / m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":337,"element_code":"70-216","element_group":"70","element_group_title":"Equipment, Tools","description":"Pipe, HDPE, 900 mm dia","unit":"m","normalized_unit":"m","rates":{"zone_a":42900.0,"zone_b":42900.0,"zone_c":42900.0,"zone_d":42900.0},"source_raw_ocr_text":"337 | 70-216 | Pipe, HDPE, 900 mm dia m 42900.00 | 42900.00 | 42900.00 | 42900.00","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-216 Pipe, HDPE, 900 mm dia m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":338,"element_code":"70-218","element_group":"70","element_group_title":"Equipment, Tools","description":"Pipe, HDPE, 1050 mm dia","unit":"m","normalized_unit":"m","rates":{"zone_a":56400.0,"zone_b":56400.0,"zone_c":56400.0,"zone_d":56400.0},"source_raw_ocr_text":"338 | 70-218 | Pipe, HDPE, 1050 mm dia m $6400.00 | 56400.00 | 56400.00 | 56400.00","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_manually_corrected","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-218 Pipe, HDPE, 1050 mm dia m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":339,"element_code":"70-220","element_group":"70","element_group_title":"Equipment, Tools","description":"Pipe, HDPE, 1200 mm dia","unit":"m","normalized_unit":"m","rates":{"zone_a":68500.0,"zone_b":68500.0,"zone_c":68500.0,"zone_d":68500.0},"source_raw_ocr_text":"339 | 70-220 | Pipe, HDPE, 1200 mm dia m ~68500.00 | 68500.00 | 68500.00 | 68500.00 |","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-220 Pipe, HDPE, 1200 mm dia m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":340,"element_code":"70-222","element_group":"70","element_group_title":"Equipment, Tools","description":"Pipe. HDPE, 1350 mm dia","unit":"m","normalized_unit":"m","rates":{"zone_a":79900.0,"zone_b":79900.0,"zone_c":79900.0,"zone_d":79900.0},"source_raw_ocr_text":"340 | 70-222 | Pipe. HDPE, 1350 mm dia m __79900.00 | 79900.00 | 79900.00 | 79900.00","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-222 Pipe. HDPE, 1350 mm dia m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":341,"element_code":"70-225","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Grab, with Winch","unit":"day","normalized_unit":"day","rates":{"zone_a":690.0,"zone_b":690.0,"zone_c":690.0,"zone_d":690.0},"source_raw_ocr_text":"341 | 70-225 | Hire charge of Grab, with Winch day | 690.00 690.00 690.00 690.00","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-225 Hire charge of Grab, with Winch day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":342,"element_code":"70-230","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Electric Auto Gas Cutter Set","unit":"day","normalized_unit":"day","rates":{"zone_a":500.0,"zone_b":500.0,"zone_c":500.0,"zone_d":500.0},"source_raw_ocr_text":"342 | 70-230 | Hire charge of Electric Auto Gas day 500.00 500.00 500.00 500.00 Cutter Set","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-230 Hire charge of Electric Auto Gas Cutter Set day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":343,"element_code":"70-235","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Vertical Drill — Machine","unit":"day","normalized_unit":"day","rates":{"zone_a":150.0,"zone_b":150.0,"zone_c":150.0,"zone_d":150.0},"source_raw_ocr_text":"343 | 70-235 | Hire charge of Vertical Drill day 150.00 150.00 150.00 150.00 —_ Machine |","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-235 Hire charge of Vertical Drill — Machine day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":344,"element_code":"70-241","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Granding Machine","unit":"day","normalized_unit":"day","rates":{"zone_a":260.0,"zone_b":260.0,"zone_c":260.0,"zone_d":260.0},"source_raw_ocr_text":"344 | 70-241 | Hire charge of Granding Machine day 260.00 260.00 260.00 260.00","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-241 Hire charge of Granding Machine day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":345,"element_code":"70-242","element_group":"70","element_group_title":"Equipment, Tools","description":"Power Brush","unit":"no","normalized_unit":"number","rates":{"zone_a":460.0,"zone_b":460.0,"zone_c":460.0,"zone_d":460.0},"source_raw_ocr_text":"345 | 70-242 | Power Brush no 460.00 460.00 460.00 460.00","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-242 Power Brush no Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":346,"element_code":"70-245","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Shaper Machine","unit":"day","normalized_unit":"day","rates":{"zone_a":2550.0,"zone_b":2550.0,"zone_c":2550.0,"zone_d":2550.0},"source_raw_ocr_text":"346 | 70-245 | Hire charge of Shaper Machine day 2550.00 | 2550.00 | 2550.00 | 2550.00","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-245 Hire charge of Shaper Machine day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":347,"element_code":"70-250","element_group":"70","element_group_title":"Equipment, Tools","description":"Hard Wood Hammer","unit":"No.","normalized_unit":"number","rates":{"zone_a":70.0,"zone_b":70.0,"zone_c":70.0,"zone_d":70.0},"source_raw_ocr_text":"347 | 70-250 | Hard Wood Hammer No. | 70.00 | 70.00 | 70.00 70.00","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-250 Hard Wood Hammer No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":348,"element_code":"70-255","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Iron Rammer, 7.0 kg","unit":"day","normalized_unit":"day","rates":{"zone_a":7.25,"zone_b":7.25,"zone_c":7.25,"zone_d":7.25},"source_raw_ocr_text":"348 | 70-255 | Hire charge of Iron Rammer, 7.0 kg | day | 7.25 7.25 7.25 7.25","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-255 Hire charge of Iron Rammer, 7.0 kg day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":349,"element_code":"70-272","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Lathe Machine","unit":"day","normalized_unit":"day","rates":{"zone_a":1000.0,"zone_b":1000.0,"zone_c":1000.0,"zone_d":1000.0},"source_raw_ocr_text":"349 | 70-272 | Hire charge of Lathe Machine day 1000.00 | 1000.00 | 1000.00 | 1000.00","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-272 Hire charge of Lathe Machine day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":350,"element_code":"70-275","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Monkey Hammer with Staging,","unit":"day","normalized_unit":"day","rates":{"zone_a":420.0,"zone_b":420.0,"zone_c":420.0,"zone_d":420.0},"source_raw_ocr_text":"350 | 70-275 | Hire charge of Monkey Hammer day 420.00 420.00 420.00 420.00 with Staging,","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-275 Hire charge of Monkey Hammer with Staging, day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":351,"element_code":"70-280","element_group":"70","element_group_title":"Equipment, Tools","description":"Paint Brush 1 ce","unit":"No.","normalized_unit":"number","rates":{"zone_a":42.0,"zone_b":42.0,"zone_c":42.0,"zone_d":42.0},"source_raw_ocr_text":"351 | 70-280 | Paint Brush ... 1... ce ee ee ee No. 42.00 42.00 | 42.00 42.00","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-280 Paint Brush 1 ce No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":352,"element_code":"70-287","element_group":"70","element_group_title":"Equipment, Tools","description":"352, 70-287 Hire charge of Special Hammer","unit":"day","normalized_unit":"day","rates":{"zone_a":92.0,"zone_b":92.0,"zone_c":92.0,"zone_d":92.0},"source_raw_ocr_text":"352, 70-287 | Hire charge of Special Hammer day 92.00 | 92.00 92.00 | 92.00","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-287 352, 70-287 Hire charge of Special Hammer day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":353,"element_code":"70-290","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Monkey Hammer with Pile Cap, 200kg","unit":"day","normalized_unit":"day","rates":{"zone_a":350.0,"zone_b":350.0,"zone_c":350.0,"zone_d":350.0},"source_raw_ocr_text":"| 353 | 70-290 | Hire charge of Monkey Hammer _| day / 350.00 350.00 350.00 350.00 with Pile Cap, 200kg","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-290 Hire charge of Monkey Hammer with Pile Cap, 200kg day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":354,"element_code":"70-295","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Hammer with Pile","unit":"day","normalized_unit":"day","rates":{"zone_a":650.0,"zone_b":650.0,"zone_c":650.0,"zone_d":650.0},"source_raw_ocr_text":"354 | 70-295 | Hire charge of Hammer with Pile | day 650.00 650.00 | 650.00 650.00","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-295 Hire charge of Hammer with Pile day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":355,"element_code":"70-305","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Vibro hammer (Excavator mounted)","unit":"day","normalized_unit":"day","rates":{"zone_a":930.0,"zone_b":930.0,"zone_c":930.0,"zone_d":930.0},"source_raw_ocr_text":"~355 | 70-305 | Hire charge of Vibro hammer day 930.00 930.00 930.00 930.00 (Excavator mounted)","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-305 Hire charge of Vibro hammer (Excavator mounted) day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":356,"element_code":"70-310","element_group":"70","element_group_title":"Equipment, Tools","description":"RCC Pipe Manf. Plant (Share Capital)","unit":"day","normalized_unit":"day","rates":{"zone_a":3450.0,"zone_b":3450.0,"zone_c":3450.0,"zone_d":3450.0},"source_raw_ocr_text":"356 | 70-310 | RCC Pipe Manf. Plant (Share day 3450.00 3450.00 3450.00 3450.00 _ Capital)","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-310 RCC Pipe Manf. Plant (Share Capital) day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":357,"element_code":"70-326","element_group":"70","element_group_title":"Equipment, Tools","description":"Pump for Well Point, 5 cusec","unit":"No.","normalized_unit":"number","rates":{"zone_a":179000.0,"zone_b":179000.0,"zone_c":179000.0,"zone_d":179000.0},"source_raw_ocr_text":"357 | 70-326 | Pump for Well Point, 5 cusec No. 179000.00 | 179000.00 | 179000.00 | 179000.00","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-326 Pump for Well Point, 5 cusec No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":358,"element_code":"70-328","element_group":"70","element_group_title":"Equipment, Tools","description":"Pump Turbine, 5 cusec, with motor","unit":"No.","normalized_unit":"number","rates":{"zone_a":179000.0,"zone_b":179000.0,"zone_c":179000.0,"zone_d":179000.0},"source_raw_ocr_text":"| 398 70-328 | Pump Turbine, 5 cusec, with motor | No. 179000.00 | 179000.00 | 179000.00 | 179000.00","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-328 Pump Turbine, 5 cusec, with motor No. Equipment, Tools","ocr_serial_no":398,"serial_note":"OCR misread the printed serial; serial_no uses the verified source order."},{"record_type":"basic_element_rate","serial_no":359,"element_code":"70-330","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Surface Water Pump, 1 Cusec","unit":"day","normalized_unit":"day","rates":{"zone_a":300.0,"zone_b":300.0,"zone_c":300.0,"zone_d":300.0},"source_raw_ocr_text":"| 359 | 70-330 | Hire charge of Surface Water Pump, | day 300.00 300.00 300.00 300.00 1 Cusec","source_pdf_page":24,"source_schedule_page":14,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-330 Hire charge of Surface Water Pump, 1 Cusec day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":360,"element_code":"70-333","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of High Power Pump","unit":"day","normalized_unit":"day","rates":{"zone_a":1730.0,"zone_b":1730.0,"zone_c":1730.0,"zone_d":1730.0},"source_raw_ocr_text":"360 | 70-333 | Hire charge of High Power Pump day 1730.00 1730.00 1730.00 1730.00","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-333 Hire charge of High Power Pump day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":361,"element_code":"70-350","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Soil Compactor, Vibratory, Engine Operated","unit":"day","normalized_unit":"day","rates":{"zone_a":350.0,"zone_b":350.0,"zone_c":350.0,"zone_d":350.0},"source_raw_ocr_text":"361 70-350 | Hire charge of Soil Compactor, day 350.00 350.00 350.00 350.00 Vibratory, Engine Operated","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-350 Hire charge of Soil Compactor, Vibratory, Engine Operated day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":362,"element_code":"70-365","element_group":"70","element_group_title":"Equipment, Tools","description":"Spade (kodal)","unit":"No.","normalized_unit":"number","rates":{"zone_a":450.0,"zone_b":450.0,"zone_c":450.0,"zone_d":450.0},"source_raw_ocr_text":"362 | 70-365 | Spade (kodal) No. 450.00 450.00 450.00 450.00","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-365 Spade (kodal) No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":363,"element_code":"70-370","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire Charge of Compressor Machine","unit":"day","normalized_unit":"day","rates":{"zone_a":1500.0,"zone_b":1500.0,"zone_c":1500.0,"zone_d":1500.0},"source_raw_ocr_text":"363 | 70-370 | Hire Charge of Compressor day 1500.00 | 1500.00 | 1500.00 | 1500.00 | Machine _|","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-370 Hire Charge of Compressor Machine day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":364,"element_code":"70-371","element_group":"70","element_group_title":"Equipment, Tools","description":"Nozzle SS (dia 50x200)","unit":"no","normalized_unit":"number","rates":{"zone_a":900.0,"zone_b":900.0,"zone_c":900.0,"zone_d":900.0},"source_raw_ocr_text":"364 | 70-371 | Nozzle SS (dia 50x200) no 900.00 900.00 900.00 900.00","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-371 Nozzle SS (dia 50x200) no Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":365,"element_code":"70-372","element_group":"70","element_group_title":"Equipment, Tools","description":"Clamp, 50 mm dia (MS)","unit":"no","normalized_unit":"number","rates":{"zone_a":40.0,"zone_b":40.0,"zone_c":40.0,"zone_d":40.0},"source_raw_ocr_text":"365 | 70-372 | Clamp, 50 mm dia (MS) no 40.00 40.00 40.00 40.00","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-372 Clamp, 50 mm dia (MS) no Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":366,"element_code":"70-373","element_group":"70","element_group_title":"Equipment, Tools","description":"Pressure Hose, 50 mm dia","unit":"no","normalized_unit":"number","rates":{"zone_a":410.0,"zone_b":410.0,"zone_c":410.0,"zone_d":410.0},"source_raw_ocr_text":"366 70-373 | Pressure Hose, 50 mm dia no 410.00 410.00 410.00 410.00","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-373 Pressure Hose, 50 mm dia no Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":367,"element_code":"70-380","element_group":"70","element_group_title":"Equipment, Tools","description":"Electric Motor, 20 HP with2cusec","unit":"No.","normalized_unit":"number","rates":{"zone_a":29000.0,"zone_b":29000.0,"zone_c":29000.0,"zone_d":29000.0},"source_raw_ocr_text":"367 | 70-380 | Electric Motor, 20 HP with2cusec | No. | 29000.00 | 29000.00 | 29000.00 | 29000.00","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-380 Electric Motor, 20 HP with2cusec No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":368,"element_code":"70-385","element_group":"70","element_group_title":"Equipment, Tools","description":"Electric Motor, 25 HP with2cusec","unit":"No.","normalized_unit":"number","rates":{"zone_a":37000.0,"zone_b":37000.0,"zone_c":37000.0,"zone_d":37000.0},"source_raw_ocr_text":"368 | 70-385 | Electric Motor, 25 HP with2cusec | No. | 37000.00 | 37000.00 | 37000.00 | 37000.00 |","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-385 Electric Motor, 25 HP with2cusec No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":369,"element_code":"70-390","element_group":"70","element_group_title":"Equipment, Tools","description":"Electric Motor, 30 HP with 2 cusec","unit":"No.","normalized_unit":"number","rates":{"zone_a":45000.0,"zone_b":45000.0,"zone_c":45000.0,"zone_d":45000.0},"source_raw_ocr_text":"369 | 70-390 | Electric Motor, 30 HP with 2 cusec | No. | 45000.00 | 45000.00 | 45000.00 | 45000.00 |","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-390 Electric Motor, 30 HP with 2 cusec No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":370,"element_code":"70-405","element_group":"70","element_group_title":"Equipment, Tools","description":"Speed Boat (without fuel and lubricants).","unit":"day","normalized_unit":"day","rates":{"zone_a":3200.0,"zone_b":3200.0,"zone_c":3200.0,"zone_d":3200.0},"source_raw_ocr_text":"370 | 70-405 | Speed Boat (without fuel and day ~ 3200.00 3200.00 3200.00 3200.00 | lubricants).","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-405 Speed Boat (without fuel and lubricants). day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":371,"element_code":"70-425","element_group":"70","element_group_title":"Equipment, Tools","description":"Net Weaving Machine (Hexagonal):","unit":"day","normalized_unit":"day","rates":{"zone_a":18.0,"zone_b":18.0,"zone_c":18.0,"zone_d":18.0},"source_raw_ocr_text":"371 | 70-425 | Net Weaving Machine (Hexagonal): | day 18.00 18.00 18.00 18.00 |","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-425 Net Weaving Machine (Hexagonal): day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":372,"element_code":"70-510","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of welding machine","unit":"day","normalized_unit":"day","rates":{"zone_a":750.0,"zone_b":750.0,"zone_c":750.0,"zone_d":750.0},"source_raw_ocr_text":"372 | 70-510 | Hire charge of welding machine day 750.00 750.00 750.00 750.00 |","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-510 Hire charge of welding machine day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":373,"element_code":"70-511","element_group":"70","element_group_title":"Equipment, Tools","description":"MS Header Pipe, 200mm, with accessories.","unit":"m","normalized_unit":"m","rates":{"zone_a":1380.0,"zone_b":1380.0,"zone_c":1380.0,"zone_d":1380.0},"source_raw_ocr_text":"373 | 70-511 | MS Header Pipe, 200mm, with m | 1380.00 | 1380.00 | 1380.00 | 1380.00 | accessories.","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-511 MS Header Pipe, 200mm, with accessories. m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":374,"element_code":"70-512","element_group":"70","element_group_title":"Equipment, Tools","description":"Swing Joint Set we an","unit":"No.","normalized_unit":"number","rates":{"zone_a":350.0,"zone_b":350.0,"zone_c":350.0,"zone_d":350.0},"source_raw_ocr_text":"374 | 70-512 | Swing Joint Set... oe we an No. 350.00 | 350.00 350.00 350.00","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-512 Swing Joint Set we an No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":375,"element_code":"70-515","element_group":"70","element_group_title":"Equipment, Tools","description":"MS. Pipe, 200mm dia","unit":"m","normalized_unit":"m","rates":{"zone_a":1200.0,"zone_b":1200.0,"zone_c":1200.0,"zone_d":1200.0},"source_raw_ocr_text":"375 | 70-515 | MS. Pipe, 200mm dia ..............|m 1200.00 | 1200.00 | 1200.00 | 1200.00","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-515 MS. Pipe, 200mm dia m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":376,"element_code":"70-550","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Pile Rig with Winch","unit":"day","normalized_unit":"day","rates":{"zone_a":2100.0,"zone_b":2100.0,"zone_c":2100.0,"zone_d":2100.0},"source_raw_ocr_text":"376 | 70-550 | Hire charge of Pile Rig with Winch | day | 2100.00 | 2100.00 | 2100.00 | 2100.00","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-550 Hire charge of Pile Rig with Winch day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":377,"element_code":"70-555","element_group":"70","element_group_title":"Equipment, Tools","description":"Hirecharge of Pile DrivingRig","unit":"day","normalized_unit":"day","rates":{"zone_a":1620.0,"zone_b":1620.0,"zone_c":1620.0,"zone_d":1620.0},"source_raw_ocr_text":"377 | 70-555 | Hirecharge of Pile DrivingRig | day | 1620.00 | 1620.00 | 1620.00 | 1620.00 |","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-555 Hirecharge of Pile DrivingRig day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":378,"element_code":"70-560","element_group":"70","element_group_title":"Equipment, Tools","description":"Wire Brush ‘","unit":"No.","normalized_unit":"number","rates":{"zone_a":40.0,"zone_b":40.0,"zone_c":40.0,"zone_d":40.0},"source_raw_ocr_text":"378 | 70-560 | Wire Brush ‘No. | 40.00 | 40.00 40.00 40.00","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-560 Wire Brush ‘ No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":379,"element_code":"70-575","element_group":"70","element_group_title":"Equipment, Tools","description":"Housing/ Casing pipe M.S, 300mm","unit":"m","normalized_unit":"m","rates":{"zone_a":2200.0,"zone_b":2200.0,"zone_c":2200.0,"zone_d":2200.0},"source_raw_ocr_text":"| 379 | 70-575 | Housing/ Casing pipe M.S, 300mm_ | m 2200.00 | 2200.00 | 2200.00 | 2200.00","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-575 Housing/ Casing pipe M.S, 300mm m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":380,"element_code":"70-580","element_group":"70","element_group_title":"Equipment, Tools","description":"Housing/ Casing pipe M.S, 350mm","unit":"m","normalized_unit":"m","rates":{"zone_a":2500.0,"zone_b":2500.0,"zone_c":2500.0,"zone_d":2500.0},"source_raw_ocr_text":"380 | 70-580 | Housing/ Casing pipe M.S, 350mm | m 2500.00 | 2500.00 | 2500.00 | 2500.00 |","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-580 Housing/ Casing pipe M.S, 350mm m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":381,"element_code":"70-582","element_group":"70","element_group_title":"Equipment, Tools","description":"75mm diaClassD PVC strainer","unit":"m","normalized_unit":"m","rates":{"zone_a":418.0,"zone_b":418.0,"zone_c":418.0,"zone_d":418.0},"source_raw_ocr_text":"381 | 70-582 | 75mm diaClassD PVC strainer m 418.00 418.00 418.00 418.00","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-582 75mm diaClassD PVC strainer m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":382,"element_code":"70-583","element_group":"70","element_group_title":"Equipment, Tools","description":"100mmdiaClassD PVCstrainer","unit":"m","normalized_unit":"m","rates":{"zone_a":692.65,"zone_b":692.65,"zone_c":692.65,"zone_d":692.65},"source_raw_ocr_text":"382 | 70-583 | 100mmdiaClassD PVCstrainer | m 692.65 692.65 692.65 692.65","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-583 100mmdiaClassD PVCstrainer m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":383,"element_code":"70-584","element_group":"70","element_group_title":"Equipment, Tools","description":"150mm diaClassD PVC strainer","unit":"m","normalized_unit":"m","rates":{"zone_a":1544.67,"zone_b":1544.67,"zone_c":1544.67,"zone_d":1544.67},"source_raw_ocr_text":"383 | 70-584 | 150mm diaClassD PVC strainer | m 1544.67 1544.67 1544.67 1544.67","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-584 150mm diaClassD PVC strainer m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":384,"element_code":"70-590","element_group":"70","element_group_title":"Equipment, Tools","description":"Brass Strainer, 150mm dia (Slot:","unit":"m","normalized_unit":"m","rates":{"zone_a":5250.0,"zone_b":5250.0,"zone_c":5250.0,"zone_d":5250.0},"source_raw_ocr_text":"384 | 70-590 | Brass Strainer, 150mm dia (Slot: m 5250.00 5250.00 5250.00 5250.00","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-590 Brass Strainer, 150mm dia (Slot: m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":385,"element_code":"70-595","element_group":"70","element_group_title":"Equipment, Tools","description":"Brass Strainer, 200mm dia (Slot:","unit":"m","normalized_unit":"m","rates":{"zone_a":5950.0,"zone_b":5950.0,"zone_c":5950.0,"zone_d":5950.0},"source_raw_ocr_text":"385 | 70-595 | Brass Strainer, 200mm dia (Slot: m 5950.00 5950.00 5950.00 5950.00","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-595 Brass Strainer, 200mm dia (Slot: m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":386,"element_code":"70-597","element_group":"70","element_group_title":"Equipment, Tools","description":"75 mm dia Class C PVC pipe (Blind pipe)","unit":"m","normalized_unit":"m","rates":{"zone_a":281.0,"zone_b":281.0,"zone_c":281.0,"zone_d":281.0},"source_raw_ocr_text":"386 | 70-597 | 75 mm dia Class C PVC pipe m 281.00 281.00 281.00 281.00 | (Blind pipe)","source_pdf_page":25,"source_schedule_page":15,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-597 75 mm dia Class C PVC pipe (Blind pipe) m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":387,"element_code":"70-598","element_group":"70","element_group_title":"Equipment, Tools","description":"100mm dia Class C PVC pipe (Blind pipe)","unit":"m","normalized_unit":"m","rates":{"zone_a":421.0,"zone_b":421.0,"zone_c":421.0,"zone_d":421.0},"source_raw_ocr_text":"387 | 70-598 | 100mm dia Class C PVC pipe m 421.00 421.00 | 421.00 | 421.00 (Blind pipe)","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-598 100mm dia Class C PVC pipe (Blind pipe) m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":388,"element_code":"70-599","element_group":"70","element_group_title":"Equipment, Tools","description":"150mm dia Class C PVC pipe (Blind pipe)","unit":"m","normalized_unit":"m","rates":{"zone_a":1051.0,"zone_b":1051.0,"zone_c":1051.0,"zone_d":1051.0},"source_raw_ocr_text":"388 | 70-599 | 150mm dia Class C PVC pipe m 1051.00 | 1051.00 | 1051.00 | 1051.00 (Blind pipe)","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-599 150mm dia Class C PVC pipe (Blind pipe) m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":389,"element_code":"70-605","element_group":"70","element_group_title":"Equipment, Tools","description":"Blind Pipe, G.I, 150mm dia, Thickness>=4mm","unit":"m","normalized_unit":"m","rates":{"zone_a":2715.0,"zone_b":2715.0,"zone_c":2715.0,"zone_d":2715.0},"source_raw_ocr_text":"389 | 70-605 | Blind Pipe, G.I, 150mm dia, m 2715.00 | 2715.00 | 2715.00 | 2715.00 Thickness>=4mm","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-605 Blind Pipe, G.I, 150mm dia, Thickness>=4mm m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":390,"element_code":"70-610","element_group":"70","element_group_title":"Equipment, Tools","description":"Blind Pipe, G.I, 200mm dia, - thickness>=8 mm","unit":"m","normalized_unit":"m","rates":{"zone_a":8892.0,"zone_b":8892.0,"zone_c":8892.0,"zone_d":8892.0},"source_raw_ocr_text":"390 | 70-610 | Blind Pipe, G.I, 200mm dia, -m | 8892.00 | 8892.00 | 8892.00 | 8892.00 thickness>=8 mm","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-610 Blind Pipe, G.I, 200mm dia, - thickness>=8 mm m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":391,"element_code":"70-620","element_group":"70","element_group_title":"Equipment, Tools","description":"Rreducer: 150 mm x 300 mm dia6 mm thick MLS.","unit":"No.","normalized_unit":"number","rates":{"zone_a":2420.0,"zone_b":2420.0,"zone_c":2420.0,"zone_d":2420.0},"source_raw_ocr_text":"391 70-620 | Rreducer: 150 mm x 300 mm dia6 | No. 2420.00 2420.00 2420.00 2420.00 mm thick MLS.","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-620 Rreducer: 150 mm x 300 mm dia6 mm thick MLS. No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":392,"element_code":"70-625","element_group":"70","element_group_title":"Equipment, Tools","description":"Reducer, M.S, 200/350mm","unit":"No.","normalized_unit":"number","rates":{"zone_a":2530.0,"zone_b":2530.0,"zone_c":2530.0,"zone_d":2530.0},"source_raw_ocr_text":"392 | 70-625 | Reducer, M.S, 200/350mm No. 2530.00 | 2530.00 | 2530.00 | 2530.00","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-625 Reducer, M.S, 200/350mm No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":393,"element_code":"70-630","element_group":"70","element_group_title":"Equipment, Tools","description":"Bail Plug, 100mm dia","unit":"No.","normalized_unit":"number","rates":{"zone_a":1190.0,"zone_b":1190.0,"zone_c":1190.0,"zone_d":1190.0},"source_raw_ocr_text":"393 | 70-630 | Bail Plug, 100mm dia .............. | No. 1190.00 | 1190.00 | 1190.00 | 1190.00","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-630 Bail Plug, 100mm dia No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":394,"element_code":"70-635","element_group":"70","element_group_title":"Equipment, Tools","description":"Bail Plug, 150mm dia","unit":"No.","normalized_unit":"number","rates":{"zone_a":1580.0,"zone_b":1580.0,"zone_c":1580.0,"zone_d":1580.0},"source_raw_ocr_text":"| 394 | 70-635 | Bail Plug, 150mm dia .............. | No. 1580.00 | 1580.00 | 1580.00 | 1580.00","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-635 Bail Plug, 150mm dia No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":395,"element_code":"70-640","element_group":"70","element_group_title":"Equipment, Tools","description":"Bail Plug, 200mm dia","unit":"No.","normalized_unit":"number","rates":{"zone_a":2250.0,"zone_b":2250.0,"zone_c":2250.0,"zone_d":2250.0},"source_raw_ocr_text":"395 | 70-640 | Bail Plug, 200mm dia ............... | No. 2250.00 | 2250.00 | 2250.00 | 2250.00","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-640 Bail Plug, 200mm dia No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":396,"element_code":"70-645","element_group":"70","element_group_title":"Equipment, Tools","description":"Centrilizer, 13mm dia","unit":"set","normalized_unit":"set","rates":{"zone_a":530.0,"zone_b":530.0,"zone_c":530.0,"zone_d":530.0},"source_raw_ocr_text":"396 | 70-645 | Centrilizer, 13mm dia............ | set 530.00 530.00 530.00 530.00","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-645 Centrilizer, 13mm dia set Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":397,"element_code":"70-648","element_group":"70","element_group_title":"Equipment, Tools","description":"Diesel Operated Engine with 1 cusec pump","unit":"No.","normalized_unit":"number","rates":{"zone_a":32500.0,"zone_b":32500.0,"zone_c":32500.0,"zone_d":32500.0},"source_raw_ocr_text":"397 | 70-648 | Diesel Operated Engine with 1 No. 32500.00 | 32500.00 | 32500.00 | 32500.00 cusec pump","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-648 Diesel Operated Engine with 1 cusec pump No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":398,"element_code":"70-665","element_group":"70","element_group_title":"Equipment, Tools","description":"Star-Delta starter, MEM/BENTEX.","unit":"No.","normalized_unit":"number","rates":{"zone_a":3600.0,"zone_b":3600.0,"zone_c":3600.0,"zone_d":3600.0},"source_raw_ocr_text":"398 | 70-665 | Star-Delta starter, No. 3600.00 | 3600.00 | 3600.00 | 3600.00 MEM/BENTEX. ... ....","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-665 Star-Delta starter, MEM/BENTEX. No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":399,"element_code":"70-670","element_group":"70","element_group_title":"Equipment, Tools","description":"Panel Board 0. se ces se ou","unit":"No.","normalized_unit":"number","rates":{"zone_a":5000.0,"zone_b":5000.0,"zone_c":5000.0,"zone_d":5000.0},"source_raw_ocr_text":"399 | 70-670 | Panel Board... 0. se ces se cee ou No. 5000.00 | 5000.00 | 5000.00 | 5000.00","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-670 Panel Board 0. se ces se ou No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":400,"element_code":"70-680","element_group":"70","element_group_title":"Equipment, Tools","description":"B/Assembly, 3stg, 190mmd, .042mps. cap","unit":"No.","normalized_unit":"number","rates":{"zone_a":48500.0,"zone_b":48500.0,"zone_c":48500.0,"zone_d":48500.0},"source_raw_ocr_text":"400 | 70-680 | B/Assembly, 3stg, No. | 48500.00 | 48500.00 | 48500.00 | 48500.00 190mmd, .042mps. cap..","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-680 B/Assembly, 3stg, 190mmd, .042mps. cap No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":401,"element_code":"70-685","element_group":"70","element_group_title":"Equipment, Tools","description":"B/Assembly,3stg, 240mmd, .056mps. cap","unit":"No.","normalized_unit":"number","rates":{"zone_a":53100.0,"zone_b":53100.0,"zone_c":53100.0,"zone_d":53100.0},"source_raw_ocr_text":"401 | 70-685 | B/Assembly,3stg, No. | 53100.00 | 53100.00 | 53100.00 | 53100.00 240mmd, .056mps. cap..","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-685 B/Assembly,3stg, 240mmd, .056mps. cap No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":402,"element_code":"70-725","element_group":"70","element_group_title":"Equipment, Tools","description":"C/Pipe, 150mmd,10m shaft 25mmd,","unit":"No.","normalized_unit":"number","rates":{"zone_a":12700.0,"zone_b":12700.0,"zone_c":12700.0,"zone_d":12700.0},"source_raw_ocr_text":"402 | 70-725 | C/Pipe, 150mmd,10m shaft 25mmd, | No. 12700.00 | 12700.00 | 12700.00 | 12700.00","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-725 C/Pipe, 150mmd,10m shaft 25mmd, No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":403,"element_code":"70-730","element_group":"70","element_group_title":"Equipment, Tools","description":"C/Pipe, 200mmd,10m shaft 25mmd,","unit":"No.","normalized_unit":"number","rates":{"zone_a":22500.0,"zone_b":22500.0,"zone_c":22500.0,"zone_d":22500.0},"source_raw_ocr_text":"403 | 70-730 | C/Pipe, 200mmd,10m shaft 25mmd, | No. 22500.00 | 22500.00 | 22500.00 | 22500.00","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-730 C/Pipe, 200mmd,10m shaft 25mmd, No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":404,"element_code":"70-740","element_group":"70","element_group_title":"Equipment, Tools","description":"C/Pipe, 150mmd,12m, shaft","unit":"No.","normalized_unit":"number","rates":{"zone_a":18500.0,"zone_b":18500.0,"zone_c":18500.0,"zone_d":18500.0},"source_raw_ocr_text":"404 | 70-740 | C/Pipe, 150mmd,12m, shaft No. 18500.00 | 18500.00 | 18500.00 | 18500.00","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-740 C/Pipe, 150mmd,12m, shaft No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":405,"element_code":"70-745","element_group":"70","element_group_title":"Equipment, Tools","description":"C/Pipe, 200mmd,12m, shaft","unit":"No.","normalized_unit":"number","rates":{"zone_a":30600.0,"zone_b":30600.0,"zone_c":30600.0,"zone_d":30600.0},"source_raw_ocr_text":"405 | 70-745 | C/Pipe, 200mmd,12m, shaft No. 30600.00 | 30600.00 | 30600.00 | 30600.00","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-745 C/Pipe, 200mmd,12m, shaft No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":406,"element_code":"70-755","element_group":"70","element_group_title":"Equipment, Tools","description":"Discharge Head, 150mm*125mm","unit":"No.","normalized_unit":"number","rates":{"zone_a":8600.0,"zone_b":8600.0,"zone_c":8600.0,"zone_d":8600.0},"source_raw_ocr_text":"406 | 70-755 | Discharge Head, 150mm*125mm No. 8600.00 8600.00 8600.00 8600.00","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-755 Discharge Head, 150mm*125mm No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":407,"element_code":"70-760","element_group":"70","element_group_title":"Equipment, Tools","description":"Discharge Head, 200mm*150mm","unit":"No.","normalized_unit":"number","rates":{"zone_a":9200.0,"zone_b":9200.0,"zone_c":9200.0,"zone_d":9200.0},"source_raw_ocr_text":"407 | 70-760 | Discharge Head, 200mm*150mm No. 9200.00 9200.00 9200.00 9200.00","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-760 Discharge Head, 200mm*150mm No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":408,"element_code":"70-765","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Fork Lift-3 Ton Capacity","unit":"day","normalized_unit":"day","rates":{"zone_a":4050.0,"zone_b":4050.0,"zone_c":4050.0,"zone_d":4050.0},"source_raw_ocr_text":"408 | 70-765 | Hire charge of Fork Lift-3 Ton day 4050.00 4050.00 4050.00 4050.00 Capacity","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-765 Hire charge of Fork Lift-3 Ton Capacity day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":409,"element_code":"70-766","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of dump truck/ tripping trucks","unit":"day","normalized_unit":"day","rates":{"zone_a":5000.0,"zone_b":5000.0,"zone_c":5000.0,"zone_d":5000.0},"source_raw_ocr_text":"409 | 70-766 | Hire charge of dump truck/ tripping | day 5000.00 5000.00 5000.00 5000.00 trucks","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-766 Hire charge of dump truck/ tripping trucks day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":410,"element_code":"70-770","element_group":"70","element_group_title":"Equipment, Tools","description":"Gate Valve, 150 mm dia","unit":"No.","normalized_unit":"number","rates":{"zone_a":11000.0,"zone_b":11000.0,"zone_c":11000.0,"zone_d":11000.0},"source_raw_ocr_text":"410 | 70-770 | Gate Valve, 150 mm dia | No. 11000.00 | 11000.00 | 11000.00 | 11000.00","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-770 Gate Valve, 150 mm dia No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":411,"element_code":"70-775","element_group":"70","element_group_title":"Equipment, Tools","description":"Gate Valve, 200 mm dia.","unit":"No.","normalized_unit":"number","rates":{"zone_a":12000.0,"zone_b":12000.0,"zone_c":12000.0,"zone_d":12000.0},"source_raw_ocr_text":"411 | 70-775 | Gate Valve, 200 mm dia. ... 0... | No. 12000.00 | 12000.00 | 12000.00 | 12000.00","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-775 Gate Valve, 200 mm dia. No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":412,"element_code":"70-785","element_group":"70","element_group_title":"Equipment, Tools","description":"Non-returnable Valve, 150 mm","unit":"No.","normalized_unit":"number","rates":{"zone_a":3300.0,"zone_b":3300.0,"zone_c":3300.0,"zone_d":3300.0},"source_raw_ocr_text":"412 | 70-785 | Non-returnable Valve, 150 mm No. 3300.00 3300.00 3300.00 3300.00","source_pdf_page":26,"source_schedule_page":16,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-785 Non-returnable Valve, 150 mm No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":413,"element_code":"70-790","element_group":"70","element_group_title":"Equipment, Tools","description":"Non-returnable Valve, 200 mm","unit":"No.","normalized_unit":"number","rates":{"zone_a":5700.0,"zone_b":5700.0,"zone_c":5700.0,"zone_d":5700.0},"source_raw_ocr_text":"413 | 70-790 | Non-returnable Valve, 200 mm No. 5700.00 5700.00 5700.00 5700.00","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-790 Non-returnable Valve, 200 mm No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":414,"element_code":"70-792","element_group":"70","element_group_title":"Equipment, Tools","description":"Pipe, G.I, 75mm dia (5 mm wall thickness)","unit":"m","normalized_unit":"m","rates":{"zone_a":1400.0,"zone_b":1400.0,"zone_c":1400.0,"zone_d":1400.0},"source_raw_ocr_text":"414 | 70-792 | Pipe, G.I, 75mm dia (5 mm wall m 1400.00 1400.00 1400.00 1400.00 thickness)","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-792 Pipe, G.I, 75mm dia (5 mm wall thickness) m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":415,"element_code":"70-793","element_group":"70","element_group_title":"Equipment, Tools","description":"Pipe, G.I, 100mm dia (5mm thickness)","unit":"m","normalized_unit":"m","rates":{"zone_a":2100.0,"zone_b":2100.0,"zone_c":2100.0,"zone_d":2100.0},"source_raw_ocr_text":"415 | 70-793 | Pipe, G.I, 100mm dia (5mm m 2100.00 2100.00 2100.00 2100.00 | thickness) |","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-793 Pipe, G.I, 100mm dia (5mm thickness) m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":416,"element_code":"70-794","element_group":"70","element_group_title":"Equipment, Tools","description":"Pipe, G.I, 150mm dia +.","unit":"m","normalized_unit":"m","rates":{"zone_a":2000.0,"zone_b":2000.0,"zone_c":2000.0,"zone_d":2000.0},"source_raw_ocr_text":"416 | 70-794 | Pipe, G.I, 150mm dia ... ... ... +. m 2000.00 2000.00 2000.00 | 2000.00","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-794 Pipe, G.I, 150mm dia +. m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":417,"element_code":"70-800","element_group":"70","element_group_title":"Equipment, Tools","description":"Delivery Pipe, G.I, 1.5m long,","unit":"No.","normalized_unit":"number","rates":{"zone_a":4072.0,"zone_b":4072.0,"zone_c":4072.0,"zone_d":4072.0},"source_raw_ocr_text":"417 | 70-800 | Delivery Pipe, G.I, 1.5m long, No. 4072.00 4072.00 4072.00 | 4072.00","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-800 Delivery Pipe, G.I, 1.5m long, No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":418,"element_code":"70-805","element_group":"70","element_group_title":"Equipment, Tools","description":"Delivery Pipe, G.I, 1.5m long,","unit":"No.","normalized_unit":"number","rates":{"zone_a":13338.0,"zone_b":13338.0,"zone_c":13338.0,"zone_d":13338.0},"source_raw_ocr_text":"418 | 70-805 | Delivery Pipe, G.I, 1.5m long, No. 13338.00 | 13338.00 | 13338.00 | 13338.00","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-805 Delivery Pipe, G.I, 1.5m long, No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":419,"element_code":"70-808","element_group":"70","element_group_title":"Equipment, Tools","description":"75 mm dia Class C PVC pipe (delivery pipe)","unit":"m","normalized_unit":"m","rates":{"zone_a":281.0,"zone_b":281.0,"zone_c":281.0,"zone_d":281.0},"source_raw_ocr_text":"419 | 70-808 | 75 mm dia Class C PVC pipe m 281.00 281.00 281.00 281.00 (delivery pipe)","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-808 75 mm dia Class C PVC pipe (delivery pipe) m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":420,"element_code":"70-810","element_group":"70","element_group_title":"Equipment, Tools","description":"100 mm dia Class C PVC pipe (delivery pipe)","unit":"m","normalized_unit":"m","rates":{"zone_a":421.0,"zone_b":421.0,"zone_c":421.0,"zone_d":421.0},"source_raw_ocr_text":"420 | 70-810 | 100 mm dia Class C PVC pipe m 421.00 421.00 421.00 421.00 (delivery pipe) |","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-810 100 mm dia Class C PVC pipe (delivery pipe) m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":421,"element_code":"70-815","element_group":"70","element_group_title":"Equipment, Tools","description":"150mm dia Class C PVC pipe (delivery pipe)","unit":"m","normalized_unit":"m","rates":{"zone_a":1051.0,"zone_b":1051.0,"zone_c":1051.0,"zone_d":1051.0},"source_raw_ocr_text":"421 | 70-815 | 150mm dia Class C PVC pipe m 1051.00 1051.00 1051.00 1051.00 (delivery pipe)","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-815 150mm dia Class C PVC pipe (delivery pipe) m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":422,"element_code":"70-820","element_group":"70","element_group_title":"Equipment, Tools","description":"200 mm dia Class C PVC pipe (delivery pipe)","unit":"m","normalized_unit":"m","rates":{"zone_a":1232.55,"zone_b":1232.55,"zone_c":1232.55,"zone_d":1232.55},"source_raw_ocr_text":"422 | 70-820 | 200 mm dia Class C PVC pipe m 1232.55 1232.55 1232.55 1232.55 (delivery pipe)","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-820 200 mm dia Class C PVC pipe (delivery pipe) m Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":423,"element_code":"70-830","element_group":"70","element_group_title":"Equipment, Tools","description":"Bend, G.I, 75mm dia","unit":"No.","normalized_unit":"number","rates":{"zone_a":416.0,"zone_b":416.0,"zone_c":416.0,"zone_d":416.0},"source_raw_ocr_text":"423 | 70-830 | Bend, G.I, 75mm dia... 0... No. | 416.00 416.00 416.00 416.00","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-830 Bend, G.I, 75mm dia No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":424,"element_code":"70-832","element_group":"70","element_group_title":"Equipment, Tools","description":"Bend, G.I, 100mm dia.","unit":"No.","normalized_unit":"number","rates":{"zone_a":603.0,"zone_b":603.0,"zone_c":603.0,"zone_d":603.0},"source_raw_ocr_text":"424 | 70-832 | Bend, G.I, 100mm dia. ............ | No. 603.00 603.00 603.00 603.00 |","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-832 Bend, G.I, 100mm dia. No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":425,"element_code":"70-835","element_group":"70","element_group_title":"Equipment, Tools","description":"Bend, G.I, 150mm dia, thickness","unit":"No.","normalized_unit":"number","rates":{"zone_a":2715.0,"zone_b":2715.0,"zone_c":2715.0,"zone_d":2715.0},"source_raw_ocr_text":"425 | 70-835 | Bend, G.I, 150mm dia, thickness No. 2715.00 2715.00 2715.00 2715.00","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-835 Bend, G.I, 150mm dia, thickness No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":426,"element_code":"70-955","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Grinding Machine","unit":"day","normalized_unit":"day","rates":{"zone_a":260.0,"zone_b":260.0,"zone_c":260.0,"zone_d":260.0},"source_raw_ocr_text":"426 | 70-955 | Hire charge of Grinding Machine day 260.00 260.00 260.00 260.00","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-955 Hire charge of Grinding Machine day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":427,"element_code":"70-965","element_group":"70","element_group_title":"Equipment, Tools","description":"Power Hacksaw Blade","unit":"No.","normalized_unit":"number","rates":{"zone_a":750.0,"zone_b":750.0,"zone_c":750.0,"zone_d":750.0},"source_raw_ocr_text":"427 | 70-965 | Power Hacksaw Blade No. 750.00 750.00 750.00 750.00","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-965 Power Hacksaw Blade No. Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":428,"element_code":"70-970","element_group":"70","element_group_title":"Equipment, Tools","description":"PVC Pipe Jointing Adhesive","unit":"kg","normalized_unit":"kg","rates":{"zone_a":280.0,"zone_b":280.0,"zone_c":280.0,"zone_d":280.0},"source_raw_ocr_text":"428 | 70-970 | PVC Pipe Jointing Adhesive kg 280.00 280.00 280.00 280.00","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-970 PVC Pipe Jointing Adhesive kg Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":429,"element_code":"70-980","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Sewing Machine","unit":"day","normalized_unit":"day","rates":{"zone_a":690.0,"zone_b":690.0,"zone_c":690.0,"zone_d":690.0},"source_raw_ocr_text":"429 | 70-980 | Hire charge of Sewing Machine | day 690.00 690.00 690.00 690.00 |","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-980 Hire charge of Sewing Machine day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":430,"element_code":"70-990","element_group":"70","element_group_title":"Equipment, Tools","description":"Hire charge of Cutter (Geo-textile)","unit":"day","normalized_unit":"day","rates":{"zone_a":410.0,"zone_b":410.0,"zone_c":410.0,"zone_d":410.0},"source_raw_ocr_text":"430 70-990 | Hire charge of Cutter (Geo-textile) | day 410.00 410.00 410.00 410.00 80. Labour","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"70-990 Hire charge of Cutter (Geo-textile) day Equipment, Tools"},{"record_type":"basic_element_rate","serial_no":431,"element_code":"80-060","element_group":"80","element_group_title":"Labour","description":"Boat, Engine","unit":"day","normalized_unit":"day","rates":{"zone_a":1760.0,"zone_b":1760.0,"zone_c":1760.0,"zone_d":1760.0},"source_raw_ocr_text":"431 | 80-060 | Boat, Engine... 0... ee day 1760.00 1760.00 1760.00 1760.00","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-060 Boat, Engine day Labour"},{"record_type":"basic_element_rate","serial_no":432,"element_code":"80-070","element_group":"80","element_group_title":"Labour","description":"Bullock Cart, with Garrian","unit":"day","normalized_unit":"day","rates":{"zone_a":1100.0,"zone_b":1100.0,"zone_c":1100.0,"zone_d":1100.0},"source_raw_ocr_text":"432 | 80-070 | Bullock Cart, with Garrian ... ... ..... day 1100.00 1100.00 1100.00 1100.00","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-070 Bullock Cart, with Garrian day Labour"},{"record_type":"basic_element_rate","serial_no":433,"element_code":"80-080","element_group":"80","element_group_title":"Labour","description":"Carpenter ce ne","unit":"day","normalized_unit":"day","rates":{"zone_a":700.0,"zone_b":700.0,"zone_c":700.0,"zone_d":650.0},"source_raw_ocr_text":"433 | 80-080 Carpenter... ee ce ee cee cee ne eee day 700.00 700.00 700.00 650.00","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-080 Carpenter ce ne day Labour"},{"record_type":"basic_element_rate","serial_no":434,"element_code":"80-085","element_group":"80","element_group_title":"Labour","description":"Carpenter, Head 0.0. o.","unit":"day","normalized_unit":"day","rates":{"zone_a":800.0,"zone_b":800.0,"zone_c":800.0,"zone_d":750.0},"source_raw_ocr_text":"434 | 80-085 | Carpenter, Head .. 0.0. o. day 800.00 800.00 800.00 750.00 |","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-085 Carpenter, Head 0.0. o. day Labour"},{"record_type":"basic_element_rate","serial_no":435,"element_code":"80-090","element_group":"80","element_group_title":"Labour","description":"Carpenter, Helper 0 00.","unit":"day","normalized_unit":"day","rates":{"zone_a":550.0,"zone_b":540.0,"zone_c":540.0,"zone_d":500.0},"source_raw_ocr_text":"435 | 80-090 Carpenter, Helper ... 0... 00. | day 550.00 540.00 540.00 500.00","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-090 Carpenter, Helper 0 00. day Labour"},{"record_type":"basic_element_rate","serial_no":436,"element_code":"80-155","element_group":"80","element_group_title":"Labour","description":"Rig man ser vee suv aee en","unit":"day","normalized_unit":"day","rates":{"zone_a":750.0,"zone_b":750.0,"zone_c":750.0,"zone_d":700.0},"source_raw_ocr_text":"436 | 80-155 | Rig man ...... cee ser vee suv aee en day 750.00 750.00 750.00 700.00 |","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-155 Rig man ser vee suv aee en day Labour"},{"record_type":"basic_element_rate","serial_no":437,"element_code":"80-180","element_group":"80","element_group_title":"Labour","description":"Driller i ccc ce ce","unit":"day","normalized_unit":"day","rates":{"zone_a":700.0,"zone_b":700.0,"zone_c":700.0,"zone_d":650.0},"source_raw_ocr_text":"| 437 | 80-180 | Driller i... ccc ce ce ee oe day 700.00 700.00 700.00 650.00","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-180 Driller i ccc ce ce day Labour"},{"record_type":"basic_element_rate","serial_no":438,"element_code":"80-185","element_group":"80","element_group_title":"Labour","description":"Driller, Helper 0","unit":"day","normalized_unit":"day","rates":{"zone_a":550.0,"zone_b":540.0,"zone_c":540.0,"zone_d":500.0},"source_raw_ocr_text":"438 | 80-185 | Driller, Helper 0... 0... day 550.00 540.00 540.00 500.00","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-185 Driller, Helper 0 day Labour"},{"record_type":"basic_element_rate","serial_no":439,"element_code":"80-190","element_group":"80","element_group_title":"Labour","description":"Electrician","unit":"day","normalized_unit":"day","rates":{"zone_a":700.0,"zone_b":700.0,"zone_c":700.0,"zone_d":650.0},"source_raw_ocr_text":"439 | 80-190 | Electrician ... 0... day 700.00 700.00 700.00 | 650.00","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-190 Electrician day Labour"},{"record_type":"basic_element_rate","serial_no":440,"element_code":"80-196","element_group":"80","element_group_title":"Labour","description":"Civil/Electrical/Mechanical Engineer ( minimum BSc in Eng.","unit":"day","normalized_unit":"day","rates":{"zone_a":1900.0,"zone_b":1900.0,"zone_c":1900.0,"zone_d":1900.0},"source_raw_ocr_text":"440 | 80-196 | Civil/Electrical/Mechanical day 1900.00 1900.00 1900.00 1900.00 Engineer ( minimum BSc in Eng.","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-196 Civil/Electrical/Mechanical Engineer ( minimum BSc in Eng. day Labour"},{"record_type":"basic_element_rate","serial_no":441,"element_code":"80-197","element_group":"80","element_group_title":"Labour","description":"44] 80-197 Survey Specialist/Team Leader","unit":"day","normalized_unit":"day","rates":{"zone_a":2200.0,"zone_b":2200.0,"zone_c":2200.0,"zone_d":2200.0},"source_raw_ocr_text":"44] 80-197 | Survey Specialist/Team Leader day 2200.00 2200.00 2200.00 2200.00","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-197 44] 80-197 Survey Specialist/Team Leader day Labour","ocr_serial_no":44,"serial_note":"OCR misread the printed serial; serial_no uses the verified source order."},{"record_type":"basic_element_rate","serial_no":442,"element_code":"80-198","element_group":"80","element_group_title":"Labour","description":"Survey Data Processing Specialist","unit":"day","normalized_unit":"day","rates":{"zone_a":1600.0,"zone_b":1600.0,"zone_c":1600.0,"zone_d":1600.0},"source_raw_ocr_text":"442 | 80-198 | Survey Data Processing Specialist day 1600.00 1600.00 1600.00 1600.00","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-198 Survey Data Processing Specialist day Labour"},{"record_type":"basic_element_rate","serial_no":443,"element_code":"80-210","element_group":"80","element_group_title":"Labour","description":"Fitter","unit":"day","normalized_unit":"day","rates":{"zone_a":700.0,"zone_b":700.0,"zone_c":700.0,"zone_d":650.0},"source_raw_ocr_text":"443 | 80-210 | Fitter oe ee day 700.00 700.00 700.00 650.00","source_pdf_page":27,"source_schedule_page":17,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-210 Fitter day Labour"},{"record_type":"basic_element_rate","serial_no":444,"element_code":"80-215","element_group":"80","element_group_title":"Labour","description":"Fitter, Helper 0 o","unit":"day","normalized_unit":"day","rates":{"zone_a":550.0,"zone_b":540.0,"zone_c":540.0,"zone_d":500.0},"source_raw_ocr_text":"444 | 80-215 | Fitter, Helper ... 0... o day 550.00 $40.00 540.00 500.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_manually_corrected","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-215 Fitter, Helper 0 o day Labour"},{"record_type":"basic_element_rate","serial_no":445,"element_code":"80-225","element_group":"80","element_group_title":"Labour","description":"Foreman 0 ae","unit":"day","normalized_unit":"day","rates":{"zone_a":850.0,"zone_b":850.0,"zone_c":850.0,"zone_d":800.0},"source_raw_ocr_text":"445 80-225 | Foreman ... 0... cee cee ee ae day 850.00 850.00 850.00 800.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-225 Foreman 0 ae day Labour"},{"record_type":"basic_element_rate","serial_no":446,"element_code":"80-230","element_group":"80","element_group_title":"Labour","description":"Assistant Foreman","unit":"day","normalized_unit":"day","rates":{"zone_a":550.0,"zone_b":540.0,"zone_c":540.0,"zone_d":500.0},"source_raw_ocr_text":"446 | 80-230 | Assistant Foreman ... 0... day 550.00 540.00 540.00 500.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-230 Assistant Foreman day Labour"},{"record_type":"basic_element_rate","serial_no":447,"element_code":"80-235","element_group":"80","element_group_title":"Labour","description":"A447 80-235 Gardener i. ie ce","unit":"day","normalized_unit":"day","rates":{"zone_a":550.0,"zone_b":540.0,"zone_c":540.0,"zone_d":500.0},"source_raw_ocr_text":"A447 | 80-235 | Gardener... i. ie cee ce cee cee oe day $50.00 540.00 540.00 500.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_manually_corrected","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-235 A447 80-235 Gardener i. ie ce day Labour"},{"record_type":"basic_element_rate","serial_no":448,"element_code":"80-265","element_group":"80","element_group_title":"Labour","description":"Driver (Passenger Vehicle)","unit":"day","normalized_unit":"day","rates":{"zone_a":700.0,"zone_b":700.0,"zone_c":700.0,"zone_d":650.0},"source_raw_ocr_text":"448 | 80-265 | Driver (Passenger Vehicle) day 700.00 700.00 700.00 650.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-265 Driver (Passenger Vehicle) day Labour"},{"record_type":"basic_element_rate","serial_no":449,"element_code":"80-305","element_group":"80","element_group_title":"Labour","description":"Head Man 2.0","unit":"day","normalized_unit":"day","rates":{"zone_a":800.0,"zone_b":800.0,"zone_c":800.0,"zone_d":750.0},"source_raw_ocr_text":"| 449 | 80-305 | Head Man 2.0... ee eee day 800.00 800.00 800.00 750.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-305 Head Man 2.0 day Labour"},{"record_type":"basic_element_rate","serial_no":450,"element_code":"80-370","element_group":"80","element_group_title":"Labour","description":"Labour, Skilled","unit":"day","normalized_unit":"day","rates":{"zone_a":600.0,"zone_b":600.0,"zone_c":600.0,"zone_d":580.0},"source_raw_ocr_text":"450 | 80-370 | Labour, Skilled day “| 600.00 600.00 600.00 580.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-370 Labour, Skilled day Labour"},{"record_type":"basic_element_rate","serial_no":451,"element_code":"80-375","element_group":"80","element_group_title":"Labour","description":"Labour, Unskilled/Ordinary","unit":"day","normalized_unit":"day","rates":{"zone_a":550.0,"zone_b":540.0,"zone_c":540.0,"zone_d":500.0},"source_raw_ocr_text":"451 | 80-375 | Labour, Unskilled/Ordinary day 550.00 540.00 540.00 500.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-375 Labour, Unskilled/Ordinary day Labour"},{"record_type":"basic_element_rate","serial_no":452,"element_code":"80-377","element_group":"80","element_group_title":"Labour","description":"Guard ese cs eer ene","unit":"day","normalized_unit":"day","rates":{"zone_a":550.0,"zone_b":540.0,"zone_c":540.0,"zone_d":500.0},"source_raw_ocr_text":"452 | 80-377 | Guard ese cs cee cee cee eee cee eee eer ene | day 550.00 | 540.00 | 540.00 | 500.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-377 Guard ese cs eer ene day Labour"},{"record_type":"basic_element_rate","serial_no":453,"element_code":"80-425","element_group":"80","element_group_title":"Labour","description":"Mason ce","unit":"day","normalized_unit":"day","rates":{"zone_a":700.0,"zone_b":700.0,"zone_c":700.0,"zone_d":650.0},"source_raw_ocr_text":"453 | 80-425 | Mason... ee ce cee cee ee eee eee day 700.00 700.00 700.00 650.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-425 Mason ce day Labour"},{"record_type":"basic_element_rate","serial_no":454,"element_code":"80-430","element_group":"80","element_group_title":"Labour","description":"Mason, Head","unit":"day","normalized_unit":"day","rates":{"zone_a":800.0,"zone_b":800.0,"zone_c":800.0,"zone_d":750.0},"source_raw_ocr_text":"454 | 80-430 | Mason, Head ... 0... ee ee oe | day 800.00 800.00 | 800.00 750.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-430 Mason, Head day Labour"},{"record_type":"basic_element_rate","serial_no":455,"element_code":"80-435","element_group":"80","element_group_title":"Labour","description":"Mason, Helper","unit":"day","normalized_unit":"day","rates":{"zone_a":590.0,"zone_b":550.0,"zone_c":540.0,"zone_d":540.0},"source_raw_ocr_text":"455 | 80-435 | Mason, Helper ... 0... day 590.00 550.00 540.00 540.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-435 Mason, Helper day Labour"},{"record_type":"basic_element_rate","serial_no":456,"element_code":"80-445","element_group":"80","element_group_title":"Labour","description":"Mechanic o.oo ces vee","unit":"day","normalized_unit":"day","rates":{"zone_a":700.0,"zone_b":700.0,"zone_c":700.0,"zone_d":650.0},"source_raw_ocr_text":"456 | 80-445 | Mechanic o.oo... cee cee ces vee oe day 700.00 700.00 700.00 650.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-445 Mechanic o.oo ces vee day Labour"},{"record_type":"basic_element_rate","serial_no":457,"element_code":"80-450","element_group":"80","element_group_title":"Labour","description":"Mechanic, Helper 00","unit":"day","normalized_unit":"day","rates":{"zone_a":590.0,"zone_b":550.0,"zone_c":540.0,"zone_d":540.0},"source_raw_ocr_text":"| 457 | 80-450 | Mechanic, Helper... ... 00... ee day 590.00 | 550.00 540.00 540.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-450 Mechanic, Helper 00 day Labour"},{"record_type":"basic_element_rate","serial_no":458,"element_code":"80-455","element_group":"80","element_group_title":"Labour","description":"Machinisht 0.0.00. ce. coe ose","unit":"day","normalized_unit":"day","rates":{"zone_a":700.0,"zone_b":700.0,"zone_c":700.0,"zone_d":650.0},"source_raw_ocr_text":"458 | 80-455 | Machinisht ... 0.0.00. ce. coe ose day 700.00 700.00 | 700.00 | 650.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-455 Machinisht 0.0.00. ce. coe ose day Labour"},{"record_type":"basic_element_rate","serial_no":459,"element_code":"80-460","element_group":"80","element_group_title":"Labour","description":"Master (Tug boat)","unit":"day","normalized_unit":"day","rates":{"zone_a":950.0,"zone_b":950.0,"zone_c":950.0,"zone_d":900.0},"source_raw_ocr_text":"459 | 80-460 | Master (Tug boat) day 950.00 950.00 950.00 900.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-460 Master (Tug boat) day Labour"},{"record_type":"basic_element_rate","serial_no":460,"element_code":"80-461","element_group":"80","element_group_title":"Labour","description":"Operator, Dredger","unit":"day","normalized_unit":"day","rates":{"zone_a":1200.0,"zone_b":1200.0,"zone_c":1200.0,"zone_d":1140.0},"source_raw_ocr_text":"460 | 80-461 | Operator, Dredger day 1200.00 1200.00 1200.00 1140.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-461 Operator, Dredger day Labour"},{"record_type":"basic_element_rate","serial_no":461,"element_code":"80-462","element_group":"80","element_group_title":"Labour","description":"Operator, Helper, Dredger","unit":"day","normalized_unit":"day","rates":{"zone_a":700.0,"zone_b":700.0,"zone_c":700.0,"zone_d":670.0},"source_raw_ocr_text":"461 | 80-462 | Operator, Helper, Dredger day 700.00 700.00 700.00 670.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-462 Operator, Helper, Dredger day Labour"},{"record_type":"basic_element_rate","serial_no":462,"element_code":"80-463","element_group":"80","element_group_title":"Labour","description":"Operator, Booster Pump","unit":"day","normalized_unit":"day","rates":{"zone_a":950.0,"zone_b":950.0,"zone_c":950.0,"zone_d":900.0},"source_raw_ocr_text":"462 | 80-463 | Operator, Booster Pump day 950.00 950.00 950.00 900.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-463 Operator, Booster Pump day Labour"},{"record_type":"basic_element_rate","serial_no":463,"element_code":"80-464","element_group":"80","element_group_title":"Labour","description":"Helper, Booster Pump","unit":"day","normalized_unit":"day","rates":{"zone_a":590.0,"zone_b":590.0,"zone_c":590.0,"zone_d":560.0},"source_raw_ocr_text":"463 | 80-464 | Helper, Booster Pump - day 590.00 | 590.00 590.00 560.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-464 Helper, Booster Pump day Labour"},{"record_type":"basic_element_rate","serial_no":464,"element_code":"80-465","element_group":"80","element_group_title":"Labour","description":"Operator, Automatic Block Making Machine","unit":"day","normalized_unit":"day","rates":{"zone_a":1200.0,"zone_b":1200.0,"zone_c":1200.0,"zone_d":1140.0},"source_raw_ocr_text":"464 | 80-465 | Operator, Automatic Block Making | day 1200.00 1200.00 | 1200.00 | 1140.00 _ Machine","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-465 Operator, Automatic Block Making Machine day Labour"},{"record_type":"basic_element_rate","serial_no":465,"element_code":"80-466","element_group":"80","element_group_title":"Labour","description":"Operator, Helper, Automatic Making Machine","unit":"day","normalized_unit":"day","rates":{"zone_a":700.0,"zone_b":700.0,"zone_c":700.0,"zone_d":670.0},"source_raw_ocr_text":"465 | 80-466 | Operator, Helper, Automatic day 700.00 700.00 700.00 670.00 Making Machine","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-466 Operator, Helper, Automatic Making Machine day Labour"},{"record_type":"basic_element_rate","serial_no":466,"element_code":"80-467","element_group":"80","element_group_title":"Labour","description":"Operator, Work Boat","unit":"day","normalized_unit":"day","rates":{"zone_a":825.0,"zone_b":825.0,"zone_c":825.0,"zone_d":780.0},"source_raw_ocr_text":"466 | 80-467 | Operator, Work Boat | day 825.00 825.00 825.00 780.00 |","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-467 Operator, Work Boat day Labour"},{"record_type":"basic_element_rate","serial_no":467,"element_code":"80-468","element_group":"80","element_group_title":"Labour","description":"Operator, Helper, Workboat","unit":"day","normalized_unit":"day","rates":{"zone_a":590.0,"zone_b":590.0,"zone_c":590.0,"zone_d":560.0},"source_raw_ocr_text":"467 80-468 | Operator, Helper, Workboat day 590.00 590.00 590,00 560.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-468 Operator, Helper, Workboat day Labour"},{"record_type":"basic_element_rate","serial_no":468,"element_code":"80-470","element_group":"80","element_group_title":"Labour","description":"Operator, Tug Boat","unit":"day","normalized_unit":"day","rates":{"zone_a":825.0,"zone_b":825.0,"zone_c":825.0,"zone_d":780.0},"source_raw_ocr_text":"468 | 80-470 | Operator, Tug Boat day 825.00 825.00 825.00 780.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-470 Operator, Tug Boat day Labour"},{"record_type":"basic_element_rate","serial_no":469,"element_code":"80-471","element_group":"80","element_group_title":"Labour","description":"Operator, Helper, Tug Boat “","unit":"day","normalized_unit":"day","rates":{"zone_a":590.0,"zone_b":590.0,"zone_c":590.0,"zone_d":560.0},"source_raw_ocr_text":"469 | 80-471 | Operator, Helper, Tug Boat “day 590.00 590.00 590.00 560.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-471 Operator, Helper, Tug Boat “ day Labour"},{"record_type":"basic_element_rate","serial_no":470,"element_code":"80-472","element_group":"80","element_group_title":"Labour","description":"Operator (Double drum mooring } winch, Generator & others work)","unit":"day","normalized_unit":"day","rates":{"zone_a":750.0,"zone_b":750.0,"zone_c":750.0,"zone_d":715.0},"source_raw_ocr_text":"| 470 | 80-472 | Operator (Double drum mooring day 750.00 750.00 750.00 715.00 } winch, Generator & others work)","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-472 Operator (Double drum mooring } winch, Generator & others work) day Labour"},{"record_type":"basic_element_rate","serial_no":471,"element_code":"80-473","element_group":"80","element_group_title":"Labour","description":"Operator Helper (Double drum mooring winch, Generator & others","unit":"day","normalized_unit":"day","rates":{"zone_a":590.0,"zone_b":590.0,"zone_c":590.0,"zone_d":560.0},"source_raw_ocr_text":"471 | 80-473 | Operator Helper (Double drum day 590.00 590.00 590.00 560.00 mooring winch, Generator & others","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-473 Operator Helper (Double drum mooring winch, Generator & others day Labour"},{"record_type":"basic_element_rate","serial_no":472,"element_code":"80-474","element_group":"80","element_group_title":"Labour","description":"Operator (Barge, 200 Ton)","unit":"day","normalized_unit":"day","rates":{"zone_a":950.0,"zone_b":950.0,"zone_c":950.0,"zone_d":900.0},"source_raw_ocr_text":"472 | 80-474 | Operator (Barge, 200 Ton) day 950.00 950.00 950.00 900.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-474 Operator (Barge, 200 Ton) day Labour"},{"record_type":"basic_element_rate","serial_no":473,"element_code":"80-475","element_group":"80","element_group_title":"Labour","description":"Operator, Helper (Barge, 200 Ton)","unit":"day","normalized_unit":"day","rates":{"zone_a":590.0,"zone_b":590.0,"zone_c":590.0,"zone_d":560.0},"source_raw_ocr_text":"473 80-475 | Operator, Helper (Barge, 200 Ton) day 590.00 590.00 590.00 560.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-475 Operator, Helper (Barge, 200 Ton) day Labour"},{"record_type":"basic_element_rate","serial_no":474,"element_code":"80-476","element_group":"80","element_group_title":"Labour","description":"Surveyor (10yrs Exp / diploma Engineer trained in survey)","unit":"day","normalized_unit":"day","rates":{"zone_a":1400.0,"zone_b":1400.0,"zone_c":1400.0,"zone_d":1400.0},"source_raw_ocr_text":"474 | 80-476 Surveyor (10yrs Exp / diploma day 1400.00 1400.00 1400.00 1400.00 Engineer trained in survey)","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-476 Surveyor (10yrs Exp / diploma Engineer trained in survey) day Labour"},{"record_type":"basic_element_rate","serial_no":475,"element_code":"80-477","element_group":"80","element_group_title":"Labour","description":"Driver/Operator (Motor Cycle/Speed Boat/ Engine Boat)","unit":"day","normalized_unit":"day","rates":{"zone_a":700.0,"zone_b":700.0,"zone_c":700.0,"zone_d":650.0},"source_raw_ocr_text":"475 80-477 | Driver/Operator (Motor day 700.00 700.00 700.00 650.00 Cycle/Speed Boat/ Engine Boat)","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-477 Driver/Operator (Motor Cycle/Speed Boat/ Engine Boat) day Labour"},{"record_type":"basic_element_rate","serial_no":476,"element_code":"80-478","element_group":"80","element_group_title":"Labour","description":"Helper, Flat Top Barge","unit":"day","normalized_unit":"day","rates":{"zone_a":590.0,"zone_b":590.0,"zone_c":590.0,"zone_d":560.0},"source_raw_ocr_text":"476 | 80-478 | Helper, Flat Top Barge day 590.00 590.00 590.00 560.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-478 Helper, Flat Top Barge day Labour"},{"record_type":"basic_element_rate","serial_no":477,"element_code":"80-479","element_group":"80","element_group_title":"Labour","description":"Helper, Engine boat","unit":"day","normalized_unit":"day","rates":{"zone_a":590.0,"zone_b":590.0,"zone_c":590.0,"zone_d":560.0},"source_raw_ocr_text":"477 | 80-479 | Helper, Engine boat day 590.00 590.00 590.00 560.00","source_pdf_page":28,"source_schedule_page":18,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-479 Helper, Engine boat day Labour"},{"record_type":"basic_element_rate","serial_no":478,"element_code":"80-480","element_group":"80","element_group_title":"Labour","description":"Operator, B.dozer/S.F .roller/V.compactor/Lon g Boom/Dump Truck.","unit":"day","normalized_unit":"day","rates":{"zone_a":950.0,"zone_b":950.0,"zone_c":950.0,"zone_d":900.0},"source_raw_ocr_text":"| 478 | 80-480 | Operator, day | 950.00 950.00 950.00 900.00 | B.dozer/S.F .roller/V.compactor/Lon | g Boom/Dump Truck.","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-480 Operator, B.dozer/S.F .roller/V.compactor/Lon g Boom/Dump Truck. day Labour"},{"record_type":"basic_element_rate","serial_no":479,"element_code":"80-481","element_group":"80","element_group_title":"Labour","description":"Operator Helper, B.dozer/ S.F.roller/V.compactor/Long Boom/ Dump Truck.","unit":"day","normalized_unit":"day","rates":{"zone_a":590.0,"zone_b":590.0,"zone_c":590.0,"zone_d":560.0},"source_raw_ocr_text":"| 479 | 80-481 | Operator Helper, B.dozer/ day | 590.00 590.00 590.00 560.00 S.F.roller/V.compactor/Long Boom/ Dump Truck.","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-481 Operator Helper, B.dozer/ S.F.roller/V.compactor/Long Boom/ Dump Truck. day Labour"},{"record_type":"basic_element_rate","serial_no":480,"element_code":"80-482","element_group":"80","element_group_title":"Labour","description":"Operator Fork Lift","unit":"day","normalized_unit":"day","rates":{"zone_a":825.0,"zone_b":825.0,"zone_c":825.0,"zone_d":780.0},"source_raw_ocr_text":"480 | 80-482 | Operator Fork Lift day 825.00 825.00 825.00 780.00","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-482 Operator Fork Lift day Labour"},{"record_type":"basic_element_rate","serial_no":481,"element_code":"80-485","element_group":"80","element_group_title":"Labour","description":"Operator, Total station","unit":"day","normalized_unit":"day","rates":{"zone_a":825.0,"zone_b":825.0,"zone_c":825.0,"zone_d":780.0},"source_raw_ocr_text":"481 | 80-485 | Operator, Total station day | 825.00 825.00 825.00 780.00 |","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-485 Operator, Total station day Labour"},{"record_type":"basic_element_rate","serial_no":482,"element_code":"80-486","element_group":"80","element_group_title":"Labour","description":"Data Entry Operator","unit":"day","normalized_unit":"day","rates":{"zone_a":700.0,"zone_b":700.0,"zone_c":700.0,"zone_d":700.0},"source_raw_ocr_text":"482 | 80-486 | Data Entry Operator day 700.00 700.00 700.00 700.00 |","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-486 Data Entry Operator day Labour"},{"record_type":"basic_element_rate","serial_no":483,"element_code":"80-490","element_group":"80","element_group_title":"Labour","description":"Operator, Crane os ces on","unit":"day","normalized_unit":"day","rates":{"zone_a":850.0,"zone_b":850.0,"zone_c":850.0,"zone_d":850.0},"source_raw_ocr_text":"483 | 80-490 | Operator, Crane os cee cee cee ces on day | 850.00 850.00 850.00 850.00","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-490 Operator, Crane os ces on day Labour"},{"record_type":"basic_element_rate","serial_no":484,"element_code":"80-493","element_group":"80","element_group_title":"Labour","description":"Operator, Helper, Crane","unit":"day","normalized_unit":"day","rates":{"zone_a":650.0,"zone_b":650.0,"zone_c":650.0,"zone_d":650.0},"source_raw_ocr_text":"484 | 80-493 | Operator, Helper, Crane........... | day | 650.00 650.00 650.00 | 650.00","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-493 Operator, Helper, Crane day Labour"},{"record_type":"basic_element_rate","serial_no":485,"element_code":"80-495","element_group":"80","element_group_title":"Labour","description":"Operator, Sewing Machine","unit":"day","normalized_unit":"day","rates":{"zone_a":750.0,"zone_b":750.0,"zone_c":750.0,"zone_d":715.0},"source_raw_ocr_text":"485 | 80-495 | Operator, Sewing Machine day 750.00 750.00 750.00 715.00","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-495 Operator, Sewing Machine day Labour"},{"record_type":"basic_element_rate","serial_no":486,"element_code":"80-496","element_group":"80","element_group_title":"Labour","description":"Operator, Cutter (Geo-textile)","unit":"day","normalized_unit":"day","rates":{"zone_a":750.0,"zone_b":750.0,"zone_c":750.0,"zone_d":715.0},"source_raw_ocr_text":"486 | 80-496 | Operator, Cutter (Geo-textile) day 750.00 750.00 750.00 715.00","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-496 Operator, Cutter (Geo-textile) day Labour"},{"record_type":"basic_element_rate","serial_no":487,"element_code":"80-497","element_group":"80","element_group_title":"Labour","description":"Operator, Helper, Cutter (Geo- textile)","unit":"day","normalized_unit":"day","rates":{"zone_a":590.0,"zone_b":590.0,"zone_c":590.0,"zone_d":560.0},"source_raw_ocr_text":"487 | 80-497 | Operator, Helper, Cutter (Geo- day 590.00 590.00 590.00 560.00 textile)","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-497 Operator, Helper, Cutter (Geo- textile) day Labour"},{"record_type":"basic_element_rate","serial_no":488,"element_code":"80-500","element_group":"80","element_group_title":"Labour","description":"Operator, Mixture Machine","unit":"day","normalized_unit":"day","rates":{"zone_a":825.0,"zone_b":825.0,"zone_c":825.0,"zone_d":780.0},"source_raw_ocr_text":"488 | 80-500 | Operator, Mixture Machine... ... .... day 825.00 | 825.00 825.00 780.00","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-500 Operator, Mixture Machine day Labour"},{"record_type":"basic_element_rate","serial_no":489,"element_code":"80-510","element_group":"80","element_group_title":"Labour","description":"Operator, PUMP 1. ce see","unit":"day","normalized_unit":"day","rates":{"zone_a":750.0,"zone_b":750.0,"zone_c":750.0,"zone_d":715.0},"source_raw_ocr_text":"489 | 80-510 | Operator, PUMP... 1. ce ee cee see day 750.00 750.00 750.00 715.00","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-510 Operator, PUMP 1. ce see day Labour"},{"record_type":"basic_element_rate","serial_no":490,"element_code":"80-525","element_group":"80","element_group_title":"Labour","description":"Operator, Power Winch","unit":"day","normalized_unit":"day","rates":{"zone_a":750.0,"zone_b":750.0,"zone_c":750.0,"zone_d":715.0},"source_raw_ocr_text":"490 | 80-525 | Operator, Power Winch... ... .. .. day 750.00 750.00 750.00 715.00 |","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-525 Operator, Power Winch day Labour"},{"record_type":"basic_element_rate","serial_no":491,"element_code":"80-535","element_group":"80","element_group_title":"Labour","description":"Painter, Helper 2 css es. woe","unit":"day","normalized_unit":"day","rates":{"zone_a":550.0,"zone_b":540.0,"zone_c":540.0,"zone_d":500.0},"source_raw_ocr_text":"491 | 80-535 | Painter, Helper ... 2... css es. woe day 550.00 540.00 540.00 500.00","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-535 Painter, Helper 2 css es. woe day Labour"},{"record_type":"basic_element_rate","serial_no":492,"element_code":"80-540","element_group":"80","element_group_title":"Labour","description":"Painter/Varnisher","unit":"day","normalized_unit":"day","rates":{"zone_a":700.0,"zone_b":700.0,"zone_c":700.0,"zone_d":650.0},"source_raw_ocr_text":"492 | 80-540 | Painter/Varnisher ... .... ... ... day 700.00 700.00 700.00 650.00","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-540 Painter/Varnisher day Labour"},{"record_type":"basic_element_rate","serial_no":493,"element_code":"80-560","element_group":"80","element_group_title":"Labour","description":"Plumber ooo csc css woe","unit":"day","normalized_unit":"day","rates":{"zone_a":700.0,"zone_b":700.0,"zone_c":700.0,"zone_d":650.0},"source_raw_ocr_text":"493 | 80-560 | Plumber... ooo cee csc css woe eee oe day 700.00 700.00 700.00 650.00","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-560 Plumber ooo csc css woe day Labour"},{"record_type":"basic_element_rate","serial_no":494,"element_code":"80-570","element_group":"80","element_group_title":"Labour","description":"Plumber, Helper 2. 02. ce ees","unit":"day","normalized_unit":"day","rates":{"zone_a":550.0,"zone_b":540.0,"zone_c":540.0,"zone_d":500.0},"source_raw_ocr_text":"494 | 80-570 | Plumber, Helper... 2. 02. ce ees oe day 550.00 | 540.00 540.00 500.00","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-570 Plumber, Helper 2. 02. ce ees day Labour"},{"record_type":"basic_element_rate","serial_no":495,"element_code":"80-605","element_group":"80","element_group_title":"Labour","description":"Rod Mistry, Head 0 soe a","unit":"day","normalized_unit":"day","rates":{"zone_a":800.0,"zone_b":800.0,"zone_c":800.0,"zone_d":750.0},"source_raw_ocr_text":"(495 | 80-605 | Rod Mistry, Head ... 0... soe oe a day 800.00 | 800.00 800.00 750.00","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-605 Rod Mistry, Head 0 soe a day Labour"},{"record_type":"basic_element_rate","serial_no":496,"element_code":"80-610","element_group":"80","element_group_title":"Labour","description":"Rod Mistry, Helper 0a","unit":"day","normalized_unit":"day","rates":{"zone_a":550.0,"zone_b":540.0,"zone_c":540.0,"zone_d":500.0},"source_raw_ocr_text":"496 | 80-610 | Rod Mistry, Helper ... 0a... day 550.00 540.00 540.00 500.00","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-610 Rod Mistry, Helper 0a day Labour"},{"record_type":"basic_element_rate","serial_no":497,"element_code":"80-705","element_group":"80","element_group_title":"Labour","description":"Sweeper wee ces on","unit":"day","normalized_unit":"day","rates":{"zone_a":800.0,"zone_b":800.0,"zone_c":800.0,"zone_d":750.0},"source_raw_ocr_text":"497 | 80-705 | Sweeper wee cee ces ee cee eee on day 800.00 800.00 800.00 750.00","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-705 Sweeper wee ces on day Labour"},{"record_type":"basic_element_rate","serial_no":498,"element_code":"80-720","element_group":"80","element_group_title":"Labour","description":"Technician 0 on","unit":"day","normalized_unit":"day","rates":{"zone_a":1000.0,"zone_b":1000.0,"zone_c":1000.0,"zone_d":1000.0},"source_raw_ocr_text":"498 | 80-720 | Technician... 0... cee eee on day 1000.00 | 1000.00 | 1000.00 | 1000.00","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-720 Technician 0 on day Labour"},{"record_type":"basic_element_rate","serial_no":499,"element_code":"80-755","element_group":"80","element_group_title":"Labour","description":"Welder i","unit":"day","normalized_unit":"day","rates":{"zone_a":700.0,"zone_b":700.0,"zone_c":700.0,"zone_d":650.0},"source_raw_ocr_text":"499 | 80-755) | Welder i... eee day 700.00 | 700.00 700.00 650.00","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-755 Welder i day Labour"},{"record_type":"basic_element_rate","serial_no":500,"element_code":"80-760","element_group":"80","element_group_title":"Labour","description":"Welder, Helper 0 css coe","unit":"day","normalized_unit":"day","rates":{"zone_a":550.0,"zone_b":540.0,"zone_c":540.0,"zone_d":500.0},"source_raw_ocr_text":"500 | 80-760 | Welder, Helper... 0... ee css coe day 550.00 | 540.00 540.00 500.00","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-760 Welder, Helper 0 css coe day Labour"},{"record_type":"basic_element_rate","serial_no":501,"element_code":"80-780","element_group":"80","element_group_title":"Labour","description":"Helper, Operator, Sewing Machine","unit":"day","normalized_unit":"day","rates":{"zone_a":550.0,"zone_b":540.0,"zone_c":540.0,"zone_d":500.0},"source_raw_ocr_text":"501 | 80-780 | Helper, Operator, Sewing Machine | day 550.00 540.00 540.00 500.00","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-780 Helper, Operator, Sewing Machine day Labour"},{"record_type":"basic_element_rate","serial_no":502,"element_code":"80-785","element_group":"80","element_group_title":"Labour","description":"Supervisor","unit":"day","normalized_unit":"day","rates":{"zone_a":850.0,"zone_b":850.0,"zone_c":850.0,"zone_d":800.0},"source_raw_ocr_text":"502 | 80-785 | Supervisor day 850.00 850.00 850.00 | 800.00","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-785 Supervisor day Labour"},{"record_type":"basic_element_rate","serial_no":503,"element_code":"80-790","element_group":"80","element_group_title":"Labour","description":"Driver (Bus/Truck/Micro Bus/Jeep/Private Car)","unit":"day","normalized_unit":"day","rates":{"zone_a":700.0,"zone_b":700.0,"zone_c":700.0,"zone_d":650.0},"source_raw_ocr_text":"503 | 80-790 | Driver (Bus/Truck/Micro day 700.00 700.00 700.00 650.00 | Bus/Jeep/Private Car)","source_pdf_page":29,"source_schedule_page":19,"rate_validation_status":"source_image_assisted_verified","description_validation_status":"source_image_ocr_assisted","serial_validation_status":"source_order_verified","search_text":"80-790 Driver (Bus/Truck/Micro Bus/Jeep/Private Car) day Labour"}],"item_rates":[{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-180-00-P30-SL1","serial_label":"1","item_code":"04-180-00","item_code_raw_ocr":"04-180-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"site and removing debris including uprooting stumps, jungle clearing, levelling dressing etc. complete as per direction of Engineer in charge. Supplying & fixing at site temporary bamboo gauges, 6cm to 99cm dia, marked in meter, decimeter and centimeter, including black & white water","unit":"sqm","rates":{"zone_a":44.52,"zone_b":43.61,"zone_c":43.54,"zone_d":40.59},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":30,"source_schedule_page":20,"raw_rate_tokens":["44.52","43.61","43.54","40.59"],"source_review_note":null,"search_text":"04-180-00 site and removing debris including uprooting stumps, jungle clearing, levelling dressing etc. complete as per direction of Engineer in charge. Supplying & fixing at site temporary bamboo gauges, 6cm to 99cm dia, marked in meter, decimeter and centimeter, including black & white water sqm Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-200-00-P30-SL2","serial_label":"2","item_code":"04-200-00","item_code_raw_ocr":"04-200-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"proof painting and printing gauge, to be driven not less than 1.80m below ground (Measurement will be given only for the marked portion) as per direction of Engineer in charge. Supplying & fixing wooden gauges at site, made of sal/gajari/sundari wood, engraved in meter,","unit":"m","rates":{"zone_a":124.89,"zone_b":116.69,"zone_c":116.69,"zone_d":118.46},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":30,"source_schedule_page":20,"raw_rate_tokens":["124.89","116.69","116.69","118.46"],"source_review_note":null,"search_text":"04-200-00 proof painting and printing gauge, to be driven not less than 1.80m below ground (Measurement will be given only for the marked portion) as per direction of Engineer in charge. Supplying & fixing wooden gauges at site, made of sal/gajari/sundari wood, engraved in meter, m Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-210-00-P30-SL3","serial_label":"3","item_code":"04-210-00","item_code_raw_ocr":"04-210-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"water proof painting with black, white & red paint, etc. complete as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":30,"source_schedule_page":20,"raw_rate_tokens":null,"source_review_note":null,"search_text":"04-210-00 water proof painting with black, white & red paint, etc. complete as per direction of Engineer in charge. Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-210-10-P30-SL3(1)","serial_label":"3(1)","item_code":"04-210-10","item_code_raw_ocr":"04-210-10","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"50mm x 25mm, size (finished section).","unit":"","rates":{"zone_a":769.47,"zone_b":768.59,"zone_c":768.59,"zone_d":745.13},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":30,"source_schedule_page":20,"raw_rate_tokens":["769.47","768.59","768.59","745.13"],"source_review_note":null,"search_text":"04-210-10 50mm x 25mm, size (finished section). Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-210-20-P30","serial_label":null,"item_code":"04-210-20","item_code_raw_ocr":"04-210-29","item_code_validation_status":"source_image_manually_corrected","section_code":"04","section_title":"Preliminary & Misc. Work","description":"100mm x 25mm, size (finished on section). Supplying & fixing at site triangular gauges of 15 cm size made of best quality local hard","unit":"","rates":{"zone_a":571.98,"zone_b":571.43,"zone_c":571.43,"zone_d":550.99},"rate_integrity_status":"source_image_manually_verified","autofill_eligible":true,"source_pdf_page":30,"source_schedule_page":20,"raw_rate_tokens":["571.98","571.43","571.43","$50.99"],"source_review_note":"Source image manually inspected in this session.","search_text":"04-210-20 100mm x 25mm, size (finished on section). Supplying & fixing at site triangular gauges of 15 cm size made of best quality local hard Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-230-00-P30-SL4","serial_label":"4","item_code":"04-230-00","item_code_raw_ocr":"04-230-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"Wood engraved in meter, 1 559-79 decimeter & centimeter, including water proof painting with black, white & red paint, etc. complete as per direction of Engineer in charge. Supplying & driving 2.8m long, 15 cm to 20 cm average dia local hard wood post of approved quality,","unit":"","rates":{"zone_a":559.79,"zone_b":1550.87,"zone_c":1550.87,"zone_d":1517.93},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":30,"source_schedule_page":20,"raw_rate_tokens":["559-79","1,550.87","1,550.87","1,517.93"],"source_review_note":null,"search_text":"04-230-00 Wood engraved in meter, 1 559-79 decimeter & centimeter, including water proof painting with black, white & red paint, etc. complete as per direction of Engineer in charge. Supplying & driving 2.8m long, 15 cm to 20 cm average dia local hard wood post of approved quality, Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-240-00-P30-SL5","serial_label":"5","item_code":"04-240-00","item_code_raw_ocr":"04-240-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"including sizing, sharpening & oo providing holes for fitting gauges (driving portion not less than 1.80 m) etc. complete as per direction of Engineer in charge. Fixing gauges to posts including","unit":"","rates":{"zone_a":1517.62,"zone_b":1406.73,"zone_c":1406.73,"zone_d":1442.55},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":30,"source_schedule_page":20,"raw_rate_tokens":["1517.62","1,406.73","1,406.73","1,442.55"],"source_review_note":null,"search_text":"04-240-00 including sizing, sharpening & oo providing holes for fitting gauges (driving portion not less than 1.80 m) etc. complete as per direction of Engineer in charge. Fixing gauges to posts including Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-260-00-P30-SL6","serial_label":"6","item_code":"04-260-00","item_code_raw_ocr":"04-260-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"supply of necessary bolts and nuts or nails. Constructing at site, cement mortar gauge on masonry wall, including engraving in meter, decimeter &","unit":"each","rates":{"zone_a":305.66,"zone_b":304.82,"zone_c":304.82,"zone_d":297.35},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":30,"source_schedule_page":20,"raw_rate_tokens":["305.66","304.82","304.82","297.35"],"source_review_note":null,"search_text":"04-260-00 supply of necessary bolts and nuts or nails. Constructing at site, cement mortar gauge on masonry wall, including engraving in meter, decimeter & each Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-280-00-P30-SL7","serial_label":"7","item_code":"04-280-00","item_code_raw_ocr":"04-280-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"with black and red water proof paint, etc. complete as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":30,"source_schedule_page":20,"raw_rate_tokens":null,"source_review_note":null,"search_text":"04-280-00 with black and red water proof paint, etc. complete as per direction of Engineer in charge. Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-280-10-P31-SL7(1)","serial_label":"7(1)","item_code":"04-280-10","item_code_raw_ocr":"04-280-10","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"150mm x 25mm","unit":"m","rates":{"zone_a":108.98,"zone_b":108.34,"zone_c":108.37,"zone_d":103.08},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":31,"source_schedule_page":21,"raw_rate_tokens":["108.98","108.34","108.37","103.08"],"source_review_note":null,"search_text":"04-280-10 150mm x 25mm m Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-280-20-P31-SL7(2)","serial_label":"7(2)","item_code":"04-280-20","item_code_raw_ocr":"04-280-20","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"100mm x 25mm m 74.28 73,84 73.86 70.30 Repairing of cement concrete 00.9) Z2uge including _ plastering,","unit":"","rates":{"zone_a":74.28,"zone_b":73.84,"zone_c":73.86,"zone_d":70.3},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":31,"source_schedule_page":21,"raw_rate_tokens":["74.28","73,84","73.86","70.30"],"source_review_note":null,"search_text":"04-280-20 100mm x 25mm m 74.28 73,84 73.86 70.30 Repairing of cement concrete 00.9) Z2uge including _ plastering, Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-290-00-P31","serial_label":null,"item_code":"04-290-00","item_code_raw_ocr":"04-290-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"painting, lettering etc. complete as per direction of Engineer in charge. Supplying 7.50 cm dia bamboo sounding rods, 450 cm long, with black & white paint, at every","unit":"m","rates":{"zone_a":70.3,"zone_b":69.9,"zone_c":69.91,"zone_d":66.37},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":31,"source_schedule_page":21,"raw_rate_tokens":["70.30","69.90","69.91","66.37"],"source_review_note":null,"search_text":"04-290-00 painting, lettering etc. complete as per direction of Engineer in charge. Supplying 7.50 cm dia bamboo sounding rods, 450 cm long, with black & white paint, at every m Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-310-00-P31","serial_label":null,"item_code":"04-310-00","item_code_raw_ocr":"04-310-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":": : . each alternative decimeter and figuring etc. complete as per direction of Engineer in charge. Supplying bamboo pegs 0.45 m to","unit":"","rates":{"zone_a":440.13,"zone_b":415.6,"zone_c":415.6,"zone_d":417.73},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":31,"source_schedule_page":21,"raw_rate_tokens":["440.13","415.60","415.60","417.73"],"source_review_note":null,"search_text":"04-310-00 : : . each alternative decimeter and figuring etc. complete as per direction of Engineer in charge. Supplying bamboo pegs 0.45 m to Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-320-00-P31-SL10","serial_label":"10","item_code":"04-320-00","item_code_raw_ocr":"04-320-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"9:75 m long and average dia6cm, 1) with saw cut top as per direction of Engineer in charge. Labour charge for fixing the","unit":"","rates":{"zone_a":41.93,"zone_b":37.38,"zone_c":37.38,"zone_d":38.87},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":31,"source_schedule_page":21,"raw_rate_tokens":["41.93","37.38","37.38","38.87"],"source_review_note":null,"search_text":"04-320-00 9:75 m long and average dia6cm, 1) with saw cut top as per direction of Engineer in charge. Labour charge for fixing the Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-330-00-P31","serial_label":null,"item_code":"04-330-00","item_code_raw_ocr":"04-330-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"bamboo pegs and average dia 6cm, as per direction of Engineer in charge. Removing water hyacinth and","unit":"","rates":{"zone_a":4.59,"zone_b":4.51,"zone_c":4.51,"zone_d":4.17},"rate_integrity_status":"source_image_manually_verified","autofill_eligible":true,"source_pdf_page":31,"source_schedule_page":21,"raw_rate_tokens":["4.59","451","4.51","4.17"],"source_review_note":"Source image manually inspected in this session.","search_text":"04-330-00 bamboo pegs and average dia 6cm, as per direction of Engineer in charge. Removing water hyacinth and Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-400-00-P31-SL12","serial_label":"12","item_code":"04-400-00","item_code_raw_ocr":"04-400-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"to ashes:","unit":"","rates":{"zone_a":10.0,"zone_b":4.59,"zone_c":4.51,"zone_d":4.17},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":31,"source_schedule_page":21,"raw_rate_tokens":["1","4.59","4.51","4.17"],"source_review_note":null,"search_text":"04-400-00 to ashes: Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-400-20-P31-SL12(2)","serial_label":"12(2)","item_code":"04-400-20","item_code_raw_ocr":"04-400-20","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"packed _ Cutting trees and uprooting stumps and removing the same from the","unit":"","rates":{"zone_a":10.19,"zone_b":10.01,"zone_c":10.01,"zone_d":9.26},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":31,"source_schedule_page":21,"raw_rate_tokens":["10.19","10.01","10.01","9.26"],"source_review_note":null,"search_text":"04-400-20 packed _ Cutting trees and uprooting stumps and removing the same from the Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-410-00-P31-SL13","serial_label":"13","item_code":"04-410-00","item_code_raw_ocr":"04-410-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"in a place, as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":31,"source_schedule_page":21,"raw_rate_tokens":null,"source_review_note":null,"search_text":"04-410-00 in a place, as per direction of Engineer in charge. Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-410-10-P31-SL13(1)","serial_label":"13(1)","item_code":"04-410-10","item_code_raw_ocr":"04-410-10","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"30 cm to","unit":"","rates":{"zone_a":340.81,"zone_b":334.61,"zone_c":334.61,"zone_d":309.82},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":31,"source_schedule_page":21,"raw_rate_tokens":["340.81","334.61","334.61","309.82"],"source_review_note":null,"search_text":"04-410-10 30 cm to Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-410-20-P31-SL13(2)","serial_label":"13(2)","item_code":"04-410-20","item_code_raw_ocr":"04-410-20","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"","unit":"","rates":{"zone_a":454.66,"zone_b":446.39,"zone_c":446.39,"zone_d":413.32},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":31,"source_schedule_page":21,"raw_rate_tokens":["454.66","446.39","446.39","413.32"],"source_review_note":null,"search_text":"04-410-20 Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-410-30-P31","serial_label":null,"item_code":"04-410-30","item_code_raw_ocr":"04-410-30","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"above Cutting and clearing jungles and uprooting trees upto 30cm girth","unit":"","rates":{"zone_a":1182.16,"zone_b":1160.67,"zone_c":1160.67,"zone_d":1074.69},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":31,"source_schedule_page":21,"raw_rate_tokens":["1,182.16","1,160.67","1,160.67","1,074.69"],"source_review_note":null,"search_text":"04-410-30 above Cutting and clearing jungles and uprooting trees upto 30cm girth Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-440-00-P31-SL14","serial_label":"14","item_code":"04-440-00","item_code_raw_ocr":"04-440-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"site as per direction of Enginer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":31,"source_schedule_page":21,"raw_rate_tokens":null,"source_review_note":null,"search_text":"04-440-00 site as per direction of Enginer in charge. Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-440-20-P31","serial_label":null,"item_code":"04-440-20","item_code_raw_ocr":"04-440-20","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"14@2)_ thick and thomy 451 Cutting, uprooting and removing","unit":"","rates":{"zone_a":4.59,"zone_b":4.51,"zone_c":4.51,"zone_d":4.17},"rate_integrity_status":"source_image_manually_verified","autofill_eligible":true,"source_pdf_page":31,"source_schedule_page":21,"raw_rate_tokens":null,"source_review_note":"Source image manually inspected in this session.","search_text":"04-440-20 14@2)_ thick and thomy 451 Cutting, uprooting and removing Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-450-00-P31-SL15","serial_label":"15","item_code":"04-450-00","item_code_raw_ocr":"04-450-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"bamboo cluster from the site as per direction of Engineer in charge. Cutting, uprooting and removing","unit":"sqm","rates":{"zone_a":40.9,"zone_b":40.15,"zone_c":40.15,"zone_d":37.18},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":31,"source_schedule_page":21,"raw_rate_tokens":["40.90","40.15","40.15","37.18"],"source_review_note":null,"search_text":"04-450-00 bamboo cluster from the site as per direction of Engineer in charge. Cutting, uprooting and removing sqm Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-460-00-P31","serial_label":null,"item_code":"04-460-00","item_code_raw_ocr":"04-460-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"} cane jungles, from the site, as per direction of Engineer in charge. _ago.on Supplying cross section nylon M7 wemnihaiied ropes, marked at every decimeter:","unit":"sqm","rates":{"zone_a":20.45,"zone_b":20.08,"zone_c":20.08,"zone_d":18.59},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":31,"source_schedule_page":21,"raw_rate_tokens":["20.45","20.08","20.08","18.59"],"source_review_note":null,"search_text":"04-460-00 } cane jungles, from the site, as per direction of Engineer in charge. _ago.on Supplying cross section nylon M7 wemnihaiied ropes, marked at every decimeter: sqm Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-470-10-P31-SL17(1)","serial_label":"17(1)","item_code":"04-470-10","item_code_raw_ocr":"04-470-10","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"6mm dia om","unit":"","rates":{"zone_a":205.07,"zone_b":205.07,"zone_c":205.07,"zone_d":204.58},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":31,"source_schedule_page":21,"raw_rate_tokens":["205.07","205.07","205.07","204.58"],"source_review_note":null,"search_text":"04-470-10 6mm dia om Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-470-20-P31-SL17(2)","serial_label":"17(2)","item_code":"04-470-20","item_code_raw_ocr":"04-470-20","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"12mmdia Zh Vail QO","unit":"m","rates":{"zone_a":21.72,"zone_b":21.72,"zone_c":21.72,"zone_d":21.23},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":31,"source_schedule_page":21,"raw_rate_tokens":["21.72","21.72","21.72","21.23"],"source_review_note":null,"search_text":"04-470-20 12mmdia Zh Vail QO m Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-600-00-P32-SL18","serial_label":"18","item_code":"04-600-00","item_code_raw_ocr":"04-600-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"all materials etc. complete as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":32,"source_schedule_page":22,"raw_rate_tokens":null,"source_review_note":null,"search_text":"04-600-00 all materials etc. complete as per direction of Engineer in charge. Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-600-10-P32-SL18(1)","serial_label":"18(1)","item_code":"04-600-10","item_code_raw_ocr":"04-600-10","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"25 mm thick sheet.","unit":"sqm","rates":{"zone_a":181.94,"zone_b":181.93,"zone_c":181.93,"zone_d":179.45},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":32,"source_schedule_page":22,"raw_rate_tokens":["181.94","181.93","181.93","179.45"],"source_review_note":null,"search_text":"04-600-10 25 mm thick sheet. sqm Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-600-20-P32-SL18(2)","serial_label":"18(2)","item_code":"04-600-20","item_code_raw_ocr":"04-600-20","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"20 mm thick sheet. Filling of expansion joints upto a depth of 40 mm with bitumen mixed with coarse sand (FM>=2.5)","unit":"","rates":{"zone_a":161.08,"zone_b":161.07,"zone_c":161.07,"zone_d":158.59},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":32,"source_schedule_page":22,"raw_rate_tokens":["161.08","161.07","161.07","158.59"],"source_review_note":null,"search_text":"04-600-20 20 mm thick sheet. Filling of expansion joints upto a depth of 40 mm with bitumen mixed with coarse sand (FM>=2.5) Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-620-00-P32","serial_label":null,"item_code":"04-620-00","item_code_raw_ocr":"04-620-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"of all materials etc. complete as per specification and direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":32,"source_schedule_page":22,"raw_rate_tokens":null,"source_review_note":null,"search_text":"04-620-00 of all materials etc. complete as per specification and direction of Engineer in charge. Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-620-10-P32-SL19(1)","serial_label":"19(1)","item_code":"04-620-10","item_code_raw_ocr":"04-620-10","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"116.51 115.82 11651 113.44","unit":"","rates":{"zone_a":116.51,"zone_b":115.82,"zone_c":116.51,"zone_d":113.44},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":32,"source_schedule_page":22,"raw_rate_tokens":["116.51","115.82","11651","113.44"],"source_review_note":null,"search_text":"04-620-10 116.51 115.82 11651 113.44 Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-620-20-P32-SL19(2)","serial_label":"19(2)","item_code":"04-620-20","item_code_raw_ocr":"04-620-20","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":") 20 mm wide. Hiring of Speed boat/Engine boat (With roof Cover, Life Jacket) in a tip top condition during travelling to different field offices or to different construction sites or any other official use, meeting,","unit":"","rates":{"zone_a":93.25,"zone_b":92.7,"zone_c":93.26,"zone_d":90.8},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":32,"source_schedule_page":22,"raw_rate_tokens":["93.25","92.70","93.26","90.80"],"source_review_note":null,"search_text":"04-620-20 ) 20 mm wide. Hiring of Speed boat/Engine boat (With roof Cover, Life Jacket) in a tip top condition during travelling to different field offices or to different construction sites or any other official use, meeting, Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-720-00-P32-SL20","serial_label":"20","item_code":"04-720-00","item_code_raw_ocr":"04-720-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"including driver (minimum 5 years of driving experience having valid driving license) and necessary maintenance of vehicle ete. complete as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":32,"source_schedule_page":22,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"04-720-00 including driver (minimum 5 years of driving experience having valid driving license) and necessary maintenance of vehicle ete. complete as per direction of Engineer in charge. Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-720-40-P32","serial_label":null,"item_code":"04-720-40","item_code_raw_ocr":"04-720-40","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"Speed Boat hr","unit":"","rates":{"zone_a":598.18,"zone_b":598.18,"zone_c":598.18,"zone_d":590.51},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":32,"source_schedule_page":22,"raw_rate_tokens":["598.18","598.18","598.18","590.51"],"source_review_note":null,"search_text":"04-720-40 Speed Boat hr Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-720-50-P32-SL20(2)","serial_label":"20(2)","item_code":"04-720-50","item_code_raw_ocr":"04-720-50","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"Engine Boat hr Cost of Fuel, Lubricant etc. for Speed Boat/Engine Boat with roof cover, life jacket for travelling to","unit":"","rates":{"zone_a":377.31,"zone_b":377.31,"zone_c":377.31,"zone_d":369.64},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":32,"source_schedule_page":22,"raw_rate_tokens":["377.31","377.31","377.31","369.64"],"source_review_note":null,"search_text":"04-720-50 Engine Boat hr Cost of Fuel, Lubricant etc. for Speed Boat/Engine Boat with roof cover, life jacket for travelling to Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-750-00-P32-SL21","serial_label":"21","item_code":"04-750-00","item_code_raw_ocr":"04-750-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"different construction sites or any other official use etc. complete as per direction of Engineer in charge. }—","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":32,"source_schedule_page":22,"raw_rate_tokens":null,"source_review_note":null,"search_text":"04-750-00 different construction sites or any other official use etc. complete as per direction of Engineer in charge. }— Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-750-10-P32-SL21(1)","serial_label":"21(1)","item_code":"04-750-10","item_code_raw_ocr":"04-750-10","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"Speed Boat","unit":"","rates":{"zone_a":3987.84,"zone_b":3987.84,"zone_c":3987.84,"zone_d":3987.84},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":32,"source_schedule_page":22,"raw_rate_tokens":["3,987.84","3,987.84","3,987.84","3,987.84"],"source_review_note":null,"search_text":"04-750-10 Speed Boat Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-750-20-P32-SL21(2)","serial_label":"21(2)","item_code":"04-750-20","item_code_raw_ocr":"04-750-20","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"Engine Boat — shr_ 75mm thick brick work with Ist. class bricks in all kinds of works in cement mortar 1:3 (sand of FM>=1.5) including —_ soaking","unit":"","rates":{"zone_a":447.25,"zone_b":447.25,"zone_c":447.25,"zone_d":447.25},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":32,"source_schedule_page":22,"raw_rate_tokens":["447.25","447.25","447.25","447.25"],"source_review_note":null,"search_text":"04-750-20 Engine Boat — shr_ 75mm thick brick work with Ist. class bricks in all kinds of works in cement mortar 1:3 (sand of FM>=1.5) including —_ soaking Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-800-00-P32-SL22","serial_label":"22","item_code":"04-800-00","item_code_raw_ocr":"04-800-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"Dricks: raking out joints, staging, sorting, cleaning the surface, curing at least for 14 days including the cost of all materials etc. complete as per direction of Engineer in charge. 125 mm thick jally brick work in bricks in clean water for 6 hours, , a bt ~~","unit":"","rates":{"zone_a":876.96,"zone_b":871.41,"zone_c":852.57,"zone_d":836.89},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":32,"source_schedule_page":22,"raw_rate_tokens":["876.96","871.41","852.57","836.89"],"source_review_note":null,"search_text":"04-800-00 Dricks: raking out joints, staging, sorting, cleaning the surface, curing at least for 14 days including the cost of all materials etc. complete as per direction of Engineer in charge. 125 mm thick jally brick work in bricks in clean water for 6 hours, , a bt ~~ Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-810-00-P33-SL4","serial_label":"4","item_code":"04-810-00","item_code_raw_ocr":"04-810-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"Shishu or equivalent timber for each . regulator/ sluices, as per approved drawing, specification and direction of Engineer in charge. 0.75m dia to 1.20m dia with 40mm","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":33,"source_schedule_page":23,"raw_rate_tokens":null,"source_review_note":null,"search_text":"04-810-00 Shishu or equivalent timber for each . regulator/ sluices, as per approved drawing, specification and direction of Engineer in charge. 0.75m dia to 1.20m dia with 40mm Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-810-10-P33-SL24(1)","serial_label":"24(1)","item_code":"04-810-10","item_code_raw_ocr":"04-810-10","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":") thick plank and 3 nos 50mmx75mm batten. Above 1.20m dia with 50mm thick","unit":"each","rates":{"zone_a":8469.75,"zone_b":8202.68,"zone_c":8202.68,"zone_d":8447.72},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":33,"source_schedule_page":23,"raw_rate_tokens":["8,469.75","8,202.68","8,202.68","8,447.72"],"source_review_note":null,"search_text":"04-810-10 ) thick plank and 3 nos 50mmx75mm batten. Above 1.20m dia with 50mm thick each Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-810-20-P33-SL24(2)","serial_label":"24(2)","item_code":"04-810-20","item_code_raw_ocr":"04-810-20","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":") plank and 3 nos 50mmx75mm batten. Supplying pressure treated wooden fall boards/stop logs of different sizes (not less than 15cm in depth)","unit":"each","rates":{"zone_a":14323.56,"zone_b":13850.55,"zone_c":13850.55,"zone_d":14317.5},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":33,"source_schedule_page":23,"raw_rate_tokens":["14,323.56","13,850.55","13,850.55","14,317.50"],"source_review_note":null,"search_text":"04-810-20 ) plank and 3 nos 50mmx75mm batten. Supplying pressure treated wooden fall boards/stop logs of different sizes (not less than 15cm in depth) each Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-04-815-00-P33-SL25","serial_label":"25","item_code":"04-815-00","item_code_raw_ocr":"04-815-00","item_code_validation_status":"ocr_source_preserved","section_code":"04","section_title":"Preliminary & Misc. Work","description":"of sal, sundari, garjan, shishu or 1) equivalent for regulator/ sluices, including fixing in position with eye hook etc. complete as per direction of Engineer in charge. 08. Carriage Carriage of materials by head load","unit":"","rates":{"zone_a":192053.43,"zone_b":97749.34,"zone_c":97749.34,"zone_d":104164.3},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":33,"source_schedule_page":23,"raw_rate_tokens":["192,053.43","97,749.34","97,749.34","104,164.30"],"source_review_note":null,"search_text":"04-815-00 of sal, sundari, garjan, shishu or 1) equivalent for regulator/ sluices, including fixing in position with eye hook etc. complete as per direction of Engineer in charge. 08. Carriage Carriage of materials by head load Preliminary & Misc. Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-100-00-P33-SL6","serial_label":"6","item_code":"08-100-00","item_code_raw_ocr":"08-100-00","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"including stacking in measurable pmt/ . stacks properly as per direction of m Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":33,"source_schedule_page":23,"raw_rate_tokens":null,"source_review_note":null,"search_text":"08-100-00 including stacking in measurable pmt/ . stacks properly as per direction of m Engineer in charge. Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-100-20-P33-SL26(2)","serial_label":"26(2)","item_code":"08-100-20","item_code_raw_ocr":"08-100-20","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"00 mt 100.00 m. 2.02 1,99 1.99","unit":"","rates":{"zone_a":1.0,"zone_b":2.02,"zone_c":1.99,"zone_d":1.99},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":33,"source_schedule_page":23,"raw_rate_tokens":["100.00","2.02","1,99","1.99"],"source_review_note":null,"search_text":"08-100-20 00 mt 100.00 m. 2.02 1,99 1.99 Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-100-30-P33-SL26(3)","serial_label":"26(3)","item_code":"08-100-30","item_code_raw_ocr":"08-100-30","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"0:00 ™ to Carriage of materials by cart in all types of road, including loading, unloading and stacking in 110. measurable stacks properly for pmt/ 27 08-10-00 every subsequent kilometer or part km thereof (less than 0.25 km to be neglected) as per direction of Engineer in charge.","unit":"","rates":{"zone_a":2.02,"zone_b":1.99,"zone_c":1.99,"zone_d":1.84},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":33,"source_schedule_page":23,"raw_rate_tokens":["2.02","1.99","1.99","1.84"],"source_review_note":null,"search_text":"08-100-30 0:00 ™ to Carriage of materials by cart in all types of road, including loading, unloading and stacking in 110. measurable stacks properly for pmt/ 27 08-10-00 every subsequent kilometer or part km thereof (less than 0.25 km to be neglected) as per direction of Engineer in charge. Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-110-10-P33-SL27(1)","serial_label":"27(1)","item_code":"08-110-10","item_code_raw_ocr":"08-110-10","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":") ithin","unit":"","rates":{"zone_a":260.84,"zone_b":257.74,"zone_c":257.74,"zone_d":245.34},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":33,"source_schedule_page":23,"raw_rate_tokens":["260.84","257.74","257.74","245.34"],"source_review_note":null,"search_text":"08-110-10 ) ithin Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-110-20-P33-SL27(2)","serial_label":"27(2)","item_code":"08-110-20","item_code_raw_ocr":"08-110-20","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"24 km and above.","unit":"","rates":{"zone_a":56.28,"zone_b":56.28,"zone_c":56.28,"zone_d":56.28},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":33,"source_schedule_page":23,"raw_rate_tokens":["56.28","56.28","56.28","56.28"],"source_review_note":null,"search_text":"08-110-20 24 km and above. Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-120-00-P33-SL28","serial_label":"28","item_code":"08-120-00","item_code_raw_ocr":"08-120-00","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"Carriage of materials by boat pmt/ including loading, unloading and km","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":33,"source_schedule_page":23,"raw_rate_tokens":null,"source_review_note":null,"search_text":"08-120-00 Carriage of materials by boat pmt/ including loading, unloading and km Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-120-10-P34-SL28(1)","serial_label":"28(1)","item_code":"08-120-10","item_code_raw_ocr":"08-120-10","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"BY boat: within","unit":"","rates":{"zone_a":392.67,"zone_b":386.47,"zone_c":386.47,"zone_d":361.68},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":34,"source_schedule_page":24,"raw_rate_tokens":["392.67","386.47","386.47","361.68"],"source_review_note":null,"search_text":"08-120-10 BY boat: within Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-120-20-P34-SL28(2)","serial_label":"28(2)","item_code":"08-120-20","item_code_raw_ocr":"08-120-20","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"BY boat : 2nd km. and above. 18.29 18.29 18,29 18.29 Carriage of cement, C.I. sheet, bitumen, M.S. rod, sheet pile of minimum 6.0m length etc. by truck in all types road, including loading,","unit":"","rates":{"zone_a":18.29,"zone_b":18.29,"zone_c":18.29,"zone_d":18.29},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":34,"source_schedule_page":24,"raw_rate_tokens":["18.29","18.29","18,29","18.29"],"source_review_note":null,"search_text":"08-120-20 BY boat : 2nd km. and above. 18.29 18.29 18,29 18.29 Carriage of cement, C.I. sheet, bitumen, M.S. rod, sheet pile of minimum 6.0m length etc. by truck in all types road, including loading, Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-130-00-P34-SL29","serial_label":"29","item_code":"08-130-00","item_code_raw_ocr":"08-130-00","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"unloading and stacking in pmt/ measurable stacks properly for km every subsequent kilometer or part thereof (less than 0.25 km to be neglected) as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":34,"source_schedule_page":24,"raw_rate_tokens":null,"source_review_note":null,"search_text":"08-130-00 unloading and stacking in pmt/ measurable stacks properly for km every subsequent kilometer or part thereof (less than 0.25 km to be neglected) as per direction of Engineer in charge. Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-130-10-P34-SL29(1)","serial_label":"29(1)","item_code":"08-130-10","item_code_raw_ocr":"08-130-10","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"Within 1.00 km. 370.37 36727 36727 354.88","unit":"","rates":{"zone_a":37037.0,"zone_b":36727.0,"zone_c":36727.0,"zone_d":35488.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":34,"source_schedule_page":24,"raw_rate_tokens":["370.37","36727","36727","354.88"],"source_review_note":null,"search_text":"08-130-10 Within 1.00 km. 370.37 36727 36727 354.88 Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-130-20-P34-SL29(2)","serial_label":"29(2)","item_code":"08-130-20","item_code_raw_ocr":"08-130-20","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"2d km and above. Carriage of sand, _ brickbats, shingles, boulders, c.c block, geo- bag, coal, timber ete. by head load cum/","unit":"","rates":{"zone_a":13.19,"zone_b":13.19,"zone_c":13.19,"zone_d":13.19},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":34,"source_schedule_page":24,"raw_rate_tokens":["13.19","13.19","13.19","13.19"],"source_review_note":null,"search_text":"08-130-20 2d km and above. Carriage of sand, _ brickbats, shingles, boulders, c.c block, geo- bag, coal, timber ete. by head load cum/ Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-140-00-P34-SL30","serial_label":"30","item_code":"08-140-00","item_code_raw_ocr":"08-140-00","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"stacks etc. complete (no carriage for 15m or part thereof) as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":34,"source_schedule_page":24,"raw_rate_tokens":null,"source_review_note":null,"search_text":"08-140-00 stacks etc. complete (no carriage for 15m or part thereof) as per direction of Engineer in charge. Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-140-20-P34-SL30(2)","serial_label":"30(2)","item_code":"08-140-20","item_code_raw_ocr":"08-140-20","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"9-90 t© Carriage of sand, brick bats, shingles, boulders, c.c block, geo- bag, coal, wood etc. from different field/ departmental stocks to work sites by truck/ boat/ cart including -150.99 Cattiage by head load upto a cum/ .","unit":"","rates":{"zone_a":4.32,"zone_b":4.24,"zone_c":4.24,"zone_d":3.93},"rate_integrity_status":"source_image_manually_verified","autofill_eligible":true,"source_pdf_page":34,"source_schedule_page":24,"raw_rate_tokens":["100.00","4.24","4.24","3.93"],"source_review_note":"Source image manually inspected in this session.","search_text":"08-140-20 9-90 t© Carriage of sand, brick bats, shingles, boulders, c.c block, geo- bag, coal, wood etc. from different field/ departmental stocks to work sites by truck/ boat/ cart including -150.99 Cattiage by head load upto a cum/ . Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-150-00-P34-SL31","serial_label":"31","item_code":"08-150-00","item_code_raw_ocr":"08-150-00","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"distance of 30m at each point km including loading, unloading and stacking at work site in measureable stacks (less than 0.25m_ neglected) as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":34,"source_schedule_page":24,"raw_rate_tokens":null,"source_review_note":null,"search_text":"08-150-00 distance of 30m at each point km including loading, unloading and stacking at work site in measureable stacks (less than 0.25m_ neglected) as per direction of Engineer in charge. Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-150-10-P34-SL31(1)","serial_label":"31(1)","item_code":"08-150-10","item_code_raw_ocr":"08-150-10","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"BY cart: Within","unit":"","rates":{"zone_a":520.73,"zone_b":514.53,"zone_c":514.53,"zone_d":489.74},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":34,"source_schedule_page":24,"raw_rate_tokens":["520.73","514.53","514.53","489.74"],"source_review_note":null,"search_text":"08-150-10 BY cart: Within Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-150-20-P34-SL31(2)","serial_label":"31(2)","item_code":"08-150-20","item_code_raw_ocr":"08-150-20","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"BY cart: 2nd km and above. a Cw Ye ka Ml.","unit":"","rates":{"zone_a":112.43,"zone_b":112.43,"zone_c":112.43,"zone_d":112.43},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":34,"source_schedule_page":24,"raw_rate_tokens":["112.43","112.43","112.43","112.43"],"source_review_note":null,"search_text":"08-150-20 BY cart: 2nd km and above. a Cw Ye ka Ml. Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-150-40-P35-SL31(4)","serial_label":"31(4)","item_code":"08-150-40","item_code_raw_ocr":"08-150-40","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"BY boat : 2nd km. and above. cum’","unit":"","rates":{"zone_a":36.96,"zone_b":36.96,"zone_c":36.96,"zone_d":36.96},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":35,"source_schedule_page":25,"raw_rate_tokens":["36.96","36.96","36.96","36.96"],"source_review_note":null,"search_text":"08-150-40 BY boat : 2nd km. and above. cum’ Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-150-50-P35-SL31(5)","serial_label":"31(5)","item_code":"08-150-50","item_code_raw_ocr":"08-150-50","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"BY tuck : within","unit":"","rates":{"zone_a":737.88,"zone_b":731.68,"zone_c":731.68,"zone_d":706.9},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":35,"source_schedule_page":25,"raw_rate_tokens":["737.88","731.68","731.68","706.90"],"source_review_note":null,"search_text":"08-150-50 BY tuck : within Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-150-60-P35-SL31(6)","serial_label":"31(6)","item_code":"08-150-60","item_code_raw_ocr":"08-150-60","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"By truck : 2nd km. and above. 26.31 2631 Carriage of bricks (1000 nos) from one place to another by head load 32 08-10-00 including stacking in measurable p1000 . stacks etc. complete (no carriage /m for 15m or part thereof) as per direction of Engineer in charge.","unit":"","rates":{"zone_a":26.31,"zone_b":26.31,"zone_c":26.31,"zone_d":26.31},"rate_integrity_status":"source_image_manually_verified","autofill_eligible":true,"source_pdf_page":35,"source_schedule_page":25,"raw_rate_tokens":null,"source_review_note":"Source image manually inspected in this session.","search_text":"08-150-60 By truck : 2nd km. and above. 26.31 2631 Carriage of bricks (1000 nos) from one place to another by head load 32 08-10-00 including stacking in measurable p1000 . stacks etc. complete (no carriage /m for 15m or part thereof) as per direction of Engineer in charge. Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-180-10-P35-SL32(1)","serial_label":"32(1)","item_code":"08-180-10","item_code_raw_ocr":"08-180-10","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"9-00 t@","unit":"","rates":{"zone_a":9.0,"zone_b":5.0,"zone_c":6.03,"zone_d":5.58},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":35,"source_schedule_page":25,"raw_rate_tokens":["9-00","50.00","6.03","5.58"],"source_review_note":null,"search_text":"08-180-10 9-00 t@ Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-180-20-P35-SL32(2)","serial_label":"32(2)","item_code":"08-180-20","item_code_raw_ocr":"08-180-20","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"9-00 to","unit":"","rates":{"zone_a":10.0,"zone_b":5.47,"zone_c":5.37,"zone_d":4.97},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":35,"source_schedule_page":25,"raw_rate_tokens":["100.00","5.47","5.37","4.97"],"source_review_note":null,"search_text":"08-180-20 9-00 to Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-180-30-P35-SL32(3)","serial_label":"32(3)","item_code":"08-180-30","item_code_raw_ocr":"08-180-30","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"9:00 to 250.00 m. poo 4.93 4.84","unit":"","rates":{"zone_a":4.93,"zone_b":4.84,"zone_c":4.84,"zone_d":4.48},"rate_integrity_status":"source_image_manually_verified","autofill_eligible":true,"source_pdf_page":35,"source_schedule_page":25,"raw_rate_tokens":["00","250.00","4.93","4.84"],"source_review_note":"Source image manually inspected in this session.","search_text":"08-180-30 9:00 to 250.00 m. poo 4.93 4.84 Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-180-40-P35-SL32(4)","serial_label":"32(4)","item_code":"08-180-40","item_code_raw_ocr":"08-180-40","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"9-00 to Carriage of bricks (1000 nos) from one place to another including loading and unloading involving carriage by head load to a distance of 30 m at each loading and p1000 33 Os-120-00 unloading point including stacking /km properly in measurable stacks etc. complete (less than 0.25 km be neglected) as per direction of Engineer in charge.","unit":"","rates":{"zone_a":9.0,"zone_b":7.5,"zone_c":4.79,"zone_d":4.7},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":35,"source_schedule_page":25,"raw_rate_tokens":["9-00","750.00","4.79","4.70"],"source_review_note":null,"search_text":"08-180-40 9-00 to Carriage of bricks (1000 nos) from one place to another including loading and unloading involving carriage by head load to a distance of 30 m at each loading and p1000 33 Os-120-00 unloading point including stacking /km properly in measurable stacks etc. complete (less than 0.25 km be neglected) as per direction of Engineer in charge. Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-190-10-P35-SL33(1)","serial_label":"33(1)","item_code":"08-190-10","item_code_raw_ocr":"08-190-19","item_code_validation_status":"source_image_manually_corrected","section_code":"08","section_title":"Carriage","description":"BY cart: Within","unit":"","rates":{"zone_a":650.97,"zone_b":643.23,"zone_c":643.23,"zone_d":612.25},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":35,"source_schedule_page":25,"raw_rate_tokens":["650.97","643.23","643.23","612.25"],"source_review_note":null,"search_text":"08-190-10 BY cart: Within Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-190-20-P35-SL33(2)","serial_label":"33(2)","item_code":"08-190-20","item_code_raw_ocr":"08-190-20","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"BY cart : 2nd km and above. pono","unit":"","rates":{"zone_a":140.64,"zone_b":140.64,"zone_c":140.64,"zone_d":140.64},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":35,"source_schedule_page":25,"raw_rate_tokens":["140.64","140.64","140.64","140.64"],"source_review_note":null,"search_text":"08-190-20 BY cart : 2nd km and above. pono Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-190-50-P35-SL33(5)","serial_label":"33(5)","item_code":"08-190-50","item_code_raw_ocr":"08-190-50","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":", BY Muck: within","unit":"","rates":{"zone_a":923.0,"zone_b":915.26,"zone_c":915.26,"zone_d":884.29},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":35,"source_schedule_page":25,"raw_rate_tokens":["923.00","915.26","915.26","884.29"],"source_review_note":null,"search_text":"08-190-50 , BY Muck: within Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-08-190-60-P35-SL33(6)","serial_label":"33(6)","item_code":"08-190-60","item_code_raw_ocr":"08-190-60","item_code_validation_status":"ocr_source_preserved","section_code":"08","section_title":"Carriage","description":"By truck : 2nd km. and above. p1000 /km","unit":"","rates":{"zone_a":32.98,"zone_b":32.98,"zone_c":32.98,"zone_d":32.98},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":35,"source_schedule_page":25,"raw_rate_tokens":["32.98","32.98","32.98","32.98"],"source_review_note":null,"search_text":"08-190-60 By truck : 2nd km. and above. p1000 /km Carriage"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-100-00-P36-SL34","serial_label":"34","item_code":"10-100-00","item_code_raw_ocr":"10-100-00","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"Unskilled Labour for field data en ° . . . collection), Accommodation, Transportation from Headquarter to site and site movement and shaded boat for bathymetric survey for field Survey Team including necessary fuels and Lubricant, Other necessary auxiliary items such as survey flags, pegs with provision for submission of report in hard binded copies (at least 6 copies required), soft copies and raw survey data with provision of 10% random re-survey for data consistency checking as per direction of Engineer in charge. River Morphological Data Collection/Bathymetric and river","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":36,"source_schedule_page":26,"raw_rate_tokens":null,"source_review_note":null,"search_text":"10-100-00 Unskilled Labour for field data en ° . . . collection), Accommodation, Transportation from Headquarter to site and site movement and shaded boat for bathymetric survey for field Survey Team including necessary fuels and Lubricant, Other necessary auxiliary items such as survey flags, pegs with provision for submission of report in hard binded copies (at least 6 copies required), soft copies and raw survey data with provision of 10% random re-survey for data consistency checking as per direction of Engineer in charge. River Morphological Data Collection/Bathymetric and river Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-110-00-P36","serial_label":null,"item_code":"10-110-00","item_code_raw_ocr":"10-110-00","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"bank topography Survey for river/khal Section (Section width 51 m to 100 m), Including cost of all necessary equipments (Level Machine, Hand GPS, DGPS, survey vessel etc.), Necessary Personnel (River Morphology 35 Expert for data consistency gach - - - checking, Engineer/Survey Specialist for data processing with survey software and prepare necessary Table, Graph and Morphological Parameter Calculations, Surveyor & Unskilled Labour for field data kK A. @ /","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":36,"source_schedule_page":26,"raw_rate_tokens":null,"source_review_note":null,"search_text":"10-110-00 bank topography Survey for river/khal Section (Section width 51 m to 100 m), Including cost of all necessary equipments (Level Machine, Hand GPS, DGPS, survey vessel etc.), Necessary Personnel (River Morphology 35 Expert for data consistency gach - - - checking, Engineer/Survey Specialist for data processing with survey software and prepare necessary Table, Graph and Morphological Parameter Calculations, Surveyor & Unskilled Labour for field data kK A. @ / Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-110-10-P37-SL35(1)","serial_label":"35(1)","item_code":"10-110-10","item_code_raw_ocr":"10-110-10","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"] Section Interval: upto 20m __ each 672.78 672.78 660.21","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":37,"source_schedule_page":27,"raw_rate_tokens":null,"source_review_note":null,"search_text":"10-110-10 ] Section Interval: upto 20m __ each 672.78 672.78 660.21 Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-110-30-P37-SL35(3)","serial_label":"35(3)","item_code":"10-110-30","item_code_raw_ocr":"10-110-30","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"Section Interval: 41mto 60m —_ each 835.65 35(4) Section Interval: 61 mto 100m __ each 957.81 939.08 River Morphological Data Collection/Bathymetric and_ river bank topography Survey for river Section (Section width 101 m to 150 m), Including cost of all necessary equipments (Level Machine, Echo Sounder, Hand GPS, DGPS, Bathymetric Survey Software with Survey ' Laptop, survey vessel etc.), Necessary Personnel (River Morphology Expert for data consistency checking, Engineer/Survey Specialist for data processing with survey software and _ prepare necessary Table, Graph and Morphological Parameter","unit":"","rates":{"zone_a":400.0,"zone_b":610.0,"zone_c":957.81,"zone_d":939.08},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":37,"source_schedule_page":27,"raw_rate_tokens":["4","61","957.81","939.08"],"source_review_note":null,"search_text":"10-110-30 Section Interval: 41mto 60m —_ each 835.65 35(4) Section Interval: 61 mto 100m __ each 957.81 939.08 River Morphological Data Collection/Bathymetric and_ river bank topography Survey for river Section (Section width 101 m to 150 m), Including cost of all necessary equipments (Level Machine, Echo Sounder, Hand GPS, DGPS, Bathymetric Survey Software with Survey ' Laptop, survey vessel etc.), Necessary Personnel (River Morphology Expert for data consistency checking, Engineer/Survey Specialist for data processing with survey software and _ prepare necessary Table, Graph and Morphological Parameter Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-120-00-P37-SL36","serial_label":"36","item_code":"10-120-00","item_code_raw_ocr":"10-120-00","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"Calculations, Surveyor & each . ° ° ° Unskilled Labour for field data collection), Accommodation, Transportation from Headquarter to site and site movement and shaded boat for bathymetric survey for field Survey Team including necessary fuels and Lubricant, Other necessary auxiliary items such as survey flags, pegs with provision for submission of report in hard binded copies (at least 6 copies required), soft copies and raw survey data with provision of 10% random re-survey for data consistency checking as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":37,"source_schedule_page":27,"raw_rate_tokens":null,"source_review_note":null,"search_text":"10-120-00 Calculations, Surveyor & each . ° ° ° Unskilled Labour for field data collection), Accommodation, Transportation from Headquarter to site and site movement and shaded boat for bathymetric survey for field Survey Team including necessary fuels and Lubricant, Other necessary auxiliary items such as survey flags, pegs with provision for submission of report in hard binded copies (at least 6 copies required), soft copies and raw survey data with provision of 10% random re-survey for data consistency checking as per direction of Engineer in charge. Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-120-10-P37-SL36(1)","serial_label":"36(1)","item_code":"10-120-10","item_code_raw_ocr":"10-120-10","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":37,"source_schedule_page":27,"raw_rate_tokens":null,"source_review_note":null,"search_text":"10-120-10 Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-120-20-P37","serial_label":null,"item_code":"10-120-20","item_code_raw_ocr":"10-120-20","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"1,068.87 1,068.87 1,176.90 1,154.61 b a @ eg }","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":37,"source_schedule_page":27,"raw_rate_tokens":null,"source_review_note":null,"search_text":"10-120-20 1,068.87 1,068.87 1,176.90 1,154.61 b a @ eg } Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-120-40-P38-SL36(4)","serial_label":"36(4)","item_code":"10-120-40","item_code_raw_ocr":"10-120-40","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"Section Interval: 61 mto 100m each River Morphological Data Collection/Bathymetric and river bank topography Survey for small river Section (Section width 151 m to 250 m), Including cost of all necessary equipments (Level Machine, Echo Sounder, Hand GPS, DGPS, Bathymetric Survey Software with Survey Laptop, survey vessel etc.), Necessary Personnel (River Morphology Expert for data consistency checking, Engineer/Survey Specialist for data processing with survey software and prepare necessary Table, Graph and","unit":"","rates":{"zone_a":1321.06,"zone_b":1315.79,"zone_c":1315.79,"zone_d":1290.38},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":38,"source_schedule_page":28,"raw_rate_tokens":["1,321.06","1,315.79","1,315.79","1,290.38"],"source_review_note":null,"search_text":"10-120-40 Section Interval: 61 mto 100m each River Morphological Data Collection/Bathymetric and river bank topography Survey for small river Section (Section width 151 m to 250 m), Including cost of all necessary equipments (Level Machine, Echo Sounder, Hand GPS, DGPS, Bathymetric Survey Software with Survey Laptop, survey vessel etc.), Necessary Personnel (River Morphology Expert for data consistency checking, Engineer/Survey Specialist for data processing with survey software and prepare necessary Table, Graph and Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-130-00-P38-SL37","serial_label":"37","item_code":"10-130-00","item_code_raw_ocr":"10-130-00","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"Morphological Parameter cach . . . . Calculations, Surveyor & Unskilled Labour for field data collection), Accommodation, Transportation from Headquarter to site and site movement and shaded boat for bathymetric survey for field Survey Team including : necessary fuels and Lubricant, Other necessary auxiliary items such as survey flags, pegs with provision for submission of report in hard binded copies (at least 6 copies required), soft copies and raw survey data with provision of 10% random re-survey for data consistency checking as per direction of Engineer in charge. 310)","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":38,"source_schedule_page":28,"raw_rate_tokens":null,"source_review_note":null,"search_text":"10-130-00 Morphological Parameter cach . . . . Calculations, Surveyor & Unskilled Labour for field data collection), Accommodation, Transportation from Headquarter to site and site movement and shaded boat for bathymetric survey for field Survey Team including : necessary fuels and Lubricant, Other necessary auxiliary items such as survey flags, pegs with provision for submission of report in hard binded copies (at least 6 copies required), soft copies and raw survey data with provision of 10% random re-survey for data consistency checking as per direction of Engineer in charge. 310) Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-130-40-P38-SL37(4)","serial_label":"37(4)","item_code":"10-130-40","item_code_raw_ocr":"10-130-40","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"} Section Interval: 61m to 100m each River Morphological Data Collection/Bathymetric and river bank topography Survey for smail river Section (Section width 251 m to 350 m), Including cost of all necessary equipments (Level Machine, Echo Sounder, Hand GPS, DGPS, Bathymetric Survey","unit":"","rates":{"zone_a":1514.71,"zone_b":1508.56,"zone_c":1508.56,"zone_d":1479.01},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":38,"source_schedule_page":28,"raw_rate_tokens":["1,514.71","1,508.56","1,508.56","1,479.01"],"source_review_note":null,"search_text":"10-130-40 } Section Interval: 61m to 100m each River Morphological Data Collection/Bathymetric and river bank topography Survey for smail river Section (Section width 251 m to 350 m), Including cost of all necessary equipments (Level Machine, Echo Sounder, Hand GPS, DGPS, Bathymetric Survey Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-140-00-P38-SL38","serial_label":"38","item_code":"10-140-00","item_code_raw_ocr":"10-140-09","item_code_validation_status":"source_image_manually_corrected","section_code":"10","section_title":"Survey Works","description":"Software with Survey Laptop, gach . . . . survey vessel etc.), Necessary Personnel (River Morphology Expert for data consistency checking, Engineer/Survey Specialist for data processing with survey software and prepare necessary Table, Graph and Morphological Parameter Calculations Surveyor & GO wo A Kb @","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":38,"source_schedule_page":28,"raw_rate_tokens":null,"source_review_note":null,"search_text":"10-140-00 Software with Survey Laptop, gach . . . . survey vessel etc.), Necessary Personnel (River Morphology Expert for data consistency checking, Engineer/Survey Specialist for data processing with survey software and prepare necessary Table, Graph and Morphological Parameter Calculations Surveyor & GO wo A Kb @ Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-140-10-P39-SL38(1)","serial_label":"38(1)","item_code":"10-140-10","item_code_raw_ocr":"10-140-10","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"Section Interval: upto 20 m 1,237.91 1,233.29 1,210.87","unit":"","rates":{"zone_a":2000.0,"zone_b":1237.91,"zone_c":1233.29,"zone_d":1210.87},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":39,"source_schedule_page":29,"raw_rate_tokens":["20","1,237.91","1,233.29","1,210.87"],"source_review_note":null,"search_text":"10-140-10 Section Interval: upto 20 m 1,237.91 1,233.29 1,210.87 Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-140-20-P39-SL38(2)","serial_label":"38(2)","item_code":"10-140-20","item_code_raw_ocr":"10-140-20","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"Section Interval: 21 m to 40m 1,377.45 1,372.18 1,346.64","unit":"","rates":{"zone_a":2100.0,"zone_b":1377.45,"zone_c":1372.18,"zone_d":1346.64},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":39,"source_schedule_page":29,"raw_rate_tokens":["21","1,377.45","1,372.18","1,346.64"],"source_review_note":null,"search_text":"10-140-20 Section Interval: 21 m to 40m 1,377.45 1,372.18 1,346.64 Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-140-30-P39-SL38(3)","serial_label":"38(3)","item_code":"10-140-30","item_code_raw_ocr":"10-140-30","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"Section Interval: 41m to 60m _ each 1,563.52 1,557.36 1,527.68","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":39,"source_schedule_page":29,"raw_rate_tokens":null,"source_review_note":null,"search_text":"10-140-30 Section Interval: 41m to 60m _ each 1,563.52 1,557.36 1,527.68 Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-140-40-P39-SL38(4)","serial_label":"38(4)","item_code":"10-140-40","item_code_raw_ocr":"10-140-40","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"Section Interval: 61 mto 100m each 1,824.01 1,816.63 1,781.14 River Morphological Data Collection/Bathymetric and_ river bank topography Survey for river Section (Section width 35] m to 500 m), Including cost of all necessary equipments (Level Machine, Echo Sounder, Hand GPS, DGPS, Bathymetric Survey Software with Survey Laptop, survey vessel etc.), Necessary Personnel (River Morphology Expert for data consistency checking, Engineer/Survey Specialist for data processing with survey software and prepare necessary Table, Graph and Morphological Parameter","unit":"","rates":{"zone_a":1824.01,"zone_b":1816.63,"zone_c":1816.63,"zone_d":1781.14},"rate_integrity_status":"source_image_manually_verified","autofill_eligible":true,"source_pdf_page":39,"source_schedule_page":29,"raw_rate_tokens":["61","1,824.01","1,816.63","1,781.14"],"source_review_note":"Source image manually inspected in this session.","search_text":"10-140-40 Section Interval: 61 mto 100m each 1,824.01 1,816.63 1,781.14 River Morphological Data Collection/Bathymetric and_ river bank topography Survey for river Section (Section width 35] m to 500 m), Including cost of all necessary equipments (Level Machine, Echo Sounder, Hand GPS, DGPS, Bathymetric Survey Software with Survey Laptop, survey vessel etc.), Necessary Personnel (River Morphology Expert for data consistency checking, Engineer/Survey Specialist for data processing with survey software and prepare necessary Table, Graph and Morphological Parameter Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-150-00-P39-SL39","serial_label":"39","item_code":"10-150-00","item_code_raw_ocr":"10-150-00","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":") Calculations, Surveyor & each ° . ° . Unskilled Labour for field data collection), Accommodation, Transportation from Headquarter to site and site movement and shaded boat for bathymetric survey for field Survey Team including necessary fuels and Lubricant, Other necessary auxiliary items such as survey flags, pegs with provision for submission of report in hard binded copies (at least 6 copies required), soft copies and raw survey data with provision of 10% random re-survey for data consistency checking as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":39,"source_schedule_page":29,"raw_rate_tokens":null,"source_review_note":null,"search_text":"10-150-00 ) Calculations, Surveyor & each ° . ° . Unskilled Labour for field data collection), Accommodation, Transportation from Headquarter to site and site movement and shaded boat for bathymetric survey for field Survey Team including necessary fuels and Lubricant, Other necessary auxiliary items such as survey flags, pegs with provision for submission of report in hard binded copies (at least 6 copies required), soft copies and raw survey data with provision of 10% random re-survey for data consistency checking as per direction of Engineer in charge. Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-150-10-P39-SL39(1)","serial_label":"39(1)","item_code":"10-150-10","item_code_raw_ocr":"10-150-10","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"Section Interval: upto 20 m each 1,441.54 1,436.26 1,436.26","unit":"","rates":{"zone_a":2000.0,"zone_b":1441.54,"zone_c":1436.26,"zone_d":1436.26},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":39,"source_schedule_page":29,"raw_rate_tokens":["20","1,441.54","1,436.26","1,436.26"],"source_review_note":null,"search_text":"10-150-10 Section Interval: upto 20 m each 1,441.54 1,436.26 1,436.26 Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-150-20-P39-SL39(2)","serial_label":"39(2)","item_code":"10-150-20","item_code_raw_ocr":"10-150-20","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"] Section Interval: 21 m to 40m each","unit":"","rates":{"zone_a":1627.6,"zone_b":1621.45,"zone_c":1621.45,"zone_d":1591.55},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":39,"source_schedule_page":29,"raw_rate_tokens":["1,627.60","1,621.45","1,621.45","1,591.55"],"source_review_note":null,"search_text":"10-150-20 ] Section Interval: 21 m to 40m each Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-160-00-P40-SL40","serial_label":"40","item_code":"10-160-00","item_code_raw_ocr":"10-160-06","item_code_validation_status":"source_image_manually_corrected","section_code":"10","section_title":"Survey Works","description":"Calculations, Surveyor & each . ° . . Unskilled Labour for field data collection), Accommodation, Transportation from Headquarter to site and site movement and shaded boat for bathymetric survey for field Survey Team including necessary fuels and Lubricant, Other necessary auxiliary items such as survey flags, pegs with provision for submission of report in hard binded copies (at least 6 copies required), soft copies and raw survey data with provision of 10% random re-survey for data consistency checking as _ per direction of Engineer in charge. each 1,951.26 1,920.92","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":40,"source_schedule_page":30,"raw_rate_tokens":null,"source_review_note":null,"search_text":"10-160-00 Calculations, Surveyor & each . ° . . Unskilled Labour for field data collection), Accommodation, Transportation from Headquarter to site and site movement and shaded boat for bathymetric survey for field Survey Team including necessary fuels and Lubricant, Other necessary auxiliary items such as survey flags, pegs with provision for submission of report in hard binded copies (at least 6 copies required), soft copies and raw survey data with provision of 10% random re-survey for data consistency checking as _ per direction of Engineer in charge. each 1,951.26 1,920.92 Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-160-20-P40","serial_label":null,"item_code":"10-160-20","item_code_raw_ocr":"10-160-20","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":") Section Interval: 21m to 40m each River Morphological Data Collection/Bathymetric and river bank topography Survey for river Section (Section width>1000 m), Including cost of all necessary equipments (Level Machine, Echo Sounder, Hand GPS, DGPS, Bathymetric Survey Software with","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":40,"source_schedule_page":30,"raw_rate_tokens":null,"source_review_note":null,"search_text":"10-160-20 ) Section Interval: 21m to 40m each River Morphological Data Collection/Bathymetric and river bank topography Survey for river Section (Section width>1000 m), Including cost of all necessary equipments (Level Machine, Echo Sounder, Hand GPS, DGPS, Bathymetric Survey Software with Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-170-00-P40-SL41","serial_label":"41","item_code":"10-170-00","item_code_raw_ocr":"10-170-00","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"Necessary Personnel (River Morphology Expert for data consistency checking, Engineer/Survey Specialist for data processing with survey software and prepare necessary Table, Graph and Morphological Parameter Calculations, Surveyor 6- kk (al, @","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":40,"source_schedule_page":30,"raw_rate_tokens":null,"source_review_note":null,"search_text":"10-170-00 Necessary Personnel (River Morphology Expert for data consistency checking, Engineer/Survey Specialist for data processing with survey software and prepare necessary Table, Graph and Morphological Parameter Calculations, Surveyor 6- kk (al, @ Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-170-10-P41-SL41(1)","serial_label":"41(1)","item_code":"10-170-10","item_code_raw_ocr":"10-170-10","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"Section Interval: upto 20 m 1,829.93","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":41,"source_schedule_page":31,"raw_rate_tokens":null,"source_review_note":null,"search_text":"10-170-10 Section Interval: upto 20 m 1,829.93 Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-170-20-P41","serial_label":null,"item_code":"10-170-20","item_code_raw_ocr":"10-170-20","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"Section Interval: 21 m to 40 m 2,082.70","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":41,"source_schedule_page":31,"raw_rate_tokens":null,"source_review_note":null,"search_text":"10-170-20 Section Interval: 21 m to 40 m 2,082.70 Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-170-30-P41","serial_label":null,"item_code":"10-170-30","item_code_raw_ocr":"10-170-30","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"Section Interval: 41 mto 60m — km 2,450.37","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":41,"source_schedule_page":31,"raw_rate_tokens":null,"source_review_note":null,"search_text":"10-170-30 Section Interval: 41 mto 60m — km 2,450.37 Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-170-40-P41","serial_label":null,"item_code":"10-170-40","item_code_raw_ocr":"10-170-40","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"Section Interval: 61 mto 100m — _km 3,034.29 Topography Survey of embankment/road/canal/river Section (Section width upto 50 m), Including cost of all necessary equipments (Level Machine, Hand GPS, DGPS ete.), Necessary Personnel (River Morphology Expert for data consistency checking, Engineer/Survey Specialist for data processing with survey software and prepare necessary Table, Graph and Morphological Parameter Calculations, Surveyor & Unskilled Labour for field data","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":41,"source_schedule_page":31,"raw_rate_tokens":null,"source_review_note":null,"search_text":"10-170-40 Section Interval: 61 mto 100m — _km 3,034.29 Topography Survey of embankment/road/canal/river Section (Section width upto 50 m), Including cost of all necessary equipments (Level Machine, Hand GPS, DGPS ete.), Necessary Personnel (River Morphology Expert for data consistency checking, Engineer/Survey Specialist for data processing with survey software and prepare necessary Table, Graph and Morphological Parameter Calculations, Surveyor & Unskilled Labour for field data Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-200-00-P41-SL42","serial_label":"42","item_code":"10-200-00","item_code_raw_ocr":"10-200-00","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"collection), Accommodation, °° . . ° ° Transportation from Headquarter to site and site movement and shaded boat for bathymetric survey for field Survey Team including necessary fuels and Lubricant, Other necessary auxiliary items such as survey flags, pegs with provision for submission of report in hard binded copies (at least 6 copies required), soft copies and raw survey data with provision of 10% random re-survey for data consistency checking as per direction of Engineer in charge. 367.98 365.63 954.52 Section Interval: 101 m to 150m 627.40 624.76 612.30 Topography Survey of","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":41,"source_schedule_page":31,"raw_rate_tokens":null,"source_review_note":null,"search_text":"10-200-00 collection), Accommodation, °° . . ° ° Transportation from Headquarter to site and site movement and shaded boat for bathymetric survey for field Survey Team including necessary fuels and Lubricant, Other necessary auxiliary items such as survey flags, pegs with provision for submission of report in hard binded copies (at least 6 copies required), soft copies and raw survey data with provision of 10% random re-survey for data consistency checking as per direction of Engineer in charge. 367.98 365.63 954.52 Section Interval: 101 m to 150m 627.40 624.76 612.30 Topography Survey of Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-210-00-P41-SL43","serial_label":"43","item_code":"10-210-00","item_code_raw_ocr":"10-210-00","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"ee Section (Section width 51 m to 100 ee A VATA","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":41,"source_schedule_page":31,"raw_rate_tokens":null,"source_review_note":null,"search_text":"10-210-00 ee Section (Section width 51 m to 100 ee A VATA Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-210-10-P42","serial_label":null,"item_code":"10-210-10","item_code_raw_ocr":"10-210-10","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"Section Interval: upto 50 m each","unit":"","rates":{"zone_a":609.4,"zone_b":607.05,"zone_c":607.05,"zone_d":595.77},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":42,"source_schedule_page":32,"raw_rate_tokens":["609.40","607.05","607.05","595.77"],"source_review_note":null,"search_text":"10-210-10 Section Interval: upto 50 m each Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-210-20-P42","serial_label":null,"item_code":"10-210-20","item_code_raw_ocr":"10-210-20","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"Section Interval: 51m to 100","unit":"m","rates":{"zone_a":668.82,"zone_b":666.18,"zone_c":666.18,"zone_d":653.54},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":42,"source_schedule_page":32,"raw_rate_tokens":["668.82","666.18","666.18","653.54"],"source_review_note":null,"search_text":"10-210-20 Section Interval: 51m to 100 m Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-210-30-P42-SL43(3)","serial_label":"43(3)","item_code":"10-210-30","item_code_raw_ocr":"10-210-30","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"Section Interval: 101 m to 150 m 745.21 742.20 72782 Topography Survey of embankment/road/canal/river Section (Section width 101 m to 150 m), Including cost of all necessary equipments (Level Machine, Hand GPS, DGPS etc.), Necessary Personnel = (River Morphology Expert for data consistency checking, Engineer/Survey Specialist for data processing with survey software and prepare necessary Table, Graph and Morphological 990.99 Parameter Calculations, Surveyor . “4 10-20-00 & Unskilled Labour for field data each collection), Accommodation, Transportation from Headquarter to site and site movement and shaded boat for bathymetric survey for field Survey Team including necessary fuels and Lubricant, Other necessary auxiliary items such as survey flags, pegs with provision for submission of report in hard binded copies (at least 6 copies required), soft copies and raw survey data with provision of 10% random re-survey for data A Car rs fa At @ J","unit":"","rates":{"zone_a":1500.0,"zone_b":745.21,"zone_c":742.2,"zone_d":727.82},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":42,"source_schedule_page":32,"raw_rate_tokens":["150","745.21","742.20","72782"],"source_review_note":null,"search_text":"10-210-30 Section Interval: 101 m to 150 m 745.21 742.20 72782 Topography Survey of embankment/road/canal/river Section (Section width 101 m to 150 m), Including cost of all necessary equipments (Level Machine, Hand GPS, DGPS etc.), Necessary Personnel = (River Morphology Expert for data consistency checking, Engineer/Survey Specialist for data processing with survey software and prepare necessary Table, Graph and Morphological 990.99 Parameter Calculations, Surveyor . “4 10-20-00 & Unskilled Labour for field data each collection), Accommodation, Transportation from Headquarter to site and site movement and shaded boat for bathymetric survey for field Survey Team including necessary fuels and Lubricant, Other necessary auxiliary items such as survey flags, pegs with provision for submission of report in hard binded copies (at least 6 copies required), soft copies and raw survey data with provision of 10% random re-survey for data A Car rs fa At @ J Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-240-00-P43-SL45","serial_label":"45","item_code":"10-240-00","item_code_raw_ocr":"10-240-00","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"checking, Engineer/Survey Specialist for data processing with survey software and prepare necessary Table, Graph and Morphological Parameter Calculations, Surveyor & Unskilled Labour for field data collection), Accommodation, Transportation from Headquarter to site and site movement and shaded boat for bathymetric survey . for field Survey Team including necessary fuels and Lubricant, Other necessary auxiliary items with provision for submission of report in hard binded copies (at least 6 copies required), soft copies and raw survey data with provision of 10% random re-survey for data consistency checking as _ per direction of Engineer in charge. (2) 2.56 Level Flying for survey work Including cost of all necessary equipments (Level Machine, Hand","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":43,"source_schedule_page":33,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"10-240-00 checking, Engineer/Survey Specialist for data processing with survey software and prepare necessary Table, Graph and Morphological Parameter Calculations, Surveyor & Unskilled Labour for field data collection), Accommodation, Transportation from Headquarter to site and site movement and shaded boat for bathymetric survey . for field Survey Team including necessary fuels and Lubricant, Other necessary auxiliary items with provision for submission of report in hard binded copies (at least 6 copies required), soft copies and raw survey data with provision of 10% random re-survey for data consistency checking as _ per direction of Engineer in charge. (2) 2.56 Level Flying for survey work Including cost of all necessary equipments (Level Machine, Hand Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-250-00-P43-SL46","serial_label":"46","item_code":"10-250-00","item_code_raw_ocr":"10-250-00","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"GPS, DGPS etc.), Necessary km Personnel (River Morphology Expert for data consistency = _checking, Engineer/Survey &K Aye @_— )","unit":"","rates":{"zone_a":1906.54,"zone_b":1899.95,"zone_c":1899.95,"zone_d":1862.68},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":43,"source_schedule_page":33,"raw_rate_tokens":["1,906.54","1,899.95","1,899.95","1,862.68"],"source_review_note":null,"search_text":"10-250-00 GPS, DGPS etc.), Necessary km Personnel (River Morphology Expert for data consistency = _checking, Engineer/Survey &K Aye @_— ) Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-10-270-00-P44-SL47","serial_label":"47","item_code":"10-270-00","item_code_raw_ocr":"10-270-00","item_code_validation_status":"ocr_source_preserved","section_code":"10","section_title":"Survey Works","description":"collection), Accommodation, km Transportation from Headquarter to site and site movement and shaded boat for bathymetric survey for field Survey Team including necessary fuels and Lubricant, Other necessary auxiliary items with provision for submission of report in hard binded copies (at least 6 copies required), soft copies and raw survey data with provision of 10% random re-survey for data consistency checking as per direction of Engineer in charge. uaabesiee op ae) ee Installation of pizeometer including supply of 38mm G.I. pipe, brass strainer, socket, labour, the elevation and providing cover on the top of the well etc. complete as per direction of Engineer in charge. sn seem seem) LL oint system, equipments and L 4d, _ A","unit":"","rates":{"zone_a":2102.75,"zone_b":2095.21,"zone_c":2095.21,"zone_d":2053.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":44,"source_schedule_page":34,"raw_rate_tokens":["2,102.75","2,095.21","2,095.21","2,053.00"],"source_review_note":null,"search_text":"10-270-00 collection), Accommodation, km Transportation from Headquarter to site and site movement and shaded boat for bathymetric survey for field Survey Team including necessary fuels and Lubricant, Other necessary auxiliary items with provision for submission of report in hard binded copies (at least 6 copies required), soft copies and raw survey data with provision of 10% random re-survey for data consistency checking as per direction of Engineer in charge. uaabesiee op ae) ee Installation of pizeometer including supply of 38mm G.I. pipe, brass strainer, socket, labour, the elevation and providing cover on the top of the well etc. complete as per direction of Engineer in charge. sn seem seem) LL oint system, equipments and L 4d, _ A Survey Works"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-120-00-P45-SL50","serial_label":"50","item_code":"12-120-00","item_code_raw_ocr":"12-120-00","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"@uring construction, providing ... shrouding materials, conducting test operation and subsequent removal of the complete dewatering set in accordance with standard specification and field requirement, as per direction of Engineer in charge. Operation of well point system, by 5 cusec vacuum pump for dewatering of subsurface water, maintaining draw down records including supply of necessary","unit":"","rates":{"zone_a":445433.85,"zone_b":443829.24,"zone_c":443874.64,"zone_d":440370.64},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":45,"source_schedule_page":35,"raw_rate_tokens":["445,433.85","443,829.24","443,874.64","440,370.64"],"source_review_note":null,"search_text":"12-120-00 @uring construction, providing ... shrouding materials, conducting test operation and subsequent removal of the complete dewatering set in accordance with standard specification and field requirement, as per direction of Engineer in charge. Operation of well point system, by 5 cusec vacuum pump for dewatering of subsurface water, maintaining draw down records including supply of necessary"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-150-00-P45-SL51","serial_label":"51","item_code":"12-150-00","item_code_raw_ocr":"12-150-00","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"fuels, lubricants, operation pphour personnel and maintenance of the same upto completion of the work in accordance with standard specification and direction of Engineer in charge. Demobilization of complete well point system, equipments and accessories from one place to","unit":"","rates":{"zone_a":1257.96,"zone_b":1257.2,"zone_c":1257.2,"zone_d":1249.53},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":45,"source_schedule_page":35,"raw_rate_tokens":["1,257.96","1,257.20","1,257.20","1,249.53"],"source_review_note":null,"search_text":"12-150-00 fuels, lubricants, operation pphour personnel and maintenance of the same upto completion of the work in accordance with standard specification and direction of Engineer in charge. Demobilization of complete well point system, equipments and accessories from one place to"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-160-00-P45-SL52","serial_label":"52","item_code":"12-160-00","item_code_raw_ocr":"12-160-00","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"another including loading and ps/km ° . unloading as per direction of Engineer in charge. Installation of dewatering tubewells at site for controlling subsurface water during construction, including supply of all materials, equipments, fuels, lubricants etc. providing shrouding materials, conducting well testing & development and subsequent","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":45,"source_schedule_page":35,"raw_rate_tokens":null,"source_review_note":null,"search_text":"12-160-00 another including loading and ps/km ° . unloading as per direction of Engineer in charge. Installation of dewatering tubewells at site for controlling subsurface water during construction, including supply of all materials, equipments, fuels, lubricants etc. providing shrouding materials, conducting well testing & development and subsequent"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-180-00-P45-SL53","serial_label":"53","item_code":"12-180-00","item_code_raw_ocr":"12-180-00","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"system in accordance with standard specification and field requirement etc. complete including sealing of hole, mobilization and demobilization of equipments and £ VAY) Sh) al Coe +4","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":45,"source_schedule_page":35,"raw_rate_tokens":null,"source_review_note":null,"search_text":"12-180-00 system in accordance with standard specification and field requirement etc. complete including sealing of hole, mobilization and demobilization of equipments and £ VAY) Sh) al Coe +4"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-180-05-P46-SL53(1)","serial_label":"53(1)","item_code":"12-180-05","item_code_raw_ocr":"12-180-05","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"(bore hole 200mm dia) with PVC ptwell pipe and strainer. 18.0m depth including strainer (as 180. per design) and 75mm dia tubewell","unit":"","rates":{"zone_a":75845.06,"zone_b":75315.67,"zone_c":75083.88,"zone_d":74321.08},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":46,"source_schedule_page":36,"raw_rate_tokens":["75,845.06","75,315.67","75,083.88","74,321.08"],"source_review_note":null,"search_text":"12-180-05 (bore hole 200mm dia) with PVC ptwell pipe and strainer. 18.0m depth including strainer (as 180. per design) and 75mm dia tubewell"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-180-10-P46-SL53(2)","serial_label":"53(2)","item_code":"12-180-10","item_code_raw_ocr":"12-180-10","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"(bore hole 200mm dia) with PVC ptwell pipe and strainer. 12m depth including strainer (as 120. per design) and 100mm dia","unit":"","rates":{"zone_a":83416.19,"zone_b":82919.66,"zone_c":82575.05,"zone_d":81703.86},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":46,"source_schedule_page":36,"raw_rate_tokens":["83,416.19","82,919.66","82,575.05","81,703.86"],"source_review_note":null,"search_text":"12-180-10 (bore hole 200mm dia) with PVC ptwell pipe and strainer. 12m depth including strainer (as 120. per design) and 100mm dia"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-180-15-P46-SL53(3)","serial_label":"53(3)","item_code":"12-180-15","item_code_raw_ocr":"12-180-15","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"tubewell (bore hole 250mm dia) ptwell with PVC pipe and strainer. 18m depth including strainer (as 180. per design) and 100mm _ dia","unit":"","rates":{"zone_a":87287.7,"zone_b":86811.05,"zone_c":86416.75,"zone_d":85545.56},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":46,"source_schedule_page":36,"raw_rate_tokens":["87,287.70","86,811.05","86,416.75","85,545.56"],"source_review_note":null,"search_text":"12-180-15 tubewell (bore hole 250mm dia) ptwell with PVC pipe and strainer. 18m depth including strainer (as 180. per design) and 100mm _ dia"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-180-20-P46-SL53(4)","serial_label":"53(4)","item_code":"12-180-20","item_code_raw_ocr":"12-180-20","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"tubewell (bore hole 250mm dia) ptwell with PVC pipe and strainer. 18m depth including strainer (as “180. per design) and 150mm _ dia 4 D","unit":"","rates":{"zone_a":98728.78,"zone_b":98300.99,"zone_c":97730.85,"zone_d":96697.08},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":46,"source_schedule_page":36,"raw_rate_tokens":["98,728.78","98,300.99","97,730.85","96,697.08"],"source_review_note":null,"search_text":"12-180-20 tubewell (bore hole 250mm dia) ptwell with PVC pipe and strainer. 18m depth including strainer (as “180. per design) and 150mm _ dia 4 D"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-180-25-P46-SL53(5)","serial_label":"53(5)","item_code":"12-180-25","item_code_raw_ocr":"12-180-25","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"tubewell (bore hole dia 300mm ptwell 148,229.23 147,760.83 147,025.66 145,639. dia) with PVC pipe and strainer. ; 24m depth including strainer (as 120. per design) and 150mm dia","unit":"","rates":{"zone_a":148229.23,"zone_b":147760.83,"zone_c":147025.66,"zone_d":145639.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":46,"source_schedule_page":36,"raw_rate_tokens":["148,229.23","147,760.83","147,025.66","145,639"],"source_review_note":null,"search_text":"12-180-25 tubewell (bore hole dia 300mm ptwell 148,229.23 147,760.83 147,025.66 145,639. dia) with PVC pipe and strainer. ; 24m depth including strainer (as 120. per design) and 150mm dia"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-180-30-P46-SL53(6)","serial_label":"53(6)","item_code":"12-180-30","item_code_raw_ocr":"12-180-30","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"tubewell (bore hole dia 300mm ptwell dia) with PVC pipe and strainer. 30m depth including strainer (as 180. per design) and 150mm _ dia","unit":"","rates":{"zone_a":212590.61,"zone_b":212446.56,"zone_c":211476.16,"zone_d":208821.42},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":46,"source_schedule_page":36,"raw_rate_tokens":["212,590.61","212,446.56","211,476.16","208,821.42"],"source_review_note":null,"search_text":"12-180-30 tubewell (bore hole dia 300mm ptwell dia) with PVC pipe and strainer. 30m depth including strainer (as 180. per design) and 150mm _ dia"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-180-35-P46-SL53(7)","serial_label":"53(7)","item_code":"12-180-35","item_code_raw_ocr":"12-180-35","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"tubewell (bore hole dia 300mm ptwell dia) with PVC pipe and strainer. 18m depth including strainer (as per design) and 150mm _ dia","unit":"","rates":{"zone_a":252126.26,"zone_b":252068.9,"zone_c":250855.87,"zone_d":247569.65},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":46,"source_schedule_page":36,"raw_rate_tokens":["252,126.26","252,068.90","250,855.87","247,569.65"],"source_review_note":null,"search_text":"12-180-35 tubewell (bore hole dia 300mm ptwell dia) with PVC pipe and strainer. 18m depth including strainer (as per design) and 150mm _ dia"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-180-40-P46-SL53(8)","serial_label":"53(8)","item_code":"12-180-40","item_code_raw_ocr":"12-180-40","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"tubewell (housing pipe 300mm dia ptwell and bowel assembly) with G1 pipe and brass strainer. 24m depth including strainer (as per design) and 150mm dia","unit":"","rates":{"zone_a":186104.39,"zone_b":185880.16,"zone_c":185152.35,"zone_d":183906.56},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":46,"source_schedule_page":36,"raw_rate_tokens":["186,104.39","185,880.16","185,152.35","183,906.56"],"source_review_note":null,"search_text":"12-180-40 tubewell (housing pipe 300mm dia ptwell and bowel assembly) with G1 pipe and brass strainer. 24m depth including strainer (as per design) and 150mm dia"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-180-45-P46-SL53(9)","serial_label":"53(9)","item_code":"12-180-45","item_code_raw_ocr":"12-180-45","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"tubewell (housing pipe 300mm dia ptwell and bowel assembly) with GI pipe and brass strainer. 30m depth including strainer (as per design) and 150mm _ dia","unit":"","rates":{"zone_a":251576.25,"zone_b":251432.19,"zone_c":250461.8,"zone_d":247600.04},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":46,"source_schedule_page":36,"raw_rate_tokens":["251,576.25","251,432.19","250,461.80","247,600.04"],"source_review_note":null,"search_text":"12-180-45 tubewell (housing pipe 300mm dia ptwell and bowel assembly) with GI pipe and brass strainer. 30m depth including strainer (as per design) and 150mm _ dia"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-180-50-P46-SL53(10)","serial_label":"53(10)","item_code":"12-180-50","item_code_raw_ocr":"12-180-50","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"tubewell (housing pipe 300mm dia ptwell and bowel assembly) with GI pipe and brass strainer. 18m depth including strainer (as per design) and 200mm dia","unit":"","rates":{"zone_a":290307.59,"zone_b":290250.24,"zone_c":289037.2,"zone_d":285492.21},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":46,"source_schedule_page":36,"raw_rate_tokens":["290,307.59","290,250.24","289,037.20","285,492.21"],"source_review_note":null,"search_text":"12-180-50 tubewell (housing pipe 300mm dia ptwell and bowel assembly) with GI pipe and brass strainer. 18m depth including strainer (as per design) and 200mm dia"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-180-55-P46-SL53(11)","serial_label":"53(11)","item_code":"12-180-55","item_code_raw_ocr":"12-180-55","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"tubewell (housing pipe 350mm dia ptwell and bowel assembly) with GI pipe and brass strainer.","unit":"","rates":{"zone_a":229668.95,"zone_b":229495.65,"zone_c":228625.19,"zone_d":227232.17},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":46,"source_schedule_page":36,"raw_rate_tokens":["229,668.95","229,495.65","228,625.19","227,232.17"],"source_review_note":null,"search_text":"12-180-55 tubewell (housing pipe 350mm dia ptwell and bowel assembly) with GI pipe and brass strainer."},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-180-60-P47-SL53(12)","serial_label":"53(12)","item_code":"12-180-60","item_code_raw_ocr":"12-180-60","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"tubewell (housing pipe 350mm dia ptwell and bowel assembly) with GI pipe and brass strainer. 30m depth including strainer (as per design) and 200mm dia","unit":"","rates":{"zone_a":291415.67,"zone_b":291347.69,"zone_c":290187.1,"zone_d":287325.34},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":47,"source_schedule_page":37,"raw_rate_tokens":["291,415.67","291,347.69","290,187.10","287,325.34"],"source_review_note":null,"search_text":"12-180-60 tubewell (housing pipe 350mm dia ptwell and bowel assembly) with GI pipe and brass strainer. 30m depth including strainer (as per design) and 200mm dia"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-180-65-P47-SL53(13)","serial_label":"53(13)","item_code":"12-180-65","item_code_raw_ocr":"12-180-65","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"tubewell (housing pipe 350mm dia ptwell and bowel assembly) with GI pipe and brass strainer. Operation of tubewell by centrifugal pump for dewatering of subsurface water, maintaining drawdown records __ including 00. supply of necessary fuels, . . . .","unit":"","rates":{"zone_a":337830.68,"zone_b":337868.39,"zone_c":336417.68,"zone_d":332872.69},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":47,"source_schedule_page":37,"raw_rate_tokens":["337,830.68","337,868.39","336,417.68","332,872.69"],"source_review_note":null,"search_text":"12-180-65 tubewell (housing pipe 350mm dia ptwell and bowel assembly) with GI pipe and brass strainer. Operation of tubewell by centrifugal pump for dewatering of subsurface water, maintaining drawdown records __ including 00. supply of necessary fuels, . . . ."},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-200-00-P47-SL4","serial_label":"4","item_code":"12-200-00","item_code_raw_ocr":"12-200-00","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"+4 lubricants, operation personnel and pphour maintenance of the same upto the completion of the work as per specification and direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":47,"source_schedule_page":37,"raw_rate_tokens":null,"source_review_note":null,"search_text":"12-200-00 +4 lubricants, operation personnel and pphour maintenance of the same upto the completion of the work as per specification and direction of Engineer in charge."},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-200-10-P47-SL54(1)","serial_label":"54(1)","item_code":"12-200-10","item_code_raw_ocr":"12-200-10","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"","unit":"","rates":{"zone_a":351.17,"zone_b":351.17,"zone_c":351.17,"zone_d":349.09},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":47,"source_schedule_page":37,"raw_rate_tokens":["351.17","351.17","351.17","349.09"],"source_review_note":null,"search_text":"12-200-10"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-200-20-P47-SL54(2)","serial_label":"54(2)","item_code":"12-200-20","item_code_raw_ocr":"12-200-20","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"Operation of tubewell by 2 cusec turbine pump for dewatering of subsurface water, maintaining drawdown records __ including 10. supply of necessary fuels, . . . .","unit":"","rates":{"zone_a":293.67,"zone_b":293.67,"zone_c":293.67,"zone_d":291.58},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":47,"source_schedule_page":37,"raw_rate_tokens":["293.67","293.67","293.67","291.58"],"source_review_note":null,"search_text":"12-200-20 Operation of tubewell by 2 cusec turbine pump for dewatering of subsurface water, maintaining drawdown records __ including 10. supply of necessary fuels, . . . ."},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-210-00-P47","serial_label":null,"item_code":"12-210-00","item_code_raw_ocr":"12-210-00","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"5S lubricants, operation personnel and pphour maintenance of the same upto the completion of the work as per specification and direction of Engineer in charge. For 18m depth of tubewell :","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":47,"source_schedule_page":37,"raw_rate_tokens":null,"source_review_note":null,"search_text":"12-210-00 5S lubricants, operation personnel and pphour maintenance of the same upto the completion of the work as per specification and direction of Engineer in charge. For 18m depth of tubewell :"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-210-10-P47-SL55(1)","serial_label":"55(1)","item_code":"12-210-10","item_code_raw_ocr":"12-210-10","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"Electric Motor, 20 HP with 2 cusec pphour pump. For 24m depth of tubewell :","unit":"","rates":{"zone_a":271.63,"zone_b":271.37,"zone_c":271.37,"zone_d":268.18},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":47,"source_schedule_page":37,"raw_rate_tokens":["271.63","271.37","271.37","268.18"],"source_review_note":null,"search_text":"12-210-10 Electric Motor, 20 HP with 2 cusec pphour pump. For 24m depth of tubewell :"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-210-20-P47-SL55(2)","serial_label":"55(2)","item_code":"12-210-20","item_code_raw_ocr":"12-210-20","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"Electric Motor, 25 HP with 2 cusec pphour pump. For 30m depth of tubewell :","unit":"","rates":{"zone_a":321.97,"zone_b":321.72,"zone_c":321.72,"zone_d":318.53},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":47,"source_schedule_page":37,"raw_rate_tokens":["321.97","321.72","321.72","318.53"],"source_review_note":null,"search_text":"12-210-20 Electric Motor, 25 HP with 2 cusec pphour pump. For 30m depth of tubewell :"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-210-30-P47-SL55(3)","serial_label":"55(3)","item_code":"12-210-30","item_code_raw_ocr":"12-210-30","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"Electric Motor, 30 HP with 2 cusec pphour pump. Installation of Booster Pump for major structure (5 cusec Turbine Pump with Motor and all other accessories) at suitable elevation within area to be dewatered including construction of masonry","unit":"","rates":{"zone_a":372.32,"zone_b":372.06,"zone_c":372.06,"zone_d":368.87},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":47,"source_schedule_page":37,"raw_rate_tokens":["372.32","372.06","372.06","368.87"],"source_review_note":null,"search_text":"12-210-30 Electric Motor, 30 HP with 2 cusec pphour pump. Installation of Booster Pump for major structure (5 cusec Turbine Pump with Motor and all other accessories) at suitable elevation within area to be dewatered including construction of masonry"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-250-00-P47-SL56","serial_label":"56","item_code":"12-250-00","item_code_raw_ocr":"12-250-00","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"sump of connecting the delivery pipes of the wells, mounting the pumps and motors, laying in position the high head delivery pipes upto discharge outlet including staging, electric connections and test operations etc.","unit":"","rates":{"zone_a":172131.93,"zone_b":170799.3,"zone_c":168389.52,"zone_d":167788.31},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":47,"source_schedule_page":37,"raw_rate_tokens":["172,131.93","170,799.30","168,389.52","167,788.31"],"source_review_note":null,"search_text":"12-250-00 sump of connecting the delivery pipes of the wells, mounting the pumps and motors, laying in position the high head delivery pipes upto discharge outlet including staging, electric connections and test operations etc."},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-260-00-P48-SL57","serial_label":"57","item_code":"12-260-00","item_code_raw_ocr":"12-260-00","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"personnel and maintenance of the our same upto completion of the work as per standard specification and direction of Engineer in charge. Construction of sump well with dug holes of size 1.80 m x 2.0 m, laying in position the perforated empty diesel/petrol drum sheet of 1.00 m dia to a depth 1.5m having slot area of 1000 sq.cm/sqm, slot dia being 30mm each with supply of necessary shrouding materials","unit":"","rates":{"zone_a":1257.96,"zone_b":1257.2,"zone_c":1257.2,"zone_d":1249.53},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":48,"source_schedule_page":38,"raw_rate_tokens":["1,257.96","1,257.20","1,257.20","1,249.53"],"source_review_note":null,"search_text":"12-260-00 personnel and maintenance of the our same upto completion of the work as per standard specification and direction of Engineer in charge. Construction of sump well with dug holes of size 1.80 m x 2.0 m, laying in position the perforated empty diesel/petrol drum sheet of 1.00 m dia to a depth 1.5m having slot area of 1000 sq.cm/sqm, slot dia being 30mm each with supply of necessary shrouding materials"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-300-00-P48-SL58","serial_label":"58","item_code":"12-300-00","item_code_raw_ocr":"12-300-00","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"comprising of 60% 40mm down each graded khoa and 40% coarse sand of FM>=2.50 and placing those around and beneath the drum sheet having thickness of 40cm and 50cm respectively —_ including necessary welding, fitting etc. complete as per direction of Engineer in charge. Bailing out of water with all leads and lifts by manual labour or pump, with all arrangements for protection of ring bund and side","unit":"","rates":{"zone_a":25260.2,"zone_b":25061.8,"zone_c":24701.37,"zone_d":24220.41},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":48,"source_schedule_page":38,"raw_rate_tokens":["25,260.20","25,061.80","24,701.37","24,220.41"],"source_review_note":null,"search_text":"12-300-00 comprising of 60% 40mm down each graded khoa and 40% coarse sand of FM>=2.50 and placing those around and beneath the drum sheet having thickness of 40cm and 50cm respectively —_ including necessary welding, fitting etc. complete as per direction of Engineer in charge. Bailing out of water with all leads and lifts by manual labour or pump, with all arrangements for protection of ring bund and side"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-310-00-P48-SL59","serial_label":"59","item_code":"12-310-00","item_code_raw_ocr":"12-310-00","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"slopes of foundation pit against cum . . . . erosion or washout etc. complete actual volume of work will be measured by sounding method before starting the work) as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":48,"source_schedule_page":38,"raw_rate_tokens":null,"source_review_note":null,"search_text":"12-310-00 slopes of foundation pit against cum . . . . erosion or washout etc. complete actual volume of work will be measured by sounding method before starting the work) as per direction of Engineer in charge."},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-310-20-P48","serial_label":null,"item_code":"12-310-20","item_code_raw_ocr":"12-310-20","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"10.33 Supplying and sinking 40mm dia G.I. tubewell pipe including test boring and hiring of all necessary equipments with all necessary ann fittings as required etc. all m . . complete including the cost of all materials as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":48,"source_schedule_page":38,"raw_rate_tokens":null,"source_review_note":null,"search_text":"12-310-20 10.33 Supplying and sinking 40mm dia G.I. tubewell pipe including test boring and hiring of all necessary equipments with all necessary ann fittings as required etc. all m . . complete including the cost of all materials as per direction of Engineer in charge."},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-400-10-P48","serial_label":null,"item_code":"12-400-10","item_code_raw_ocr":"12-400-10","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"Depth upto 60m. m 1,017.07 1,017.04 1,017.04","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":48,"source_schedule_page":38,"raw_rate_tokens":null,"source_review_note":null,"search_text":"12-400-10 Depth upto 60m. m 1,017.07 1,017.04 1,017.04"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-400-20-P48-SL60(2)","serial_label":"60(2)","item_code":"12-400-20","item_code_raw_ocr":"12-400-20","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"Depth above 60m. 1,184.20 1,170.33 Supplying and sinking 40mm dia PVC tubewell pipe (B.S. 3505)","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":48,"source_schedule_page":38,"raw_rate_tokens":null,"source_review_note":null,"search_text":"12-400-20 Depth above 60m. 1,184.20 1,170.33 Supplying and sinking 40mm dia PVC tubewell pipe (B.S. 3505)"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-410-00-P48-SL61","serial_label":"61","item_code":"12-410-00","item_code_raw_ocr":"12-410-00","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"ieluding test boring and hiring of , . . all necessary equipments with all necessary fittings as required etc. complete including the cost of all","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":48,"source_schedule_page":38,"raw_rate_tokens":null,"source_review_note":null,"search_text":"12-410-00 ieluding test boring and hiring of , . . all necessary equipments with all necessary fittings as required etc. complete including the cost of all"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-410-10-P49-SL61(1)","serial_label":"61(1)","item_code":"12-410-10","item_code_raw_ocr":"12-410-10","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"depth upto 60m.","unit":"","rates":{"zone_a":353.9,"zone_b":353.87,"zone_c":353.87,"zone_d":344.92},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":49,"source_schedule_page":39,"raw_rate_tokens":["353.90","353.87","353.87","344.92"],"source_review_note":null,"search_text":"12-410-10 depth upto 60m."},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-410-20-P49-SL61(2)","serial_label":"61(2)","item_code":"12-410-20","item_code_raw_ocr":"12-410-20","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"depth above 60m. 49939 49936 49936 485.53 Supplying, fitting and fixing 40mm dia brass/PVC strainer, 1.80m long including hiring necessary","unit":"","rates":{"zone_a":49939.0,"zone_b":49936.0,"zone_c":49936.0,"zone_d":48553.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":49,"source_schedule_page":39,"raw_rate_tokens":["49939","49936","49936","485.53"],"source_review_note":null,"search_text":"12-410-20 depth above 60m. 49939 49936 49936 485.53 Supplying, fitting and fixing 40mm dia brass/PVC strainer, 1.80m long including hiring necessary"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-420-00-P49-SL62","serial_label":"62","item_code":"12-420-00","item_code_raw_ocr":"12-420-00","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"necsssary fittings etc. complete including the cost of all materials as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":49,"source_schedule_page":39,"raw_rate_tokens":null,"source_review_note":null,"search_text":"12-420-00 necsssary fittings etc. complete including the cost of all materials as per direction of Engineer in charge."},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-420-10-P49-SL62(1)","serial_label":"62(1)","item_code":"12-420-10","item_code_raw_ocr":"12-420-10","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"Brass strainer.","unit":"","rates":{"zone_a":1108.69,"zone_b":1107.22,"zone_c":1107.22,"zone_d":1079.64},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":49,"source_schedule_page":39,"raw_rate_tokens":["1,108.69","1,107.22","1,107.22","1,079.64"],"source_review_note":null,"search_text":"12-420-10 Brass strainer."},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-420-20-P49","serial_label":null,"item_code":"12-420-20","item_code_raw_ocr":"12-420-20","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"PVC strainer. Supplying, fitting and fixing pump No. 6 for 40mm dia tubewell, as","unit":"each","rates":{"zone_a":985.98,"zone_b":984.52,"zone_c":984.52,"zone_d":956.93},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":49,"source_schedule_page":39,"raw_rate_tokens":["985.98","984.52","984.52","956.93"],"source_review_note":null,"search_text":"12-420-20 PVC strainer. Supplying, fitting and fixing pump No. 6 for 40mm dia tubewell, as each"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-440-00-P49-SL63","serial_label":"63","item_code":"12-440-00","item_code_raw_ocr":"12-440-00","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"Per approved quality with all 34 accessories etc. complete including } the cost of all materials as per direction of Engineer in charge. Labour charge for taking out and resinking of 40mm dia GI. tubewell pipes upto required depth, . including test’ boring and hire 64 112-450-00 charge of the equipments with alll m ° . necessary fittings as required etc. complete, as per direction of Engineer in charge. .","unit":"","rates":{"zone_a":3985.99,"zone_b":3284.46,"zone_c":3284.46,"zone_d":3270.65},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":49,"source_schedule_page":39,"raw_rate_tokens":["3985.99","3,284.46","3,284.46","3,270.65"],"source_review_note":null,"search_text":"12-440-00 Per approved quality with all 34 accessories etc. complete including } the cost of all materials as per direction of Engineer in charge. Labour charge for taking out and resinking of 40mm dia GI. tubewell pipes upto required depth, . including test’ boring and hire 64 112-450-00 charge of the equipments with alll m ° . necessary fittings as required etc. complete, as per direction of Engineer in charge. ."},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-450-10-P49-SL64(1)","serial_label":"64(1)","item_code":"12-450-10","item_code_raw_ocr":"12-450-10","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"Depth upto 60m. m","unit":"","rates":{"zone_a":303.81,"zone_b":303.77,"zone_c":303.77,"zone_d":290.35},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":49,"source_schedule_page":39,"raw_rate_tokens":["303.81","303.77","303.77","290.35"],"source_review_note":null,"search_text":"12-450-10 Depth upto 60m. m"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-450-20-P49-SL64(2)","serial_label":"64(2)","item_code":"12-450-20","item_code_raw_ocr":"12-450-20","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"Depth above 60m. m 547.35 54735 547.35 524.81 Labour charge for taking out 40mm dia tubewell pipes including","unit":"","rates":{"zone_a":547.35,"zone_b":547.35,"zone_c":547.35,"zone_d":524.81},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":49,"source_schedule_page":39,"raw_rate_tokens":["547.35","54735","547.35","524.81"],"source_review_note":null,"search_text":"12-450-20 Depth above 60m. m 547.35 54735 547.35 524.81 Labour charge for taking out 40mm dia tubewell pipes including"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-12-460-00-P49-SL65","serial_label":"65","item_code":"12-460-00","item_code_raw_ocr":"12-460-00","item_code_validation_status":"ocr_source_preserved","section_code":"12","section_title":null,"description":"cleaning the pipes and other fittings, as per direction of Engineer in charge. 16. Earthwork Erection of bamboo profile with full bamboo posts and pegs not less","unit":"m","rates":{"zone_a":201.23,"zone_b":201.23,"zone_c":201.23,"zone_d":192.38},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":49,"source_schedule_page":39,"raw_rate_tokens":["201.23","201.23","201.23","192.38"],"source_review_note":null,"search_text":"12-460-00 cleaning the pipes and other fittings, as per direction of Engineer in charge. 16. Earthwork Erection of bamboo profile with full bamboo posts and pegs not less m"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-100-00-P49-SL66","serial_label":"66","item_code":"16-100-00","item_code_raw_ocr":"16-100-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"than 60mm in diameter, and coir strings etc. complete as per direction of Engineer in charge. Earth work by manual labour in constructing/ _resectioning of embankment/ canal bank/ road ete. with clayey soil(minimum 30% clay, 0-40% silt and 0-30% sand) within the initial lead of 30m, and","unit":"each","rates":{"zone_a":398.13,"zone_b":372.04,"zone_c":372.04,"zone_d":378.11},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":49,"source_schedule_page":39,"raw_rate_tokens":["398.13","372.04","372.04","378.11"],"source_review_note":null,"search_text":"16-100-00 than 60mm in diameter, and coir strings etc. complete as per direction of Engineer in charge. Earth work by manual labour in constructing/ _resectioning of embankment/ canal bank/ road ete. with clayey soil(minimum 30% clay, 0-40% silt and 0-30% sand) within the initial lead of 30m, and each Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-110-00-P49-SL67","serial_label":"67","item_code":"16-110-00","item_code_raw_ocr":"16-110-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":") all lifts including throwing the cum spoils to profiles in layers not exceeding 150mm in thickness, clod breaking upto a maximum size of 100mm, benching the side slopes, stripping/ ploughing the We base of embankment and borrow koa @- Gh )","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":49,"source_schedule_page":39,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-110-00 ) all lifts including throwing the cum spoils to profiles in layers not exceeding 150mm in thickness, clod breaking upto a maximum size of 100mm, benching the side slopes, stripping/ ploughing the We base of embankment and borrow koa @- Gh ) Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-110-40-P50-SL67(4)","serial_label":"67(4)","item_code":"16-110-40","item_code_raw_ocr":"16-110-40","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"0 to 6 m height. 275.28 Earth work by manual labour in constructing/ resectioning of embankment/ canal bank/ road etc. compacted to 85%/90% maximum dry density at optimum moisture content, with reference to laboratory density test AAHSTO modified hammer, with clayey soil(minm 30% clay, 0-40% silt, 0- 30% sand) within the initial lead of 30m and all lifts including throwing the spoils to profiles in layers not exceeding 230mm in thickness with clod breaking to a maximum size of 100mm,","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":50,"source_schedule_page":40,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-110-40 0 to 6 m height. 275.28 Earth work by manual labour in constructing/ resectioning of embankment/ canal bank/ road etc. compacted to 85%/90% maximum dry density at optimum moisture content, with reference to laboratory density test AAHSTO modified hammer, with clayey soil(minm 30% clay, 0-40% silt, 0- 30% sand) within the initial lead of 30m and all lifts including throwing the spoils to profiles in layers not exceeding 230mm in thickness with clod breaking to a maximum size of 100mm, Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-120-00-P50-SL68","serial_label":"68","item_code":"16-120-00","item_code_raw_ocr":"16-120-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"roots and stumps of trees of girth upto 200mm from the ground, stripping/ ploughing the base of embankment and borrow pit area, dug bailing, bail out of water, rough dressing including 150mm cambering at the centre of crest ete. complete, including maintenance of the same for 6 months after completion, (compaction will be done by the contractor with approved equipment, including all ancillary charges for compaction and testing) as per direction of Engineer in charge. compaction. compaction. compaction. 85% compaction. compaction. compaction. A @e @ G@ “ %","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":50,"source_schedule_page":40,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"16-120-00 roots and stumps of trees of girth upto 200mm from the ground, stripping/ ploughing the base of embankment and borrow pit area, dug bailing, bail out of water, rough dressing including 150mm cambering at the centre of crest ete. complete, including maintenance of the same for 6 months after completion, (compaction will be done by the contractor with approved equipment, including all ancillary charges for compaction and testing) as per direction of Engineer in charge. compaction. compaction. compaction. 85% compaction. compaction. compaction. A @e @ G@ “ % Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-120-79-P51-SL68(7)","serial_label":"68(7)","item_code":"16-120-79","item_code_raw_ocr":"16-120-79","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"© ™ t 5 m height with 90% compaction. 0 m to 6 m height & above with","unit":"","rates":{"zone_a":351.22,"zone_b":346.08,"zone_c":346.08,"zone_d":325.25},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":51,"source_schedule_page":41,"raw_rate_tokens":["351.22","346.08","346.08","325.25"],"source_review_note":null,"search_text":"16-120-79 © ™ t 5 m height with 90% compaction. 0 m to 6 m height & above with Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-120-80-P51-SL68(8)","serial_label":"68(8)","item_code":"16-120-80","item_code_raw_ocr":"16-120-80","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"90% compaction. Earth work by manual labour in resectioning of embankment/ canal bank/ river slopes/ road/ compound etc. manually compacted by 7.0 kg iron rammer to avoid any air pocket in clayey soil (minimum 30% clay, 0-40% silt and 0-30% sand) within the initial lead of 30m and all lifts including throwing the spoils to profile in layers not exceeding 150mm thickness with","unit":"","rates":{"zone_a":369.24,"zone_b":363.77,"zone_c":363.77,"zone_d":341.63},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":51,"source_schedule_page":41,"raw_rate_tokens":["369.24","363.77","363.77","341.63"],"source_review_note":null,"search_text":"16-120-80 90% compaction. Earth work by manual labour in resectioning of embankment/ canal bank/ river slopes/ road/ compound etc. manually compacted by 7.0 kg iron rammer to avoid any air pocket in clayey soil (minimum 30% clay, 0-40% silt and 0-30% sand) within the initial lead of 30m and all lifts including throwing the spoils to profile in layers not exceeding 150mm thickness with Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-130-00-P51-SL69","serial_label":"69","item_code":"16-130-00","item_code_raw_ocr":"16-130-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"of 100mm, removing roots & stumps of trees of girth upto 200mm from the ground, benching the side slopes, __stripping/ ploughing the base of embankment and borrowpit areas, dug bailing, bail out of water, rough dressing including 150mm cambering at the centre of the crest (where necessary) etc. complete as per direction of Engineer in charge. _","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":51,"source_schedule_page":41,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"16-130-00 of 100mm, removing roots & stumps of trees of girth upto 200mm from the ground, benching the side slopes, __stripping/ ploughing the base of embankment and borrowpit areas, dug bailing, bail out of water, rough dressing including 150mm cambering at the centre of the crest (where necessary) etc. complete as per direction of Engineer in charge. _ Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-130-10-P51-SL69(1)","serial_label":"69(1)","item_code":"16-130-10","item_code_raw_ocr":"16-130-10","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"0 m to 3 m height. cum","unit":"","rates":{"zone_a":304.06,"zone_b":298.59,"zone_c":298.59,"zone_d":276.55},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":51,"source_schedule_page":41,"raw_rate_tokens":["304.06","298.59","298.59","276.55"],"source_review_note":null,"search_text":"16-130-10 0 m to 3 m height. cum Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-130-20-P51-SL69(2)","serial_label":"69(2)","item_code":"16-130-20","item_code_raw_ocr":"16-130-20","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"0 m to 4 m height.","unit":"cum","rates":{"zone_a":322.08,"zone_b":316.28,"zone_c":316.28,"zone_d":292.93},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":51,"source_schedule_page":41,"raw_rate_tokens":["322.08","316.28","316.28","292.93"],"source_review_note":null,"search_text":"16-130-20 0 m to 4 m height. cum Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-130-30-P51-SL69(3)","serial_label":"69(3)","item_code":"16-130-30","item_code_raw_ocr":"16-130-30","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"0 m to 5 m height.","unit":"","rates":{"zone_a":340.24,"zone_b":334.1,"zone_c":334.1,"zone_d":309.43},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":51,"source_schedule_page":41,"raw_rate_tokens":["340.24","334.10","334.10","309.43"],"source_review_note":null,"search_text":"16-130-30 0 m to 5 m height. Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-130-40-P51-SL69(4)","serial_label":"69(4)","item_code":"16-130-40","item_code_raw_ocr":"16-130-40","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"0 m to 6 m height. Compaction of earth = in resectioning of embankment/ canal bank/ road/ river bank slopes/ compounds ete as per design to - 7 _ .","unit":"","rates":{"zone_a":358.19,"zone_b":351.73,"zone_c":351.73,"zone_d":325.75},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":51,"source_schedule_page":41,"raw_rate_tokens":["358.19","351.73","351.73","325.75"],"source_review_note":null,"search_text":"16-130-40 0 m to 6 m height. Compaction of earth = in resectioning of embankment/ canal bank/ road/ river bank slopes/ compounds ete as per design to - 7 _ . Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-140-00-P51-SL70","serial_label":"70","item_code":"16-140-00","item_code_raw_ocr":"16-140-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"profile in layers not exceeding cum 150mm in thickness in all kinds of soils etc. complete as per direction of Engineer in charge. By engine operated vibratory soil compactor to attain 80% maximum","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":51,"source_schedule_page":41,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-140-00 profile in layers not exceeding cum 150mm in thickness in all kinds of soils etc. complete as per direction of Engineer in charge. By engine operated vibratory soil compactor to attain 80% maximum Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-140-10-P51-SL70(1)","serial_label":"70(1)","item_code":"16-140-10","item_code_raw_ocr":"16-140-10","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"SY density at optimum moisture O44, content with reference to laboratory density test AASHTO- 180 modified hammer. ;","unit":"","rates":{"zone_a":54.59,"zone_b":54.58,"zone_c":54.58,"zone_d":54.04},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":51,"source_schedule_page":41,"raw_rate_tokens":["54.59","54.58","54.58","54.04"],"source_review_note":null,"search_text":"16-140-10 SY density at optimum moisture O44, content with reference to laboratory density test AASHTO- 180 modified hammer. ; Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-140-20-P51","serial_label":null,"item_code":"16-140-20","item_code_raw_ocr":"16-140-20","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"BY all voids from soil. Compaction of earth in constructing/resectioning of embankment/ canal","unit":"","rates":{"zone_a":55.04,"zone_b":54.25,"zone_c":54.25,"zone_d":50.28},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":51,"source_schedule_page":41,"raw_rate_tokens":["55.04","54.25","54.25","50.28"],"source_review_note":null,"search_text":"16-140-20 BY all voids from soil. Compaction of earth in constructing/resectioning of embankment/ canal Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-150-00-P51-SL7","serial_label":"7","item_code":"16-150-00","item_code_raw_ocr":"16-150-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"bank/road/river slopes etc. by cum . . mechanical equipment to attain 85% / 90% maximum dry density at optimum moisture content with reference to laboratory density test _ ; p ) for every _ a A Op @ 6. V/","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":51,"source_schedule_page":41,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-150-00 bank/road/river slopes etc. by cum . . mechanical equipment to attain 85% / 90% maximum dry density at optimum moisture content with reference to laboratory density test _ ; p ) for every _ a A Op @ 6. V/ Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-160-00-P52-SL72","serial_label":"72","item_code":"16-160-00","item_code_raw_ocr":"16-160-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"maximum of 19 leads (3m neglected) for all kinds of earth work, Extra rate for every additional lift of 1.0m or part thereof beyond the Pit","unit":"cum","rates":{"zone_a":34.44,"zone_b":33.82,"zone_c":33.82,"zone_d":31.31},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":52,"source_schedule_page":42,"raw_rate_tokens":["34.44","33.82","33.82","31.31"],"source_review_note":null,"search_text":"16-160-00 maximum of 19 leads (3m neglected) for all kinds of earth work, Extra rate for every additional lift of 1.0m or part thereof beyond the Pit cum Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-170-00-P52-SL73","serial_label":"73","item_code":"16-170-00","item_code_raw_ocr":"16-170-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"initial lift of neglected) for all kinds of earth “U™ work. Royalty of specified earth taken from private land (with prior permission of the Executive","unit":"","rates":{"zone_a":17.82,"zone_b":17.49,"zone_c":17.49,"zone_d":16.2},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":52,"source_schedule_page":42,"raw_rate_tokens":["17.82","17.49","17.49","16.20"],"source_review_note":null,"search_text":"16-170-00 initial lift of neglected) for all kinds of earth “U™ work. Royalty of specified earth taken from private land (with prior permission of the Executive Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-180-00-P52-SL74","serial_label":"74","item_code":"16-180-00","item_code_raw_ocr":"16-180-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"Engineer on production of royalty deeds with the land owner) from the area to be selected by the contractor with mutual agreement. Earth work by carried earth by truck/boat or any other means supplied at contractor's own cost (including royalty) in constructing/ resectioning of the embankment/ canal bank/ road etc. in clayey soil (minimum 30% clay, 0-40% silt and 0-30% sand) beyond the initial lead of 300m including throwing the spoils to a profile in layers not exceeding 150mm in thickness,","unit":"cum","rates":{"zone_a":22.09,"zone_b":22.09,"zone_c":22.09,"zone_d":22.09},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":52,"source_schedule_page":42,"raw_rate_tokens":["22.09","22.09","22.09","22.09"],"source_review_note":null,"search_text":"16-180-00 Engineer on production of royalty deeds with the land owner) from the area to be selected by the contractor with mutual agreement. Earth work by carried earth by truck/boat or any other means supplied at contractor's own cost (including royalty) in constructing/ resectioning of the embankment/ canal bank/ road etc. in clayey soil (minimum 30% clay, 0-40% silt and 0-30% sand) beyond the initial lead of 300m including throwing the spoils to a profile in layers not exceeding 150mm in thickness, cum Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-200-00-P52-SL75","serial_label":"75","item_code":"16-200-00","item_code_raw_ocr":"16-200-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"jy rcaking clods, benching the side CU ° ° ° . slopes, stripping the base of embankment and borrow pit area, dug bailing, cutting trees upto 200mm girth =~ with uprooting stumps, clearing jungles, bail out of water, rough dressing and 150mm cambering at the centre of the crest etc. complete as per design, specification and direction of Engineer in charge. Earth work by Carried Earth (by truck/boat or any other means) supplied at contractor's own cost","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":52,"source_schedule_page":42,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-200-00 jy rcaking clods, benching the side CU ° ° ° . slopes, stripping the base of embankment and borrow pit area, dug bailing, cutting trees upto 200mm girth =~ with uprooting stumps, clearing jungles, bail out of water, rough dressing and 150mm cambering at the centre of the crest etc. complete as per design, specification and direction of Engineer in charge. Earth work by Carried Earth (by truck/boat or any other means) supplied at contractor's own cost Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-210-00-P52-SL76","serial_label":"76","item_code":"16-210-00","item_code_raw_ocr":"16-210-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"(including royalty) in resectioning cum of embankment/ canal bank/ river slopes/ road/ compound etc. manually compacted by 7.0 kg iron L (de Q fw *","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":52,"source_schedule_page":42,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-210-00 (including royalty) in resectioning cum of embankment/ canal bank/ river slopes/ road/ compound etc. manually compacted by 7.0 kg iron L (de Q fw * Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-210-10-P53-SL76(1)","serial_label":"76(1)","item_code":"16-210-10","item_code_raw_ocr":"16-210-10","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"300 m to Earth work by carried earth (by truck/boat or any other means) supplied at contractor's own cost (including royalty) in constructing/ resectioning of the embankment/ canal bank/ road etc. compacted to 85%/90% maximum dry density at optimum moisture content with reference to laboratory density test AASHTO modified hammer, with clayey soil (minimum 30% clay, 0- 40% silt and 0-30% sand) beyond initial lead of 300m_ including throwing the spoils to profiles in layer not exceeding 230mm in","unit":"","rates":{"zone_a":1000.0,"zone_b":549.48,"zone_c":543.02,"zone_d":517.05},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":53,"source_schedule_page":43,"raw_rate_tokens":["1.00","549.48","543.02","517.05"],"source_review_note":null,"search_text":"16-210-10 300 m to Earth work by carried earth (by truck/boat or any other means) supplied at contractor's own cost (including royalty) in constructing/ resectioning of the embankment/ canal bank/ road etc. compacted to 85%/90% maximum dry density at optimum moisture content with reference to laboratory density test AASHTO modified hammer, with clayey soil (minimum 30% clay, 0- 40% silt and 0-30% sand) beyond initial lead of 300m_ including throwing the spoils to profiles in layer not exceeding 230mm in Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-220-00-P53-SL7","serial_label":"7","item_code":"16-220-00","item_code_raw_ocr":"16-220-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"thickness with clod breaking to cui . . . . maximum size =oof-. —s- 100mm, benching the side slopes, removing roots and stumps of trees of girth upto 200mm, stripping/ ploughing the base of embankment and borrow pit area, dug bailing, clearing jungles, bail out of water, rough dressing including 150mm cambering at the centre of crest with all leads and lifts complete (compaction will be done by the contractor with approved equipment including all ancillary charges for compaction and testing) as per direction of Engineer in charge. compaction) compaction,(Extra rate). kK Q@- fw YN,","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":53,"source_schedule_page":43,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-220-00 thickness with clod breaking to cui . . . . maximum size =oof-. —s- 100mm, benching the side slopes, removing roots and stumps of trees of girth upto 200mm, stripping/ ploughing the base of embankment and borrow pit area, dug bailing, clearing jungles, bail out of water, rough dressing including 150mm cambering at the centre of crest with all leads and lifts complete (compaction will be done by the contractor with approved equipment including all ancillary charges for compaction and testing) as per direction of Engineer in charge. compaction) compaction,(Extra rate). kK Q@- fw YN, Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-220-40-P54","serial_label":null,"item_code":"16-220-40","item_code_raw_ocr":"16-220-40","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"774) davmpaction, (Extra rate) 90% cum 103.82 103.82 103.82 Earth work by Mechanical Excavator (Long Boom ) in constructing/resectioning of embankment/canal bank/road etc. with clayey soil (minimum 30% clay, 0-40% silt and 0-30% sand) within the initial lead of 30m, and all lifts including throwing the spoils to profiles in layers not exceeding 150mm _ in thickness, clod breaking upto a>","unit":"","rates":{"zone_a":90.0,"zone_b":103.82,"zone_c":103.82,"zone_d":103.82},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":54,"source_schedule_page":44,"raw_rate_tokens":["90","103.82","103.82","103.82"],"source_review_note":null,"search_text":"16-220-40 774) davmpaction, (Extra rate) 90% cum 103.82 103.82 103.82 Earth work by Mechanical Excavator (Long Boom ) in constructing/resectioning of embankment/canal bank/road etc. with clayey soil (minimum 30% clay, 0-40% silt and 0-30% sand) within the initial lead of 30m, and all lifts including throwing the spoils to profiles in layers not exceeding 150mm _ in thickness, clod breaking upto a> Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-230-00-P54-SL78","serial_label":"78","item_code":"16-230-00","item_code_raw_ocr":"16-230-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"benching the side slopes, stripping/ ploughing the base of embankment and borrow pit area, dug bailing, cutting trees upto 200mm girth, with uprooting stumps, clearing jungles, rough dressing and 150mm cambering at the centre of the crest ete. complete as per specification and direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":54,"source_schedule_page":44,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"16-230-00 benching the side slopes, stripping/ ploughing the base of embankment and borrow pit area, dug bailing, cutting trees upto 200mm girth, with uprooting stumps, clearing jungles, rough dressing and 150mm cambering at the centre of the crest ete. complete as per specification and direction of Engineer in charge. Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-230-10-P54-SL78(1)","serial_label":"78(1)","item_code":"16-230-10","item_code_raw_ocr":"16-230-10","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"Embankment = by mechanical om excavator, ht: 0 to 4m","unit":"","rates":{"zone_a":173.49,"zone_b":172.75,"zone_c":172.75,"zone_d":169.28},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":54,"source_schedule_page":44,"raw_rate_tokens":["173.49","172.75","172.75","169.28"],"source_review_note":null,"search_text":"16-230-10 Embankment = by mechanical om excavator, ht: 0 to 4m Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-230-20-P54-SL78(2)","serial_label":"78(2)","item_code":"16-230-20","item_code_raw_ocr":"16-230-20","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"Embankment by mechanical 208.29 20741 207.41 203.23 excavator, ht: 4 m above Earth work by Mechanical Excavator (Long Boon) in constructing/ resectioning of embankment/canal bank/ road etc. compacted to 85%/90% maximum dry density at optimum moisture content, with reference to laboratory density test AAHSTO modified hammer, with clayey soil(minm 30% clay, 0-40% silt, 0-30% sand) within the initial lead of 30m and all lifts including throwing the spoils","unit":"","rates":{"zone_a":208.29,"zone_b":207.41,"zone_c":207.41,"zone_d":203.23},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":54,"source_schedule_page":44,"raw_rate_tokens":["208.29","20741","207.41","203.23"],"source_review_note":null,"search_text":"16-230-20 Embankment by mechanical 208.29 20741 207.41 203.23 excavator, ht: 4 m above Earth work by Mechanical Excavator (Long Boon) in constructing/ resectioning of embankment/canal bank/ road etc. compacted to 85%/90% maximum dry density at optimum moisture content, with reference to laboratory density test AAHSTO modified hammer, with clayey soil(minm 30% clay, 0-40% silt, 0-30% sand) within the initial lead of 30m and all lifts including throwing the spoils Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-240-00-P54-SL79","serial_label":"79","item_code":"16-240-00","item_code_raw_ocr":"16-240-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"exceeding 230mm _ in_ thickness with clod breaking to a maximum ~ size of 100mm, benching the side slopes, removing roots and stumps of trees of girth upto 200mm from the — ground, stripping/ploughing the base of embankment and borrow pit area, dug bailing, rough dressing including 150mm _ cambering at the centre of crest etc. complete, including maintenance of the same for 6 months after k Oh a ff“ *","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":54,"source_schedule_page":44,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-240-00 exceeding 230mm _ in_ thickness with clod breaking to a maximum ~ size of 100mm, benching the side slopes, removing roots and stumps of trees of girth upto 200mm from the — ground, stripping/ploughing the base of embankment and borrow pit area, dug bailing, rough dressing including 150mm _ cambering at the centre of crest etc. complete, including maintenance of the same for 6 months after k Oh a ff“ * Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-240-10-P55-SL79(1)","serial_label":"79(1)","item_code":"16-240-10","item_code_raw_ocr":"16-240-10","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"Equipment; ht: 0 to 4m; 85% comp.","unit":"cum","rates":{"zone_a":203.76,"zone_b":203.27,"zone_c":203.27,"zone_d":200.7},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":55,"source_schedule_page":45,"raw_rate_tokens":["203.76","203.27","203.27","200.70"],"source_review_note":null,"search_text":"16-240-10 Equipment; ht: 0 to 4m; 85% comp. cum Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-240-30-P55-SL79(3)","serial_label":"79(3)","item_code":"16-240-30","item_code_raw_ocr":"16-240-30","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"Embk: by Mech. Equipment; ht: 0 om 210.01 210.01 to 4m; 90% comp.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":55,"source_schedule_page":45,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-240-30 Embk: by Mech. Equipment; ht: 0 om 210.01 210.01 to 4m; 90% comp. Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-240-40-P55-SL79(4)","serial_label":"79(4)","item_code":"16-240-40","item_code_raw_ocr":"16-240-40","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"TS sbowe: 90%, come ht: 4 242.10 242.10 238.99 Earth work by carried earth (by truck/boat or any other means) supplied at contractor's own cost (including royalty) in constructing/ resectioning of the embankment/ canal bank/ road etc. by Mechanical Excavator (Long Boon) compacted to 85%/90% maximum dry density at optimum moisture content with reference to laboratory density test AASHTO modified hammer, with clayey soil (minimum 30% clay, 0-40% silt and 0-30% sand) beyond initial lead of 300m including throwing the spoils to profiles in layer not","unit":"","rates":{"zone_a":400.0,"zone_b":242.1,"zone_c":242.1,"zone_d":238.99},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":55,"source_schedule_page":45,"raw_rate_tokens":["4","242.10","242.10","238.99"],"source_review_note":null,"search_text":"16-240-40 TS sbowe: 90%, come ht: 4 242.10 242.10 238.99 Earth work by carried earth (by truck/boat or any other means) supplied at contractor's own cost (including royalty) in constructing/ resectioning of the embankment/ canal bank/ road etc. by Mechanical Excavator (Long Boon) compacted to 85%/90% maximum dry density at optimum moisture content with reference to laboratory density test AASHTO modified hammer, with clayey soil (minimum 30% clay, 0-40% silt and 0-30% sand) beyond initial lead of 300m including throwing the spoils to profiles in layer not Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-250-00-P55-SL80","serial_label":"80","item_code":"16-250-00","item_code_raw_ocr":"16-250-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"with clod breaking to maximum size of 100mm, benching the side slopes, removing roots and stumps of trees of girth upto 200mm, stripping/ ploughing the base of embankment and borrow pit area, dug bailing, clearing jungles, rough dressing including 150mm cambering at the centre of crest with all leads and lifts complete (compaction will be done by the contractor with approved equipment including all ancillary charges for compaction and testing) as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":55,"source_schedule_page":45,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"16-250-00 with clod breaking to maximum size of 100mm, benching the side slopes, removing roots and stumps of trees of girth upto 200mm, stripping/ ploughing the base of embankment and borrow pit area, dug bailing, clearing jungles, rough dressing including 150mm cambering at the centre of crest with all leads and lifts complete (compaction will be done by the contractor with approved equipment including all ancillary charges for compaction and testing) as per direction of Engineer in charge. Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-250-10-P55-SL80(1)","serial_label":"80(1)","item_code":"16-250-10","item_code_raw_ocr":"16-250-10","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"me econ bt: 010 cum 408.93 408.33 405.32","unit":"","rates":{"zone_a":1000.0,"zone_b":408.93,"zone_c":408.33,"zone_d":405.32},"rate_integrity_status":"numeric_outlier_review_required","autofill_eligible":false,"source_pdf_page":55,"source_schedule_page":45,"raw_rate_tokens":["010","408.93","408.33","405.32"],"source_review_note":null,"search_text":"16-250-10 me econ bt: 010 cum 408.93 408.33 405.32 Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-250-30-P55-SL80(3)","serial_label":"80(3)","item_code":"16-250-30","item_code_raw_ocr":"16-250-30","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"a mt oncom mt Oto cum 415.67 415.07 412.02","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":55,"source_schedule_page":45,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-250-30 a mt oncom mt Oto cum 415.67 415.07 412.02 Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-250-40-P55-SL80(4)","serial_label":"80(4)","item_code":"16-250-40","item_code_raw_ocr":"16-250-40","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"Ome socom he 4m om","unit":"","rates":{"zone_a":447.86,"zone_b":447.16,"zone_c":447.16,"zone_d":443.6},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":55,"source_schedule_page":45,"raw_rate_tokens":["447.86","447.16","447.16","443.60"],"source_review_note":null,"search_text":"16-250-40 Ome socom he 4m om Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-260-00-P56-SL81","serial_label":"81","item_code":"16-260-00","item_code_raw_ocr":"16-260-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"85%/90% minimum dry density at optimum moisture content with reference to laboratory density test 1 AASHTO modified hammer with suitable equipment dressing etc complete as per design specification and direction of Engineer-in-charge. Location of river bed from where earth will be collected and quality of borrow soil must have prior approval from the Engineer-in-charge. In no circumstances, earth shall be borrowed from agricultural/homestead land. The borrow earth have to be collected from river bed by avoiding any detrimental impact on the river channel. Borrowed earth from river bed:","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":56,"source_schedule_page":46,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"16-260-00 85%/90% minimum dry density at optimum moisture content with reference to laboratory density test 1 AASHTO modified hammer with suitable equipment dressing etc complete as per design specification and direction of Engineer-in-charge. Location of river bed from where earth will be collected and quality of borrow soil must have prior approval from the Engineer-in-charge. In no circumstances, earth shall be borrowed from agricultural/homestead land. The borrow earth have to be collected from river bed by avoiding any detrimental impact on the river channel. Borrowed earth from river bed: Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-260-10-P56","serial_label":null,"item_code":"16-260-10","item_code_raw_ocr":"16-260-10","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"upto to Borrowed earth from river bed:","unit":"","rates":{"zone_a":520.67,"zone_b":515.28,"zone_c":515.28,"zone_d":493.43},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":56,"source_schedule_page":46,"raw_rate_tokens":["520.67","515.28","515.28","493.43"],"source_review_note":null,"search_text":"16-260-10 upto to Borrowed earth from river bed: Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-260-20-P56-SL81(2)","serial_label":"81(2)","item_code":"16-260-20","item_code_raw_ocr":"16-260-20","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":") Beyond compaction (extra rate). Borrowed earth from river bed:","unit":"","rates":{"zone_a":88.12,"zone_b":88.12,"zone_c":88.12,"zone_d":88.12},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":56,"source_schedule_page":46,"raw_rate_tokens":["88.12","88.12","88.12","88.12"],"source_review_note":null,"search_text":"16-260-20 ) Beyond compaction (extra rate). Borrowed earth from river bed: Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-260-30-P56-SL81(3)","serial_label":"81(3)","item_code":"16-260-30","item_code_raw_ocr":"16-260-30","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"From upto compaction). Ko on ge","unit":"","rates":{"zone_a":545.72,"zone_b":540.33,"zone_c":540.33,"zone_d":518.56},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":56,"source_schedule_page":46,"raw_rate_tokens":["545.72","540.33","540.33","518.56"],"source_review_note":null,"search_text":"16-260-30 From upto compaction). Ko on ge Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-260-40-P57-SL81(4)","serial_label":"81(4)","item_code":"16-260-40","item_code_raw_ocr":"16-260-40","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"Beyond compaction (extra rate). Providing clay blanket/clay core by carried earth supplied —_at contractor's own cost (including royalty) in different thickness over embankment crest and __ side slopes/embankment core/bed and slope of irrigation canal/crest and side slopes of irrigation canal dykes etc. with selected clay (clay content minimum 80% and silt content maximum 20%) including throwing clay in layers not","unit":"","rates":{"zone_a":103.82,"zone_b":103.82,"zone_c":103.82,"zone_d":103.82},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":57,"source_schedule_page":47,"raw_rate_tokens":["103.82","103.82","103.82","103.82"],"source_review_note":null,"search_text":"16-260-40 Beyond compaction (extra rate). Providing clay blanket/clay core by carried earth supplied —_at contractor's own cost (including royalty) in different thickness over embankment crest and __ side slopes/embankment core/bed and slope of irrigation canal/crest and side slopes of irrigation canal dykes etc. with selected clay (clay content minimum 80% and silt content maximum 20%) including throwing clay in layers not Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-310-00-P57","serial_label":null,"item_code":"16-310-00","item_code_raw_ocr":"16-310-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"82 ]/ exceeding 150mm in thickness, “”™” ° . ° . clod breaking, benching the side slopes, and compacting to 85% maximum dry density at optimum moisture content with suitable equipment, dressing etc. complete (clay blanket should be extended upto 0.5m below the berm on the outside of embankment/ irrigation canal dyke etc.) as per design, specification and direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":57,"source_schedule_page":47,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-310-00 82 ]/ exceeding 150mm in thickness, “”™” ° . ° . clod breaking, benching the side slopes, and compacting to 85% maximum dry density at optimum moisture content with suitable equipment, dressing etc. complete (clay blanket should be extended upto 0.5m below the berm on the outside of embankment/ irrigation canal dyke etc.) as per design, specification and direction of Engineer in charge. Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-310-10-P57-SL82(1)","serial_label":"82(1)","item_code":"16-310-10","item_code_raw_ocr":"16-310-10","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"!","unit":"","rates":{"zone_a":0.0,"zone_b":665.97,"zone_c":655.57,"zone_d":612.9},"rate_integrity_status":"numeric_outlier_review_required","autofill_eligible":false,"source_pdf_page":57,"source_schedule_page":47,"raw_rate_tokens":["0","665.97","655.57","612.90"],"source_review_note":null,"search_text":"16-310-10 ! Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-310-20-P57-SL82(2)","serial_label":"82(2)","item_code":"16-310-20","item_code_raw_ocr":"16-310-20","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"Carried by truck/boat or any oun means: 300m to 1.0km. . Carried by truck/boat or any Providing clay cover by carried earth by any means in different thickness over the side slopes or crest of the embankment with selected soil (clay soil with a plasticity index between 10 and 20 % and liquid limit between 30 and 50% that falls above the A-Line in the Casagrande Plasticity Chart) including throwing clay in layers not exceeding 230 mm_ in thickness, clod breaking, benching","unit":"","rates":{"zone_a":625.61,"zone_b":618.94,"zone_c":618.94,"zone_d":591.15},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":57,"source_schedule_page":47,"raw_rate_tokens":["625.61","618.94","618.94","591.15"],"source_review_note":null,"search_text":"16-310-20 Carried by truck/boat or any oun means: 300m to 1.0km. . Carried by truck/boat or any Providing clay cover by carried earth by any means in different thickness over the side slopes or crest of the embankment with selected soil (clay soil with a plasticity index between 10 and 20 % and liquid limit between 30 and 50% that falls above the A-Line in the Casagrande Plasticity Chart) including throwing clay in layers not exceeding 230 mm_ in thickness, clod breaking, benching Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-320-00-P57-SL83","serial_label":"83","item_code":"16-320-00","item_code_raw_ocr":"16-320-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"90% minimum dry density at optimum moisture content with reference to laboratory density test AASHTO modified hammer with suitable equipment dressing ete. complete as per direction of Engineer-in-charge. Composition of specified soil must be confirmed by laboratory test (from a recognized Institute) before use. Compaction of the soil must also be confirmed by test (expenditure","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":57,"source_schedule_page":47,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-320-00 90% minimum dry density at optimum moisture content with reference to laboratory density test AASHTO modified hammer with suitable equipment dressing ete. complete as per direction of Engineer-in-charge. Composition of specified soil must be confirmed by laboratory test (from a recognized Institute) before use. Compaction of the soil must also be confirmed by test (expenditure Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-320-20-P58-SL83(2)","serial_label":"83(2)","item_code":"16-320-20","item_code_raw_ocr":"16-320-20","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":") Beyond rate). Earth work by manual labour for clay cover in different thickness over the side slopes or crest of the embankment with selected soil (clay soil with a plasticity index between 10 and 20 % and liquid limit between 30 and 50% that falls above the A-Line in the Casagrande Plasticity Chart) including throwing clay in layers not exceeding 230 mm _ in thickness, clod breaking, benching the side slopes and compacting to","unit":"","rates":{"zone_a":103.82,"zone_b":103.82,"zone_c":103.82,"zone_d":103.82},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":58,"source_schedule_page":48,"raw_rate_tokens":["103.82","103.82","103.82","103.82"],"source_review_note":null,"search_text":"16-320-20 ) Beyond rate). Earth work by manual labour for clay cover in different thickness over the side slopes or crest of the embankment with selected soil (clay soil with a plasticity index between 10 and 20 % and liquid limit between 30 and 50% that falls above the A-Line in the Casagrande Plasticity Chart) including throwing clay in layers not exceeding 230 mm _ in thickness, clod breaking, benching the side slopes and compacting to Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-325-00-P58-SL84","serial_label":"84","item_code":"16-325-00","item_code_raw_ocr":"16-325-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"optimum moisture content with reference to laboratory density test AASHTO modified hammer with suitable equipment dressing etc. complete as per direction of Engineer-in-charge. Composition of specified soil must be confirmed by laboratory test (from a recognized Institute) before use. Compaction of the soil must also be confirmed by test (expenditure for all Test is the responsibility of contractor). compaction. compaction. compaction.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":58,"source_schedule_page":48,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"16-325-00 optimum moisture content with reference to laboratory density test AASHTO modified hammer with suitable equipment dressing etc. complete as per direction of Engineer-in-charge. Composition of specified soil must be confirmed by laboratory test (from a recognized Institute) before use. Compaction of the soil must also be confirmed by test (expenditure for all Test is the responsibility of contractor). compaction. compaction. compaction. Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-325-40-P58","serial_label":null,"item_code":"16-325-40","item_code_raw_ocr":"16-325-40","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"0m to 6 m height & above with on 346.80 341.33 85% compaction.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":58,"source_schedule_page":48,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-325-40 0m to 6 m height & above with on 346.80 341.33 85% compaction. Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-325-50-P58","serial_label":null,"item_code":"16-325-50","item_code_raw_ocr":"16-325-50","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"9 ™ to 3 m height with 90% a, 310.63 292.43 compaction. compaction. compaction. @ compaction. Earth work by carried earth by truck/boat or any other means)","unit":"","rates":{"zone_a":300.0,"zone_b":90.0,"zone_c":310.63,"zone_d":292.43},"rate_integrity_status":"numeric_outlier_review_required","autofill_eligible":false,"source_pdf_page":58,"source_schedule_page":48,"raw_rate_tokens":["3","90","310.63","292.43"],"source_review_note":null,"search_text":"16-325-50 9 ™ to 3 m height with 90% a, 310.63 292.43 compaction. compaction. compaction. @ compaction. Earth work by carried earth by truck/boat or any other means) Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-330-00-P58-SL85","serial_label":"85","item_code":"16-330-00","item_code_raw_ocr":"16-330-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"(including royalty) beyond initial lead of 300m, in _resectioning. n @& & € ™","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":58,"source_schedule_page":48,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-330-00 (including royalty) beyond initial lead of 300m, in _resectioning. n @& & € ™ Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-330-10-P59-SL85(1)","serial_label":"85(1)","item_code":"16-330-10","item_code_raw_ocr":"16-330-10","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":") 300m to","unit":"","rates":{"zone_a":554.08,"zone_b":554.08,"zone_c":554.08,"zone_d":541.92},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":59,"source_schedule_page":49,"raw_rate_tokens":["554.08","554.08","554.08","541.92"],"source_review_note":null,"search_text":"16-330-10 ) 300m to Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-330-20-P59-SL85(2)","serial_label":"85(2)","item_code":"16-330-20","item_code_raw_ocr":"16-330-20","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"Earth work in closing ghogs or holes in the embankment or banks with clayey soil (minimum 30% clay, 0-40% silt and 0-30% sand)","unit":"","rates":{"zone_a":66.94,"zone_b":66.94,"zone_c":66.94,"zone_d":66.94},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":59,"source_schedule_page":49,"raw_rate_tokens":["66.94","66.94","66.94","66.94"],"source_review_note":null,"search_text":"16-330-20 Earth work in closing ghogs or holes in the embankment or banks with clayey soil (minimum 30% clay, 0-40% silt and 0-30% sand) Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-340-00-P59-SL86","serial_label":"86","item_code":"16-340-00","item_code_raw_ocr":"16-340-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":". including cutting, filling, watering etc. complete with all leads and lifts (only pit measurement will be allowed) as per direction of Engineer in charge. _ Earth work by manual labour with clayey soil (minimum 30% clay, 0- 40% silt and 0-30% sand) for closing breach or channel, with all","unit":"cum","rates":{"zone_a":156.11,"zone_b":153.3,"zone_c":153.31,"zone_d":141.98},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":59,"source_schedule_page":49,"raw_rate_tokens":["156.11","153.3","153.31","141.98"],"source_review_note":null,"search_text":"16-340-00 . including cutting, filling, watering etc. complete with all leads and lifts (only pit measurement will be allowed) as per direction of Engineer in charge. _ Earth work by manual labour with clayey soil (minimum 30% clay, 0- 40% silt and 0-30% sand) for closing breach or channel, with all cum Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-350-00-P59-SL87","serial_label":"87","item_code":"16-350-00","item_code_raw_ocr":"16-350-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"width including profiling, clod breaking, ramming etc. complete as per specification and direction ofEngineerin charge. ee eee al","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":59,"source_schedule_page":49,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"16-350-00 width including profiling, clod breaking, ramming etc. complete as per specification and direction ofEngineerin charge. ee eee al Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-350-10-P59-SL87(1)","serial_label":"87(1)","item_code":"16-350-10","item_code_raw_ocr":"16-350-10","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"Upto 30m width. 218.79 21485 214.85 198,96","unit":"","rates":{"zone_a":218.79,"zone_b":214.85,"zone_c":214.85,"zone_d":198.96},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":59,"source_schedule_page":49,"raw_rate_tokens":["218.79","21485","214.85","198,96"],"source_review_note":null,"search_text":"16-350-10 Upto 30m width. 218.79 21485 214.85 198,96 Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-350-20-P59-SL87(2)","serial_label":"87(2)","item_code":"16-350-20","item_code_raw_ocr":"16-350-20","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":") Upto 45m width.","unit":"cum","rates":{"zone_a":242.82,"zone_b":238.44,"zone_c":238.44,"zone_d":220.8},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":59,"source_schedule_page":49,"raw_rate_tokens":["242.82","238.44","238.44","220.80"],"source_review_note":null,"search_text":"16-350-20 ) Upto 45m width. cum Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-350-30-P59-SL87(3)","serial_label":"87(3)","item_code":"16-350-30","item_code_raw_ocr":"16-350-30","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"Upto 60m width.","unit":"cum","rates":{"zone_a":266.84,"zone_b":262.03,"zone_c":262.03,"zone_d":242.64},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":59,"source_schedule_page":49,"raw_rate_tokens":["266.84","262.03","262.03","242.64"],"source_review_note":null,"search_text":"16-350-30 Upto 60m width. cum Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-350-40-P59-SL87(4)","serial_label":"87(4)","item_code":"16-350-40","item_code_raw_ocr":"16-350-40","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"Upto 75m width.","unit":"cum","rates":{"zone_a":290.93,"zone_b":285.68,"zone_c":285.68,"zone_d":264.55},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":59,"source_schedule_page":49,"raw_rate_tokens":["290.93","285.68","285.68","264.55"],"source_review_note":null,"search_text":"16-350-40 Upto 75m width. cum Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-350-50-P59-SL87(5)","serial_label":"87(5)","item_code":"16-350-50","item_code_raw_ocr":"16-350-50","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"Upto 90m width. : Earth work by carried earth (by truck/boat or any other means) supplied at contractor's own cost (including royalty) with clayey soil (minimum 30% clay, 0-40% silt and 0-30% sand) in closing breach","unit":"cum","rates":{"zone_a":315.03,"zone_b":309.34,"zone_c":309.34,"zone_d":286.45},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":59,"source_schedule_page":49,"raw_rate_tokens":["315.03","309.34","309.34","286.45"],"source_review_note":null,"search_text":"16-350-50 Upto 90m width. : Earth work by carried earth (by truck/boat or any other means) supplied at contractor's own cost (including royalty) with clayey soil (minimum 30% clay, 0-40% silt and 0-30% sand) in closing breach cum Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-360-00-P59-SL88","serial_label":"88","item_code":"16-360-00","item_code_raw_ocr":"16-360-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"final closing with all leads and lifts including clod breaking , dressing and ramming etc. complete (applicable in case of final closing portion only) as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":59,"source_schedule_page":49,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"16-360-00 final closing with all leads and lifts including clod breaking , dressing and ramming etc. complete (applicable in case of final closing portion only) as per direction of Engineer in charge. Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-360-10-P59-SL88(1)","serial_label":"88(1)","item_code":"16-360-10","item_code_raw_ocr":"16-360-10","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"300m. to","unit":"","rates":{"zone_a":626.58,"zone_b":618.71,"zone_c":618.71,"zone_d":587.07},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":59,"source_schedule_page":49,"raw_rate_tokens":["626.58","618.71","618.71","587.07"],"source_review_note":null,"search_text":"16-360-10 300m. to Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-360-20-P59-SL88(2)","serial_label":"88(2)","item_code":"16-360-20","item_code_raw_ocr":"16-360-20","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"Earth work by carried (by truck/boat or any other means)","unit":"","rates":{"zone_a":6338.0,"zone_b":6338.0,"zone_c":6338.0,"zone_d":6338.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":59,"source_schedule_page":49,"raw_rate_tokens":["63.38","6338","6338","63.38"],"source_review_note":null,"search_text":"16-360-20 Earth work by carried (by truck/boat or any other means) Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-370-00-P59-SL89","serial_label":"89","item_code":"16-370-00","item_code_raw_ocr":"16-370-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"cost (including royalty) with clayey soil (minimum 30% clay, 0- =","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":59,"source_schedule_page":49,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"16-370-00 cost (including royalty) with clayey soil (minimum 30% clay, 0- = Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-380-00-P60-SL90","serial_label":"90","item_code":"16-380-00","item_code_raw_ocr":"16-380-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"80mm dia and 2.4m (average) apart for construction of closure dam etc. complete including the cost of all materials as per direction of Engineer in charge. Manufacturing and — supplying packed straw bundles (average dia 0.9m and 1.20m long) tied with 91 ne straw rope and laying in position bun jgo55 igoss 189.55 187.31 for construction of closure dam etc. dle complete including the cost of all materials as per direction of Engineer in charge. Earth work by manual labour in all kinds of soil in excavation or reexcavation of channels with the initial lead of 30m and lift of 1.5m including levelling, dressing and","unit":"","rates":{"zone_a":1943.37,"zone_b":1934.78,"zone_c":1934.78,"zone_d":1928.18},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":60,"source_schedule_page":50,"raw_rate_tokens":["1,943.37","1,934.78","1,934.78","1,928.18"],"source_review_note":null,"search_text":"16-380-00 80mm dia and 2.4m (average) apart for construction of closure dam etc. complete including the cost of all materials as per direction of Engineer in charge. Manufacturing and — supplying packed straw bundles (average dia 0.9m and 1.20m long) tied with 91 ne straw rope and laying in position bun jgo55 igoss 189.55 187.31 for construction of closure dam etc. dle complete including the cost of all materials as per direction of Engineer in charge. Earth work by manual labour in all kinds of soil in excavation or reexcavation of channels with the initial lead of 30m and lift of 1.5m including levelling, dressing and Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-400-00-P60-SL92","serial_label":"92","item_code":"16-400-00","item_code_raw_ocr":"16-400-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"throwing the spoils to profile with breaking clods, rough dressing, clearing jungles including cutting trees upto 200mm girth, dug bailing etc. complete as per direction of Engineer in charge. Earth work by Mechanical Excavator ( Long Boom ) in all kinds of soil in excavation / re- excavation of channel/canal/khal","unit":"cum","rates":{"zone_a":230.8,"zone_b":226.65,"zone_c":226.65,"zone_d":209.88},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":60,"source_schedule_page":50,"raw_rate_tokens":["230.80","226.65","226.65","209.88"],"source_review_note":null,"search_text":"16-400-00 throwing the spoils to profile with breaking clods, rough dressing, clearing jungles including cutting trees upto 200mm girth, dug bailing etc. complete as per direction of Engineer in charge. Earth work by Mechanical Excavator ( Long Boom ) in all kinds of soil in excavation / re- excavation of channel/canal/khal cum Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-410-00-P60-SL93","serial_label":"93","item_code":"16-410-00","item_code_raw_ocr":"16-410-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"etc. Including disposal of spoil-soil upto 30m away from the point of excavation with rough dressing and levelling etc. complete as per direction of Engineer-in-Charge. Earth work by Amphibious Excavator in all kinds of soil in excavation / re-excavation of","unit":"cum","rates":{"zone_a":159.91,"zone_b":159.42,"zone_c":159.42,"zone_d":156.93},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":60,"source_schedule_page":50,"raw_rate_tokens":["159.91","159,42","159.42","156.93"],"source_review_note":null,"search_text":"16-410-00 etc. Including disposal of spoil-soil upto 30m away from the point of excavation with rough dressing and levelling etc. complete as per direction of Engineer-in-Charge. Earth work by Amphibious Excavator in all kinds of soil in excavation / re-excavation of cum Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-415-00-P60-SL94","serial_label":"94","item_code":"16-415-00","item_code_raw_ocr":"16-415-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"Tver/channeV/canal/khal ete. cum Including disposal of spoil-soil upto 30m away from the point of excavation with rough dressing and levelling _ ete.","unit":"","rates":{"zone_a":239.4,"zone_b":239.17,"zone_c":239.17,"zone_d":237.51},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":60,"source_schedule_page":50,"raw_rate_tokens":["239.40","239.17","239.17","237.51"],"source_review_note":null,"search_text":"16-415-00 Tver/channeV/canal/khal ete. cum Including disposal of spoil-soil upto 30m away from the point of excavation with rough dressing and levelling _ ete. Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-418-00-P61-SL95","serial_label":"95","item_code":"16-418-00","item_code_raw_ocr":"16-418-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"slope on both side of spoil earth in sqm . layers not exceeding 150 mm thickness all complete as per = direction of Engineer-In-Charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":61,"source_schedule_page":51,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-418-00 slope on both side of spoil earth in sqm . layers not exceeding 150 mm thickness all complete as per = direction of Engineer-In-Charge. Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-418-10-P61-SL95(1)","serial_label":"95(1)","item_code":"16-418-10","item_code_raw_ocr":"16-418-10","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"BY mechanical soil compactor 26.60 2648 2648 25.88 machine","unit":"","rates":{"zone_a":2660.0,"zone_b":2648.0,"zone_c":2648.0,"zone_d":2588.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":61,"source_schedule_page":51,"raw_rate_tokens":["26.60","2648","2648","25.88"],"source_review_note":null,"search_text":"16-418-10 BY mechanical soil compactor 26.60 2648 2648 25.88 machine Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-418-29-P61-SL95(2)","serial_label":"95(2)","item_code":"16-418-29","item_code_raw_ocr":"16-418-29","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"BY manual labour with a rammer Extra Rate for every additional shift of Dredged/Excavated earth or shifting of earth by Mechanical Excavator ( Long Boom ) of 30m","unit":"","rates":{"zone_a":70.0,"zone_b":39.39,"zone_c":39.39,"zone_d":36.55},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":61,"source_schedule_page":51,"raw_rate_tokens":["7","39.39","39.39","36.55"],"source_review_note":null,"search_text":"16-418-29 BY manual labour with a rammer Extra Rate for every additional shift of Dredged/Excavated earth or shifting of earth by Mechanical Excavator ( Long Boom ) of 30m Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-420-00-P61-SL96","serial_label":"96","item_code":"16-420-00","item_code_raw_ocr":"16-420-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"or part thereof beyond the initial PSP® shift of 30m upto a maximum of 9 shift for all kind of earthwork shift. (Unit: per shift per cum) Extra Rate for Carriage of Dredged earth/Excavated earth or shifting of","unit":"","rates":{"zone_a":51.92,"zone_b":51.92,"zone_c":51.92,"zone_d":51.79},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":61,"source_schedule_page":51,"raw_rate_tokens":["51.92","51.92","51.92","51.79"],"source_review_note":null,"search_text":"16-420-00 or part thereof beyond the initial PSP® shift of 30m upto a maximum of 9 shift for all kind of earthwork shift. (Unit: per shift per cum) Extra Rate for Carriage of Dredged earth/Excavated earth or shifting of Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-430-00-P61-SL97","serial_label":"97","item_code":"16-430-00","item_code_raw_ocr":"16-430-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"loading, unloading complete as per 7 direction of Engineer in charge. -t {","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":61,"source_schedule_page":51,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"16-430-00 loading, unloading complete as per 7 direction of Engineer in charge. -t { Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-430-10-P61","serial_label":null,"item_code":"16-430-10","item_code_raw_ocr":"16-430-10","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"toe by Dump Truck: Up to om","unit":"","rates":{"zone_a":98.12,"zone_b":98.12,"zone_c":98.12,"zone_d":97.19},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":61,"source_schedule_page":51,"raw_rate_tokens":["98.12","98.12","98.12","97.19"],"source_review_note":null,"search_text":"16-430-10 toe by Dump Truck: Up to om Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-430-20-P61-SL97(2)","serial_label":"97(2)","item_code":"16-430-20","item_code_raw_ocr":"16-430-20","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"Cartage by Dump Truck: 2nd Km cum ¢5 55 60.25 60.25 59.77 and above. /km Extra Rate for Carriage of Dredged earth/Excavated earth by","unit":"","rates":{"zone_a":55.0,"zone_b":60.25,"zone_c":60.25,"zone_d":59.77},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":61,"source_schedule_page":51,"raw_rate_tokens":["55","60.25","60.25","59.77"],"source_review_note":null,"search_text":"16-430-20 Cartage by Dump Truck: 2nd Km cum ¢5 55 60.25 60.25 59.77 and above. /km Extra Rate for Carriage of Dredged earth/Excavated earth by Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-440-00-P61-SL98","serial_label":"98","item_code":"16-440-00","item_code_raw_ocr":"16-440-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"cargo/Engine boat or by any other NU . means including loading, LL unloading complete as _ per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":61,"source_schedule_page":51,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-440-00 cargo/Engine boat or by any other NU . means including loading, LL unloading complete as _ per direction of Engineer in charge. Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-440-10-P61-SL98(1)","serial_label":"98(1)","item_code":"16-440-10","item_code_raw_ocr":"16-440-10","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"carriage by Boat/Cargo: Up to 1-0 } on","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":61,"source_schedule_page":51,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-440-10 carriage by Boat/Cargo: Up to 1-0 } on Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-440-20-P61-SL98(2)","serial_label":"98(2)","item_code":"16-440-20","item_code_raw_ocr":"16-440-20","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"CaTiage by Boat/Cargo: 2nd Km) cum ggg ygog aga 48.68 and above. /km Earth work by manual labour with clayey soil (minimum 30% clay, 0- 40% silt and 0-30% sand) in construction of cross bundh/ ring bundh as per design and specification with all leads and","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":61,"source_schedule_page":51,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-440-20 CaTiage by Boat/Cargo: 2nd Km) cum ggg ygog aga 48.68 and above. /km Earth work by manual labour with clayey soil (minimum 30% clay, 0- 40% silt and 0-30% sand) in construction of cross bundh/ ring bundh as per design and specification with all leads and Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-450-00-P61-SL99","serial_label":"99","item_code":"16-450-00","item_code_raw_ocr":"16-450-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"lifts, throwing the earth in layers not exceeding 150mm in thickness, including breaking clods, rough dressing, clearing the jungle, removing stumps, dug bailing and 75mm cambering etc. complete as per direction of Engineer in charge. Earth work by carried earth (by","unit":"cum","rates":{"zone_a":230.74,"zone_b":226.58,"zone_c":226.58,"zone_d":209.82},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":61,"source_schedule_page":51,"raw_rate_tokens":["230.74","226.58","226.58","209.82"],"source_review_note":null,"search_text":"16-450-00 lifts, throwing the earth in layers not exceeding 150mm in thickness, including breaking clods, rough dressing, clearing the jungle, removing stumps, dug bailing and 75mm cambering etc. complete as per direction of Engineer in charge. Earth work by carried earth (by cum Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-460-00-P61-SL100","serial_label":"100","item_code":"16-460-00","item_code_raw_ocr":"16-460-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"supplied at contractor's own cost","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":61,"source_schedule_page":51,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-460-00 supplied at contractor's own cost Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-460-20-P62","serial_label":null,"item_code":"16-460-20","item_code_raw_ocr":"16-460-20","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"1.00 km. to 5.00 km, (Extra rate) 56.79 Earth work by manual labour, in all kinds of soil in removing the cross bundh/ ring bundh, including all","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":62,"source_schedule_page":52,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-460-20 1.00 km. to 5.00 km, (Extra rate) 56.79 Earth work by manual labour, in all kinds of soil in removing the cross bundh/ ring bundh, including all Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-470-90-P62-SL101","serial_label":"101","item_code":"16-470-90","item_code_raw_ocr":"16-470-90","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"ads and lifts complete and om placing the spoils to a safe distance, (minimun 15m apart from the bank) as per direction of Engineer in charge. Earth work in removal of slushy earth, including all Jeads and lifts form the bed of the sluices or any other places, in accordance with specification (prior permission","unit":"","rates":{"zone_a":230.8,"zone_b":226.65,"zone_c":226.65,"zone_d":209.88},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":62,"source_schedule_page":52,"raw_rate_tokens":["230.80","226.65","226.65","209.88"],"source_review_note":null,"search_text":"16-470-90 ads and lifts complete and om placing the spoils to a safe distance, (minimun 15m apart from the bank) as per direction of Engineer in charge. Earth work in removal of slushy earth, including all Jeads and lifts form the bed of the sluices or any other places, in accordance with specification (prior permission Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-480-00-P62-SL102","serial_label":"102","item_code":"16-480-00","item_code_raw_ocr":"16-480-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"Free Executive Engineer has to Cum be taken before execution of the work regarding necessity and quantity of work) as per direction of Engineer in charge. Earth work by manual labour in all kinds of soil for excavation/ re- excavation of pond/ tank and constructing bank as per design and specification, throwing the","unit":"","rates":{"zone_a":412.66,"zone_b":405.23,"zone_c":405.23,"zone_d":375.35},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":62,"source_schedule_page":52,"raw_rate_tokens":["412.66","405.23","405.23","375.35"],"source_review_note":null,"search_text":"16-480-00 Free Executive Engineer has to Cum be taken before execution of the work regarding necessity and quantity of work) as per direction of Engineer in charge. Earth work by manual labour in all kinds of soil for excavation/ re- excavation of pond/ tank and constructing bank as per design and specification, throwing the Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-490-00-P62-SL103","serial_label":"103","item_code":"16-490-00","item_code_raw_ocr":"16-490-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"spoil earth in layers of 150mm “™ ° ° including breaking clods, dressing, profiling etc. complete with all leads and lifts as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":62,"source_schedule_page":52,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-490-00 spoil earth in layers of 150mm “™ ° ° including breaking clods, dressing, profiling etc. complete with all leads and lifts as per direction of Engineer in charge. Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-490-10-P62","serial_label":null,"item_code":"16-490-10","item_code_raw_ocr":"16-490-10","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"1031) 226.65 _ 209.88","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":62,"source_schedule_page":52,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-490-10 1031) 226.65 _ 209.88 Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-490-20-P62-SL103(2)","serial_label":"103(2)","item_code":"16-490-20","item_code_raw_ocr":"16-490-20","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"290.87 Supplying and filling sand in foundation of hydraulic structures, buildings and in protective works","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":62,"source_schedule_page":52,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-490-20 290.87 Supplying and filling sand in foundation of hydraulic structures, buildings and in protective works Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-540-00-P62","serial_label":null,"item_code":"16-540-00","item_code_raw_ocr":"16-540-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"With selected sand, in 150mm thick yy . layer, including levelling, dressing, ramming, watering etc. complete (compacted to 50% relative density by manual labour using mallet/ ko GG & Ry","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":62,"source_schedule_page":52,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-540-00 With selected sand, in 150mm thick yy . layer, including levelling, dressing, ramming, watering etc. complete (compacted to 50% relative density by manual labour using mallet/ ko GG & Ry Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-540-10-P63-SL104(1)","serial_label":"104(1)","item_code":"16-540-10","item_code_raw_ocr":"16-540-10","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"sand of FM>=","unit":"","rates":{"zone_a":1241.92,"zone_b":1244.19,"zone_c":1211.71,"zone_d":1192.85},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":63,"source_schedule_page":53,"raw_rate_tokens":["1,241.92","1,244.19","1,211.71","1,192.85"],"source_review_note":null,"search_text":"16-540-10 sand of FM>= Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-540-20-P63-SL104(2)","serial_label":"104(2)","item_code":"16-540-20","item_code_raw_ocr":"16-540-20","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"sand of FM>= Back filling in hydraulic structures and slope building in protective works including all leads and lifts with selected local soil in layer of","unit":"","rates":{"zone_a":1692.85,"zone_b":1622.98,"zone_c":1654.91,"zone_d":1616.73},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":63,"source_schedule_page":53,"raw_rate_tokens":["1,692.85","1,622.98","1,654.91","1,616.73"],"source_review_note":null,"search_text":"16-540-20 sand of FM>= Back filling in hydraulic structures and slope building in protective works including all leads and lifts with selected local soil in layer of Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-550-99-P63","serial_label":null,"item_code":"16-550-99","item_code_raw_ocr":"16-550-99","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"105. 190mm — including — watering. cum 254.06 24991 249.80 234.24 ramming etc. complete compacted to 20% relative density by compactor or any other suitable method as per direction of Engineer in charge. Back filling in hydraulic structures including all leads and lifts with sand in 150mm layer including sco _qn Watering, ramming, compacting to . . .","unit":"","rates":{"zone_a":254.06,"zone_b":249.91,"zone_c":249.8,"zone_d":234.24},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":63,"source_schedule_page":53,"raw_rate_tokens":["254.06","24991","249.80","234.24"],"source_review_note":null,"search_text":"16-550-99 105. 190mm — including — watering. cum 254.06 24991 249.80 234.24 ramming etc. complete compacted to 20% relative density by compactor or any other suitable method as per direction of Engineer in charge. Back filling in hydraulic structures including all leads and lifts with sand in 150mm layer including sco _qn Watering, ramming, compacting to . . . Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-560-00-P63-SL106","serial_label":"106","item_code":"16-560-00","item_code_raw_ocr":"16-560-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"30% relative density etc. complete cum by compactor or any other suitable method as per direction of Engineer in charge. z","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":63,"source_schedule_page":53,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-560-00 30% relative density etc. complete cum by compactor or any other suitable method as per direction of Engineer in charge. z Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-560-10-P63-SL106(1)","serial_label":"106(1)","item_code":"16-560-10","item_code_raw_ocr":"16-560-10","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"Sand of FM>=","unit":"","rates":{"zone_a":1007.36,"zone_b":1008.34,"zone_c":1001.63,"zone_d":982.77},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":63,"source_schedule_page":53,"raw_rate_tokens":["1,007.36","1,008.34","1,001.63","982.77"],"source_review_note":null,"search_text":"16-560-10 Sand of FM>= Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-560-20-P63-SL106(2)","serial_label":"106(2)","item_code":"16-560-20","item_code_raw_ocr":"16-560-20","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"Sand of FM>= Filling ditch/pond/channel/khal etc or land development/improvment by sand including carrying, -","unit":"","rates":{"zone_a":1071.78,"zone_b":1070.19,"zone_c":1037.71,"zone_d":1018.85},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":63,"source_schedule_page":53,"raw_rate_tokens":["1,071.78","1,070.19","1,037.71","1,018.85"],"source_review_note":null,"search_text":"16-560-20 Sand of FM>= Filling ditch/pond/channel/khal etc or land development/improvment by sand including carrying, - Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-570-00-P63-SL107","serial_label":"107","item_code":"16-570-00","item_code_raw_ocr":"16-570-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"loading, unloading, all leads and YU” . ° lift etc. complete as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":63,"source_schedule_page":53,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-570-00 loading, unloading, all leads and YU” . ° lift etc. complete as per direction of Engineer in charge. Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-570-10-P63-SL107(1)","serial_label":"107(1)","item_code":"16-570-10","item_code_raw_ocr":"16-570-10","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"Sand of FM>=","unit":"","rates":{"zone_a":732.81,"zone_b":738.89,"zone_c":732.76,"zone_d":732.29},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":63,"source_schedule_page":53,"raw_rate_tokens":["732.81","738.89","732.76","732.29"],"source_review_note":null,"search_text":"16-570-10 Sand of FM>= Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-570-20-P63-SL107(2)","serial_label":"107(2)","item_code":"16-570-20","item_code_raw_ocr":"16-570-20","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"Sand of FM>= Shoring for slope protection of foundation trench, canal, embankment, road, pond ete. as per","unit":"","rates":{"zone_a":794.16,"zone_b":797.79,"zone_c":767.11,"zone_d":766.65},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":63,"source_schedule_page":53,"raw_rate_tokens":["794.16","797.79","767.11","766.65"],"source_review_note":null,"search_text":"16-570-20 Sand of FM>= Shoring for slope protection of foundation trench, canal, embankment, road, pond ete. as per Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-620-00-P63-SL108","serial_label":"108","item_code":"16-620-00","item_code_raw_ocr":"16-620-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"removal of spoils to a safe distance as per direction of Engineer in - charge. By bamboo post of 6.0m length, 60mm to 80mm dia, 25 cm c/c and","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":63,"source_schedule_page":53,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-620-00 removal of spoils to a safe distance as per direction of Engineer in - charge. By bamboo post of 6.0m length, 60mm to 80mm dia, 25 cm c/c and Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-620-10-P63-SL108(1)","serial_label":"108(1)","item_code":"16-620-10","item_code_raw_ocr":"16-620-10","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"2:0™ drive with diagonally woven 816.74 77836 77836 786.52 tarza walling and average 70mm dia half split bamboo batten @ 2.0m c/c fixed with nails. By bamboo post of 6.0m length, 60mm to 80mm dia, 20cm c/c,","unit":"","rates":{"zone_a":81674.0,"zone_b":77836.0,"zone_c":77836.0,"zone_d":78652.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":63,"source_schedule_page":53,"raw_rate_tokens":["816.74","77836","77836","786.52"],"source_review_note":null,"search_text":"16-620-10 2:0™ drive with diagonally woven 816.74 77836 77836 786.52 tarza walling and average 70mm dia half split bamboo batten @ 2.0m c/c fixed with nails. By bamboo post of 6.0m length, 60mm to 80mm dia, 20cm c/c, Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-620-20-P63-SL108(2)","serial_label":"108(2)","item_code":"16-620-20","item_code_raw_ocr":"16-620-20","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"“riven drum sheet walling and average 70mm dia half split bamboo batten @ 2.0m c/c fixed with nails. By local hard wood ballah post of","unit":"","rates":{"zone_a":965.52,"zone_b":922.54,"zone_c":922.54,"zone_d":933.46},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":63,"source_schedule_page":53,"raw_rate_tokens":["965.52","922.54","922.54","933.46"],"source_review_note":null,"search_text":"16-620-20 “riven drum sheet walling and average 70mm dia half split bamboo batten @ 2.0m c/c fixed with nails. By local hard wood ballah post of Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-620-30-P63-SL108(3)","serial_label":"108(3)","item_code":"16-620-30","item_code_raw_ocr":"16-620-30","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"} and 2.0m drive with 6.0m_ long","unit":"","rates":{"zone_a":1117.12,"zone_b":1066.15,"zone_c":1066.15,"zone_d":1072.48},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":63,"source_schedule_page":53,"raw_rate_tokens":["1,117.12","1,066.15","1,066.15","1,072.48"],"source_review_note":null,"search_text":"16-620-30 } and 2.0m drive with 6.0m_ long Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-700-00-P64-SL109","serial_label":"109","item_code":"16-700-00","item_code_raw_ocr":"16-700-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":") spoils to profile in layers with clod 182.70 182.70 169.47 breaking to a maximum size of 100mm, removing roots & stumps of trees of girth upto 200mm from the ground etc. complete as per direction of Engineer in charge. Ditch filling by Carried Earth (by truck/boat or any other means) supplied at contractor's own cost (including royalty) manually compacted by 7.0 kg iron rammer to avoid any air pocket beyond the initial lead of 300m and all lifts","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":64,"source_schedule_page":54,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-700-00 ) spoils to profile in layers with clod 182.70 182.70 169.47 breaking to a maximum size of 100mm, removing roots & stumps of trees of girth upto 200mm from the ground etc. complete as per direction of Engineer in charge. Ditch filling by Carried Earth (by truck/boat or any other means) supplied at contractor's own cost (including royalty) manually compacted by 7.0 kg iron rammer to avoid any air pocket beyond the initial lead of 300m and all lifts Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-710-00-P64-SL110","serial_label":"110","item_code":"16-710-00","item_code_raw_ocr":"16-710-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"including throwing the spoils to “\"™ . . . . profile in layers with clod breaking to a maximum size of 100mm, removing roots & stumps of trees of girth upto 200mm from the ground etc. complete as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":64,"source_schedule_page":54,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-710-00 including throwing the spoils to “\"™ . . . . profile in layers with clod breaking to a maximum size of 100mm, removing roots & stumps of trees of girth upto 200mm from the ground etc. complete as per direction of Engineer in charge. Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-710-10-P64-SL110(1)","serial_label":"110(1)","item_code":"16-710-10","item_code_raw_ocr":"16-710-10","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"300 m to","unit":"","rates":{"zone_a":241.41,"zone_b":240.33,"zone_c":240.33,"zone_d":234.92},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":64,"source_schedule_page":54,"raw_rate_tokens":["241.41","240.33","240.33","234.92"],"source_review_note":null,"search_text":"16-710-10 300 m to Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-710-20-P64-SL110(2)","serial_label":"110(2)","item_code":"16-710-20","item_code_raw_ocr":"16-710-20","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"/110(2) 1.00 km. to 5.00 km.(Extra rate). 63.38 Filling ditch/pond/channel/khal ete or land development/improvment by dredged earth from river bed (all kind of soil but excluding organic material) : carried by Bulkhead/cargo/boat or any other mean, loading and unloading/Disposing/placing the cum","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":64,"source_schedule_page":54,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-710-20 /110(2) 1.00 km. to 5.00 km.(Extra rate). 63.38 Filling ditch/pond/channel/khal ete or land development/improvment by dredged earth from river bed (all kind of soil but excluding organic material) : carried by Bulkhead/cargo/boat or any other mean, loading and unloading/Disposing/placing the cum Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-720-00-P64-SL11","serial_label":"11","item_code":"16-720-00","item_code_raw_ocr":"16-720-00","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"I11 dredged materials in the designated /km . area upto 1 km from river bank by bulkhead dredger including , maintaining slopes, levelling and dressing in layers upto finished level with all lifts & leads etc. all complete as per direction of the Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":64,"source_schedule_page":54,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-720-00 I11 dredged materials in the designated /km . area upto 1 km from river bank by bulkhead dredger including , maintaining slopes, levelling and dressing in layers upto finished level with all lifts & leads etc. all complete as per direction of the Engineer in charge. Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-720-10-P64-SL111(1)","serial_label":"111(1)","item_code":"16-720-10","item_code_raw_ocr":"16-720-10","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"173.46 173.46 172.59 means: within 1 km along the river /km Bulkhead/cargo/boat or any other cum","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":64,"source_schedule_page":54,"raw_rate_tokens":null,"source_review_note":null,"search_text":"16-720-10 173.46 173.46 172.59 means: within 1 km along the river /km Bulkhead/cargo/boat or any other cum Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-16-720-20-P64-SL111(2)","serial_label":"111(2)","item_code":"16-720-20","item_code_raw_ocr":"16-720-20","item_code_validation_status":"ocr_source_preserved","section_code":"16","section_title":"Earthwork","description":"means: 2nd km and above. ik 40. Protective Work Manufacturing and — supplying","unit":"","rates":{"zone_a":5.33,"zone_b":5.31,"zone_c":5.31,"zone_d":5.16},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":64,"source_schedule_page":54,"raw_rate_tokens":["5.33","5.31","5.31","5.16"],"source_review_note":null,"search_text":"16-720-20 means: 2nd km and above. ik 40. Protective Work Manufacturing and — supplying Earthwork"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-100-00-P64-SL112","serial_label":"112","item_code":"40-100-00","item_code_raw_ocr":"40-100-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"and sand (FM>=1.5), in 1:8","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":64,"source_schedule_page":54,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-100-00 and sand (FM>=1.5), in 1:8 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-100-10-P65-SL112(1)","serial_label":"112(1)","item_code":"40-100-10","item_code_raw_ocr":"40-100-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40omx40cmx30cem","unit":"","rates":{"zone_a":373.29,"zone_b":368.06,"zone_c":369.22,"zone_d":360.47},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":65,"source_schedule_page":55,"raw_rate_tokens":["373.29","368.06","369.22","360.47"],"source_review_note":null,"search_text":"40-100-10 Block Size: 40omx40cmx30cem Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-100-20-P65-SL112(2)","serial_label":"112(2)","item_code":"40-100-20","item_code_raw_ocr":"40-100-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} Block Size: 30cmx30cmx30cm","unit":"each","rates":{"zone_a":218.44,"zone_b":215.47,"zone_c":215.93,"zone_d":210.93},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":65,"source_schedule_page":55,"raw_rate_tokens":["218.44","215.47","215.93","210.93"],"source_review_note":null,"search_text":"40-100-20 } Block Size: 30cmx30cmx30cm each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-100-30-P65-SL112(3)","serial_label":"112(3)","item_code":"40-100-30","item_code_raw_ocr":"40-100-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30cmx30cmx20cm 162.33 16032 160.48 157.09","unit":"","rates":{"zone_a":162.33,"zone_b":160.32,"zone_c":160.48,"zone_d":157.09},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":65,"source_schedule_page":55,"raw_rate_tokens":["162.33","16032","160.48","157.09"],"source_review_note":null,"search_text":"40-100-30 Block Size: 30cmx30cmx20cm 162.33 16032 160.48 157.09 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-100-40-P65-SL112(4)","serial_label":"112(4)","item_code":"40-100-40","item_code_raw_ocr":"40-100-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 25cmx25cmx25cm","unit":"each","rates":{"zone_a":137.61,"zone_b":135.85,"zone_c":135.94,"zone_d":132.98},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":65,"source_schedule_page":55,"raw_rate_tokens":["137.61","135.85","135.94","132.98"],"source_review_note":null,"search_text":"40-100-40 Block Size: 25cmx25cmx25cm each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-100-50-P65-SL112(5)","serial_label":"112(5)","item_code":"40-100-50","item_code_raw_ocr":"40-100-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 20cmx20cmx20cm Manufacturing and supplying sand-cement block with cement and sand (FM>=1.5), in 1:6 proportion, to attain a 28 day minimum strength of 2.5 N/mm?, including screening and washing sand, mixing, laying in forms, compacting, curing for at least 14","unit":"each","rates":{"zone_a":82.63,"zone_b":81.7,"zone_c":81.52,"zone_d":79.89},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":65,"source_schedule_page":55,"raw_rate_tokens":["82.63","81.70","81.52","79.89"],"source_review_note":null,"search_text":"40-100-50 Block Size: 20cmx20cmx20cm Manufacturing and supplying sand-cement block with cement and sand (FM>=1.5), in 1:6 proportion, to attain a 28 day minimum strength of 2.5 N/mm?, including screening and washing sand, mixing, laying in forms, compacting, curing for at least 14 each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-110-00-P65","serial_label":null,"item_code":"40-110-00","item_code_raw_ocr":"40-110-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"brick flat soling platform finishing with sand cement mortar, shuttering (steel shutter to be used) and stacking in measurable stacks, cost of all materials and charges, etc. complete as per technical specification, approved design and direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":65,"source_schedule_page":55,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"40-110-00 brick flat soling platform finishing with sand cement mortar, shuttering (steel shutter to be used) and stacking in measurable stacks, cost of all materials and charges, etc. complete as per technical specification, approved design and direction of Engineer in charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-110-10-P65-SL113(1)","serial_label":"113(1)","item_code":"40-110-10","item_code_raw_ocr":"40-110-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx30cm","unit":"each","rates":{"zone_a":413.7,"zone_b":408.64,"zone_c":409.93,"zone_d":401.23},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":65,"source_schedule_page":55,"raw_rate_tokens":["413.70","408.64","409.93","401.23"],"source_review_note":null,"search_text":"40-110-10 Block Size: 40cmx40cmx30cm each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-110-20-P65-SL113(2)","serial_label":"113(2)","item_code":"40-110-20","item_code_raw_ocr":"40-110-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30cmx30cmx30cm 238.78 235.90 23652 231.55","unit":"","rates":{"zone_a":238.78,"zone_b":235.9,"zone_c":236.52,"zone_d":231.55},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":65,"source_schedule_page":55,"raw_rate_tokens":["238.78","235.90","23652","231.55"],"source_review_note":null,"search_text":"40-110-20 Block Size: 30cmx30cmx30cm 238.78 235.90 23652 231.55 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-110-30-P65-SL113(3)","serial_label":"113(3)","item_code":"40-110-30","item_code_raw_ocr":"40-110-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30cmx30cmx20cm each","unit":"","rates":{"zone_a":173.14,"zone_b":171.2,"zone_c":171.54,"zone_d":168.17},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":65,"source_schedule_page":55,"raw_rate_tokens":["173.14","171.20","171.54","168.17"],"source_review_note":null,"search_text":"40-110-30 Block Size: 30cmx30cmx20cm each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-110-40-P65-SL113(4)","serial_label":"113(4)","item_code":"40-110-40","item_code_raw_ocr":"40-110-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 25cemx25cmx25cm","unit":"each","rates":{"zone_a":146.5,"zone_b":144.8,"zone_c":145.07,"zone_d":142.13},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":65,"source_schedule_page":55,"raw_rate_tokens":["146.50","144.80","145.07","142.13"],"source_review_note":null,"search_text":"40-110-40 Block Size: 25cemx25cmx25cm each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-110-50-P65-SL113(5)","serial_label":"113(5)","item_code":"40-110-50","item_code_raw_ocr":"40-110-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 20cmx20cmx20em Labour charge for protective work in laying sand cement blocks of","unit":"each","rates":{"zone_a":85.31,"zone_b":84.4,"zone_c":84.43,"zone_d":82.81},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":65,"source_schedule_page":55,"raw_rate_tokens":["85.31","84.40","84.43","82.81"],"source_review_note":null,"search_text":"40-110-50 Block Size: 20cmx20cmx20em Labour charge for protective work in laying sand cement blocks of each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-120-00-P65-SL114","serial_label":"114","item_code":"40-120-00","item_code_raw_ocr":"40-120-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"different sizes including cum . . . . preparation of base, ramming of base etc. complete as per direction of the Engineer in charge:","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":65,"source_schedule_page":55,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-120-00 different sizes including cum . . . . preparation of base, ramming of base etc. complete as per direction of the Engineer in charge: Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-120-10-P65-SL114(1)","serial_label":"114(1)","item_code":"40-120-10","item_code_raw_ocr":"40-120-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} Within 200m. cum","unit":"","rates":{"zone_a":1632.36,"zone_b":1602.1,"zone_c":1602.1,"zone_d":1484.58},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":65,"source_schedule_page":55,"raw_rate_tokens":["1,632.36","1,602.10","1,602.10","1,484.58"],"source_review_note":null,"search_text":"40-120-10 } Within 200m. cum Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-120-20-P65-SL114(2)","serial_label":"114(2)","item_code":"40-120-20","item_code_raw_ocr":"40-120-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"200 m to 500 Manufacturing and supplying of brick blocks with first class brick in","unit":"m","rates":{"zone_a":2558.61,"zone_b":2511.5,"zone_c":2511.5,"zone_d":2326.62},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":65,"source_schedule_page":55,"raw_rate_tokens":["2,558.61","2,511.50","2,511.50","2,326.62"],"source_review_note":null,"search_text":"40-120-20 200 m to 500 Manufacturing and supplying of brick blocks with first class brick in m Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-130-00-P65-SL11","serial_label":"11","item_code":"40-130-00","item_code_raw_ocr":"40-130-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"° cement mortar (1:4), with sand of each FM>=1.5, including _ soaking","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":65,"source_schedule_page":55,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-130-00 ° cement mortar (1:4), with sand of each FM>=1.5, including _ soaking Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-130-10-P66-SL115(1)","serial_label":"115(1)","item_code":"40-130-10","item_code_raw_ocr":"40-130-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 63cemx63cmx38cm","unit":"","rates":{"zone_a":1442.97,"zone_b":1436.52,"zone_c":1399.06,"zone_d":1386.2},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":66,"source_schedule_page":56,"raw_rate_tokens":["1,442.97","1,436.52","1,399.06","1,386.20"],"source_review_note":null,"search_text":"40-130-10 Block Size: 63cemx63cmx38cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-130-20-P66-SL115(2)","serial_label":"115(2)","item_code":"40-130-20","item_code_raw_ocr":"40-130-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 63emx63cmx30cm","unit":"","rates":{"zone_a":1142.0,"zone_b":1136.9,"zone_c":1107.24,"zone_d":1097.06},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":66,"source_schedule_page":56,"raw_rate_tokens":["1,142.00","1,136.90","1,107.24","1,097.06"],"source_review_note":null,"search_text":"40-130-20 Block Size: 63emx63cmx30cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-130-30-P66-SL115(3)","serial_label":"115(3)","item_code":"40-130-30","item_code_raw_ocr":"40-130-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50omx50cmx38em","unit":"","rates":{"zone_a":915.14,"zone_b":911.06,"zone_c":887.3,"zone_d":987.91},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":66,"source_schedule_page":56,"raw_rate_tokens":["915.14","911.06","887.30","9879.14"],"source_review_note":null,"search_text":"40-130-30 Block Size: 50omx50cmx38em Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-130-40-P66-SL115(4)","serial_label":"115(4)","item_code":"40-130-40","item_code_raw_ocr":"40-130-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx30cm","unit":"","rates":{"zone_a":725.74,"zone_b":722.5,"zone_c":703.64,"zone_d":697.16},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":66,"source_schedule_page":56,"raw_rate_tokens":["725.74","722.50","703.64","697.16"],"source_review_note":null,"search_text":"40-130-40 Block Size: 50cmx50cmx30cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-130-50-P66-SL115(5)","serial_label":"115(5)","item_code":"40-130-50","item_code_raw_ocr":"40-130-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"] Block Size: 50cmx50cmx15em","unit":"","rates":{"zone_a":370.39,"zone_b":368.73,"zone_c":359.09,"zone_d":355.77},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":66,"source_schedule_page":56,"raw_rate_tokens":["370.39","368.73","359.09","355.77"],"source_review_note":null,"search_text":"40-130-50 ] Block Size: 50cmx50cmx15em Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-130-60-P66-SL115(6)","serial_label":"115(6)","item_code":"40-130-60","item_code_raw_ocr":"40-130-60","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 38cmx38cmx30cm","unit":"","rates":{"zone_a":424.93,"zone_b":423.03,"zone_c":411.96,"zone_d":408.15},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":66,"source_schedule_page":56,"raw_rate_tokens":["424.93","423.03","411.96","408.15"],"source_review_note":null,"search_text":"40-130-60 Block Size: 38cmx38cmx30cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-130-65-P66-SL115(7)","serial_label":"115(7)","item_code":"40-130-65","item_code_raw_ocr":"40-130-65","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 38cmx38cmx22cm","unit":"each","rates":{"zone_a":311.59,"zone_b":310.2,"zone_c":302.08,"zone_d":299.29},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":66,"source_schedule_page":56,"raw_rate_tokens":["311.59","310.20","302.08","299.29"],"source_review_note":null,"search_text":"40-130-65 Block Size: 38cmx38cmx22cm each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-130-70-P66-SL115(8)","serial_label":"115(8)","item_code":"40-130-70","item_code_raw_ocr":"40-130-70","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 38cmx38cmx15cem each 220.10 219.11 213,37 211.40","unit":"","rates":{"zone_a":220.1,"zone_b":219.11,"zone_c":213.37,"zone_d":211.4},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":66,"source_schedule_page":56,"raw_rate_tokens":["220.10","219.11","213,37","211.40"],"source_review_note":null,"search_text":"40-130-70 Block Size: 38cmx38cmx15cem each 220.10 219.11 213,37 211.40 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-130-80-P66-SL115(9)","serial_label":"115(9)","item_code":"40-130-80","item_code_raw_ocr":"40-130-80","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 25cmx25cmx22cm Labour charge for placing brick blocks of all sizes, including preparation of base, ramming,","unit":"","rates":{"zone_a":145.21,"zone_b":144.56,"zone_c":140.75,"zone_d":139.45},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":66,"source_schedule_page":56,"raw_rate_tokens":["145.21","144.56","140.75","139.45"],"source_review_note":null,"search_text":"40-130-80 Block Size: 25cmx25cmx22cm Labour charge for placing brick blocks of all sizes, including preparation of base, ramming, Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-140-00-P66-SL116","serial_label":"116","item_code":"40-140-00","item_code_raw_ocr":"40-140-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"including carriage within the site of the sluice or any protective work as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":66,"source_schedule_page":56,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"40-140-00 including carriage within the site of the sluice or any protective work as per direction of Engineer in charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-140-10-P66-SL116(1)","serial_label":"116(1)","item_code":"40-140-10","item_code_raw_ocr":"40-140-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Within 200 m. cum","unit":"","rates":{"zone_a":1616.91,"zone_b":1586.93,"zone_c":1586.93,"zone_d":1470.53},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":66,"source_schedule_page":56,"raw_rate_tokens":["1,616.91","1,586.93","1,586.93","1,470.53"],"source_review_note":null,"search_text":"40-140-10 Within 200 m. cum Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-140-20-P66-SL116(2)","serial_label":"116(2)","item_code":"40-140-20","item_code_raw_ocr":"40-140-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"200 m to 500 Manufacturing and supplying C.C. blocks in leanest mix. 1:3:6, with cement, sand (FM>=1.5) and Stone Chips (40mm down graded), to attain a minimum 28 days cylinder strength of 9.0 N/mm? including grading, washing stone chips, mixing, laying in forms,","unit":"m","rates":{"zone_a":2533.38,"zone_b":2486.73,"zone_c":2486.73,"zone_d":2303.68},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":66,"source_schedule_page":56,"raw_rate_tokens":["2,533.38","2,486.73","2,486.73","2,303.68"],"source_review_note":null,"search_text":"40-140-20 200 m to 500 Manufacturing and supplying C.C. blocks in leanest mix. 1:3:6, with cement, sand (FM>=1.5) and Stone Chips (40mm down graded), to attain a minimum 28 days cylinder strength of 9.0 N/mm? including grading, washing stone chips, mixing, laying in forms, m Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-150-00-P66-SL117","serial_label":"117","item_code":"40-150-00","item_code_raw_ocr":"40-150-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"consolidation, curing for at least 21 each . . . . days, preparation of one layer of brick flat soling platform finishing with sacl cement mortar, shuttering (steel shutter to be used) and stacking in measurable stacks, cost of all materials and charges, etc. complete as per technical specification, approved design and direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":66,"source_schedule_page":56,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-150-00 consolidation, curing for at least 21 each . . . . days, preparation of one layer of brick flat soling platform finishing with sacl cement mortar, shuttering (steel shutter to be used) and stacking in measurable stacks, cost of all materials and charges, etc. complete as per technical specification, approved design and direction of Engineer in charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-150-04-P66-SL117(1)","serial_label":"117(1)","item_code":"40-150-04","item_code_raw_ocr":"40-150-04","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 60cmx60cmx40cm.","unit":"","rates":{"zone_a":2315.97,"zone_b":2336.88,"zone_c":2202.88,"zone_d":2121.45},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":66,"source_schedule_page":56,"raw_rate_tokens":["2,315.97","2,336.88","2,202.88","2,121.45"],"source_review_note":null,"search_text":"40-150-04 Block Size: 60cmx60cmx40cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-150-05-P66-SL117(2)","serial_label":"117(2)","item_code":"40-150-05","item_code_raw_ocr":"40-150-05","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50emx50cmx30em.","unit":"","rates":{"zone_a":1204.06,"zone_b":1214.93,"zone_c":1145.26,"zone_d":1102.93},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":66,"source_schedule_page":56,"raw_rate_tokens":["1,204.06","1,214.93","1,145.26","1,102.93"],"source_review_note":null,"search_text":"40-150-05 Block Size: 50emx50cmx30em. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-150-06-P66","serial_label":null,"item_code":"40-150-06","item_code_raw_ocr":"40-150-06","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cemx40cmx30cm.","unit":"","rates":{"zone_a":769.37,"zone_b":776.32,"zone_c":731.8,"zone_d":704.75},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":66,"source_schedule_page":56,"raw_rate_tokens":["769.37","776.32","731.80","704.75"],"source_review_note":null,"search_text":"40-150-06 Block Size: 40cemx40cmx30cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-150-10-P66-SL117(4)","serial_label":"117(4)","item_code":"40-150-10","item_code_raw_ocr":"40-150-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 60cmx60cmx60cm.","unit":"","rates":{"zone_a":3465.12,"zone_b":3496.41,"zone_c":3295.91,"zone_d":3174.07},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":66,"source_schedule_page":56,"raw_rate_tokens":["3,465.12","3,496.41","3,295.91","3,174.07"],"source_review_note":null,"search_text":"40-150-10 Block Size: 60cmx60cmx60cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-150-15-P66-SL117(5)","serial_label":"117(5)","item_code":"40-150-15","item_code_raw_ocr":"40-150-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx50cm. each","unit":"","rates":{"zone_a":2008.54,"zone_b":2026.68,"zone_c":1910.46,"zone_d":1839.84},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":66,"source_schedule_page":56,"raw_rate_tokens":["2,008.54","2,026.68","1,910.46","1,839.84"],"source_review_note":null,"search_text":"40-150-15 Block Size: 50cmx50cmx50cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-150-20-P66-SL117(6)","serial_label":"117(6)","item_code":"40-150-20","item_code_raw_ocr":"40-150-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx40em.","unit":"","rates":{"zone_a":1603.99,"zone_b":1618.48,"zone_c":1525.67,"zone_d":1469.27},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":66,"source_schedule_page":56,"raw_rate_tokens":["1,603.99","1,618.48","1,525.67","1,469.27"],"source_review_note":null,"search_text":"40-150-20 Block Size: 50cmx50cmx40em. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-150-25-P66-SL117(7)","serial_label":"117(7)","item_code":"40-150-25","item_code_raw_ocr":"40-150-25","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 4Semx4Scmx45cm.","unit":"","rates":{"zone_a":1464.29,"zone_b":1477.51,"zone_c":1392.79,"zone_d":1341.3},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":66,"source_schedule_page":56,"raw_rate_tokens":["1,464.29","1,477.51","1,392.79","1,341.30"],"source_review_note":null,"search_text":"40-150-25 Block Size: 4Semx4Scmx45cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-150-30-P66-SL117(8)","serial_label":"117(8)","item_code":"40-150-30","item_code_raw_ocr":"40-150-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45cmx45cmx30cm.","unit":"each","rates":{"zone_a":974.1,"zone_b":982.9,"zone_c":926.53,"zone_d":892.28},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":66,"source_schedule_page":56,"raw_rate_tokens":["974.10","982.90","926.53","892.28"],"source_review_note":null,"search_text":"40-150-30 Block Size: 45cmx45cmx30cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-150-35-P66-SL117(9)","serial_label":"117(9)","item_code":"40-150-35","item_code_raw_ocr":"40-150-35","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40emx40cmx40em. K Ob. @ ¢ °* ‘","unit":"","rates":{"zone_a":1026.99,"zone_b":1036.27,"zone_c":976.84,"zone_d":940.73},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":66,"source_schedule_page":56,"raw_rate_tokens":["1,026.99","1,036.27","976.84","940.73"],"source_review_note":null,"search_text":"40-150-35 Block Size: 40emx40cmx40em. K Ob. @ ¢ °* ‘ Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-150-40-P67-SL117(10)","serial_label":"117(10)","item_code":"40-150-40","item_code_raw_ocr":"40-150-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40emx40cmx20em. each","unit":"","rates":{"zone_a":512.92,"zone_b":517.55,"zone_c":487.87,"zone_d":469.83},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["512.92","517.55","487.87","469.83"],"source_review_note":null,"search_text":"40-150-40 Block Size: 40emx40cmx20em. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-150-45-P67-SL117(11)","serial_label":"117(11)","item_code":"40-150-45","item_code_raw_ocr":"40-150-45","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 35emx35cmx35cm.","unit":"each","rates":{"zone_a":687.77,"zone_b":693.98,"zone_c":654.19,"zone_d":630.01},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["687.77","693.98","654.19","630.01"],"source_review_note":null,"search_text":"40-150-45 Block Size: 35emx35cmx35cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-150-50-P67-SL117(12)","serial_label":"117(12)","item_code":"40-150-50","item_code_raw_ocr":"40-150-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30cmx30cmx30cm. each","unit":"","rates":{"zone_a":433.14,"zone_b":437.05,"zone_c":411.99,"zone_d":396.76},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["433.14","437.05","411.99","396.76"],"source_review_note":null,"search_text":"40-150-50 Block Size: 30cmx30cmx30cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-150-55-P67-SL117(13)","serial_label":"117(13)","item_code":"40-150-55","item_code_raw_ocr":"40-150-55","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30cmx30cmx! Sem. 216.47 21842 205.90 198.29","unit":"","rates":{"zone_a":216.47,"zone_b":218.42,"zone_c":205.9,"zone_d":198.29},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["216.47","21842","205.90","198.29"],"source_review_note":null,"search_text":"40-150-55 Block Size: 30cmx30cmx! Sem. 216.47 21842 205.90 198.29 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-150-60-P67-SL117(14)","serial_label":"117(14)","item_code":"40-150-60","item_code_raw_ocr":"40-150-60","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 25cmx25cmx25em. cach","unit":"","rates":{"zone_a":250.51,"zone_b":252.78,"zone_c":238.28,"zone_d":229.47},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["250.51","252.78","238.28","229.47"],"source_review_note":null,"search_text":"40-150-60 Block Size: 25cmx25cmx25em. cach Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-150-65-P67-SL117(15)","serial_label":"117(15)","item_code":"40-150-65","item_code_raw_ocr":"40-150-65","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 20cmx20cmx20cm. 128.23 12939 121.97 117.46","unit":"","rates":{"zone_a":128.23,"zone_b":129.39,"zone_c":121.97,"zone_d":117.46},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["128.23","12939","121.97","117.46"],"source_review_note":null,"search_text":"40-150-65 Block Size: 20cmx20cmx20cm. 128.23 12939 121.97 117.46 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-150-70-P67","serial_label":null,"item_code":"40-150-70","item_code_raw_ocr":"40-150-70","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45emx45cmx20cm.","unit":"","rates":{"zone_a":649.4,"zone_b":655.26,"zone_c":617.69,"zone_d":594.86},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["649.40","655.26","617.69","594.86"],"source_review_note":null,"search_text":"40-150-70 Block Size: 45emx45cmx20cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-150-75-P67-SL117(17)","serial_label":"117(17)","item_code":"40-150-75","item_code_raw_ocr":"40-150-75","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cemx40cmx15cm. each","unit":"","rates":{"zone_a":384.69,"zone_b":388.16,"zone_c":365.9,"zone_d":352.38},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["384.69","388.16","365.90","352.38"],"source_review_note":null,"search_text":"40-150-75 Block Size: 40cemx40cmx15cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-150-80-P67-SL117(18)","serial_label":"117(18)","item_code":"40-150-80","item_code_raw_ocr":"40-150-80","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx60em. each","unit":"","rates":{"zone_a":2414.52,"zone_b":2436.33,"zone_c":2296.62,"zone_d":2211.72},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["2,414.52","2,436.33","2,296.62","2,211.72"],"source_review_note":null,"search_text":"40-150-80 Block Size: 50cmx50cmx60em. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-150-85-P67-SL117(19)","serial_label":"117(19)","item_code":"40-150-85","item_code_raw_ocr":"40-150-85","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx25em. each","unit":"","rates":{"zone_a":1002.05,"zone_b":1011.1,"zone_c":953.12,"zone_d":917.89},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["1,002.05","1,011.10","953.12","917.89"],"source_review_note":null,"search_text":"40-150-85 Block Size: 50cmx50cmx25em. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-150-90-P67-SL117(20)","serial_label":"117(20)","item_code":"40-150-90","item_code_raw_ocr":"40-150-90","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx20cm. Manufacturing and supplying C.C. blocks in leanest mix. 1:3:6, with cement, sand (FM>=1.5) and shingles (40mm down graded), to attain a minimum 28 days cylinder strength of 9.0 N/mm? including grading, washing shingles, mixing, laying in forms, consolidation,","unit":"each","rates":{"zone_a":802.0,"zone_b":809.24,"zone_c":762.83,"zone_d":734.64},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["802.00","809.24","762.83","734.64"],"source_review_note":null,"search_text":"40-150-90 Block Size: 50cmx50cmx20cm. Manufacturing and supplying C.C. blocks in leanest mix. 1:3:6, with cement, sand (FM>=1.5) and shingles (40mm down graded), to attain a minimum 28 days cylinder strength of 9.0 N/mm? including grading, washing shingles, mixing, laying in forms, consolidation, each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-160-00-P67-SL118","serial_label":"118","item_code":"40-160-00","item_code_raw_ocr":"40-160-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") Curing for at least 21 days, each . . . preparation of one layer of brick flat soling platform finishing with sand cement mortar, shuttering (steel shutter to be used) and stacking in measurable stacks, cost of all materials and charges, etc. complete as per _ technical specification, approved design and direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-160-00 ) Curing for at least 21 days, each . . . preparation of one layer of brick flat soling platform finishing with sand cement mortar, shuttering (steel shutter to be used) and stacking in measurable stacks, cost of all materials and charges, etc. complete as per _ technical specification, approved design and direction of Engineer in charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-160-04-P67-SL118(1)","serial_label":"118(1)","item_code":"40-160-04","item_code_raw_ocr":"40-160-04","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 60cmx60cemx40em","unit":"","rates":{"zone_a":2036.73,"zone_b":2121.47,"zone_c":1883.74,"zone_d":1858.16},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["2,036.73","2,121.47","1,883.74","1,858.16"],"source_review_note":null,"search_text":"40-160-04 Block Size: 60cmx60cemx40em Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-160-05-P67-SL118(2)","serial_label":"118(2)","item_code":"40-160-05","item_code_raw_ocr":"40-160-05","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: $0cmx50emx30em","unit":"","rates":{"zone_a":1058.88,"zone_b":1102.94,"zone_c":979.35,"zone_d":966.05},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["1,058.88","1,102.94","979.35","966.05"],"source_review_note":null,"search_text":"40-160-05 Block Size: $0cmx50emx30em Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-160-06-P67-SL118(3)","serial_label":"118(3)","item_code":"40-160-06","item_code_raw_ocr":"40-160-06","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx30em each","unit":"","rates":{"zone_a":676.61,"zone_b":704.76,"zone_c":625.79,"zone_d":617.29},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["676.61","704.76","625.79","617.29"],"source_review_note":null,"search_text":"40-160-06 Block Size: 40cmx40cmx30em each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-160-10-P67-SL118(4)","serial_label":"118(4)","item_code":"40-160-10","item_code_raw_ocr":"40-160-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 60cemx60cmx60em each","unit":"","rates":{"zone_a":3047.32,"zone_b":3174.11,"zone_c":2818.42,"zone_d":2780.15},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["3,047.32","3,174.11","2,818.42","2,780.15"],"source_review_note":null,"search_text":"40-160-10 Block Size: 60cemx60cmx60em each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-160-15-P67-SL118(5)","serial_label":"118(5)","item_code":"40-160-15","item_code_raw_ocr":"40-160-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50emx50cm","unit":"","rates":{"zone_a":1766.37,"zone_b":1839.86,"zone_c":1633.69,"zone_d":1611.5},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["1,766.37","1,839.86","1,633.69","1,611.50"],"source_review_note":null,"search_text":"40-160-15 Block Size: 50cmx50emx50cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-160-20-P67-SL118(6)","serial_label":"118(6)","item_code":"40-160-20","item_code_raw_ocr":"40-160-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50emx50cmx40cm","unit":"","rates":{"zone_a":1410.6,"zone_b":1469.29,"zone_c":1304.64,"zone_d":1286.92},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["1,410.60","1,469.29","1,304.64","1,286.92"],"source_review_note":null,"search_text":"40-160-20 Block Size: 50emx50cmx40cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-160-25-P67-SL118(7)","serial_label":"118(7)","item_code":"40-160-25","item_code_raw_ocr":"40-160-25","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45cmx4Semx45em","unit":"","rates":{"zone_a":1287.74,"zone_b":1341.32,"zone_c":1191.01,"zone_d":1174.84},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["1,287.74","1,341.32","1,191.01","1,174.84"],"source_review_note":null,"search_text":"40-160-25 Block Size: 45cmx4Semx45em Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-160-30-P67-SL118(8)","serial_label":"118(8)","item_code":"40-160-30","item_code_raw_ocr":"40-160-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45cmx4Semx30em","unit":"","rates":{"zone_a":356.65,"zone_b":892.29,"zone_c":792.3,"zone_d":781.54},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["356.65","892.29","792.30","781.54"],"source_review_note":null,"search_text":"40-160-30 Block Size: 45cmx4Semx30em Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-160-35-P67-SL118(9)","serial_label":"118(9)","item_code":"40-160-35","item_code_raw_ocr":"40-160-35","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40emx40cmx40om","unit":"","rates":{"zone_a":903.17,"zone_b":940.74,"zone_c":835.32,"zone_d":823.98},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["903.17","940.74","835.32","823.98"],"source_review_note":null,"search_text":"40-160-35 Block Size: 40emx40cmx40om Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-160-40-P67-SL118(10)","serial_label":"118(10)","item_code":"40-160-40","item_code_raw_ocr":"40-160-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40emx40cmx20em","unit":"","rates":{"zone_a":451.07,"zone_b":469.84,"zone_c":417.19,"zone_d":411.53},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["451.07","469.84","417.19","411.53"],"source_review_note":null,"search_text":"40-160-40 Block Size: 40emx40cmx20em Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-160-45-P67-SL118(11)","serial_label":"118(11)","item_code":"40-160-45","item_code_raw_ocr":"40-160-45","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 35cmx3Semx3Sem","unit":"","rates":{"zone_a":604.85,"zone_b":630.01,"zone_c":359.41,"zone_d":551.82},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["604.85","630.01","359.41","551.82"],"source_review_note":null,"search_text":"40-160-45 Block Size: 35cmx3Semx3Sem Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-160-50-P67-SL118(12)","serial_label":"118(12)","item_code":"40-160-50","item_code_raw_ocr":"40-160-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30cmx30cmx30cm","unit":"","rates":{"zone_a":380.92,"zone_b":396.76,"zone_c":352.3,"zone_d":347.52},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["380.92","396.76","352.30","347.52"],"source_review_note":null,"search_text":"40-160-50 Block Size: 30cmx30cmx30cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-160-55-P67-SL118(13)","serial_label":"118(13)","item_code":"40-160-55","item_code_raw_ocr":"40-160-55","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30cmx30cmx15em each","unit":"","rates":{"zone_a":190.37,"zone_b":198.29,"zone_c":176.07,"zone_d":173.68},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["190.37","198.29","176.07","173.68"],"source_review_note":null,"search_text":"40-160-55 Block Size: 30cmx30cmx15em each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-160-60-P67-SL118(14)","serial_label":"118(14)","item_code":"40-160-60","item_code_raw_ocr":"40-160-60","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 25cmx25emx25em each","unit":"","rates":{"zone_a":220.31,"zone_b":229.47,"zone_c":203.76,"zone_d":200.99},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["220.31","229.47","203.76","200.99"],"source_review_note":null,"search_text":"40-160-60 Block Size: 25cmx25emx25em each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-160-65-P67-SL118(15)","serial_label":"118(15)","item_code":"40-160-65","item_code_raw_ocr":"40-160-65","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 20cmx20cmx20cm","unit":"","rates":{"zone_a":112.77,"zone_b":117.46,"zone_c":104.3,"zone_d":102.88},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["112.77","117.46","104.30","102.88"],"source_review_note":null,"search_text":"40-160-65 Block Size: 20cmx20cmx20cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-160-70-P67-SL118(16)","serial_label":"118(16)","item_code":"40-160-70","item_code_raw_ocr":"40-160-70","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45emx4Scmx20em each","unit":"","rates":{"zone_a":571.1,"zone_b":594.86,"zone_c":528.2,"zone_d":521.03},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["571.10","594.86","528.20","521.03"],"source_review_note":null,"search_text":"40-160-70 Block Size: 45emx4Scmx20em each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-160-75-P67-SL118(17)","serial_label":"118(17)","item_code":"40-160-75","item_code_raw_ocr":"40-160-75","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx 15cm","unit":"each","rates":{"zone_a":338.3,"zone_b":352.38,"zone_c":312.89,"zone_d":308.64},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["338.30","352.38","312.89","308.64"],"source_review_note":null,"search_text":"40-160-75 Block Size: 40cmx40cmx 15cm each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-160-80-P67-SL118(18)","serial_label":"118(18)","item_code":"40-160-80","item_code_raw_ocr":"40-160-80","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: $0emx50cmx60em k @__ we )","unit":"","rates":{"zone_a":2123.4,"zone_b":2211.74,"zone_c":1963.9,"zone_d":1937.23},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":67,"source_schedule_page":57,"raw_rate_tokens":["2,123.40","2,211.74","1,963.90","1,937.23"],"source_review_note":null,"search_text":"40-160-80 Block Size: $0emx50cmx60em k @__ we ) Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-160-85-P68-SL118(19)","serial_label":"118(19)","item_code":"40-160-85","item_code_raw_ocr":"40-160-85","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50emx50cmx25Sem","unit":"","rates":{"zone_a":881.23,"zone_b":917.9,"zone_c":815.04,"zone_d":803.97},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":["881.23","917.90","815.04","803.97"],"source_review_note":null,"search_text":"40-160-85 Block Size: 50emx50cmx25Sem Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-160-90-P68-SL118(20)","serial_label":"118(20)","item_code":"40-160-90","item_code_raw_ocr":"40-160-90","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx20cm. Manufacturing and supplying C.C. blocks in leanest mix. 1:3:5.5 with cement, sand (FM>=1.5) and Stone Chips (40mm down graded) to attain a 28 days cylinder strength of 10.5 N/mm? including grading, washing stone chips, mixing, laying in forms, consolidation,","unit":"","rates":{"zone_a":705.3,"zone_b":734.64,"zone_c":652.32,"zone_d":643.46},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":["705.30","734.64","652.32","643.46"],"source_review_note":null,"search_text":"40-160-90 Block Size: 50cmx50cmx20cm. Manufacturing and supplying C.C. blocks in leanest mix. 1:3:5.5 with cement, sand (FM>=1.5) and Stone Chips (40mm down graded) to attain a 28 days cylinder strength of 10.5 N/mm? including grading, washing stone chips, mixing, laying in forms, consolidation, Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-170-00-P68-SL119","serial_label":"119","item_code":"40-170-00","item_code_raw_ocr":"40-170-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"curing for at least 21 _ days, each . . . . preparation of one layer of brick flat soling platform finishing with sand cement mortar, shuttering (steel shutter to be used) and stacking in measurable stacks, cost of all materials and charges, ete. complete as per _ technical specification, approved design and direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-170-00 curing for at least 21 _ days, each . . . . preparation of one layer of brick flat soling platform finishing with sand cement mortar, shuttering (steel shutter to be used) and stacking in measurable stacks, cost of all materials and charges, ete. complete as per _ technical specification, approved design and direction of Engineer in charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-170-04-P68-SL119(1)","serial_label":"119(1)","item_code":"40-170-04","item_code_raw_ocr":"40-170-04","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 60emx60emx400m","unit":"","rates":{"zone_a":2299.69,"zone_b":2319.32,"zone_c":2189.94,"zone_d":2110.31},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":["2,299.69","2,319.32","2,189.94","2,110.31"],"source_review_note":null,"search_text":"40-170-04 Block Size: 60emx60emx400m Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-170-05-P68-SL119(2)","serial_label":"119(2)","item_code":"40-170-05","item_code_raw_ocr":"40-170-05","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx30cm","unit":"","rates":{"zone_a":1195.59,"zone_b":1205.8,"zone_c":1138.54,"zone_d":1097.14},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":["1,195.59","1,205.80","1,138.54","1,097.14"],"source_review_note":null,"search_text":"40-170-05 Block Size: 50cmx50cmx30cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-170-06-P68-SL119(3)","serial_label":"119(3)","item_code":"40-170-06","item_code_raw_ocr":"40-170-06","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx30cm","unit":"","rates":{"zone_a":763.96,"zone_b":770.49,"zone_c":727.51,"zone_d":701.05},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":["763.96","770.49","727.51","701.05"],"source_review_note":null,"search_text":"40-170-06 Block Size: 40cmx40cmx30cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-170-10-P68-SL119(4)","serial_label":"119(4)","item_code":"40-170-10","item_code_raw_ocr":"40-170-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 60cmx60cmx60cm","unit":"","rates":{"zone_a":3440.76,"zone_b":3470.12,"zone_c":3276.55,"zone_d":3157.41},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":["3,440.76","3,470.12","3,276.55","3,157.41"],"source_review_note":null,"search_text":"40-170-10 Block Size: 60cmx60cmx60cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-170-15-P68-SL119(5)","serial_label":"119(5)","item_code":"40-170-15","item_code_raw_ocr":"40-170-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx50cm each","unit":"","rates":{"zone_a":1994.42,"zone_b":2011.44,"zone_c":1899.24,"zone_d":1830.18},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":["1,994.42","2,011.44","1,899.24","1,830.18"],"source_review_note":null,"search_text":"40-170-15 Block Size: 50cmx50cmx50cm each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-170-20-P68-SL119(6)","serial_label":"119(6)","item_code":"40-170-20","item_code_raw_ocr":"40-170-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cemx50cmx40cm","unit":"each","rates":{"zone_a":1592.72,"zone_b":1606.31,"zone_c":1516.71,"zone_d":1461.56},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":["1,592.72","1,606.31","1,516.71","1,461.56"],"source_review_note":null,"search_text":"40-170-20 Block Size: 50cemx50cmx40cm each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-170-25-P68-SL119(7)","serial_label":"119(7)","item_code":"40-170-25","item_code_raw_ocr":"40-170-25","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") Block Size: 45emx45cmx45cm each","unit":"","rates":{"zone_a":1454.0,"zone_b":1466.41,"zone_c":1384.61,"zone_d":1334.26},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":["1,454.00","1,466.41","1,384.61","1,334.26"],"source_review_note":null,"search_text":"40-170-25 ) Block Size: 45emx45cmx45cm each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-170-30-P68-SL119(8)","serial_label":"119(8)","item_code":"40-170-30","item_code_raw_ocr":"40-170-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45cmx45cmx30cm","unit":"each","rates":{"zone_a":967.25,"zone_b":975.51,"zone_c":921.09,"zone_d":887.6},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":["967.25","975.51","921.09","887.60"],"source_review_note":null,"search_text":"40-170-30 Block Size: 45cmx45cmx30cm each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-170-35-P68","serial_label":null,"item_code":"40-170-35","item_code_raw_ocr":"40-170-35","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx40cm","unit":"each","rates":{"zone_a":1019.77,"zone_b":1028.48,"zone_c":971.11,"zone_d":935.79},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":["1,019.77","1,028.48","971.11","935.79"],"source_review_note":null,"search_text":"40-170-35 Block Size: 40cmx40cmx40cm each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-170-40-P68-SL119(10)","serial_label":"119(10)","item_code":"40-170-40","item_code_raw_ocr":"40-170-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx20cm","unit":"each","rates":{"zone_a":509.31,"zone_b":513.66,"zone_c":485.0,"zone_d":467.37},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":["509.31","513.66","485.00","467.37"],"source_review_note":null,"search_text":"40-170-40 Block Size: 40cmx40cmx20cm each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-170-45-P68-SL119(11)","serial_label":"119(11)","item_code":"40-170-45","item_code_raw_ocr":"40-170-45","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 35cmx3Semx3Sem","unit":"","rates":{"zone_a":682.94,"zone_b":688.77,"zone_c":650.35,"zone_d":626.7},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":["682.94","688.77","650.35","626.70"],"source_review_note":null,"search_text":"40-170-45 Block Size: 35cmx3Semx3Sem Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-170-50-P68-SL119(12)","serial_label":"119(12)","item_code":"40-170-50","item_code_raw_ocr":"40-170-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30cemx30cmx30cm","unit":"each","rates":{"zone_a":430.09,"zone_b":433.77,"zone_c":409.57,"zone_d":394.68},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":["430.09","433.77","409.57","394.68"],"source_review_note":null,"search_text":"40-170-50 Block Size: 30cemx30cmx30cm each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-170-55-P68-SL119(13)","serial_label":"119(13)","item_code":"40-170-55","item_code_raw_ocr":"40-170-55","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30cmx30cmx15cm","unit":"each","rates":{"zone_a":214.94,"zone_b":216.78,"zone_c":204.69,"zone_d":197.24},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":["214.94","216.78","204.69","197.24"],"source_review_note":null,"search_text":"40-170-55 Block Size: 30cmx30cmx15cm each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-170-60-P68-SL119(14)","serial_label":"119(14)","item_code":"40-170-60","item_code_raw_ocr":"40-170-60","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 25emx25cmx25cm","unit":"each","rates":{"zone_a":248.75,"zone_b":250.88,"zone_c":236.88,"zone_d":228.27},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":["248.75","250.88","236.88","228.27"],"source_review_note":null,"search_text":"40-170-60 Block Size: 25emx25cmx25cm each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-170-65-P68-SL119(15)","serial_label":"119(15)","item_code":"40-170-65","item_code_raw_ocr":"40-170-65","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 20cmx20cmx20em","unit":"","rates":{"zone_a":127.33,"zone_b":128.41,"zone_c":121.25,"zone_d":116.84},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":["127.33","128.41","121.25","116.84"],"source_review_note":null,"search_text":"40-170-65 Block Size: 20cmx20cmx20em Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-170-70-P68-SL119(16)","serial_label":"119(16)","item_code":"40-170-70","item_code_raw_ocr":"40-170-70","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 4Scmx4Semx20em","unit":"","rates":{"zone_a":644.83,"zone_b":650.34,"zone_c":614.06,"zone_d":591.73},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":["644.83","650.34","614.06","591.73"],"source_review_note":null,"search_text":"40-170-70 Block Size: 4Scmx4Semx20em Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-170-75-P68-SL119(17)","serial_label":"119(17)","item_code":"40-170-75","item_code_raw_ocr":"40-170-75","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx1 Sem","unit":"","rates":{"zone_a":381.98,"zone_b":385.24,"zone_c":363.75,"zone_d":350.53},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":["381.98","385.24","363.75","350.53"],"source_review_note":null,"search_text":"40-170-75 Block Size: 40cmx40cmx1 Sem Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-170-80-P68-SL119(18)","serial_label":"119(18)","item_code":"40-170-80","item_code_raw_ocr":"40-170-80","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx60em","unit":"","rates":{"zone_a":2397.55,"zone_b":2418.01,"zone_c":2283.13,"zone_d":2200.11},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":["2,397.55","2,418.01","2,283.13","2,200.11"],"source_review_note":null,"search_text":"40-170-80 Block Size: 50cmx50cmx60em Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-170-85-P68-SL119(19)","serial_label":"119(19)","item_code":"40-170-85","item_code_raw_ocr":"40-170-85","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx25cm","unit":"","rates":{"zone_a":995.01,"zone_b":1003.5,"zone_c":947.52,"zone_d":913.07},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":["995.01","1,003.50","947.52","913.07"],"source_review_note":null,"search_text":"40-170-85 Block Size: 50cmx50cmx25cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-170-90-P68-SL119(20)","serial_label":"119(20)","item_code":"40-170-90","item_code_raw_ocr":"40-170-90","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmxS0cemx20cm, Manufacturing and supplying C.C. blocks in leanest mix. 1:3:5.5 with cement, sand (FM>=1.5) and shingles (40mm down graded) to","unit":"","rates":{"zone_a":796.36,"zone_b":803.16,"zone_c":758.35,"zone_d":730.78},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":["796.36","803.16","758.35","730.78"],"source_review_note":null,"search_text":"40-170-90 Block Size: 50cmxS0cemx20cm, Manufacturing and supplying C.C. blocks in leanest mix. 1:3:5.5 with cement, sand (FM>=1.5) and shingles (40mm down graded) to Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-180-00-P68-SL120","serial_label":"120","item_code":"40-180-00","item_code_raw_ocr":"40-180-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"2ttain a 28 days cylinder strength of . . ° 10.5 N/mm? including grading, each washing shingles, mixing, laying in forms, consolidation, curing for at least 21 days, preparation of one layer of brick flat soling platform _ KO & a !","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":68,"source_schedule_page":58,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-180-00 2ttain a 28 days cylinder strength of . . ° 10.5 N/mm? including grading, each washing shingles, mixing, laying in forms, consolidation, curing for at least 21 days, preparation of one layer of brick flat soling platform _ KO & a ! Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-180-04-P69-SL120(1)","serial_label":"120(1)","item_code":"40-180-04","item_code_raw_ocr":"40-180-04","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} Block Size: 60emx60cmx40cm. each","unit":"","rates":{"zone_a":2029.76,"zone_b":2111.08,"zone_c":1881.45,"zone_d":1855.8},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["2,029.76","2,111.08","1,881.45","1,855.80"],"source_review_note":null,"search_text":"40-180-04 } Block Size: 60emx60cmx40cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-180-05-P69-SL120(2)","serial_label":"120(2)","item_code":"40-180-05","item_code_raw_ocr":"40-180-05","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cemx50cmx30cm. each","unit":"","rates":{"zone_a":1055.26,"zone_b":1097.54,"zone_c":978.15,"zone_d":964.82},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["1,055.26","1,097.54","978.15","964.82"],"source_review_note":null,"search_text":"40-180-05 Block Size: 50cemx50cmx30cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-180-06-P69-SL120(3)","serial_label":"120(3)","item_code":"40-180-06","item_code_raw_ocr":"40-180-06","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") Block Size: 40emx40cmx30cm.","unit":"","rates":{"zone_a":674.29,"zone_b":701.31,"zone_c":625.02,"zone_d":616.5},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["674.29","701.31","625.02","616.50"],"source_review_note":null,"search_text":"40-180-06 ) Block Size: 40emx40cmx30cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-180-10-P69-SL120(4)","serial_label":"120(4)","item_code":"40-180-10","item_code_raw_ocr":"40-180-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 60cmx60cmx60cem.","unit":"","rates":{"zone_a":3036.89,"zone_b":3158.57,"zone_c":2814.99,"zone_d":2776.61},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["3,036.89","3,158.57","2,814.99","2,776.61"],"source_review_note":null,"search_text":"40-180-10 Block Size: 60cmx60cmx60cem. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-180-15-P69-SL120(5)","serial_label":"120(5)","item_code":"40-180-15","item_code_raw_ocr":"40-180-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") Block Size: 50cmx50cmx50cm.","unit":"","rates":{"zone_a":1760.32,"zone_b":1830.85,"zone_c":1631.7,"zone_d":1609.45},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["1,760.32","1,830.85","1,631.70","1,609.45"],"source_review_note":null,"search_text":"40-180-15 ) Block Size: 50cmx50cmx50cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-180-20-P69-SL120(6)","serial_label":"120(6)","item_code":"40-180-20","item_code_raw_ocr":"40-180-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx40cm.","unit":"","rates":{"zone_a":1405.77,"zone_b":1462.09,"zone_c":1303.05,"zone_d":1285.29},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["1,405.77","1,462.09","1,303.05","1,285.29"],"source_review_note":null,"search_text":"40-180-20 Block Size: 50cmx50cmx40cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-180-25-P69-SL120(7)","serial_label":"120(7)","item_code":"40-180-25","item_code_raw_ocr":"40-180-25","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45cemx45cemx45cm. each","unit":"","rates":{"zone_a":1283.33,"zone_b":1334.75,"zone_c":1189.56,"zone_d":1173.34},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["1,283.33","1,334.75","1,189.56","1,173.34"],"source_review_note":null,"search_text":"40-180-25 Block Size: 45cemx45cemx45cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-180-30-P69-SL120(8)","serial_label":"120(8)","item_code":"40-180-30","item_code_raw_ocr":"40-180-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45emx45cmx30cm.","unit":"","rates":{"zone_a":853.72,"zone_b":887.92,"zone_c":791.34,"zone_d":780.55},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["853.72","887.92","791.34","780.55"],"source_review_note":null,"search_text":"40-180-30 Block Size: 45emx45cmx30cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-180-35-P69-SL120(9)","serial_label":"120(9)","item_code":"40-180-35","item_code_raw_ocr":"40-180-35","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx40cm.","unit":"each","rates":{"zone_a":900.07,"zone_b":936.14,"zone_c":834.31,"zone_d":822.93},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["900.07","936.14","834.31","822.93"],"source_review_note":null,"search_text":"40-180-35 Block Size: 40cmx40cmx40cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-180-40-P69-SL120(10)","serial_label":"120(10)","item_code":"40-180-40","item_code_raw_ocr":"40-180-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx20cm. each 449,53 467.54 416.68 411.00 -—— —","unit":"","rates":{"zone_a":449.53,"zone_b":467.54,"zone_c":416.68,"zone_d":411.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["449,53","467.54","416.68","411.00"],"source_review_note":null,"search_text":"40-180-40 Block Size: 40cmx40cmx20cm. each 449,53 467.54 416.68 411.00 -—— — Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-180-45-P69-SL120(11)","serial_label":"120(11)","item_code":"40-180-45","item_code_raw_ocr":"40-180-45","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 35cmx35cmx35cm.","unit":"each","rates":{"zone_a":602.78,"zone_b":626.93,"zone_c":558.73,"zone_d":551.12},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["602.78","626.93","558.73","551.12"],"source_review_note":null,"search_text":"40-180-45 Block Size: 35cmx35cmx35cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-180-50-P69-SL120(12)","serial_label":"120(12)","item_code":"40-180-50","item_code_raw_ocr":"40-180-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30cemx30cmx30cm.","unit":"each","rates":{"zone_a":379.61,"zone_b":394.82,"zone_c":351.87,"zone_d":347.08},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["379.61","394.82","351.87","347.08"],"source_review_note":null,"search_text":"40-180-50 Block Size: 30cemx30cmx30cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-180-55-P69-SL120(13)","serial_label":"120(13)","item_code":"40-180-55","item_code_raw_ocr":"40-180-55","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30cmx30cmx15cm.","unit":"each","rates":{"zone_a":189.71,"zone_b":197.32,"zone_c":175.85,"zone_d":173.46},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["189.71","197.32","175.85","173.46"],"source_review_note":null,"search_text":"40-180-55 Block Size: 30cmx30cmx15cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-180-60-P69-SL120(14)","serial_label":"120(14)","item_code":"40-180-60","item_code_raw_ocr":"40-180-60","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} Block Size: 25cemx25cmx25cem.","unit":"each","rates":{"zone_a":219.55,"zone_b":228.35,"zone_c":203.51,"zone_d":200.74},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["219.55","228.35","203.51","200.74"],"source_review_note":null,"search_text":"40-180-60 } Block Size: 25cemx25cmx25cem. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-180-65-P69-SL120(15)","serial_label":"120(15)","item_code":"40-180-65","item_code_raw_ocr":"40-180-65","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 20cemx20cemx20cm.","unit":"each","rates":{"zone_a":112.38,"zone_b":116.88,"zone_c":104.17,"zone_d":102.75},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["112.38","116.88","104.17","102.75"],"source_review_note":null,"search_text":"40-180-65 Block Size: 20cemx20cemx20cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-180-70-P69-SL120(16)","serial_label":"120(16)","item_code":"40-180-70","item_code_raw_ocr":"40-180-70","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45cemx45cmx20cm.","unit":"each","rates":{"zone_a":569.14,"zone_b":591.95,"zone_c":527.56,"zone_d":520.37},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["569.14","591.95","527.56","520.37"],"source_review_note":null,"search_text":"40-180-70 Block Size: 45cemx45cmx20cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-180-75-P69-SL120(17)","serial_label":"120(17)","item_code":"40-180-75","item_code_raw_ocr":"40-180-75","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx 15cm.","unit":"each","rates":{"zone_a":337.15,"zone_b":350.65,"zone_c":312.51,"zone_d":308.25},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["337.15","350.65","312.51","308.25"],"source_review_note":null,"search_text":"40-180-75 Block Size: 40cmx40cmx 15cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-180-80-P69-SL120(18)","serial_label":"120(18)","item_code":"40-180-80","item_code_raw_ocr":"40-180-80","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx60em.","unit":"","rates":{"zone_a":2116.13,"zone_b":2200.92,"zone_c":1961.51,"zone_d":1934.77},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["2,116.13","2,200.92","1,961.51","1,934.77"],"source_review_note":null,"search_text":"40-180-80 Block Size: 50cmx50cmx60em. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-180-85-P69-SL120(19)","serial_label":"120(19)","item_code":"40-180-85","item_code_raw_ocr":"40-180-85","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50emx50emx25em.","unit":"","rates":{"zone_a":878.22,"zone_b":913.4,"zone_c":814.05,"zone_d":802.95},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["878.22","913.40","814.05","802.95"],"source_review_note":null,"search_text":"40-180-85 Block Size: 50emx50emx25em. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-180-90-P69-SL120(20)","serial_label":"120(20)","item_code":"40-180-90","item_code_raw_ocr":"40-180-90","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx20em. Manufacturing and supplying C.C. blocks in leanest mix. 1:2.5:5 with cement, sand (FM>=1.5) and Stone Chips (40mm down graded) to attain a 28 days cylinder strength of 12 N/mm? including — grading, washing stone chips, mixing, laying in forms, consolidation,","unit":"","rates":{"zone_a":702.88,"zone_b":731.05,"zone_c":651.53,"zone_d":642.64},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["702.88","731.05","651.53","642.64"],"source_review_note":null,"search_text":"40-180-90 Block Size: 50cmx50cmx20em. Manufacturing and supplying C.C. blocks in leanest mix. 1:2.5:5 with cement, sand (FM>=1.5) and Stone Chips (40mm down graded) to attain a 28 days cylinder strength of 12 N/mm? including — grading, washing stone chips, mixing, laying in forms, consolidation, Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-190-00-P69-SL121","serial_label":"121","item_code":"40-190-00","item_code_raw_ocr":"40-190-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"curing for at least 21 days, each . . . . preparation of one layer of brick flat soling platform finishing with sand cement mortar, shuttering (steel shutter to be used) and stacking in measurable stacks, cost of all materials and charges, etc. complete as per _ technical specification, approved design and direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-190-00 curing for at least 21 days, each . . . . preparation of one layer of brick flat soling platform finishing with sand cement mortar, shuttering (steel shutter to be used) and stacking in measurable stacks, cost of all materials and charges, etc. complete as per _ technical specification, approved design and direction of Engineer in charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-190-04-P69-SL121(1)","serial_label":"121(1)","item_code":"40-190-04","item_code_raw_ocr":"40-190-04","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 60cmx60cmx40cm","unit":"","rates":{"zone_a":2359.17,"zone_b":2379.63,"zone_c":2247.84,"zone_d":2167.37},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["2,359.17","2,379.63","2,247.84","2,167.37"],"source_review_note":null,"search_text":"40-190-04 Block Size: 60cmx60cmx40cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-190-05-P69-SL121(2)","serial_label":"121(2)","item_code":"40-190-05","item_code_raw_ocr":"40-190-05","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: $0cmx50cmx30em","unit":"","rates":{"zone_a":1226.52,"zone_b":1237.15,"zone_c":1168.64,"zone_d":1126.8},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["1,226.52","1,237.15","1,168.64","1,126.80"],"source_review_note":null,"search_text":"40-190-05 Block Size: $0cmx50cmx30em Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-190-06-P69-SL121(3)","serial_label":"121(3)","item_code":"40-190-06","item_code_raw_ocr":"40-190-06","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40emx40cmx30cm","unit":"","rates":{"zone_a":783.73,"zone_b":790.52,"zone_c":746.74,"zone_d":720.01},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["783.73","790.52","746.74","720.01"],"source_review_note":null,"search_text":"40-190-06 Block Size: 40emx40cmx30cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-190-10-P69-SL121(4)","serial_label":"121(4)","item_code":"40-190-10","item_code_raw_ocr":"40-190-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 60emx60cmx60cm","unit":"","rates":{"zone_a":3529.76,"zone_b":3560.36,"zone_c":3363.19,"zone_d":3242.78},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":69,"source_schedule_page":59,"raw_rate_tokens":["3,529.76","3,560.36","3,363.19","3,242.78"],"source_review_note":null,"search_text":"40-190-10 Block Size: 60emx60cmx60cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-190-15-P70-SL121(5)","serial_label":"121(5)","item_code":"40-190-15","item_code_raw_ocr":"40-190-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx50cm","unit":"","rates":{"zone_a":2046.01,"zone_b":2063.75,"zone_c":1949.46,"zone_d":1879.66},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["2,046.01","2,063.75","1,949.46","1,879.66"],"source_review_note":null,"search_text":"40-190-15 Block Size: 50cmx50cmx50cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-190-20-P70-SL121(6)","serial_label":"121(6)","item_code":"40-190-20","item_code_raw_ocr":"40-190-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50emx50cmx40cm","unit":"","rates":{"zone_a":1633.92,"zone_b":1648.08,"zone_c":1556.81,"zone_d":1501.07},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["1,633.92","1,648.08","1,556.81","1,501.07"],"source_review_note":null,"search_text":"40-190-20 Block Size: 50emx50cmx40cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-190-25-P70-SL121(7)","serial_label":"121(7)","item_code":"40-190-25","item_code_raw_ocr":"40-190-25","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45emx45cmx45cm","unit":"","rates":{"zone_a":1491.61,"zone_b":1504.54,"zone_c":1421.22,"zone_d":1370.33},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["1,491.61","1,504.54","1,421.22","1,370.33"],"source_review_note":null,"search_text":"40-190-25 Block Size: 45emx45cmx45cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-190-30-P70-SL121(8)","serial_label":"121(8)","item_code":"40-190-30","item_code_raw_ocr":"40-190-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45emx4Scmx30cm","unit":"","rates":{"zone_a":992.27,"zone_b":1000.87,"zone_c":945.44,"zone_d":911.6},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["992.27","1,000.87","945.44","911.60"],"source_review_note":null,"search_text":"40-190-30 Block Size: 45emx4Scmx30cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-190-35-P70-SL121(9)","serial_label":"121(9)","item_code":"40-190-35","item_code_raw_ocr":"40-190-35","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx40cm","unit":"","rates":{"zone_a":1046.15,"zone_b":1055.22,"zone_c":996.78,"zone_d":961.09},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["1,046.15","1,055.22","996.78","961.09"],"source_review_note":null,"search_text":"40-190-35 Block Size: 40cmx40cmx40cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-190-40-P70-SL121(10)","serial_label":"121(10)","item_code":"40-190-40","item_code_raw_ocr":"40-190-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx20cm","unit":"","rates":{"zone_a":522.48,"zone_b":527.01,"zone_c":497.83,"zone_d":480.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["522.48","527.01","497.83","480.00"],"source_review_note":null,"search_text":"40-190-40 Block Size: 40cmx40cmx20cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-190-45-P70-SL121(11)","serial_label":"121(11)","item_code":"40-190-45","item_code_raw_ocr":"40-190-45","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 35cmx3Semx3Sem","unit":"","rates":{"zone_a":700.6,"zone_b":706.68,"zone_c":667.54,"zone_d":643.64},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["700.60","706.68","667.54","643.64"],"source_review_note":null,"search_text":"40-190-45 Block Size: 35cmx3Semx3Sem Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-190-50-P70-SL121(12)","serial_label":"121(12)","item_code":"40-190-50","item_code_raw_ocr":"40-190-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30cmx30cmx30em each","unit":"","rates":{"zone_a":441.22,"zone_b":445.04,"zone_c":420.4,"zone_d":405.35},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["441.22","445.04","420.40","405.35"],"source_review_note":null,"search_text":"40-190-50 Block Size: 30cmx30cmx30em each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-190-55-P70-SL121(13)","serial_label":"121(13)","item_code":"40-190-55","item_code_raw_ocr":"40-190-55","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30cmx30cmxl5em each","unit":"","rates":{"zone_a":220.5,"zone_b":222.42,"zone_c":210.1,"zone_d":202.58},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["220.50","222.42","210.10","202.58"],"source_review_note":null,"search_text":"40-190-55 Block Size: 30cmx30cmxl5em each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-190-60-P70-SL121(14)","serial_label":"121(14)","item_code":"40-190-60","item_code_raw_ocr":"40-190-60","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 25emx2Semx25em each","unit":"","rates":{"zone_a":255.19,"zone_b":257.4,"zone_c":243.14,"zone_d":234.44},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["255.19","257.40","243.14","234.44"],"source_review_note":null,"search_text":"40-190-60 Block Size: 25emx2Semx25em each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-190-65-P70-SL121(15)","serial_label":"121(15)","item_code":"40-190-65","item_code_raw_ocr":"40-190-65","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 20cmx20cmx20em each","unit":"","rates":{"zone_a":130.62,"zone_b":131.75,"zone_c":124.46,"zone_d":120.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["130.62","131.75","124.46","120.00"],"source_review_note":null,"search_text":"40-190-65 Block Size: 20cmx20cmx20em each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-190-70-P70-SL121(16)","serial_label":"121(16)","item_code":"40-190-70","item_code_raw_ocr":"40-190-70","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45emx45cemx20cm","unit":"each","rates":{"zone_a":661.51,"zone_b":667.25,"zone_c":630.3,"zone_d":607.73},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["661.51","667.25","630.30","607.73"],"source_review_note":null,"search_text":"40-190-70 Block Size: 45emx45cemx20cm each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-190-75-P70-SL121(17)","serial_label":"121(17)","item_code":"40-190-75","item_code_raw_ocr":"40-190-75","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40emx15em each","unit":"","rates":{"zone_a":391.86,"zone_b":395.26,"zone_c":373.37,"zone_d":360.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["391.86","395.26","373.37","360.00"],"source_review_note":null,"search_text":"40-190-75 Block Size: 40cmx40emx15em each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-190-80-P70-SL121(18)","serial_label":"121(18)","item_code":"40-190-80","item_code_raw_ocr":"40-190-80","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx60em each","unit":"","rates":{"zone_a":2459.56,"zone_b":2480.89,"zone_c":2343.5,"zone_d":2259.59},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["2,459.56","2,480.89","2,343.50","2,259.59"],"source_review_note":null,"search_text":"40-190-80 Block Size: 50cmx50cmx60em each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-190-85-P70-SL121(19)","serial_label":"121(19)","item_code":"40-190-85","item_code_raw_ocr":"40-190-85","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx25em","unit":"","rates":{"zone_a":1020.75,"zone_b":1029.6,"zone_c":972.58,"zone_d":937.76},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["1,020.75","1,029.60","972.58","937.76"],"source_review_note":null,"search_text":"40-190-85 Block Size: 50cmx50cmx25em Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-190-90-P70-SL121(20)","serial_label":"121(20)","item_code":"40-190-90","item_code_raw_ocr":"40-190-90","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx20em 816.96 824.04 77841 750.54 Manufacturing and supplying C.C. blocks in leanest mix. 1:2.5:5 with cement, sand (FM>=1.5) and shingles (40mm down graded) to attain a 28 days cylinder strength of 12 N/mm? including grading, washing shingles, mixing, laying in forms, consolidation, curing for at","unit":"","rates":{"zone_a":816.96,"zone_b":824.04,"zone_c":778.41,"zone_d":750.54},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["816.96","824.04","77841","750.54"],"source_review_note":null,"search_text":"40-190-90 Block Size: 50cmx50cmx20em 816.96 824.04 77841 750.54 Manufacturing and supplying C.C. blocks in leanest mix. 1:2.5:5 with cement, sand (FM>=1.5) and shingles (40mm down graded) to attain a 28 days cylinder strength of 12 N/mm? including grading, washing shingles, mixing, laying in forms, consolidation, curing for at Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-200-00-P70-SL122","serial_label":"122","item_code":"40-200-00","item_code_raw_ocr":"40-200-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"layer of brick flat soling platform finishing with sand cement mortar, shuttering (steel shutter to be used) and stacking in measurable stacks, cost of all materials and charges, etc. complete as per technical specification, approved design and direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"40-200-00 layer of brick flat soling platform finishing with sand cement mortar, shuttering (steel shutter to be used) and stacking in measurable stacks, cost of all materials and charges, etc. complete as per technical specification, approved design and direction of Engineer in charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-200-04-P70-SL122(1)","serial_label":"122(1)","item_code":"40-200-04","item_code_raw_ocr":"40-200-04","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 60cmx60cmx40cm","unit":"","rates":{"zone_a":2084.59,"zone_b":2167.8,"zone_c":1934.03,"zone_d":1908.47},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["2,084.59","2,167.80","1,934.03","1,908.47"],"source_review_note":null,"search_text":"40-200-04 Block Size: 60cmx60cmx40cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-200-05-P70-SL122(2)","serial_label":"122(2)","item_code":"40-200-05","item_code_raw_ocr":"40-200-05","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50emx50cmx30em","unit":"","rates":{"zone_a":1083.76,"zone_b":1127.03,"zone_c":1005.49,"zone_d":992.2},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["1,083.76","1,127.03","1,005.49","992.20"],"source_review_note":null,"search_text":"40-200-05 Block Size: 50emx50cmx30em Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-200-06-P70-SL122(3)","serial_label":"122(3)","item_code":"40-200-06","item_code_raw_ocr":"40-200-06","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx30cm","unit":"each","rates":{"zone_a":692.51,"zone_b":720.15,"zone_c":642.49,"zone_d":634.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["692.51","720.15","642.49","634.00"],"source_review_note":null,"search_text":"40-200-06 Block Size: 40cmx40cmx30cm each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-200-10-P70-SL122(4)","serial_label":"122(4)","item_code":"40-200-10","item_code_raw_ocr":"40-200-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 60cmx60cmx60em each","unit":"","rates":{"zone_a":3118.92,"zone_b":3243.43,"zone_c":2893.66,"zone_d":2855.42},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["3,118.92","3,243.43","2,893.66","2,855.42"],"source_review_note":null,"search_text":"40-200-10 Block Size: 60cmx60cmx60em each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-200-15-P70-SL122(5)","serial_label":"122(5)","item_code":"40-200-15","item_code_raw_ocr":"40-200-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cemx50cmx50cm","unit":"","rates":{"zone_a":1807.87,"zone_b":1880.04,"zone_c":1677.3,"zone_d":1655.13},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["1,807.87","1,880.04","1,677.30","1,655.13"],"source_review_note":null,"search_text":"40-200-15 Block Size: 50cemx50cmx50cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-200-20-P70-SL122(6)","serial_label":"122(6)","item_code":"40-200-20","item_code_raw_ocr":"40-200-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"] Block Size: 50emx50cmx40cem each","unit":"","rates":{"zone_a":1443.74,"zone_b":1501.37,"zone_c":1339.47,"zone_d":1321.77},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["1,443.74","1,501.37","1,339.47","1,321.77"],"source_review_note":null,"search_text":"40-200-20 ] Block Size: 50emx50cmx40cem each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-200-25-P70-SL122(7)","serial_label":"122(7)","item_code":"40-200-25","item_code_raw_ocr":"40-200-25","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} Block Size: 45cmx45cemx45cem each","unit":"","rates":{"zone_a":1318.0,"zone_b":1370.61,"zone_c":1222.8,"zone_d":1206.64},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["1,318.00","1,370.61","1,222.80","1,206.64"],"source_review_note":null,"search_text":"40-200-25 } Block Size: 45cmx45cemx45cem each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-200-30-P70-SL122(8)","serial_label":"122(8)","item_code":"40-200-30","item_code_raw_ocr":"40-200-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45emx45emx30em each","unit":"","rates":{"zone_a":876.78,"zone_b":911.78,"zone_c":813.45,"zone_d":802.7},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["876.78","911.78","813.45","802.70"],"source_review_note":null,"search_text":"40-200-30 Block Size: 45emx45emx30em each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-200-35-P70-SL122(9)","serial_label":"122(9)","item_code":"40-200-35","item_code_raw_ocr":"40-200-35","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx40em","unit":"","rates":{"zone_a":924.39,"zone_b":961.29,"zone_c":857.62,"zone_d":846.29},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["924.39","961.29","857.62","846.29"],"source_review_note":null,"search_text":"40-200-35 Block Size: 40cmx40cmx40em Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-200-40-P70-SL122(10)","serial_label":"122(10)","item_code":"40-200-40","item_code_raw_ocr":"40-200-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx20cm","unit":"","rates":{"zone_a":461.67,"zone_b":480.1,"zone_c":428.33,"zone_d":422.67},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["461.67","480.10","428.33","422.67"],"source_review_note":null,"search_text":"40-200-40 Block Size: 40cmx40cmx20cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-200-45-P70-SL122(11)","serial_label":"122(11)","item_code":"40-200-45","item_code_raw_ocr":"40-200-45","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 35cmx3Scmx35em","unit":"","rates":{"zone_a":619.06,"zone_b":643.77,"zone_c":574.35,"zone_d":566.76},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["619.06","643.77","574.35","566.76"],"source_review_note":null,"search_text":"40-200-45 Block Size: 35cmx3Scmx35em Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-200-50-P70-SL122(12)","serial_label":"122(12)","item_code":"40-200-50","item_code_raw_ocr":"40-200-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30emx30cmx30cm","unit":"","rates":{"zone_a":389.87,"zone_b":405.43,"zone_c":361.71,"zone_d":356.93},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["389.87","405.43","361.71","356.93"],"source_review_note":null,"search_text":"40-200-50 Block Size: 30emx30cmx30cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-200-55-P70-SL122(13)","serial_label":"122(13)","item_code":"40-200-55","item_code_raw_ocr":"40-200-55","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30cmx30cmx15em 194.84 202.62 180.77 17838","unit":"","rates":{"zone_a":194.84,"zone_b":202.62,"zone_c":180.77,"zone_d":178.38},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["194.84","202.62","180.77","17838"],"source_review_note":null,"search_text":"40-200-55 Block Size: 30cmx30cmx15em 194.84 202.62 180.77 17838 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-200-60-P70-SL122(14)","serial_label":"122(14)","item_code":"40-200-60","item_code_raw_ocr":"40-200-60","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 25cmx25emx25cm","unit":"","rates":{"zone_a":225.49,"zone_b":234.49,"zone_c":209.2,"zone_d":206.43},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":70,"source_schedule_page":60,"raw_rate_tokens":["225.49","234.49","209.20","206.43"],"source_review_note":null,"search_text":"40-200-60 Block Size: 25cmx25emx25cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-200-65-P71-SL122(15)","serial_label":"122(15)","item_code":"40-200-65","item_code_raw_ocr":"40-200-65","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 20emx20cmx20em","unit":"","rates":{"zone_a":115.42,"zone_b":120.03,"zone_c":107.08,"zone_d":105.67},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["115.42","120.03","107.08","105.67"],"source_review_note":null,"search_text":"40-200-65 Block Size: 20emx20cmx20em Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-200-70-P71-SL122(16)","serial_label":"122(16)","item_code":"40-200-70","item_code_raw_ocr":"40-200-70","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45cmx45emx20cm","unit":"","rates":{"zone_a":584.52,"zone_b":607.85,"zone_c":542.3,"zone_d":535.14},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["584.52","607.85","542.30","535.14"],"source_review_note":null,"search_text":"40-200-70 Block Size: 45cmx45emx20cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-200-75-P71-SL122(17)","serial_label":"122(17)","item_code":"40-200-75","item_code_raw_ocr":"40-200-75","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx15em","unit":"","rates":{"zone_a":346.25,"zone_b":360.08,"zone_c":321.25,"zone_d":317.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["346.25","360.08","321.25","317.00"],"source_review_note":null,"search_text":"40-200-75 Block Size: 40cmx40cmx15em Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-200-80-P71-SL122(18)","serial_label":"122(18)","item_code":"40-200-80","item_code_raw_ocr":"40-200-80","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} Block Size: SO0cmx50cmx60cm each","unit":"","rates":{"zone_a":2173.29,"zone_b":2260.05,"zone_c":2016.33,"zone_d":1989.68},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["2,173.29","2,260.05","2,016.33","1,989.68"],"source_review_note":null,"search_text":"40-200-80 } Block Size: SO0cmx50cmx60cm each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-200-85-P71-SL122(19)","serial_label":"122(19)","item_code":"40-200-85","item_code_raw_ocr":"40-200-85","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50emx50cmx25cem","unit":"each","rates":{"zone_a":901.94,"zone_b":937.94,"zone_c":836.8,"zone_d":825.74},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["901.94","937.94","836.80","825.74"],"source_review_note":null,"search_text":"40-200-85 Block Size: 50emx50cmx25cem each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-200-90-P71-SL122(20)","serial_label":"122(20)","item_code":"40-200-90","item_code_raw_ocr":"40-200-90","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cemx50cemx20cm Manufacturing and supplying C.C. blocks in leanest mix. 1:2:4 with cement, sand (FM>=1.5) and Stone Chips (40mm down graded) to attain a 28 days cylinder strength of 15 N/mm? including grading, washing stone chips, mixing, laying in forms, consolidation,","unit":"each","rates":{"zone_a":721.87,"zone_b":750.69,"zone_c":669.73,"zone_d":660.88},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["721.87","750.69","669.73","660.88"],"source_review_note":null,"search_text":"40-200-90 Block Size: 50cemx50cemx20cm Manufacturing and supplying C.C. blocks in leanest mix. 1:2:4 with cement, sand (FM>=1.5) and Stone Chips (40mm down graded) to attain a 28 days cylinder strength of 15 N/mm? including grading, washing stone chips, mixing, laying in forms, consolidation, each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-00-P71-SL123","serial_label":"123","item_code":"40-210-00","item_code_raw_ocr":"40-210-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Curing for at least 21 days, each . . . . preparation of one layer of brick flat soling platform finishing with sand cement mortar, shuttering (steel shutter to be used) and stacking in measurable stacks, cost of all materials and charges, etc. complete as per _ technical specification, approved design and direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-210-00 Curing for at least 21 days, each . . . . preparation of one layer of brick flat soling platform finishing with sand cement mortar, shuttering (steel shutter to be used) and stacking in measurable stacks, cost of all materials and charges, etc. complete as per _ technical specification, approved design and direction of Engineer in charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-01-P71-SL123(1)","serial_label":"123(1)","item_code":"40-210-01","item_code_raw_ocr":"40-210-01","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 100cmx80cmx60cm.","unit":"","rates":{"zone_a":8044.51,"zone_b":8109.71,"zone_c":7684.34,"zone_d":7422.21},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["8,044.51","8,109.71","7,684.34","7,422.21"],"source_review_note":null,"search_text":"40-210-01 Block Size: 100cmx80cmx60cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-02-P71-SL123(2)","serial_label":"123(2)","item_code":"40-210-02","item_code_raw_ocr":"40-210-02","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 90cmx90cmx60cem. each","unit":"","rates":{"zone_a":8183.21,"zone_b":8249.54,"zone_c":7816.83,"zone_d":7550.18},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["8,183.21","8,249.54","7,816.83","7,550.18"],"source_review_note":null,"search_text":"40-210-02 Block Size: 90cmx90cmx60cem. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-03-P71-SL123(3)","serial_label":"123(3)","item_code":"40-210-03","item_code_raw_ocr":"40-210-03","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 75cemx75cmx75cem. each","unit":"","rates":{"zone_a":7083.97,"zone_b":7141.39,"zone_c":6766.81,"zone_d":6535.97},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["7,083.97","7,141.39","6,766.81","6,535.97"],"source_review_note":null,"search_text":"40-210-03 Block Size: 75cemx75cmx75cem. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-04-P71-SL123(4)","serial_label":"123(4)","item_code":"40-210-04","item_code_raw_ocr":"40-210-04","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 60cmx60cmx40cm. each","unit":"","rates":{"zone_a":2421.56,"zone_b":2441.19,"zone_c":2313.14,"zone_d":2234.24},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["2,421.56","2,441.19","2,313.14","2,234.24"],"source_review_note":null,"search_text":"40-210-04 Block Size: 60cmx60cmx40cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-05-P71-SL123(5)","serial_label":"123(5)","item_code":"40-210-05","item_code_raw_ocr":"40-210-05","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx30cm.","unit":"","rates":{"zone_a":1258.96,"zone_b":1269.16,"zone_c":1202.59,"zone_d":1161.57},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["1,258.96","1,269.16","1,202.59","1,161.57"],"source_review_note":null,"search_text":"40-210-05 Block Size: 50cmx50cmx30cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-06-P71-SL123(6)","serial_label":"123(6)","item_code":"40-210-06","item_code_raw_ocr":"40-210-06","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40emx40cmx30cm. 804.45 810.97 76843 742.22","unit":"","rates":{"zone_a":804.45,"zone_b":810.97,"zone_c":768.43,"zone_d":742.22},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["804.45","810.97","76843","742.22"],"source_review_note":null,"search_text":"40-210-06 Block Size: 40emx40cmx30cm. 804.45 810.97 76843 742.22 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-10-P71-SL123(7)","serial_label":"123(7)","item_code":"40-210-10","item_code_raw_ocr":"40-210-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 60cmx60cmx60cm. each","unit":"","rates":{"zone_a":3623.1,"zone_b":3652.47,"zone_c":3460.89,"zone_d":3342.83},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["3,623.10","3,652.47","3,460.89","3,342.83"],"source_review_note":null,"search_text":"40-210-10 Block Size: 60cmx60cmx60cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-15-P71-SL123(8)","serial_label":"123(8)","item_code":"40-210-15","item_code_raw_ocr":"40-210-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: S0cmxS0cmx50cm. each","unit":"","rates":{"zone_a":2100.12,"zone_b":2117.14,"zone_c":2006.09,"zone_d":1937.66},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["2,100.12","2,117.14","2,006.09","1,937.66"],"source_review_note":null,"search_text":"40-210-15 Block Size: S0cmxS0cmx50cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-20-P71-SL123(9)","serial_label":"123(9)","item_code":"40-210-20","item_code_raw_ocr":"40-210-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50emx50cmx40cm. each","unit":"","rates":{"zone_a":1677.12,"zone_b":1690.72,"zone_c":1602.04,"zone_d":1547.39},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["1,677.12","1,690.72","1,602.04","1,547.39"],"source_review_note":null,"search_text":"40-210-20 Block Size: 50emx50cmx40cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-25-P71-SL123(10)","serial_label":"123(10)","item_code":"40-210-25","item_code_raw_ocr":"40-210-25","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45cmx45cmx45cm.","unit":"","rates":{"zone_a":1531.05,"zone_b":1543.46,"zone_c":1462.5,"zone_d":1412.61},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["1,531.05","1,543.46","1,462.50","1,412.61"],"source_review_note":null,"search_text":"40-210-25 Block Size: 45cmx45cmx45cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-30-P71-SL123(11)","serial_label":"123(11)","item_code":"40-210-30","item_code_raw_ocr":"40-210-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45emx45emx300m.","unit":"","rates":{"zone_a":1018.51,"zone_b":1026.77,"zone_c":972.91,"zone_d":939.72},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["1,018.51","1,026.77","972.91","939.72"],"source_review_note":null,"search_text":"40-210-30 Block Size: 45emx45emx300m. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-35-P71-SL123(12)","serial_label":"123(12)","item_code":"40-210-35","item_code_raw_ocr":"40-210-35","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx40em.","unit":"","rates":{"zone_a":1073.81,"zone_b":1082.52,"zone_c":1025.74,"zone_d":990.75},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["1,073.81","1,082.52","1,025.74","990.75"],"source_review_note":null,"search_text":"40-210-35 Block Size: 40cmx40cmx40em. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-40-P71-SL123(13)","serial_label":"123(13)","item_code":"40-210-40","item_code_raw_ocr":"40-210-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx20cm.","unit":"each","rates":{"zone_a":536.3,"zone_b":540.65,"zone_c":512.29,"zone_d":494.81},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["536.30","540.65","512.29","494.81"],"source_review_note":null,"search_text":"40-210-40 Block Size: 40cmx40cmx20cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-45-P71-SL123(14)","serial_label":"123(14)","item_code":"40-210-45","item_code_raw_ocr":"40-210-45","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"] Block Size: 35emx35cmx35cm.","unit":"each","rates":{"zone_a":719.13,"zone_b":724.96,"zone_c":686.93,"zone_d":663.5},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["719.13","724.96","686.93","663.50"],"source_review_note":null,"search_text":"40-210-45 ] Block Size: 35emx35cmx35cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-50-P71-SL123(15)","serial_label":"123(15)","item_code":"40-210-50","item_code_raw_ocr":"40-210-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30cmx30cmx30em.","unit":"","rates":{"zone_a":452.89,"zone_b":456.56,"zone_c":432.61,"zone_d":417.85},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["452.89","456.56","432.61","417.85"],"source_review_note":null,"search_text":"40-210-50 Block Size: 30cmx30cmx30em. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-55-P71-SL123(16)","serial_label":"123(16)","item_code":"40-210-55","item_code_raw_ocr":"40-210-55","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30emx30cmx15cm.","unit":"each","rates":{"zone_a":226.34,"zone_b":228.17,"zone_c":216.2,"zone_d":208.83},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["226.34","228.17","216.20","208.83"],"source_review_note":null,"search_text":"40-210-55 Block Size: 30emx30cmx15cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-60-P71-SL123(17)","serial_label":"123(17)","item_code":"40-210-60","item_code_raw_ocr":"40-210-60","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 25cmx25cmx25cm.","unit":"each","rates":{"zone_a":261.93,"zone_b":264.06,"zone_c":250.21,"zone_d":241.67},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["261.93","264.06","250.21","241.67"],"source_review_note":null,"search_text":"40-210-60 Block Size: 25cmx25cmx25cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-65-P71-SL123(18)","serial_label":"123(18)","item_code":"40-210-65","item_code_raw_ocr":"40-210-65","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 20cmx20cmx20cm.","unit":"","rates":{"zone_a":134.08,"zone_b":135.16,"zone_c":128.07,"zone_d":123.7},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["134.08","135.16","128.07","123.70"],"source_review_note":null,"search_text":"40-210-65 Block Size: 20cmx20cmx20cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-70-P71-SL123(19)","serial_label":"123(19)","item_code":"40-210-70","item_code_raw_ocr":"40-210-70","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45cmx45cmx20cm.","unit":"","rates":{"zone_a":679.01,"zone_b":684.51,"zone_c":648.61,"zone_d":626.48},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["679.01","684.51","648.61","626.48"],"source_review_note":null,"search_text":"40-210-70 Block Size: 45cmx45cmx20cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-75-P71-SL123(20)","serial_label":"123(20)","item_code":"40-210-75","item_code_raw_ocr":"40-210-75","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx15cm.","unit":"each","rates":{"zone_a":402.23,"zone_b":405.49,"zone_c":384.22,"zone_d":371.11},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["402.23","405.49","384.22","371.11"],"source_review_note":null,"search_text":"40-210-75 Block Size: 40cmx40cmx15cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-80-P71-SL123(21)","serial_label":"123(21)","item_code":"40-210-80","item_code_raw_ocr":"40-210-80","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx60cm. each","unit":"","rates":{"zone_a":2524.61,"zone_b":2545.07,"zone_c":2411.58,"zone_d":2329.31},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["2,524.61","2,545.07","2,411.58","2,329.31"],"source_review_note":null,"search_text":"40-210-80 Block Size: 50cmx50cmx60cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-85-P71-SL123(22)","serial_label":"123(22)","item_code":"40-210-85","item_code_raw_ocr":"40-210-85","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx25cm. ;","unit":"each","rates":{"zone_a":1047.74,"zone_b":1056.23,"zone_c":1000.83,"zone_d":966.69},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["1,047.74","1,056.23","1,000.83","966.69"],"source_review_note":null,"search_text":"40-210-85 Block Size: 50cmx50cmx25cm. ; each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-210-90-P71-SL123(23)","serial_label":"123(23)","item_code":"40-210-90","item_code_raw_ocr":"40-210-90","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: SOcmx50cmx20cm. ~ @he @— '","unit":"each","rates":{"zone_a":838.56,"zone_b":845.36,"zone_c":801.02,"zone_d":773.69},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":71,"source_schedule_page":61,"raw_rate_tokens":["838.56","845.36","801.02","773.69"],"source_review_note":null,"search_text":"40-210-90 Block Size: SOcmx50cmx20cm. ~ @he @— ' each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-220-09-P72-SL124","serial_label":"124","item_code":"40-220-09","item_code_raw_ocr":"40-220-09","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Curing for at least 21 days, each . . preparation of one layer of brick flat soling platform finishing with sand cement mortar, shuttering (steel shutter to be used) and stacking in measurable stacks, cost of all materials and charges, etc. complete as per _ technical specification, approved design and direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":72,"source_schedule_page":62,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-220-09 Curing for at least 21 days, each . . preparation of one layer of brick flat soling platform finishing with sand cement mortar, shuttering (steel shutter to be used) and stacking in measurable stacks, cost of all materials and charges, etc. complete as per _ technical specification, approved design and direction of Engineer in charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-220-01-P72-SL124(1)","serial_label":"124(1)","item_code":"40-220-01","item_code_raw_ocr":"40-220-01","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} Block Size: 100cmx80cmx60cm. each","unit":"","rates":{"zone_a":7158.09,"zone_b":7425.9,"zone_c":6671.29,"zone_d":6586.44},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":72,"source_schedule_page":62,"raw_rate_tokens":["7,158.09","7,425.90","6,671.29","6,586.44"],"source_review_note":null,"search_text":"40-220-01 } Block Size: 100cmx80cmx60cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-220-02-P72-SL124(2)","serial_label":"124(2)","item_code":"40-220-02","item_code_raw_ocr":"40-220-02","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 90cmx90cmx60cm. each","unit":"","rates":{"zone_a":7281.5,"zone_b":7553.94,"zone_c":6786.31,"zone_d":6700.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":72,"source_schedule_page":62,"raw_rate_tokens":["7,281.50","7,553.94","6,786.31","6,700.00"],"source_review_note":null,"search_text":"40-220-02 Block Size: 90cmx90cmx60cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-220-03-P72-SL124(3)","serial_label":"124(3)","item_code":"40-220-03","item_code_raw_ocr":"40-220-03","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 75emx7Semx7Scm.","unit":"","rates":{"zone_a":6303.39,"zone_b":6539.23,"zone_c":5874.71,"zone_d":5800.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":72,"source_schedule_page":62,"raw_rate_tokens":["6,303.39","6,539.23","5,874.71","5,800.00"],"source_review_note":null,"search_text":"40-220-03 Block Size: 75emx7Semx7Scm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-220-05-P72-SL124(5)","serial_label":"124(5)","item_code":"40-220-05","item_code_raw_ocr":"40-220-05","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: SOcmx50cmx30cm. each","unit":"","rates":{"zone_a":1120.23,"zone_b":1162.14,"zone_c":1044.05,"zone_d":1030.77},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":72,"source_schedule_page":62,"raw_rate_tokens":["1,120.23","1,162.14","1,044.05","1,030.77"],"source_review_note":null,"search_text":"40-220-05 Block Size: SOcmx50cmx30cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-220-06-P72-SL124(6)","serial_label":"124(6)","item_code":"40-220-06","item_code_raw_ocr":"40-220-06","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx30cm.","unit":"each","rates":{"zone_a":715.81,"zone_b":742.59,"zone_c":667.13,"zone_d":658.64},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":72,"source_schedule_page":62,"raw_rate_tokens":["715.81","742.59","667.13","658.64"],"source_review_note":null,"search_text":"40-220-06 Block Size: 40cmx40cmx30cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-220-10-P72-SL124(7)","serial_label":"124(7)","item_code":"40-220-10","item_code_raw_ocr":"40-220-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 60cmx60cmx60cm. each","unit":"","rates":{"zone_a":3223.87,"zone_b":3344.49,"zone_c":3004.63,"zone_d":2966.41},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":72,"source_schedule_page":62,"raw_rate_tokens":["3,223.87","3,344.49","3,004.63","2,966.41"],"source_review_note":null,"search_text":"40-220-10 Block Size: 60cmx60cmx60cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-220-15-P72-SL124(8)","serial_label":"124(8)","item_code":"40-220-15","item_code_raw_ocr":"40-220-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx50cm.","unit":"each","rates":{"zone_a":1868.7,"zone_b":1938.62,"zone_c":1741.62,"zone_d":1719.47},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":72,"source_schedule_page":62,"raw_rate_tokens":["1,868.70","1,938.62","1,741.62","1,719.47"],"source_review_note":null,"search_text":"40-220-15 Block Size: 50cmx50cmx50cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-220-20-P72-SL124(9)","serial_label":"124(9)","item_code":"40-220-20","item_code_raw_ocr":"40-220-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmxS0cmx40cm. each","unit":"","rates":{"zone_a":1492.32,"zone_b":1548.16,"zone_c":1390.83,"zone_d":1373.14},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":72,"source_schedule_page":62,"raw_rate_tokens":["1,492.32","1,548.16","1,390.83","1,373.14"],"source_review_note":null,"search_text":"40-220-20 Block Size: 50cmxS0cmx40cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-220-25-P72-SL124(10)","serial_label":"124(10)","item_code":"40-220-25","item_code_raw_ocr":"40-220-25","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45cmx45cemx45cm. each","unit":"","rates":{"zone_a":1362.35,"zone_b":1413.32,"zone_c":1269.7,"zone_d":1253.55},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":72,"source_schedule_page":62,"raw_rate_tokens":["1,362.35","1,413.32","1,269.70","1,253.55"],"source_review_note":null,"search_text":"40-220-25 Block Size: 45cmx45cemx45cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-220-30-P72-SL124(11)","serial_label":"124(11)","item_code":"40-220-30","item_code_raw_ocr":"40-220-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45cmx45cemx30em.","unit":"each","rates":{"zone_a":906.28,"zone_b":940.19,"zone_c":844.65,"zone_d":833.91},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":72,"source_schedule_page":62,"raw_rate_tokens":["906.28","940.19","844.65","833.91"],"source_review_note":null,"search_text":"40-220-30 Block Size: 45cmx45cemx30em. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-220-35-P72-SL124(12)","serial_label":"124(12)","item_code":"40-220-35","item_code_raw_ocr":"40-220-35","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx40cm.","unit":"each","rates":{"zone_a":955.49,"zone_b":991.24,"zone_c":890.51,"zone_d":879.19},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":72,"source_schedule_page":62,"raw_rate_tokens":["955.49","991.24","890.51","879.19"],"source_review_note":null,"search_text":"40-220-35 Block Size: 40cmx40cmx40cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-220-45-P72-SL124(14)","serial_label":"124(14)","item_code":"40-220-45","item_code_raw_ocr":"40-220-45","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 35cmx3Scmx3Scm.","unit":"","rates":{"zone_a":639.89,"zone_b":663.83,"zone_c":596.37,"zone_d":588.79},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":72,"source_schedule_page":62,"raw_rate_tokens":["639.89","663.83","596.37","588.79"],"source_review_note":null,"search_text":"40-220-45 Block Size: 35cmx3Scmx3Scm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-220-50-P72-SL124(15)","serial_label":"124(15)","item_code":"40-220-50","item_code_raw_ocr":"40-220-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30cmx30cmx30cm,","unit":"","rates":{"zone_a":402.98,"zone_b":418.06,"zone_c":375.58,"zone_d":370.8},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":72,"source_schedule_page":62,"raw_rate_tokens":["402.98","418.06","375.58","370.80"],"source_review_note":null,"search_text":"40-220-50 Block Size: 30cmx30cmx30cm, Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-220-55-P72-SL124(16)","serial_label":"124(16)","item_code":"40-220-55","item_code_raw_ocr":"40-220-55","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30cmx30cmx15em. 201.40 20893 187.70 185.31","unit":"","rates":{"zone_a":201.4,"zone_b":208.93,"zone_c":187.7,"zone_d":185.31},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":72,"source_schedule_page":62,"raw_rate_tokens":["201.40","20893","187.70","185.31"],"source_review_note":null,"search_text":"40-220-55 Block Size: 30cmx30cmx15em. 201.40 20893 187.70 185.31 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-220-60-P72-SL124(17)","serial_label":"124(17)","item_code":"40-220-60","item_code_raw_ocr":"40-220-60","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 25emx2Semx2S5em. 233.07 241.79 21722 214.46","unit":"","rates":{"zone_a":233.07,"zone_b":241.79,"zone_c":217.22,"zone_d":214.46},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":72,"source_schedule_page":62,"raw_rate_tokens":["233.07","241.79","21722","214.46"],"source_review_note":null,"search_text":"40-220-60 Block Size: 25emx2Semx2S5em. 233.07 241.79 21722 214.46 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-220-65-P72-SL124(18)","serial_label":"124(18)","item_code":"40-220-65","item_code_raw_ocr":"40-220-65","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 20cmx20cmx20cm.","unit":"","rates":{"zone_a":119.3,"zone_b":123.77,"zone_c":111.19,"zone_d":109.77},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":72,"source_schedule_page":62,"raw_rate_tokens":["119.30","123.77","111.19","109.77"],"source_review_note":null,"search_text":"40-220-65 Block Size: 20cmx20cmx20cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-220-70-P72-SL124(19)","serial_label":"124(19)","item_code":"40-220-70","item_code_raw_ocr":"40-220-70","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45cmx45cmx20cem.","unit":"","rates":{"zone_a":604.19,"zone_b":626.79,"zone_c":563.1,"zone_d":555.94},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":72,"source_schedule_page":62,"raw_rate_tokens":["604.19","626.79","563.10","555.94"],"source_review_note":null,"search_text":"40-220-70 Block Size: 45cmx45cmx20cem. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-220-80-P72-SL124(21)","serial_label":"124(21)","item_code":"40-220-80","item_code_raw_ocr":"40-220-80","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx60cm.","unit":"","rates":{"zone_a":2246.42,"zone_b":2330.47,"zone_c":2093.65,"zone_d":2067.02},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":72,"source_schedule_page":62,"raw_rate_tokens":["2,246.42","2,330.47","2,093.65","2,067.02"],"source_review_note":null,"search_text":"40-220-80 Block Size: 50cmx50cmx60cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-220-85-P72-SL124(22)","serial_label":"124(22)","item_code":"40-220-85","item_code_raw_ocr":"40-220-85","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx25em,","unit":"","rates":{"zone_a":932.29,"zone_b":967.17,"zone_c":868.89,"zone_d":857.84},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":72,"source_schedule_page":62,"raw_rate_tokens":["932.29","967.17","868.89","857.84"],"source_review_note":null,"search_text":"40-220-85 Block Size: 50cmx50cmx25em, Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-220-90-P72-SL124(23)","serial_label":"124(23)","item_code":"40-220-90","item_code_raw_ocr":"40-220-90","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmxS50cmx20cem. _ each Manufacturing and supplying C.C. blocks in leanest mix. 1:2:4 with cement, sand (FM>=2.0) and Stone","unit":"","rates":{"zone_a":746.16,"zone_b":774.08,"zone_c":695.42,"zone_d":686.57},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":72,"source_schedule_page":62,"raw_rate_tokens":["746.16","774.08","695.42","686.57"],"source_review_note":null,"search_text":"40-220-90 Block Size: 50cmxS50cmx20cem. _ each Manufacturing and supplying C.C. blocks in leanest mix. 1:2:4 with cement, sand (FM>=2.0) and Stone Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-00-P72-SL125","serial_label":"125","item_code":"40-230-00","item_code_raw_ocr":"40-230-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Chips (40mm down graded) to) coon . attain a 28 days cylinder strength of 18 N/mm? including — grading, washing stone chips, mixing, laying in forms, consolidation k @_ we ®","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":72,"source_schedule_page":62,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-230-00 Chips (40mm down graded) to) coon . attain a 28 days cylinder strength of 18 N/mm? including — grading, washing stone chips, mixing, laying in forms, consolidation k @_ we ® Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-01-P73-SL125(1)","serial_label":"125(1)","item_code":"40-230-01","item_code_raw_ocr":"40-230-01","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 100cmx80cmx60cm. each","unit":"","rates":{"zone_a":8223.86,"zone_b":8285.47,"zone_c":7860.1,"zone_d":7596.43},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["8,223.86","8,285.47","7,860.10","7,596.43"],"source_review_note":null,"search_text":"40-230-01 Block Size: 100cmx80cmx60cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-02-P73-SL125(2)","serial_label":"125(2)","item_code":"40-230-02","item_code_raw_ocr":"40-230-02","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") Block Size: 90cmx90cmx60cm. each","unit":"","rates":{"zone_a":8365.65,"zone_b":8428.33,"zone_c":7995.62,"zone_d":7727.4},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["8,365.65","8,428.33","7,995.62","7,727.40"],"source_review_note":null,"search_text":"40-230-02 ) Block Size: 90cmx90cmx60cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-03-P73-SL125(3)","serial_label":"125(3)","item_code":"40-230-03","item_code_raw_ocr":"40-230-03","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 75emx75cmx75cm. each","unit":"","rates":{"zone_a":7241.9,"zone_b":7296.16,"zone_c":6921.58,"zone_d":6689.39},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["7,241.90","7,296.16","6,921.58","6,689.39"],"source_review_note":null,"search_text":"40-230-03 Block Size: 75emx75cmx75cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-04-P73-SL125(4)","serial_label":"125(4)","item_code":"40-230-04","item_code_raw_ocr":"40-230-04","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 60cmx60cmx40em. each","unit":"","rates":{"zone_a":2475.55,"zone_b":2494.1,"zone_c":2366.05,"zone_d":2286.68},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["2,475.55","2,494.10","2,366.05","2,286.68"],"source_review_note":null,"search_text":"40-230-04 Block Size: 60cmx60cmx40em. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-05-P73-SL125(5)","serial_label":"125(5)","item_code":"40-230-05","item_code_raw_ocr":"40-230-05","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx30em.","unit":"","rates":{"zone_a":1287.02,"zone_b":1296.67,"zone_c":1230.1,"zone_d":1188.83},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["1,287.02","1,296.67","1,230.10","1,188.83"],"source_review_note":null,"search_text":"40-230-05 Block Size: 50cmx50cmx30em. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-06-P73-SL125(6)","serial_label":"125(6)","item_code":"40-230-06","item_code_raw_ocr":"40-230-06","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx30em,","unit":"","rates":{"zone_a":822.39,"zone_b":828.55,"zone_c":786.01,"zone_d":759.64},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["822.39","828.55","786.01","759.64"],"source_review_note":null,"search_text":"40-230-06 Block Size: 40cmx40cmx30em, Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-10-P73-SL125(7)","serial_label":"125(7)","item_code":"40-230-10","item_code_raw_ocr":"40-230-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 60cmx60cmx60em. each","unit":"","rates":{"zone_a":3703.87,"zone_b":3731.63,"zone_c":3540.04,"zone_d":3421.29},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["3,703.87","3,731.63","3,540.04","3,421.29"],"source_review_note":null,"search_text":"40-230-10 Block Size: 60cmx60cmx60em. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-15-P73-SL125(8)","serial_label":"125(8)","item_code":"40-230-15","item_code_raw_ocr":"40-230-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx50cm. each","unit":"","rates":{"zone_a":2146.94,"zone_b":2163.02,"zone_c":2051.97,"zone_d":1983.14},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["2,146.94","2,163.02","2,051.97","1,983.14"],"source_review_note":null,"search_text":"40-230-15 Block Size: 50cmx50cmx50cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-20-P73-SL125(9)","serial_label":"125(9)","item_code":"40-230-20","item_code_raw_ocr":"40-230-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: $0cmx50cmx40cm.","unit":"","rates":{"zone_a":1714.51,"zone_b":1727.36,"zone_c":1638.68,"zone_d":1583.71},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["1,714.51","1,727.36","1,638.68","1,583.71"],"source_review_note":null,"search_text":"40-230-20 Block Size: $0cmx50cmx40cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-25-P73-SL125(10)","serial_label":"125(10)","item_code":"40-230-25","item_code_raw_ocr":"40-230-25","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45cemx4Scmx45em.","unit":"","rates":{"zone_a":1565.19,"zone_b":1576.91,"zone_c":1495.95,"zone_d":1445.77},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["1,565.19","1,576.91","1,495.95","1,445.77"],"source_review_note":null,"search_text":"40-230-25 Block Size: 45cemx4Scmx45em. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-30-P73-SL125(11)","serial_label":"125(11)","item_code":"40-230-30","item_code_raw_ocr":"40-230-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45cmx45cmx30em.","unit":"","rates":{"zone_a":1041.22,"zone_b":1049.02,"zone_c":995.16,"zone_d":961.78},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["1,041.22","1,049.02","995.16","961.78"],"source_review_note":null,"search_text":"40-230-30 Block Size: 45cmx45cmx30em. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-35-P73-SL125(12)","serial_label":"125(12)","item_code":"40-230-35","item_code_raw_ocr":"40-230-35","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx40cm.","unit":"","rates":{"zone_a":1097.75,"zone_b":1105.98,"zone_c":1049.2,"zone_d":1014.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["1,097.75","1,105.98","1,049.20","1,014.00"],"source_review_note":null,"search_text":"40-230-35 Block Size: 40cmx40cmx40cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-40-P73-SL125(13)","serial_label":"125(13)","item_code":"40-230-40","item_code_raw_ocr":"40-230-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx20em. 548.26 552.36 $24.01 50643","unit":"","rates":{"zone_a":548.26,"zone_b":552.36,"zone_c":524.01,"zone_d":506.43},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["548.26","552.36","$24.01","50643"],"source_review_note":null,"search_text":"40-230-40 Block Size: 40cmx40cmx20em. 548.26 552.36 $24.01 50643 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-45-P73-SL125(14)","serial_label":"125(14)","item_code":"40-230-45","item_code_raw_ocr":"40-230-45","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 35emx3Scmx35em.","unit":"","rates":{"zone_a":735.16,"zone_b":740.67,"zone_c":702.65,"zone_d":679.07},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["735.16","740.67","702.65","679.07"],"source_review_note":null,"search_text":"40-230-45 Block Size: 35emx3Scmx35em. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-50-P73-SL125(15)","serial_label":"125(15)","item_code":"40-230-50","item_code_raw_ocr":"40-230-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30cmx30cmx30cm. each","unit":"","rates":{"zone_a":462.98,"zone_b":466.45,"zone_c":442.51,"zone_d":427.66},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["462.98","466.45","442.51","427.66"],"source_review_note":null,"search_text":"40-230-50 Block Size: 30cmx30cmx30cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-55-P73-SL125(16)","serial_label":"125(16)","item_code":"40-230-55","item_code_raw_ocr":"40-230-55","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30cmx30cmx15cm.","unit":"each","rates":{"zone_a":231.38,"zone_b":233.12,"zone_c":221.15,"zone_d":213.73},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["231.38","233.12","221.15","213.73"],"source_review_note":null,"search_text":"40-230-55 Block Size: 30cmx30cmx15cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-60-P73-SL125(17)","serial_label":"125(17)","item_code":"40-230-60","item_code_raw_ocr":"40-230-60","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 25emx25emx25cm.","unit":"","rates":{"zone_a":267.77,"zone_b":269.78,"zone_c":255.93,"zone_d":247.35},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["267.77","269.78","255.93","247.35"],"source_review_note":null,"search_text":"40-230-60 Block Size: 25emx25emx25cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-65-P73-SL125(18)","serial_label":"125(18)","item_code":"40-230-65","item_code_raw_ocr":"40-230-65","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 20cmx20cmx20em. 137.06 138.09 131.00 12661","unit":"","rates":{"zone_a":137.06,"zone_b":138.09,"zone_c":131.0,"zone_d":126.61},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["137.06","138.09","131.00","12661"],"source_review_note":null,"search_text":"40-230-65 Block Size: 20cmx20cmx20em. 137.06 138.09 131.00 12661 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-70-P73-SL125(19)","serial_label":"125(19)","item_code":"40-230-70","item_code_raw_ocr":"40-230-70","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45emx45cmx20cm,","unit":"","rates":{"zone_a":694.15,"zone_b":699.35,"zone_c":663.44,"zone_d":641.19},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["694.15","699.35","663.44","641.19"],"source_review_note":null,"search_text":"40-230-70 Block Size: 45emx45cmx20cm, Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-75-P73-SL125(20)","serial_label":"125(20)","item_code":"40-230-75","item_code_raw_ocr":"40-230-75","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx15cm.","unit":"","rates":{"zone_a":411.19,"zone_b":414.27,"zone_c":393.0,"zone_d":379.82},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["411.19","414.27","393.00","379.82"],"source_review_note":null,"search_text":"40-230-75 Block Size: 40cmx40cmx15cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-80-P73-SL125(21)","serial_label":"125(21)","item_code":"40-230-80","item_code_raw_ocr":"40-230-80","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx60cem.","unit":"","rates":{"zone_a":2580.89,"zone_b":2600.23,"zone_c":2466.73,"zone_d":2383.99},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["2,580.89","2,600.23","2,466.73","2,383.99"],"source_review_note":null,"search_text":"40-230-80 Block Size: 50cmx50cmx60cem. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-85-P73-SL125(22)","serial_label":"125(22)","item_code":"40-230-85","item_code_raw_ocr":"40-230-85","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmxS0cmx25em.","unit":"","rates":{"zone_a":1071.1,"zone_b":1079.12,"zone_c":1023.72,"zone_d":989.38},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["1,071.10","1,079.12","1,023.72","989.38"],"source_review_note":null,"search_text":"40-230-85 Block Size: 50cmxS0cmx25em. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-230-90-P73-SL125(23)","serial_label":"125(23)","item_code":"40-230-90","item_code_raw_ocr":"40-230-90","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx20em. Manufacturing and supplying C.C. blocks in leanest mix. 1:2:4 with cement, sand (FM>=2.0) and Shingles (40mm down graded) to attain a 28 days cylinder strength of 18 N/mm? including grading, washing stone shingles, mixing,","unit":"","rates":{"zone_a":857.26,"zone_b":863.68,"zone_c":819.34,"zone_d":791.85},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":["857.26","863.68","819.34","791.85"],"source_review_note":null,"search_text":"40-230-90 Block Size: 50cmx50cmx20em. Manufacturing and supplying C.C. blocks in leanest mix. 1:2:4 with cement, sand (FM>=2.0) and Shingles (40mm down graded) to attain a 28 days cylinder strength of 18 N/mm? including grading, washing stone shingles, mixing, Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-00-P73-SL126","serial_label":"126","item_code":"40-240-00","item_code_raw_ocr":"40-240-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"laying in forms, consolidation, each curing for at least 21 days, preparation of one layer of brick flat soling platform finishing with sand cement mortar, shuttering (steel shutter to be used) and stacking in measurable stacks, cost of all materials and charges, etc. complete as per _ technical k aL a te ~ r","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":73,"source_schedule_page":63,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-240-00 laying in forms, consolidation, each curing for at least 21 days, preparation of one layer of brick flat soling platform finishing with sand cement mortar, shuttering (steel shutter to be used) and stacking in measurable stacks, cost of all materials and charges, etc. complete as per _ technical k aL a te ~ r Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-01-P74-SL126(1)","serial_label":"126(1)","item_code":"40-240-01","item_code_raw_ocr":"40-240-01","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") Block Size: 100cmx80cmx60cm.","unit":"","rates":{"zone_a":7337.44,"zone_b":7601.66,"zone_c":6847.05,"zone_d":6760.66},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["7,337.44","7,601.66","6,847.05","6,760.66"],"source_review_note":null,"search_text":"40-240-01 ) Block Size: 100cmx80cmx60cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-02-P74-SL126(2)","serial_label":"126(2)","item_code":"40-240-02","item_code_raw_ocr":"40-240-02","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 90cmx90cmx60cm.","unit":"","rates":{"zone_a":7463.94,"zone_b":7732.72,"zone_c":6965.1,"zone_d":6877.22},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["7,463.94","7,732.72","6,965.10","6,877.22"],"source_review_note":null,"search_text":"40-240-02 Block Size: 90cmx90cmx60cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-03-P74-SL126(3)","serial_label":"126(3)","item_code":"40-240-03","item_code_raw_ocr":"40-240-03","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 75emx7Scmx75em.","unit":"","rates":{"zone_a":6461.32,"zone_b":6694.0,"zone_c":6029.49,"zone_d":5953.42},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["6,461.32","6,694.00","6,029.49","5,953.42"],"source_review_note":null,"search_text":"40-240-03 Block Size: 75emx7Scmx75em. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-04-P74-SL126(4)","serial_label":"126(4)","item_code":"40-240-04","item_code_raw_ocr":"40-240-04","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 60cmx60cmx40cm.","unit":"","rates":{"zone_a":2208.72,"zone_b":2288.26,"zone_c":2061.1,"zone_d":2035.1},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["2,208.72","2,288.26","2,061.10","2,035.10"],"source_review_note":null,"search_text":"40-240-04 Block Size: 60cmx60cmx40cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-05-P74-SL126(5)","serial_label":"126(5)","item_code":"40-240-05","item_code_raw_ocr":"40-240-05","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx30cm.","unit":"","rates":{"zone_a":1148.3,"zone_b":1189.65,"zone_c":1071.55,"zone_d":1058.03},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["1,148.30","1,189.65","1,071.55","1,058.03"],"source_review_note":null,"search_text":"40-240-05 Block Size: 50cmx50cmx30cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-06-P74-SL126(6)","serial_label":"126(6)","item_code":"40-240-06","item_code_raw_ocr":"40-240-06","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx30cm.","unit":"each","rates":{"zone_a":733.74,"zone_b":760.17,"zone_c":684.7,"zone_d":676.07},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["733.74","760.17","684.70","676.07"],"source_review_note":null,"search_text":"40-240-06 Block Size: 40cmx40cmx30cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-10-P74-SL126(7)","serial_label":"126(7)","item_code":"40-240-10","item_code_raw_ocr":"40-240-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} Block Size: 60cmx60cmx60cm. each","unit":"","rates":{"zone_a":3304.65,"zone_b":3423.65,"zone_c":3083.78,"zone_d":3044.88},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["3,304.65","3,423.65","3,083.78","3,044.88"],"source_review_note":null,"search_text":"40-240-10 } Block Size: 60cmx60cmx60cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-15-P74-SL126(8)","serial_label":"126(8)","item_code":"40-240-15","item_code_raw_ocr":"40-240-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"] Block Size: 50cmx50cmx50cm. each","unit":"","rates":{"zone_a":1915.53,"zone_b":1984.5,"zone_c":1787.5,"zone_d":1764.95},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["1,915.53","1,984.50","1,787.50","1,764.95"],"source_review_note":null,"search_text":"40-240-15 ] Block Size: 50cmx50cmx50cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-20-P74-SL126(9)","serial_label":"126(9)","item_code":"40-240-20","item_code_raw_ocr":"40-240-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx40cm. each","unit":"","rates":{"zone_a":1529.71,"zone_b":1584.8,"zone_c":1427.48,"zone_d":1409.47},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["1,529.71","1,584.80","1,427.48","1,409.47"],"source_review_note":null,"search_text":"40-240-20 Block Size: 50cmx50cmx40cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-25-P74-SL126(10)","serial_label":"126(10)","item_code":"40-240-25","item_code_raw_ocr":"40-240-25","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45cmx45cmx45cm. each","unit":"","rates":{"zone_a":1396.48,"zone_b":1446.77,"zone_c":1303.15,"zone_d":1286.71},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["1,396.48","1,446.77","1,303.15","1,286.71"],"source_review_note":null,"search_text":"40-240-25 Block Size: 45cmx45cmx45cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-30-P74-SL126(11)","serial_label":"126(11)","item_code":"40-240-30","item_code_raw_ocr":"40-240-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45cmx45cmx30cm.","unit":"","rates":{"zone_a":928.99,"zone_b":962.44,"zone_c":866.9,"zone_d":855.96},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["928.99","962.44","866.90","855.96"],"source_review_note":null,"search_text":"40-240-30 Block Size: 45cmx45cmx30cm. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-35-P74-SL126(12)","serial_label":"126(12)","item_code":"40-240-35","item_code_raw_ocr":"40-240-35","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx40em.","unit":"","rates":{"zone_a":979.43,"zone_b":1014.7,"zone_c":913.97,"zone_d":902.44},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["979.43","1,014.70","913.97","902.44"],"source_review_note":null,"search_text":"40-240-35 Block Size: 40cmx40cmx40em. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-40-P74-SL126(13)","serial_label":"126(13)","item_code":"40-240-40","item_code_raw_ocr":"40-240-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40cmx20cem. 489.16 506.78 45647 450.71","unit":"","rates":{"zone_a":489.16,"zone_b":506.78,"zone_c":456.47,"zone_d":450.71},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["489.16","506.78","45647","450.71"],"source_review_note":null,"search_text":"40-240-40 Block Size: 40cmx40cmx20cem. 489.16 506.78 45647 450.71 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-45-P74-SL126(14)","serial_label":"126(14)","item_code":"40-240-45","item_code_raw_ocr":"40-240-45","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 35emx35emx35cm.","unit":"each","rates":{"zone_a":655.92,"zone_b":679.54,"zone_c":612.08,"zone_d":604.36},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["655.92","679.54","612.08","604.36"],"source_review_note":null,"search_text":"40-240-45 Block Size: 35emx35emx35cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-50-P74-SL126(15)","serial_label":"126(15)","item_code":"40-240-50","item_code_raw_ocr":"40-240-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30cmx30cmx30cm.","unit":"each","rates":{"zone_a":413.08,"zone_b":427.96,"zone_c":385.47,"zone_d":380.61},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["413.08","427.96","385.47","380.61"],"source_review_note":null,"search_text":"40-240-50 Block Size: 30cmx30cmx30cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-55-P74-SL126(16)","serial_label":"126(16)","item_code":"40-240-55","item_code_raw_ocr":"40-240-55","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 30cmx30cmx15cm. cach","unit":"","rates":{"zone_a":206.44,"zone_b":213.88,"zone_c":192.64,"zone_d":190.21},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["206.44","213.88","192.64","190.21"],"source_review_note":null,"search_text":"40-240-55 Block Size: 30cmx30cmx15cm. cach Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-60-P74-SL126(17)","serial_label":"126(17)","item_code":"40-240-60","item_code_raw_ocr":"40-240-60","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 25cemx25emx25em.","unit":"each","rates":{"zone_a":238.91,"zone_b":247.52,"zone_c":222.94,"zone_d":220.13},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["238.91","247.52","222.94","220.13"],"source_review_note":null,"search_text":"40-240-60 Block Size: 25cemx25emx25em. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-65-P74-SL126(18)","serial_label":"126(18)","item_code":"40-240-65","item_code_raw_ocr":"40-240-65","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 20cmx20cmx20cm.","unit":"each","rates":{"zone_a":122.29,"zone_b":126.69,"zone_c":114.12,"zone_d":112.68},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["122.29","126.69","114.12","112.68"],"source_review_note":null,"search_text":"40-240-65 Block Size: 20cmx20cmx20cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-70-P74-SL126(19)","serial_label":"126(19)","item_code":"40-240-70","item_code_raw_ocr":"40-240-70","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 45emx45cmx20cm.","unit":"each","rates":{"zone_a":700.0,"zone_b":641.63,"zone_c":577.93,"zone_d":570.64},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["7","641.63","577.93","570.64"],"source_review_note":null,"search_text":"40-240-70 Block Size: 45emx45cmx20cm. each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-75-P74-SL126(20)","serial_label":"126(20)","item_code":"40-240-75","item_code_raw_ocr":"40-240-75","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 40cmx40emx15em.","unit":"","rates":{"zone_a":366.87,"zone_b":380.08,"zone_c":342.35,"zone_d":338.03},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["366.87","380.08","342.35","338.03"],"source_review_note":null,"search_text":"40-240-75 Block Size: 40cmx40emx15em. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-80-P74-SL126(21)","serial_label":"126(21)","item_code":"40-240-80","item_code_raw_ocr":"40-240-80","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50emx50cmx60cem.","unit":"","rates":{"zone_a":2302.71,"zone_b":2385.63,"zone_c":2148.81,"zone_d":2121.7},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["2,302.71","2,385.63","2,148.81","2,121.70"],"source_review_note":null,"search_text":"40-240-80 Block Size: 50emx50cmx60cem. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-85-P74-SL126(22)","serial_label":"126(22)","item_code":"40-240-85","item_code_raw_ocr":"40-240-85","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx25em,","unit":"","rates":{"zone_a":955.65,"zone_b":990.06,"zone_c":891.78,"zone_d":880.53},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["955.65","990.06","891.78","880.53"],"source_review_note":null,"search_text":"40-240-85 Block Size: 50cmx50cmx25em, Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-240-90-P74-SL126(23)","serial_label":"126(23)","item_code":"40-240-90","item_code_raw_ocr":"40-240-90","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Block Size: 50cmx50cmx20cm. each Manufacturing and supplying C.C. blocks of diffrent sizes and shapes in leanest mix. 1:2:4 with cement, sand (FM>=2.0) and Stone Chips (40mm down graded) to attain a 28 days cylinder strength of 18 N/mm? including grading, washing stone","unit":"","rates":{"zone_a":764.86,"zone_b":792.4,"zone_c":713.74,"zone_d":704.73},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["764.86","792.40","713.74","704.73"],"source_review_note":null,"search_text":"40-240-90 Block Size: 50cmx50cmx20cm. each Manufacturing and supplying C.C. blocks of diffrent sizes and shapes in leanest mix. 1:2:4 with cement, sand (FM>=2.0) and Stone Chips (40mm down graded) to attain a 28 days cylinder strength of 18 N/mm? including grading, washing stone Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-246-00-P74-SL127","serial_label":"127","item_code":"40-246-00","item_code_raw_ocr":"40-246-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"consolidation, curing for at least 21 days, including preparation of platform, shuttering and stacking in measurable stacks etc. complete including supply of all materials (steel shutter to be used) as per direction of Engineer in charge. L_ shape block: Size (50-","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-246-00 consolidation, curing for at least 21 days, including preparation of platform, shuttering and stacking in measurable stacks etc. complete including supply of all materials (steel shutter to be used) as per direction of Engineer in charge. L_ shape block: Size (50- Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-246-10-P74-SL127(1)","serial_label":"127(1)","item_code":"40-246-10","item_code_raw_ocr":"40-246-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"] 100)cmx(50-100)cmx150cm, Vol: each 1.125 cum Supplying local hard rock (Maddhapara, mini. unit weight of","unit":"","rates":{"zone_a":18464.63,"zone_b":18619.52,"zone_c":17584.09,"zone_d":16966.39},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":["18,464.63","18,619.52","17,584.09","16,966.39"],"source_review_note":null,"search_text":"40-246-10 ] 100)cmx(50-100)cmx150cm, Vol: each 1.125 cum Supplying local hard rock (Maddhapara, mini. unit weight of Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-250-00-P74-SL128","serial_label":"128","item_code":"40-250-00","item_code_raw_ocr":"40-250-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"2700 _ kg/cum) at work site cum including all modes of carriages, handling, loading, unloading and _ stacking in measurable stacks as y @ or :","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":74,"source_schedule_page":64,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-250-00 2700 _ kg/cum) at work site cum including all modes of carriages, handling, loading, unloading and _ stacking in measurable stacks as y @ or : Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-250-10-P75-SL128(1)","serial_label":"128(1)","item_code":"40-250-10","item_code_raw_ocr":"40-250-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"10cm to 15em size; void 10 %","unit":"","rates":{"zone_a":8834.59,"zone_b":10184.32,"zone_c":10184.32,"zone_d":7730.27},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":75,"source_schedule_page":65,"raw_rate_tokens":["8,834.59","10,184.32","10,184.32","7,730.27"],"source_review_note":null,"search_text":"40-250-10 10cm to 15em size; void 10 % Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-250-20-P75-SL128(2)","serial_label":"128(2)","item_code":"40-250-20","item_code_raw_ocr":"40-250-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"15cm to 22cm size; void 12 %","unit":"","rates":{"zone_a":8834.59,"zone_b":10184.32,"zone_c":10184.32,"zone_d":7730.27},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":75,"source_schedule_page":65,"raw_rate_tokens":["8,834.59","10,184.32","10,184.32","7,730.27"],"source_review_note":null,"search_text":"40-250-20 15cm to 22cm size; void 12 % Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-250-30-P75-SL128(3)","serial_label":"128(3)","item_code":"40-250-30","item_code_raw_ocr":"40-250-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"22cm to 30cm size; void 15 % cum","unit":"","rates":{"zone_a":8834.59,"zone_b":10184.32,"zone_c":10184.32,"zone_d":7730.27},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":75,"source_schedule_page":65,"raw_rate_tokens":["8,834.59","10,184.32","10,184.32","7,730.27"],"source_review_note":null,"search_text":"40-250-30 22cm to 30cm size; void 15 % cum Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-250-40-P75-SL128(4)","serial_label":"128(4)","item_code":"40-250-40","item_code_raw_ocr":"40-250-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"30cm to 45cm size; void 20 % cum","unit":"","rates":{"zone_a":8834.59,"zone_b":10184.32,"zone_c":10184.32,"zone_d":7730.27},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":75,"source_schedule_page":65,"raw_rate_tokens":["8,834.59","10,184.32","10,184.32","7,730.27"],"source_review_note":null,"search_text":"40-250-40 30cm to 45cm size; void 20 % cum Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-250-50-P75-SL128(5)","serial_label":"128(5)","item_code":"40-250-50","item_code_raw_ocr":"40-250-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"45cm to 60cm size ; void 20 % cum","unit":"","rates":{"zone_a":8834.59,"zone_b":10184.32,"zone_c":10184.32,"zone_d":7730.27},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":75,"source_schedule_page":65,"raw_rate_tokens":["8,834.59","10,184.32","10,184.32","7,730.27"],"source_review_note":null,"search_text":"40-250-50 45cm to 60cm size ; void 20 % cum Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-250-60-P75-SL128(6)","serial_label":"128(6)","item_code":"40-250-60","item_code_raw_ocr":"40-250-60","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"60cm and above size ; void 20 % cum Supply of local hard stone/boulders at work site including all modes carriages, handling, _ loading, unloading and _— stacking in measurable stacks as per specific","unit":"","rates":{"zone_a":8711.89,"zone_b":10061.62,"zone_c":10061.62,"zone_d":7607.57},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":75,"source_schedule_page":65,"raw_rate_tokens":["8,711.89","10,061.62","10,061.62","7,607.57"],"source_review_note":null,"search_text":"40-250-60 60cm and above size ; void 20 % cum Supply of local hard stone/boulders at work site including all modes carriages, handling, _ loading, unloading and _— stacking in measurable stacks as per specific Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-260-00-P75-SL129","serial_label":"129","item_code":"40-260-00","item_code_raw_ocr":"40-260-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"] size ranges, including all taxes etc. cum complete (deduction for voids will be made at the rate mentioned against each size range for arriving at actual volume) as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":75,"source_schedule_page":65,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-260-00 ] size ranges, including all taxes etc. cum complete (deduction for voids will be made at the rate mentioned against each size range for arriving at actual volume) as per direction of Engineer in charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-260-10-P75-SL129(1)","serial_label":"129(1)","item_code":"40-260-10","item_code_raw_ocr":"40-260-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"","unit":"","rates":{"zone_a":6871.35,"zone_b":7607.57,"zone_c":5767.03,"zone_d":5767.03},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":75,"source_schedule_page":65,"raw_rate_tokens":["6,871.35","7,607.57","5,767.03","5,767.03"],"source_review_note":null,"search_text":"40-260-10 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-260-20-P75-SL129(2)","serial_label":"129(2)","item_code":"40-260-20","item_code_raw_ocr":"40-260-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"","unit":"","rates":{"zone_a":6871.35,"zone_b":7607.57,"zone_c":5767.03,"zone_d":5767.03},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":75,"source_schedule_page":65,"raw_rate_tokens":["6,871.35","7,607.57","5,767.03","5,767.03"],"source_review_note":null,"search_text":"40-260-20 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-260-30-P75-SL129(3)","serial_label":"129(3)","item_code":"40-260-30","item_code_raw_ocr":"40-260-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"","unit":"","rates":{"zone_a":6994.05,"zone_b":7730.27,"zone_c":5889.73,"zone_d":5889.73},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":75,"source_schedule_page":65,"raw_rate_tokens":["6,994.05","7,730.27","5,889.73","5,889.73"],"source_review_note":null,"search_text":"40-260-30 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-260-40-P75-SL129(4)","serial_label":"129(4)","item_code":"40-260-40","item_code_raw_ocr":"40-260-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"","unit":"","rates":{"zone_a":6994.05,"zone_b":7730.27,"zone_c":5889.73,"zone_d":5889.73},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":75,"source_schedule_page":65,"raw_rate_tokens":["6,994.05","7,730.27","5,889.73","5,889.73"],"source_review_note":null,"search_text":"40-260-40 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-260-50-P75-SL129(5)","serial_label":"129(5)","item_code":"40-260-50","item_code_raw_ocr":"40-260-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Labour charge for protective works in laying CC blocks of different","unit":"","rates":{"zone_a":7116.76,"zone_b":7852.97,"zone_c":6012.43,"zone_d":6012.43},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":75,"source_schedule_page":65,"raw_rate_tokens":["7,116.76","7,852.97","6,012.43","6,012.43"],"source_review_note":null,"search_text":"40-260-50 Labour charge for protective works in laying CC blocks of different Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-270-00-P75-SL130","serial_label":"130","item_code":"40-270-00","item_code_raw_ocr":"40-270-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"sizes including preparation of base, cum . . watering and ramming of base etc. complete as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":75,"source_schedule_page":65,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-270-00 sizes including preparation of base, cum . . watering and ramming of base etc. complete as per direction of Engineer in charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-270-10-P75-SL130(1)","serial_label":"130(1)","item_code":"40-270-10","item_code_raw_ocr":"40-270-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Within 200 m. cum","unit":"","rates":{"zone_a":1616.91,"zone_b":1586.93,"zone_c":1586.93,"zone_d":1470.53},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":75,"source_schedule_page":65,"raw_rate_tokens":["1,616.91","1,586.93","1,586.93","1,470.53"],"source_review_note":null,"search_text":"40-270-10 Within 200 m. cum Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-270-20-P75-SL130(2)","serial_label":"130(2)","item_code":"40-270-20","item_code_raw_ocr":"40-270-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"200 m to 500 m. Labour charge for protective works in laying stone/hard rock/ boulders of different sizes from 15cm to 50","unit":"","rates":{"zone_a":2533.38,"zone_b":2486.73,"zone_c":2486.73,"zone_d":2303.68},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":75,"source_schedule_page":65,"raw_rate_tokens":["2,533.38","2,486.73","2,486.73","2,303.68"],"source_review_note":null,"search_text":"40-270-20 200 m to 500 m. Labour charge for protective works in laying stone/hard rock/ boulders of different sizes from 15cm to 50 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-280-00-P75-SL131","serial_label":"131","item_code":"40-280-00","item_code_raw_ocr":"40-280-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"and levelling, dressing etc. complete as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":75,"source_schedule_page":65,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-280-00 and levelling, dressing etc. complete as per direction of Engineer in charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-280-10-P75-SL131(1)","serial_label":"131(1)","item_code":"40-280-10","item_code_raw_ocr":"40-280-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Within 200 m.","unit":"","rates":{"zone_a":1633.03,"zone_b":1602.76,"zone_c":1602.76,"zone_d":1485.19},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":75,"source_schedule_page":65,"raw_rate_tokens":["1,633.03","1,602.76","1,602.76","1,485.19"],"source_review_note":null,"search_text":"40-280-10 Within 200 m. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-280-20-P75-SL131(2)","serial_label":"131(2)","item_code":"40-280-20","item_code_raw_ocr":"40-280-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"200 m to 500 m. Dumping work of Hard rock/ stone/ boulders/C.C blocks/brick","unit":"","rates":{"zone_a":2558.61,"zone_b":2511.5,"zone_c":2511.5,"zone_d":2326.62},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":75,"source_schedule_page":65,"raw_rate_tokens":["2,558.61","2,511.50","2,511.50","2,326.62"],"source_review_note":null,"search_text":"40-280-20 200 m to 500 m. Dumping work of Hard rock/ stone/ boulders/C.C blocks/brick Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-290-00-P75-SL132","serial_label":"132","item_code":"40-290-00","item_code_raw_ocr":"40-290-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"blocks/sand cement blocks over a Qin . uniform area from properly positioned by engine boat upto an accuracy of 10cm monitoring with Note: Technical Specification for Civil. Works, Specification of Materials and General Instructions for Execution of Works . ae v7 @L @__ &- ;","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":75,"source_schedule_page":65,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-290-00 blocks/sand cement blocks over a Qin . uniform area from properly positioned by engine boat upto an accuracy of 10cm monitoring with Note: Technical Specification for Civil. Works, Specification of Materials and General Instructions for Execution of Works . ae v7 @L @__ &- ; Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-290-10-P76-SL132(1)","serial_label":"132(1)","item_code":"40-290-10","item_code_raw_ocr":"40-290-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Within 200 m. cum 2,157.10 2,026.13 Dumping work of Hard rock/ stone/ boulders/C.C_ blocks/brick blocks/sand cement blocks over a uniform area from properly positioned flat-top pontoon/barge upto an accuracy of 10cm monitoring with Total Station. The dumping area to be determined by conducting bathymetric survey, furnishing topographic site plan, cross section, dumping alignment, providing location of benchmark and stake at batches of dumping activity, doing by a river survey team (including survey manager, hydrographic surveyor, Auto cad","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":76,"source_schedule_page":66,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-290-10 Within 200 m. cum 2,157.10 2,026.13 Dumping work of Hard rock/ stone/ boulders/C.C_ blocks/brick blocks/sand cement blocks over a uniform area from properly positioned flat-top pontoon/barge upto an accuracy of 10cm monitoring with Total Station. The dumping area to be determined by conducting bathymetric survey, furnishing topographic site plan, cross section, dumping alignment, providing location of benchmark and stake at batches of dumping activity, doing by a river survey team (including survey manager, hydrographic surveyor, Auto cad Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-300-00-P76-SL133","serial_label":"133","item_code":"40-300-00","item_code_raw_ocr":"40-300-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Sequential stacking of Hard rock/ stone/ boulders/C.C_ blocks/brick blocks/sand cement blocks on the pontoon/barge to be done by fork lift or manual labour, carrying the Hard rock/ stone/ boulders/C.C blocks/brick blocks/sand cement blocks to dumping area and dumping the block from the properly positioned barge by a pay loader/forklift, inducing the cost of mobilization & demobilization of equipment’s, all materials & charges etc. complete as per direction of engineer in charge, specification and design. & Of @__ &","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":76,"source_schedule_page":66,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"40-300-00 Sequential stacking of Hard rock/ stone/ boulders/C.C_ blocks/brick blocks/sand cement blocks on the pontoon/barge to be done by fork lift or manual labour, carrying the Hard rock/ stone/ boulders/C.C blocks/brick blocks/sand cement blocks to dumping area and dumping the block from the properly positioned barge by a pay loader/forklift, inducing the cost of mobilization & demobilization of equipment’s, all materials & charges etc. complete as per direction of engineer in charge, specification and design. & Of @__ & Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-320-00-P77-SL134","serial_label":"134","item_code":"40-320-00","item_code_raw_ocr":"40-320-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"accordance with the detailed drawing and Technical Specifications included in the Tender Document and Schedule of Rates of BWDB, protecting the geo-textile bags form UV ray or any other damages including cost of all materials, labours, incidental charges etc. complete as per direction of Engineer in charge. } Geo-bag; inner size: 1200mmx950mm, outer","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":77,"source_schedule_page":67,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-320-00 accordance with the detailed drawing and Technical Specifications included in the Tender Document and Schedule of Rates of BWDB, protecting the geo-textile bags form UV ray or any other damages including cost of all materials, labours, incidental charges etc. complete as per direction of Engineer in charge. } Geo-bag; inner size: 1200mmx950mm, outer Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-320-10-P77-SL134(1)","serial_label":"134(1)","item_code":"40-320-10","item_code_raw_ocr":"40-320-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") size:1250mmx1000mm, geo- fabric th=>3.dmm, Fill Vol: 0.1664cum; wt: 250kg Geo-bag; inner size:1100mmx850mm, outer","unit":"no","rates":{"zone_a":424.12,"zone_b":424.09,"zone_c":424.09,"zone_d":423.82},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":77,"source_schedule_page":67,"raw_rate_tokens":["424.12","424.09","424.09","423.82"],"source_review_note":null,"search_text":"40-320-10 ) size:1250mmx1000mm, geo- fabric th=>3.dmm, Fill Vol: 0.1664cum; wt: 250kg Geo-bag; inner size:1100mmx850mm, outer no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-320-15-P77-SL134(2)","serial_label":"134(2)","item_code":"40-320-15","item_code_raw_ocr":"40-320-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} size:1150mmx900mm, geo-fabric th.=>3.0mm, Fill Vol: 0.1333cum; wt: 200kg Geo-bag; inner size:1075mmx850mm, outer","unit":"no","rates":{"zone_a":353.91,"zone_b":353.88,"zone_c":353.88,"zone_d":353.61},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":77,"source_schedule_page":67,"raw_rate_tokens":["353.91","353.88","353.88","353.61"],"source_review_note":null,"search_text":"40-320-15 } size:1150mmx900mm, geo-fabric th.=>3.0mm, Fill Vol: 0.1333cum; wt: 200kg Geo-bag; inner size:1075mmx850mm, outer no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-320-20-P77-SL134(3)","serial_label":"134(3)","item_code":"40-320-20","item_code_raw_ocr":"40-320-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1125mmx900mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer","unit":"no","rates":{"zone_a":346.42,"zone_b":346.4,"zone_c":346.4,"zone_d":346.13},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":77,"source_schedule_page":67,"raw_rate_tokens":["346.42","346.40","346.40","346.13"],"source_review_note":null,"search_text":"40-320-20 size:1125mmx900mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-320-30-P77-SL134(4)","serial_label":"134(4)","item_code":"40-320-30","item_code_raw_ocr":"40-320-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1000mmx800mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer","unit":"no","rates":{"zone_a":275.26,"zone_b":275.24,"zone_c":275.24,"zone_d":275.02},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":77,"source_schedule_page":67,"raw_rate_tokens":["275.26","275.24","275.24","275.02"],"source_review_note":null,"search_text":"40-320-30 size:1000mmx800mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-320-40-P77-SL134(5)","serial_label":"134(5)","item_code":"40-320-40","item_code_raw_ocr":"40-320-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:950mmx750mm, geo-fabric th.=>3.0mm, Fill Vol: 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer","unit":"no","rates":{"zone_a":246.6,"zone_b":246.58,"zone_c":246.58,"zone_d":246.36},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":77,"source_schedule_page":67,"raw_rate_tokens":["246.60","246.58","246.58","246.36"],"source_review_note":null,"search_text":"40-320-40 size:950mmx750mm, geo-fabric th.=>3.0mm, Fill Vol: 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-320-50-P77-SL134(6)","serial_label":"134(6)","item_code":"40-320-50","item_code_raw_ocr":"40-320-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") size:850mmx700mm, _ geo-fabric th.=>3.0mm, Fill Vol: 0.0520cum; wt: 80kg os mi mre ew Station ko gy a & « *","unit":"","rates":{"zone_a":206.64,"zone_b":206.62,"zone_c":206.62,"zone_d":206.43},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":77,"source_schedule_page":67,"raw_rate_tokens":["206.64","206.62","206.62","206.43"],"source_review_note":null,"search_text":"40-320-50 ) size:850mmx700mm, _ geo-fabric th.=>3.0mm, Fill Vol: 0.0520cum; wt: 80kg os mi mre ew Station ko gy a & « * Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-330-10-P78-SL135(1)","serial_label":"135(1)","item_code":"40-330-10","item_code_raw_ocr":"40-330-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1250mmx1000mm,, Fill Vol: 0.1664cum; wt: 250kg Geo-bag; inner size:1100mmx850mm, outer","unit":"no","rates":{"zone_a":262.48,"zone_b":263.47,"zone_c":257.63,"zone_d":253.15},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":78,"source_schedule_page":68,"raw_rate_tokens":["262.48","263.47","257.63","253.15"],"source_review_note":null,"search_text":"40-330-10 size:1250mmx1000mm,, Fill Vol: 0.1664cum; wt: 250kg Geo-bag; inner size:1100mmx850mm, outer no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-330-15-P78-SL135(2)","serial_label":"135(2)","item_code":"40-330-15","item_code_raw_ocr":"40-330-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1150mmx900mm,, Fill Vol: 0.1333cum; wt: 200kg Geo-bag; inner size:1075mmx850mm, outer","unit":"no","rates":{"zone_a":215.07,"zone_b":215.83,"zone_c":211.15,"zone_d":207.45},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":78,"source_schedule_page":68,"raw_rate_tokens":["215.07","215.83","211.15","207.45"],"source_review_note":null,"search_text":"40-330-15 size:1150mmx900mm,, Fill Vol: 0.1333cum; wt: 200kg Geo-bag; inner size:1075mmx850mm, outer no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-330-20-P78-SL135(3)","serial_label":"135(3)","item_code":"40-330-20","item_code_raw_ocr":"40-330-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1125mmx900mm, Fill Vol: 0.1164cum; wt: 175kg _ Geo-bag; inner size:950mmx750mm, outer","unit":"no","rates":{"zone_a":191.62,"zone_b":192.27,"zone_c":188.19,"zone_d":184.84},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":78,"source_schedule_page":68,"raw_rate_tokens":["191.62","192.27","188.19","184.84"],"source_review_note":null,"search_text":"40-330-20 size:1125mmx900mm, Fill Vol: 0.1164cum; wt: 175kg _ Geo-bag; inner size:950mmx750mm, outer no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-330-30-P78-SL135(4)","serial_label":"135(4)","item_code":"40-330-30","item_code_raw_ocr":"40-330-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1000mmx800mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer","unit":"no","rates":{"zone_a":141.73,"zone_b":142.19,"zone_c":139.24,"zone_d":136.78},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":78,"source_schedule_page":68,"raw_rate_tokens":["141.73","142.19","139.24","136.78"],"source_review_note":null,"search_text":"40-330-30 size:1000mmx800mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-330-40-P78-SL135(5)","serial_label":"135(5)","item_code":"40-330-40","item_code_raw_ocr":"40-330-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size-950mmx750mm,, Fill Vol: 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer","unit":"no","rates":{"zone_a":124.4,"zone_b":124.8,"zone_c":122.24,"zone_d":120.1},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":78,"source_schedule_page":68,"raw_rate_tokens":["124.40","124.80","122.24","120.10"],"source_review_note":null,"search_text":"40-330-40 size-950mmx750mm,, Fill Vol: 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-330-50-P78-SL135(6)","serial_label":"135(6)","item_code":"40-330-50","item_code_raw_ocr":"40-330-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:850mmx700mm,, Fill Vol: 0.0520cum; wt: 80kg Filling and dumping of geo-textile","unit":"","rates":{"zone_a":93.78,"zone_b":94.04,"zone_c":92.22,"zone_d":90.57},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":78,"source_schedule_page":68,"raw_rate_tokens":["93.78","94.04","92.22","90.57"],"source_review_note":null,"search_text":"40-330-50 size:850mmx700mm,, Fill Vol: 0.0520cum; wt: 80kg Filling and dumping of geo-textile Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-340-00-P78-SL136","serial_label":"136","item_code":"40-340-00","item_code_raw_ocr":"40-340-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"bags of different sizes and capacity at project/work site, protecting the","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":78,"source_schedule_page":68,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-340-00 bags of different sizes and capacity at project/work site, protecting the Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-340-10-P79-SL136(1)","serial_label":"136(1)","item_code":"40-340-10","item_code_raw_ocr":"40-340-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size1250mmx1000mm, Fill Vol: 0.1664cum; wt: 250kg Geo-bag; inner size:1100mmx850mm, outer","unit":"no","rates":{"zone_a":245.4,"zone_b":245.98,"zone_c":240.14,"zone_d":234.69},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":79,"source_schedule_page":69,"raw_rate_tokens":["245.40","245.98","240.14","234.69"],"source_review_note":null,"search_text":"40-340-10 size1250mmx1000mm, Fill Vol: 0.1664cum; wt: 250kg Geo-bag; inner size:1100mmx850mm, outer no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-340-15-P79-SL136(2)","serial_label":"136(2)","item_code":"40-340-15","item_code_raw_ocr":"40-340-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1150mmx900mm, Fill Vol: _ 0.1333cum; wt: 200kg = Geo-bag; inner size:1075mmx850mm, outer","unit":"no","rates":{"zone_a":202.87,"zone_b":203.26,"zone_c":198.58,"zone_d":193.88},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":79,"source_schedule_page":69,"raw_rate_tokens":["202.87","203.26","198.58","193.88"],"source_review_note":null,"search_text":"40-340-15 size:1150mmx900mm, Fill Vol: _ 0.1333cum; wt: 200kg = Geo-bag; inner size:1075mmx850mm, outer no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-340-20-P79-SL136(3)","serial_label":"136(3)","item_code":"40-340-20","item_code_raw_ocr":"40-340-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1125mmx900mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer","unit":"no","rates":{"zone_a":180.64,"zone_b":180.94,"zone_c":176.86,"zone_d":172.63},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":79,"source_schedule_page":69,"raw_rate_tokens":["180.64","180.94","176.86","172.63"],"source_review_note":null,"search_text":"40-340-20 size:1125mmx900mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-340-30-P79-SL136(4)","serial_label":"136(4)","item_code":"40-340-30","item_code_raw_ocr":"40-340-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1000mmx800mm, Fill Vol: no 136.32 136.47 133,52 130.18 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer","unit":"","rates":{"zone_a":136.32,"zone_b":136.47,"zone_c":133.52,"zone_d":130.18},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":79,"source_schedule_page":69,"raw_rate_tokens":["136.32","136.47","133,52","130.18"],"source_review_note":null,"search_text":"40-340-30 size:1000mmx800mm, Fill Vol: no 136.32 136.47 133,52 130.18 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-340-40-P79-SL136(5)","serial_label":"136(5)","item_code":"40-340-40","item_code_raw_ocr":"40-340-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size-950mmx750mm, Fill Vol: 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer","unit":"no","rates":{"zone_a":118.69,"zone_b":118.83,"zone_c":116.26,"zone_d":113.4},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":79,"source_schedule_page":69,"raw_rate_tokens":["118.69","118.83","116.26","113.40"],"source_review_note":null,"search_text":"40-340-40 size-950mmx750mm, Fill Vol: 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-340-50-P79-SL136(6)","serial_label":"136(6)","item_code":"40-340-50","item_code_raw_ocr":"40-340-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:850mmx700mm, Fill Vol: 91.22 89.39 87.00 0.0520cum; wt: 80kg \"Filling and placing of geo-textile bags of different sizes and capacity","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":79,"source_schedule_page":69,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-340-50 size:850mmx700mm, Fill Vol: 91.22 89.39 87.00 0.0520cum; wt: 80kg \"Filling and placing of geo-textile bags of different sizes and capacity Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-350-00-P79-SL137","serial_label":"137","item_code":"40-350-00","item_code_raw_ocr":"40-350-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"! a project/work site, filling with 3 ead sand (dry and minimum 80% sand must be retained on sieve no 100), = sewing along one transverse (top)","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":79,"source_schedule_page":69,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-350-00 ! a project/work site, filling with 3 ead sand (dry and minimum 80% sand must be retained on sieve no 100), = sewing along one transverse (top) Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-350-10-P80-SL137(1)","serial_label":"137(1)","item_code":"40-350-10","item_code_raw_ocr":"40-350-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1250mmx1000mm, Fill Vol: 0.1664cum; wt: 250kg Geo-bag; inner size: 1100mmx850mm, outer","unit":"No.","rates":{"zone_a":236.82,"zone_b":237.37,"zone_c":231.53,"zone_d":225.98},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":80,"source_schedule_page":70,"raw_rate_tokens":["236.82","237.37","231.53","225.98"],"source_review_note":null,"search_text":"40-350-10 size:1250mmx1000mm, Fill Vol: 0.1664cum; wt: 250kg Geo-bag; inner size: 1100mmx850mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-350-15-P80-SL137(2)","serial_label":"137(2)","item_code":"40-350-15","item_code_raw_ocr":"40-350-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1150mmx900mm,, Fill Vol: 0.1333cum; wt: 200kg Geo-bag; inner size:1075mmx850mm, outer","unit":"No.","rates":{"zone_a":197.87,"zone_b":198.2,"zone_c":193.53,"zone_d":188.64},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":80,"source_schedule_page":70,"raw_rate_tokens":["197.87","198.20","193.53","188.64"],"source_review_note":null,"search_text":"40-350-15 size:1150mmx900mm,, Fill Vol: 0.1333cum; wt: 200kg Geo-bag; inner size:1075mmx850mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-350-20-P80-SL137(3)","serial_label":"137(3)","item_code":"40-350-20","item_code_raw_ocr":"40-350-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size-1125mmx900mm, Fill Vol: ; 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer","unit":"No.","rates":{"zone_a":173.78,"zone_b":174.08,"zone_c":169.99,"zone_d":165.75},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":80,"source_schedule_page":70,"raw_rate_tokens":["173.78","174.08","169.99","165.75"],"source_review_note":null,"search_text":"40-350-20 size-1125mmx900mm, Fill Vol: ; 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-350-30-P80-SL137(4)","serial_label":"137(4)","item_code":"40-350-30","item_code_raw_ocr":"40-350-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1000mmx800mm, Fill Vol: —_ 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer","unit":"No.","rates":{"zone_a":126.13,"zone_b":126.37,"zone_c":123.42,"zone_d":120.45},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":80,"source_schedule_page":70,"raw_rate_tokens":["126.13","126.37","123.42","120.45"],"source_review_note":null,"search_text":"40-350-30 size:1000mmx800mm, Fill Vol: —_ 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-350-40-P80-SL137(5)","serial_label":"137(5)","item_code":"40-350-40","item_code_raw_ocr":"40-350-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size-950mmx750mm, Fill Vol: 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer","unit":"No.","rates":{"zone_a":111.1,"zone_b":111.29,"zone_c":108.73,"zone_d":106.09},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":80,"source_schedule_page":70,"raw_rate_tokens":["111.10","111.29","108.73","106.09"],"source_review_note":null,"search_text":"40-350-40 size-950mmx750mm, Fill Vol: 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-350-50-P80-SL137(6)","serial_label":"137(6)","item_code":"40-350-50","item_code_raw_ocr":"40-350-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:850mmx700mm, Fill Vol: 0.0520cum; wt: 80kg [Dumping with Barge & Total Station]Supplying, filling and dumping of geo-textile bags of different sizes and capacity at project/work site, making with standard geo-textile fabric (97% Polypropylene Fabric with 3% additives, mass>= 400gm/m?, unit","unit":"No.","rates":{"zone_a":84.39,"zone_b":84.47,"zone_c":82.65,"zone_d":80.5},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":80,"source_schedule_page":70,"raw_rate_tokens":["84.39","84.47","82.65","80.50"],"source_review_note":null,"search_text":"40-350-50 size:850mmx700mm, Fill Vol: 0.0520cum; wt: 80kg [Dumping with Barge & Total Station]Supplying, filling and dumping of geo-textile bags of different sizes and capacity at project/work site, making with standard geo-textile fabric (97% Polypropylene Fabric with 3% additives, mass>= 400gm/m?, unit No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-360-00-P80-SL138","serial_label":"138","item_code":"40-360-00","item_code_raw_ocr":"40-360-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"EOS<=0.075 mm, Test of service life according to ISO 13438:2018, Test of exposure time according to EN 12224 :2000) and sewing in accordance with the drawing and Technical Specifications of BWDB and Schedule of Rates of BWDB, protecting the geotextile ke FY: A __ ;","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":80,"source_schedule_page":70,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-360-00 EOS<=0.075 mm, Test of service life according to ISO 13438:2018, Test of exposure time according to EN 12224 :2000) and sewing in accordance with the drawing and Technical Specifications of BWDB and Schedule of Rates of BWDB, protecting the geotextile ke FY: A __ ; Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-360-10-P81-SL138(1)","serial_label":"138(1)","item_code":"40-360-10","item_code_raw_ocr":"40-360-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1250mmx1000mm, geo- fabric th=>3.0mm, Fill Vol: 0.1664cum; wt: 250kg Geo-bag; inner size:1100mmx850mm, outer","unit":"No.","rates":{"zone_a":686.6,"zone_b":687.56,"zone_c":681.72,"zone_d":676.98},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":81,"source_schedule_page":71,"raw_rate_tokens":["686.60","687.56","681.72","676.98"],"source_review_note":null,"search_text":"40-360-10 size:1250mmx1000mm, geo- fabric th=>3.0mm, Fill Vol: 0.1664cum; wt: 250kg Geo-bag; inner size:1100mmx850mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-360-15-P81-SL138(2)","serial_label":"138(2)","item_code":"40-360-15","item_code_raw_ocr":"40-360-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") size:1150mmx900mm, geo-fabric th,=>3.0mm, Fill Vol: 0.1333cum; wt: 200kg Geo-bag; inner size:1075mmx850mm, outer","unit":"No.","rates":{"zone_a":568.98,"zone_b":569.72,"zone_c":565.04,"zone_d":561.06},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":81,"source_schedule_page":71,"raw_rate_tokens":["568.98","569.72","565.04","561.06"],"source_review_note":null,"search_text":"40-360-15 ) size:1150mmx900mm, geo-fabric th,=>3.0mm, Fill Vol: 0.1333cum; wt: 200kg Geo-bag; inner size:1075mmx850mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-360-20-P81-SL138(3)","serial_label":"138(3)","item_code":"40-360-20","item_code_raw_ocr":"40-360-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") size:1125mmx900mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer","unit":"No.","rates":{"zone_a":538.05,"zone_b":538.67,"zone_c":534.58,"zone_d":530.97},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":81,"source_schedule_page":71,"raw_rate_tokens":["538.05","538.67","534.58","530.97"],"source_review_note":null,"search_text":"40-360-20 ) size:1125mmx900mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-360-30-P81-SL138(4)","serial_label":"138(4)","item_code":"40-360-30","item_code_raw_ocr":"40-360-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") size:1000mmx800mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer","unit":"No.","rates":{"zone_a":417.0,"zone_b":417.43,"zone_c":414.49,"zone_d":411.79},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":81,"source_schedule_page":71,"raw_rate_tokens":["417.00","417.43","414.49","411.79"],"source_review_note":null,"search_text":"40-360-30 ) size:1000mmx800mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-360-40-P81-SL138(5)","serial_label":"138(5)","item_code":"40-360-40","item_code_raw_ocr":"40-360-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:950mmx750mm, — geo-fabric th.=>3.0mm, Fill Vol: 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer","unit":"No.","rates":{"zone_a":371.0,"zone_b":371.38,"zone_c":368.82,"zone_d":366.46},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":81,"source_schedule_page":71,"raw_rate_tokens":["371.00","371.38","368.82","366.46"],"source_review_note":null,"search_text":"40-360-40 size:950mmx750mm, — geo-fabric th.=>3.0mm, Fill Vol: 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-360-50-P81-SL138(6)","serial_label":"138(6)","item_code":"40-360-50","item_code_raw_ocr":"40-360-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:850mmx700mm, geo-fabric th.=>3.0mm, Fill Vol: 0.0520cum; wt: 80kg A BL @ h& « *&","unit":"No.","rates":{"zone_a":299.31,"zone_b":299.56,"zone_c":297.73,"zone_d":295.89},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":81,"source_schedule_page":71,"raw_rate_tokens":["299.31","299.56","297.73","295.89"],"source_review_note":null,"search_text":"40-360-50 size:850mmx700mm, geo-fabric th.=>3.0mm, Fill Vol: 0.0520cum; wt: 80kg A BL @ h& « *& No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-365-00-P82-SL139","serial_label":"139","item_code":"40-365-00","item_code_raw_ocr":"40-365-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"paint during counting, dumping from properly positioned and anchored flat top barge/pontoon with necessary arrangements for guided dumping including making guided cage/frame along the length of the flat top barge/pontoon over an area as per drawing, maintaining & recording the position of dumping barge/pontoon using total station including loading, unloading, sequential piling of geo-bags on the dumping edge of barge/pontoon, dumping the bags through cage/frame and checking the water depth to ensure no geo- bag is blocked in the cage/frame, cost of all materials & equipments and its mobilization, labour, incidental charges etc. complete as per technical specification, approved design and direction of Engineer in charge. [fill volume and weight will be measured after filling with dry sand] Geo-bag; inner size:1200mmx950mm, outer","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":82,"source_schedule_page":72,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"40-365-00 paint during counting, dumping from properly positioned and anchored flat top barge/pontoon with necessary arrangements for guided dumping including making guided cage/frame along the length of the flat top barge/pontoon over an area as per drawing, maintaining & recording the position of dumping barge/pontoon using total station including loading, unloading, sequential piling of geo-bags on the dumping edge of barge/pontoon, dumping the bags through cage/frame and checking the water depth to ensure no geo- bag is blocked in the cage/frame, cost of all materials & equipments and its mobilization, labour, incidental charges etc. complete as per technical specification, approved design and direction of Engineer in charge. [fill volume and weight will be measured after filling with dry sand] Geo-bag; inner size:1200mmx950mm, outer Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-365-10-P82-SL139(1)","serial_label":"139(1)","item_code":"40-365-10","item_code_raw_ocr":"40-365-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1250mmx1000mm, geo- fabric th=>3.0mm, Fill Vol: 0.1664cum; wt: 250kg Geo-bag; inner size:1150mmx900mm, _geo-fabric - ’ yA AL @ €","unit":"No.","rates":{"zone_a":698.21,"zone_b":699.17,"zone_c":693.33,"zone_d":688.58},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":82,"source_schedule_page":72,"raw_rate_tokens":["698.21","699.17","693.33","688.58"],"source_review_note":null,"search_text":"40-365-10 size:1250mmx1000mm, geo- fabric th=>3.0mm, Fill Vol: 0.1664cum; wt: 250kg Geo-bag; inner size:1150mmx900mm, _geo-fabric - ’ yA AL @ € No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-365-20-P83-SL139(3)","serial_label":"139(3)","item_code":"40-365-20","item_code_raw_ocr":"40-365-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") size:1125mmx900mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer","unit":"No.","rates":{"zone_a":546.49,"zone_b":547.11,"zone_c":543.02,"zone_d":539.41},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":83,"source_schedule_page":73,"raw_rate_tokens":["546.49","547.11","543.02","539.41"],"source_review_note":null,"search_text":"40-365-20 ) size:1125mmx900mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-365-30-P83-SL139(4)","serial_label":"139(4)","item_code":"40-365-30","item_code_raw_ocr":"40-365-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1000mmx800mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer","unit":"No.","rates":{"zone_a":423.06,"zone_b":423.5,"zone_c":420.55,"zone_d":417.86},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":83,"source_schedule_page":73,"raw_rate_tokens":["423.06","423.50","420.55","417.86"],"source_review_note":null,"search_text":"40-365-30 size:1000mmx800mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-365-40-P83-SL139(5)","serial_label":"139(5)","item_code":"40-365-40","item_code_raw_ocr":"40-365-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:950mmx750mm, — geo-fabric th.=>3.0mm, Fill Vol: 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer","unit":"No.","rates":{"zone_a":376.28,"zone_b":376.66,"zone_c":374.1,"zone_d":371.73},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":83,"source_schedule_page":73,"raw_rate_tokens":["376.28","376.66","374.10","371.73"],"source_review_note":null,"search_text":"40-365-40 size:950mmx750mm, — geo-fabric th.=>3.0mm, Fill Vol: 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-365-50-P83-SL139(6)","serial_label":"139(6)","item_code":"40-365-50","item_code_raw_ocr":"40-365-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:850mmx700mm, —_geo-fabric th.=>3.0mm, Fill Vol: 0.0520cum; wt: 80kg Supplying, filling and dumping of geo-textile bags of different sizes and capacity at project/work site, making with standard geo-textile fabric (97% Polypropylene Fabric with 3% additives, mass>= 400gm/m?, unit weight : 855 Kg/m3 to 946 Kg/m3, EOS<=0.075 mm, Test of service life according to ISO 13438:2018, Test of exposure time according to EN 12224 :2000) and sewing in accordance with the drawing and Technical Specifications of BWDB and Schedule of Rates of BWDB, protecting the geotextile bags from UV ray or any other","unit":"No.","rates":{"zone_a":303.01,"zone_b":303.25,"zone_c":301.43,"zone_d":299.59},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":83,"source_schedule_page":73,"raw_rate_tokens":["303.01","303.25","301.43","299.59"],"source_review_note":null,"search_text":"40-365-50 size:850mmx700mm, —_geo-fabric th.=>3.0mm, Fill Vol: 0.0520cum; wt: 80kg Supplying, filling and dumping of geo-textile bags of different sizes and capacity at project/work site, making with standard geo-textile fabric (97% Polypropylene Fabric with 3% additives, mass>= 400gm/m?, unit weight : 855 Kg/m3 to 946 Kg/m3, EOS<=0.075 mm, Test of service life according to ISO 13438:2018, Test of exposure time according to EN 12224 :2000) and sewing in accordance with the drawing and Technical Specifications of BWDB and Schedule of Rates of BWDB, protecting the geotextile bags from UV ray or any other No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-370-00-P83-SL140","serial_label":"140","item_code":"40-370-00","item_code_raw_ocr":"40-370-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"damages, filling with sand (dry and yyy. . . . . minimum 80% sand must be retained on sieve no 100), sewing along one transverse (top) side after filling, staking in measurable/countable stakes, marking by synthetic enamel paint during counting, dumping from properly positioned and anchored flat top engine boat over an area as per drawing, including loading, unloading, sequential piling of geo-bags on the dumping edge of boat, carrying geo-bags from stake-yard to dumping place by head load and power driven flat top country boat, cost of all materials & equipments and its mobilization, _ labour, incidental charges etc Qe & a & LB,","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":83,"source_schedule_page":73,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-370-00 damages, filling with sand (dry and yyy. . . . . minimum 80% sand must be retained on sieve no 100), sewing along one transverse (top) side after filling, staking in measurable/countable stakes, marking by synthetic enamel paint during counting, dumping from properly positioned and anchored flat top engine boat over an area as per drawing, including loading, unloading, sequential piling of geo-bags on the dumping edge of boat, carrying geo-bags from stake-yard to dumping place by head load and power driven flat top country boat, cost of all materials & equipments and its mobilization, _ labour, incidental charges etc Qe & a & LB, Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-370-10-P84-SL140(1)","serial_label":"140(1)","item_code":"40-370-10","item_code_raw_ocr":"40-370-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} size:1250mmx1000mm, geo- fabric th=>3.0mm, Fill Vol: 0.1664cum; wt: 250kg a a i Geo-bag; inner size:1100mmx850mm, outer","unit":"No.","rates":{"zone_a":669.51,"zone_b":670.07,"zone_c":664.23,"zone_d":658.51},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":84,"source_schedule_page":74,"raw_rate_tokens":["669.51","670.07","664.23","658.51"],"source_review_note":null,"search_text":"40-370-10 } size:1250mmx1000mm, geo- fabric th=>3.0mm, Fill Vol: 0.1664cum; wt: 250kg a a i Geo-bag; inner size:1100mmx850mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-370-15-P84-SL140(2)","serial_label":"140(2)","item_code":"40-370-15","item_code_raw_ocr":"40-370-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") size:1150mmx900mm, geo-fabric th.=>3.0mm, Fill Vol: 0.1333cum; wt: 200kg Geo-bag; inner size:1075mmx850mm, outer","unit":"No.","rates":{"zone_a":556.78,"zone_b":557.14,"zone_c":552.46,"zone_d":547.5},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":84,"source_schedule_page":74,"raw_rate_tokens":["556.78","557.14","552.46","547.50"],"source_review_note":null,"search_text":"40-370-15 ) size:1150mmx900mm, geo-fabric th.=>3.0mm, Fill Vol: 0.1333cum; wt: 200kg Geo-bag; inner size:1075mmx850mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-370-20-P84-SL140(3)","serial_label":"140(3)","item_code":"40-370-20","item_code_raw_ocr":"40-370-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} size:1125mmx900mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer","unit":"No.","rates":{"zone_a":527.06,"zone_b":527.34,"zone_c":523.26,"zone_d":518.75},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":84,"source_schedule_page":74,"raw_rate_tokens":["527.06","527.34","523.26","518.75"],"source_review_note":null,"search_text":"40-370-20 } size:1125mmx900mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-370-30-P84-SL140(4)","serial_label":"140(4)","item_code":"40-370-30","item_code_raw_ocr":"40-370-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") size:1000mmx800mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer","unit":"No.","rates":{"zone_a":411.58,"zone_b":411.71,"zone_c":408.76,"zone_d":405.2},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":84,"source_schedule_page":74,"raw_rate_tokens":["411.58","411.71","408.76","405.20"],"source_review_note":null,"search_text":"40-370-30 ) size:1000mmx800mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-370-40-P84-SL140(5)","serial_label":"140(5)","item_code":"40-370-40","item_code_raw_ocr":"40-370-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:950mmx750mm, —_geo-fabric th.=>3.0mm, Fill Vol: 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer","unit":"No.","rates":{"zone_a":365.29,"zone_b":365.41,"zone_c":362.85,"zone_d":359.76},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":84,"source_schedule_page":74,"raw_rate_tokens":["365.29","365.41","362.85","359.76"],"source_review_note":null,"search_text":"40-370-40 size:950mmx750mm, —_geo-fabric th.=>3.0mm, Fill Vol: 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-370-50-P84-SL140(6)","serial_label":"140(6)","item_code":"40-370-50","item_code_raw_ocr":"40-370-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} size:850mmx700mm, geo-fabric th.=>3.0mm, Fill Vol: 0.0520cum; wt: 80kg Supplying filling and placing of geo-textile bags of different sizes and capacity at project/work site, making with standard geo-textile fabric (97% Polypropylene Fabric with 3% additives, mass>= 400gm/m?, unit weight : 855 Kg/m3 to 946 Kg/m3, EOS<=0.075 mm, Test of service life according to ISO 13438:2018,","unit":"No.","rates":{"zone_a":297.84,"zone_b":297.84,"zone_c":296.01,"zone_d":293.43},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":84,"source_schedule_page":74,"raw_rate_tokens":["297.84","297.84","296.01","293.43"],"source_review_note":null,"search_text":"40-370-50 } size:850mmx700mm, geo-fabric th.=>3.0mm, Fill Vol: 0.0520cum; wt: 80kg Supplying filling and placing of geo-textile bags of different sizes and capacity at project/work site, making with standard geo-textile fabric (97% Polypropylene Fabric with 3% additives, mass>= 400gm/m?, unit weight : 855 Kg/m3 to 946 Kg/m3, EOS<=0.075 mm, Test of service life according to ISO 13438:2018, No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-380-00-P84-SL141","serial_label":"141","item_code":"40-380-00","item_code_raw_ocr":"40-380-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"EN 12224 :2000) and sewing in accordance with the drawing and Technical Specifications of BWDB and Schedule of Rates of BWDB, filling with sand (dry and minimum 80% sand must be retained on sieve no 100), sewing along one transverse (top) side after filling, staking in measurable/countable stakes, A ae","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":84,"source_schedule_page":74,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-380-00 EN 12224 :2000) and sewing in accordance with the drawing and Technical Specifications of BWDB and Schedule of Rates of BWDB, filling with sand (dry and minimum 80% sand must be retained on sieve no 100), sewing along one transverse (top) side after filling, staking in measurable/countable stakes, A ae Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-380-10-P85-SL141(1)","serial_label":"141(1)","item_code":"40-380-10","item_code_raw_ocr":"40-380-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} size:1250mmx1000mm, geo- fabric th.=>3.0mm, Fill Vol: 0.1664cum; wt: 250kg Geo-bag; inner size: 1100mmx850mm, outer","unit":"No.","rates":{"zone_a":660.94,"zone_b":661.46,"zone_c":655.62,"zone_d":649.8},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":85,"source_schedule_page":75,"raw_rate_tokens":["660.94","661.46","655.62","649.80"],"source_review_note":null,"search_text":"40-380-10 } size:1250mmx1000mm, geo- fabric th.=>3.0mm, Fill Vol: 0.1664cum; wt: 250kg Geo-bag; inner size: 1100mmx850mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-380-15-P85-SL141(2)","serial_label":"141(2)","item_code":"40-380-15","item_code_raw_ocr":"40-380-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1150mmx900mm, geo-fabric th.=>3.0mm, Fill Vol: 0.1333cum; wt: 200kg Geo-bag; inner size: 1075mmx850mm, outer","unit":"No.","rates":{"zone_a":551.78,"zone_b":552.09,"zone_c":547.41,"zone_d":542.25},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":85,"source_schedule_page":75,"raw_rate_tokens":["551.78","552.09","547.41","542.25"],"source_review_note":null,"search_text":"40-380-15 size:1150mmx900mm, geo-fabric th.=>3.0mm, Fill Vol: 0.1333cum; wt: 200kg Geo-bag; inner size: 1075mmx850mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-380-20-P85-SL141(3)","serial_label":"141(3)","item_code":"40-380-20","item_code_raw_ocr":"40-380-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") size:1125mmx900mm_ geo-fabric No. $ th.=>3.0mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer","unit":"","rates":{"zone_a":520.2,"zone_b":520.47,"zone_c":516.39,"zone_d":511.88},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":85,"source_schedule_page":75,"raw_rate_tokens":["$20.20","520.47","516.39","511.88"],"source_review_note":null,"search_text":"40-380-20 ) size:1125mmx900mm_ geo-fabric No. $ th.=>3.0mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-380-30-P85-SL141(4)","serial_label":"141(4)","item_code":"40-380-30","item_code_raw_ocr":"40-380-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") size:1000mmx800mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer","unit":"No.","rates":{"zone_a":401.4,"zone_b":401.62,"zone_c":398.67,"zone_d":395.47},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":85,"source_schedule_page":75,"raw_rate_tokens":["401.40","401.62","398.67","395.47"],"source_review_note":null,"search_text":"40-380-30 ) size:1000mmx800mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-380-40-P85-SL141(5)","serial_label":"141(5)","item_code":"40-380-40","item_code_raw_ocr":"40-380-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:950mmx750mm, _geo-fabric th.=>3.0mm, Fill Vol: 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer","unit":"No.","rates":{"zone_a":357.7,"zone_b":357.87,"zone_c":355.31,"zone_d":352.45},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":85,"source_schedule_page":75,"raw_rate_tokens":["357.70","357.87","355.31","352.45"],"source_review_note":null,"search_text":"40-380-40 size:950mmx750mm, _geo-fabric th.=>3.0mm, Fill Vol: 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-380-50-P85-SL141(6)","serial_label":"141(6)","item_code":"40-380-50","item_code_raw_ocr":"40-380-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:850mmx700mm, geo-fabric th.=>3.0mm, Fill Vol: 0.0520cum; wt: 80kg Supplying of geo-textile bags (empty) of different sizes and capacity at project/work _ site, making the bag with standard Geo- Textile fabric (Polystar fabric, mass>= 300gm/m?) and sewing in accordance with the detailed drawing and Technical","unit":"No.","rates":{"zone_a":291.03,"zone_b":291.09,"zone_c":289.27,"zone_d":286.93},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":85,"source_schedule_page":75,"raw_rate_tokens":["291.03","291.09","289.27","286.93"],"source_review_note":null,"search_text":"40-380-50 size:850mmx700mm, geo-fabric th.=>3.0mm, Fill Vol: 0.0520cum; wt: 80kg Supplying of geo-textile bags (empty) of different sizes and capacity at project/work _ site, making the bag with standard Geo- Textile fabric (Polystar fabric, mass>= 300gm/m?) and sewing in accordance with the detailed drawing and Technical No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-400-00-P85-SL142","serial_label":"142","item_code":"40-400-00","item_code_raw_ocr":"40-400-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Specifications included in the no ° ° Tender Document and Schedule of Rates of BWDB, protecting the geo-textile bags form UV ray or any other damages including cost of all materials, labours, incidental charges etc. complete as per direction of Engineer in charge. ke ay @","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":85,"source_schedule_page":75,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-400-00 Specifications included in the no ° ° Tender Document and Schedule of Rates of BWDB, protecting the geo-textile bags form UV ray or any other damages including cost of all materials, labours, incidental charges etc. complete as per direction of Engineer in charge. ke ay @ Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-400-20-P86-SL142(1)","serial_label":"142(1)","item_code":"40-400-20","item_code_raw_ocr":"40-400-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} size:1125mmx900mm _ geo-fabric th.=>2.0mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer","unit":"no","rates":{"zone_a":229.02,"zone_b":228.99,"zone_c":228.99,"zone_d":228.72},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":86,"source_schedule_page":76,"raw_rate_tokens":["229.02","228.99","228.99","228.72"],"source_review_note":null,"search_text":"40-400-20 } size:1125mmx900mm _ geo-fabric th.=>2.0mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-400-30-P86-SL142(2)","serial_label":"142(2)","item_code":"40-400-30","item_code_raw_ocr":"40-400-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} size:1000mmx800mm_geo-fabric th.=>2.0mm, Fill Vol: 0.0840cum; wt: 125kg Supplying of geo-textile bags (empty) of different sizes and capacity at project/work _ site, making the bag with standard Geo- Textile fabric (Polyestar Fabric, mass>= 400gm/m?, EOS<=0.075 mm) and sewing in accordance with the detailed drawing and","unit":"no","rates":{"zone_a":182.5,"zone_b":182.48,"zone_c":182.48,"zone_d":182.25},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":86,"source_schedule_page":76,"raw_rate_tokens":["182.50","182.48","182.48","182.25"],"source_review_note":null,"search_text":"40-400-30 } size:1000mmx800mm_geo-fabric th.=>2.0mm, Fill Vol: 0.0840cum; wt: 125kg Supplying of geo-textile bags (empty) of different sizes and capacity at project/work _ site, making the bag with standard Geo- Textile fabric (Polyestar Fabric, mass>= 400gm/m?, EOS<=0.075 mm) and sewing in accordance with the detailed drawing and no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-410-00-P86-SL143","serial_label":"143","item_code":"40-410-00","item_code_raw_ocr":"40-410-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"in the Tender Document and Schedule of Rates of BWDB, protecting the geo-textile bags form UV ray or any other damages including cost of all materials, labours, incidental charges etc. complete as per direction of Engineer in charge. Geo-bag; inner size:1200mmx950mm, outer","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":86,"source_schedule_page":76,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-410-00 in the Tender Document and Schedule of Rates of BWDB, protecting the geo-textile bags form UV ray or any other damages including cost of all materials, labours, incidental charges etc. complete as per direction of Engineer in charge. Geo-bag; inner size:1200mmx950mm, outer Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-410-10-P86-SL143(1)","serial_label":"143(1)","item_code":"40-410-10","item_code_raw_ocr":"40-410-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} size:1250mmx1000mm, geo- fabric th=>3.0mm, Fill Vol: 0.1664cum; wt: 250kg Geo-bag; inner size:1100mmx850mm, outer","unit":"No.","rates":{"zone_a":307.32,"zone_b":307.29,"zone_c":307.29,"zone_d":306.96},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":86,"source_schedule_page":76,"raw_rate_tokens":["307.32","307.29","307.29","306.96"],"source_review_note":null,"search_text":"40-410-10 } size:1250mmx1000mm, geo- fabric th=>3.0mm, Fill Vol: 0.1664cum; wt: 250kg Geo-bag; inner size:1100mmx850mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-410-15-P86-SL143(2)","serial_label":"143(2)","item_code":"40-410-15","item_code_raw_ocr":"40-410-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} size:1150mmx900mm, geo-fabric th.=>3.0mm, Fill Vol: 0.1333cum; wt: 200kg Geo-bag; inner size:1075mmx850mm, outer","unit":"No.","rates":{"zone_a":257.02,"zone_b":256.99,"zone_c":256.99,"zone_d":256.65},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":86,"source_schedule_page":76,"raw_rate_tokens":["257.02","256.99","256.99","256.65"],"source_review_note":null,"search_text":"40-410-15 } size:1150mmx900mm, geo-fabric th.=>3.0mm, Fill Vol: 0.1333cum; wt: 200kg Geo-bag; inner size:1075mmx850mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-410-20-P86-SL143(3)","serial_label":"143(3)","item_code":"40-410-20","item_code_raw_ocr":"40-410-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} size:1125mmx900mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer","unit":"No.","rates":{"zone_a":251.69,"zone_b":251.66,"zone_c":251.66,"zone_d":251.33},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":86,"source_schedule_page":76,"raw_rate_tokens":["251.69","251.66","251.66","251.33"],"source_review_note":null,"search_text":"40-410-20 } size:1125mmx900mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-410-30-P86-SL143(4)","serial_label":"143(4)","item_code":"40-410-30","item_code_raw_ocr":"40-410-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} size:1000mmx800mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer","unit":"No.","rates":{"zone_a":199.97,"zone_b":199.94,"zone_c":199.94,"zone_d":199.66},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":86,"source_schedule_page":76,"raw_rate_tokens":["199.97","199.94","199.94","199.66"],"source_review_note":null,"search_text":"40-410-30 } size:1000mmx800mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-410-40-P86-SL143(5)","serial_label":"143(5)","item_code":"40-410-40","item_code_raw_ocr":"40-410-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} size:950mmx750mm, geo-fabric th.=>3.0mm, Fill Vol: 0.0730cum; wt: 110kg","unit":"No.","rates":{"zone_a":179.45,"zone_b":179.43,"zone_c":179.43,"zone_d":179.15},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":86,"source_schedule_page":76,"raw_rate_tokens":["179.45","179.43","179.43","179.15"],"source_review_note":null,"search_text":"40-410-40 } size:950mmx750mm, geo-fabric th.=>3.0mm, Fill Vol: 0.0730cum; wt: 110kg No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-410-50-P86-SL143(6)","serial_label":"143(6)","item_code":"40-410-50","item_code_raw_ocr":"40-410-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:800mmx650mm, outer size:850mmx700mm, _ geo-fabric @_ oH vA A,","unit":"No.","rates":{"zone_a":150.31,"zone_b":150.29,"zone_c":150.29,"zone_d":150.05},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":86,"source_schedule_page":76,"raw_rate_tokens":["150.31","150.29","150.29","150.05"],"source_review_note":null,"search_text":"40-410-50 size:800mmx650mm, outer size:850mmx700mm, _ geo-fabric @_ oH vA A, No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-420-00-P87-SL144","serial_label":"144","item_code":"40-420-00","item_code_raw_ocr":"40-420-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"including levelling, dressing, preparation of base, cost of all materials & equipments and _ its mobilization, labour, incidental charges etc complete as_ per technical specification, approved design and direction of Engineer in charge. [fill volume and weight will be measured after filling with dry sand] Geo-bag; inner size:1200mmx950mm, outer","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":87,"source_schedule_page":77,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-420-00 including levelling, dressing, preparation of base, cost of all materials & equipments and _ its mobilization, labour, incidental charges etc complete as_ per technical specification, approved design and direction of Engineer in charge. [fill volume and weight will be measured after filling with dry sand] Geo-bag; inner size:1200mmx950mm, outer Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-420-10-P87-SL144(1)","serial_label":"144(1)","item_code":"40-420-10","item_code_raw_ocr":"40-420-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"! size:1250mmx1000mm, geo- fabric, Fill Vol: 0,1664cum; wt: 250kg Geo-bag; inner size:1100mmx850mm, outer","unit":"No.","rates":{"zone_a":129.92,"zone_b":129.81,"zone_c":129.81,"zone_d":127.46},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":87,"source_schedule_page":77,"raw_rate_tokens":["129.92","129.81","129.81","127.46"],"source_review_note":null,"search_text":"40-420-10 ! size:1250mmx1000mm, geo- fabric, Fill Vol: 0,1664cum; wt: 250kg Geo-bag; inner size:1100mmx850mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-420-15-P87-SL144(2)","serial_label":"144(2)","item_code":"40-420-15","item_code_raw_ocr":"40-420-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1150mmx900mm, geo-fabric, Fill Vol: 0.1333cum; wt: 200kg Geo-bag; inner size: 1075mmx850mm, outer","unit":"No.","rates":{"zone_a":113.73,"zone_b":113.63,"zone_c":113.63,"zone_d":111.43},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":87,"source_schedule_page":77,"raw_rate_tokens":["113.73","113.63","113.63","111.43"],"source_review_note":null,"search_text":"40-420-15 size:1150mmx900mm, geo-fabric, Fill Vol: 0.1333cum; wt: 200kg Geo-bag; inner size: 1075mmx850mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-420-20-P87-SL144(3)","serial_label":"144(3)","item_code":"40-420-20","item_code_raw_ocr":"40-420-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1125mmx900mm_ geo-fabric, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer","unit":"No.","rates":{"zone_a":99.56,"zone_b":99.48,"zone_c":99.48,"zone_d":97.58},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":87,"source_schedule_page":77,"raw_rate_tokens":["99.56","99.48","99.48","97.58"],"source_review_note":null,"search_text":"40-420-20 size:1125mmx900mm_ geo-fabric, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-420-30-P87-SL144(4)","serial_label":"144(4)","item_code":"40-420-30","item_code_raw_ocr":"40-420-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1000mmx800mm _ geo-fabric, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer","unit":"No.","rates":{"zone_a":71.62,"zone_b":71.55,"zone_c":71.55,"zone_d":70.19},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":87,"source_schedule_page":77,"raw_rate_tokens":["71.62","71.55","71.55","70.19"],"source_review_note":null,"search_text":"40-420-30 size:1000mmx800mm _ geo-fabric, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-420-40-P87-SL144(5)","serial_label":"144(5)","item_code":"40-420-40","item_code_raw_ocr":"40-420-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:950mmx750mm, geo-fabric, Fill Vol: 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer","unit":"No.","rates":{"zone_a":63.6,"zone_b":63.54,"zone_c":63.54,"zone_d":62.34},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":87,"source_schedule_page":77,"raw_rate_tokens":["63.60","63.54","63.54","62.34"],"source_review_note":null,"search_text":"40-420-40 size:950mmx750mm, geo-fabric, Fill Vol: 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-420-50-P87-SL144(6)","serial_label":"144(6)","item_code":"40-420-50","item_code_raw_ocr":"40-420-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:850mmx700mm, —geo-fabric th.=>3.0mm, Fill Vol: 0.0520cum; wt: 80kg Filling and dumping of geo-textile bags of different sizes and capacity","unit":"No.","rates":{"zone_a":51.42,"zone_b":51.36,"zone_c":51.36,"zone_d":50.3},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":87,"source_schedule_page":77,"raw_rate_tokens":["51.42","51.36","51.36","50.30"],"source_review_note":null,"search_text":"40-420-50 size:850mmx700mm, —geo-fabric th.=>3.0mm, Fill Vol: 0.0520cum; wt: 80kg Filling and dumping of geo-textile bags of different sizes and capacity No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-430-00-P87-SL145","serial_label":"145","item_code":"40-430-00","item_code_raw_ocr":"40-430-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"2 project/work site, protecting the a geotextile bags from any damage, filling with locally available sand free from silt and clay, sewing","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":87,"source_schedule_page":77,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-430-00 2 project/work site, protecting the a geotextile bags from any damage, filling with locally available sand free from silt and clay, sewing Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-430-10-P88-SL145(1)","serial_label":"145(1)","item_code":"40-430-10","item_code_raw_ocr":"40-430-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") i e1250mmx1000mm, Fill Vol: 137.94 137.85 0.1664cum; wt: 250kg Geo-bag; inner size:1100mmx850mm, outer","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":88,"source_schedule_page":78,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-430-10 ) i e1250mmx1000mm, Fill Vol: 137.94 137.85 0.1664cum; wt: 250kg Geo-bag; inner size:1100mmx850mm, outer Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-430-15-P88-SL145(2)","serial_label":"145(2)","item_code":"40-430-15","item_code_raw_ocr":"40-430-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1150mmx900mm, Fill Vol: 0.1333cum; wt: 200kg Geo-bag; inner size: 1075mmx850mm, outer","unit":"","rates":{"zone_a":117.63,"zone_b":117.55,"zone_c":117.55,"zone_d":115.48},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":88,"source_schedule_page":78,"raw_rate_tokens":["117.63","117.55","117.55","115.48"],"source_review_note":null,"search_text":"40-430-15 size:1150mmx900mm, Fill Vol: 0.1333cum; wt: 200kg Geo-bag; inner size: 1075mmx850mm, outer Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-430-20-P88-SL145(3)","serial_label":"145(3)","item_code":"40-430-20","item_code_raw_ocr":"40-430-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1125mmx900mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer","unit":"no","rates":{"zone_a":106.3,"zone_b":106.22,"zone_c":106.22,"zone_d":104.32},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":88,"source_schedule_page":78,"raw_rate_tokens":["106.30","106.22","106.22","104.32"],"source_review_note":null,"search_text":"40-430-20 size:1125mmx900mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-430-30-P88-SL145(4)","serial_label":"145(4)","item_code":"40-430-30","item_code_raw_ocr":"40-430-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1000mmx800mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer","unit":"no","rates":{"zone_a":83.58,"zone_b":83.51,"zone_c":83.51,"zone_d":81.92},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":88,"source_schedule_page":78,"raw_rate_tokens":["83.58","83.51","83.51","81.92"],"source_review_note":null,"search_text":"40-430-30 size:1000mmx800mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-430-40-P88-SL145(5)","serial_label":"145(5)","item_code":"40-430-40","item_code_raw_ocr":"40-430-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size-950mmx750mm Fill Vol: 2° 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer","unit":"","rates":{"zone_a":72.27,"zone_b":72.21,"zone_c":72.21,"zone_d":70.87},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":88,"source_schedule_page":78,"raw_rate_tokens":["72.27","72.21","72.21","70.87"],"source_review_note":null,"search_text":"40-430-40 size-950mmx750mm Fill Vol: 2° 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-430-50-P88-SL145(6)","serial_label":"145(6)","item_code":"40-430-50","item_code_raw_ocr":"40-430-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:850mmx700mm, Fill Vol: °° 0.0520cum; wt: 80kg Supplying, filling and placing of geo-textile bags of different sizes and capacity at project/work site, making with standard geo-textile fabric (Polyester fabric, Thickness>=3.0 mm, mass>=","unit":"","rates":{"zone_a":59.47,"zone_b":59.42,"zone_c":59.42,"zone_d":58.2},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":88,"source_schedule_page":78,"raw_rate_tokens":["59.47","59.42","59.42","58.20"],"source_review_note":null,"search_text":"40-430-50 size:850mmx700mm, Fill Vol: °° 0.0520cum; wt: 80kg Supplying, filling and placing of geo-textile bags of different sizes and capacity at project/work site, making with standard geo-textile fabric (Polyester fabric, Thickness>=3.0 mm, mass>= Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-440-00-P88-SL146","serial_label":"146","item_code":"40-440-00","item_code_raw_ocr":"40-440-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"400gm/m*) and _—_ sewing in No, accordance with the drawing and Technical Specifications of BWDB and Schedule of Rates of BWDB, filling with locally available sand free from silt and clay, sewing along one transverse (top) side after filling, staking in k Al a ;","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":88,"source_schedule_page":78,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-440-00 400gm/m*) and _—_ sewing in No, accordance with the drawing and Technical Specifications of BWDB and Schedule of Rates of BWDB, filling with locally available sand free from silt and clay, sewing along one transverse (top) side after filling, staking in k Al a ; Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-440-10-P89-SL146(1)","serial_label":"146(1)","item_code":"40-440-10","item_code_raw_ocr":"40-440-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} size:1250mmx1000mm, geo- fabric th.=>3.0mm, Fill Vol: 0.1664cum; wt: 250kg Geo-bag; inner size:1100mmx850mm, ~ outer","unit":"No.","rates":{"zone_a":437.24,"zone_b":437.11,"zone_c":437.11,"zone_d":434.41},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":89,"source_schedule_page":79,"raw_rate_tokens":["437.24","437.11","437.11","434.41"],"source_review_note":null,"search_text":"40-440-10 } size:1250mmx1000mm, geo- fabric th.=>3.0mm, Fill Vol: 0.1664cum; wt: 250kg Geo-bag; inner size:1100mmx850mm, ~ outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-440-15-P89-SL146(2)","serial_label":"146(2)","item_code":"40-440-15","item_code_raw_ocr":"40-440-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} size:1150mmx900mm, geo-fabric th.=>3.0mm, Fill Vol: 0.1333cum; wt: 200kg Geo-bag; inner size:1075mmx850mm, outer","unit":"No.","rates":{"zone_a":370.75,"zone_b":370.62,"zone_c":370.62,"zone_d":368.09},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":89,"source_schedule_page":79,"raw_rate_tokens":["370.75","370.62","370.62","368.09"],"source_review_note":null,"search_text":"40-440-15 } size:1150mmx900mm, geo-fabric th.=>3.0mm, Fill Vol: 0.1333cum; wt: 200kg Geo-bag; inner size:1075mmx850mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-440-20-P89-SL146(3)","serial_label":"146(3)","item_code":"40-440-20","item_code_raw_ocr":"40-440-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") size:1125mmx900mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer","unit":"No.","rates":{"zone_a":351.26,"zone_b":351.14,"zone_c":351.14,"zone_d":348.9},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":89,"source_schedule_page":79,"raw_rate_tokens":["351.26","351.14","351.14","348.90"],"source_review_note":null,"search_text":"40-440-20 ) size:1125mmx900mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-440-30-P89-SL146(4)","serial_label":"146(4)","item_code":"40-440-30","item_code_raw_ocr":"40-440-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1000mmx800mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer","unit":"No.","rates":{"zone_a":271.59,"zone_b":271.48,"zone_c":271.48,"zone_d":269.85},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":89,"source_schedule_page":79,"raw_rate_tokens":["271.59","271.48","271.48","269.85"],"source_review_note":null,"search_text":"40-440-30 size:1000mmx800mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-440-40-P89-SL146(5)","serial_label":"146(5)","item_code":"40-440-40","item_code_raw_ocr":"40-440-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} size:950mmx750mm, geo-fabric th.=>3.0mm, Fill Vol: 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer","unit":"No.","rates":{"zone_a":243.05,"zone_b":242.96,"zone_c":242.96,"zone_d":241.49},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":89,"source_schedule_page":79,"raw_rate_tokens":["243.05","242.96","242.96","241.49"],"source_review_note":null,"search_text":"40-440-40 } size:950mmx750mm, geo-fabric th.=>3.0mm, Fill Vol: 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-440-50-P89-SL146(6)","serial_label":"146(6)","item_code":"40-440-50","item_code_raw_ocr":"40-440-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:850mmx700mm, — geo-fabric th.=>3.0mm, Fill Vol: 0.0520cum; wt: 80kg Supplying, filling and dumping of geo-textile bags of different sizes and capacity at project/work site, making with standard geo-textile fabric (Polyester fabric, Thickness>=3.0 mm, mass>=","unit":"No.","rates":{"zone_a":201.73,"zone_b":201.65,"zone_c":201.65,"zone_d":200.35},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":89,"source_schedule_page":79,"raw_rate_tokens":["201.73","201.65","201.65","200.35"],"source_review_note":null,"search_text":"40-440-50 size:850mmx700mm, — geo-fabric th.=>3.0mm, Fill Vol: 0.0520cum; wt: 80kg Supplying, filling and dumping of geo-textile bags of different sizes and capacity at project/work site, making with standard geo-textile fabric (Polyester fabric, Thickness>=3.0 mm, mass>= No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-450-00-P89-SL147","serial_label":"147","item_code":"40-450-00","item_code_raw_ocr":"40-450-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"accordance with the drawing and Technical Specifications of BWDB and Schedule of Rates of BWDB, protecting the geotextile bags from any damage, filling with locally available sand free from silt k i @- GF —","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":89,"source_schedule_page":79,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-450-00 accordance with the drawing and Technical Specifications of BWDB and Schedule of Rates of BWDB, protecting the geotextile bags from any damage, filling with locally available sand free from silt k i @- GF — Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-450-10-P90-SL147(1)","serial_label":"147(1)","item_code":"40-450-10","item_code_raw_ocr":"40-450-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") size:1250mmx1000mm, geo- fabric th=>3.0mm, Fill Vol: 0.1664cum; wt: 250kg Geo-bag; inner size:1100mmx850mm, outer","unit":"No.","rates":{"zone_a":445.26,"zone_b":445.14,"zone_c":445.14,"zone_d":442.51},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":90,"source_schedule_page":80,"raw_rate_tokens":["445.26","445.14","445.14","442.51"],"source_review_note":null,"search_text":"40-450-10 ) size:1250mmx1000mm, geo- fabric th=>3.0mm, Fill Vol: 0.1664cum; wt: 250kg Geo-bag; inner size:1100mmx850mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-450-15-P90-SL147(2)","serial_label":"147(2)","item_code":"40-450-15","item_code_raw_ocr":"40-450-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1150mmx900mm, geo-fabric th.=>3.0mm, Fill Vol: 0.1333cum; wt: 200kg Geo-bag; inner size:1075mmx850mm, outer","unit":"No.","rates":{"zone_a":374.65,"zone_b":374.54,"zone_c":374.54,"zone_d":372.14},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":90,"source_schedule_page":80,"raw_rate_tokens":["374.65","374.54","374.54","372.14"],"source_review_note":null,"search_text":"40-450-15 size:1150mmx900mm, geo-fabric th.=>3.0mm, Fill Vol: 0.1333cum; wt: 200kg Geo-bag; inner size:1075mmx850mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-450-20-P90-SL147(3)","serial_label":"147(3)","item_code":"40-450-20","item_code_raw_ocr":"40-450-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") size:1125mmx900mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer","unit":"No.","rates":{"zone_a":357.99,"zone_b":357.88,"zone_c":357.88,"zone_d":355.65},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":90,"source_schedule_page":80,"raw_rate_tokens":["357.99","357.88","357.88","355.65"],"source_review_note":null,"search_text":"40-450-20 ) size:1125mmx900mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:950mmx750mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-450-30-P90-SL147(4)","serial_label":"147(4)","item_code":"40-450-30","item_code_raw_ocr":"40-450-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1000mmx800mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer","unit":"No.","rates":{"zone_a":283.55,"zone_b":283.45,"zone_c":283.45,"zone_d":281.58},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":90,"source_schedule_page":80,"raw_rate_tokens":["283.55","283.45","283.45","281.58"],"source_review_note":null,"search_text":"40-450-30 size:1000mmx800mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:900mmx700mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-450-40-P90-SL147(5)","serial_label":"147(5)","item_code":"40-450-40","item_code_raw_ocr":"40-450-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") size:950mmx750mm, geo-fabric th.=>3.0mm, Fill Vol: 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer","unit":"No.","rates":{"zone_a":251.72,"zone_b":251.64,"zone_c":251.64,"zone_d":250.01},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":90,"source_schedule_page":80,"raw_rate_tokens":["251.72","251.64","251.64","250.01"],"source_review_note":null,"search_text":"40-450-40 ) size:950mmx750mm, geo-fabric th.=>3.0mm, Fill Vol: 0.0730cum; wt: 110kg Geo-bag; inner size:800mmx650mm, outer No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-450-50-P90-SL147(6)","serial_label":"147(6)","item_code":"40-450-50","item_code_raw_ocr":"40-450-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") size:850mmx700mm, —_geo-fabric th.=>3.0mm, Fill Vol: 0.0520cum; wt: 80kg [Geo-textile bag filled with sand cement mixture]","unit":"No.","rates":{"zone_a":209.78,"zone_b":209.71,"zone_c":209.71,"zone_d":208.25},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":90,"source_schedule_page":80,"raw_rate_tokens":["209.78","209.71","209.71","208.25"],"source_review_note":null,"search_text":"40-450-50 ) size:850mmx700mm, —_geo-fabric th.=>3.0mm, Fill Vol: 0.0520cum; wt: 80kg [Geo-textile bag filled with sand cement mixture] No. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-460-00-P90-SL148","serial_label":"148","item_code":"40-460-00","item_code_raw_ocr":"40-460-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"geo-textile bags of different sizes and capacity at project/work site, making with standard _geo-textile","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":90,"source_schedule_page":80,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-460-00 geo-textile bags of different sizes and capacity at project/work site, making with standard _geo-textile Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-460-10-P91-SL148(1)","serial_label":"148(1)","item_code":"40-460-10","item_code_raw_ocr":"40-460-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") size:1000mmx800mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size: 1075mmx850mm, outer","unit":"no","rates":{"zone_a":718.12,"zone_b":718.34,"zone_c":715.47,"zone_d":712.67},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":91,"source_schedule_page":81,"raw_rate_tokens":["718.12","718.34","715.47","712.67"],"source_review_note":null,"search_text":"40-460-10 ) size:1000mmx800mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size: 1075mmx850mm, outer no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-460-20-P91-SL148(2)","serial_label":"148(2)","item_code":"40-460-20","item_code_raw_ocr":"40-460-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} size:1125mmx900mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size: 1200mmx950mm, outer","unit":"no","rates":{"zone_a":957.63,"zone_b":957.9,"zone_c":953.93,"zone_d":950.08},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":91,"source_schedule_page":81,"raw_rate_tokens":["957.63","957.90","953.93","950.08"],"source_review_note":null,"search_text":"40-460-20 } size:1125mmx900mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size: 1200mmx950mm, outer no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-460-30-P91-SL148(3)","serial_label":"148(3)","item_code":"40-460-30","item_code_raw_ocr":"40-460-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1250mmx1000mm, geo- fabric th.=>3.0mm, Fill Vol: 0.1664cum; wt: 250kg [Geo-textile bag filled with sand cement mixture] Supplying filling and placing of geo-textile bags of different sizes and capacity at project/work site, making with standard geo-textile fabric (Polystar fabric, mass>=","unit":"","rates":{"zone_a":1283.1,"zone_b":1283.66,"zone_c":1277.97,"zone_d":1273.31},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":91,"source_schedule_page":81,"raw_rate_tokens":["1,283.10","1,283.66","1,277.97","1,273.31"],"source_review_note":null,"search_text":"40-460-30 size:1250mmx1000mm, geo- fabric th.=>3.0mm, Fill Vol: 0.1664cum; wt: 250kg [Geo-textile bag filled with sand cement mixture] Supplying filling and placing of geo-textile bags of different sizes and capacity at project/work site, making with standard geo-textile fabric (Polystar fabric, mass>= Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-470-00-P91-SL149","serial_label":"149","item_code":"40-470-00","item_code_raw_ocr":"40-470-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"400gm/m?) and sewing in no accordance with the drawing and Technical Specifications of BWDB and Schedule of Rates of BWDB, filling with sand-cement mixed (6:1 Proportion, sand: F.M => 1.00, Portland cement) , sewing along one transverse (top) side & nye @A— © on","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":91,"source_schedule_page":81,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-470-00 400gm/m?) and sewing in no accordance with the drawing and Technical Specifications of BWDB and Schedule of Rates of BWDB, filling with sand-cement mixed (6:1 Proportion, sand: F.M => 1.00, Portland cement) , sewing along one transverse (top) side & nye @A— © on Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-470-10-P92-SL149(1)","serial_label":"149(1)","item_code":"40-470-10","item_code_raw_ocr":"40-470-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"size:1000mmx800mm_ geo-fabric no th.=>3.0mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:1075mmx850mm, outer","unit":"","rates":{"zone_a":645.97,"zone_b":646.19,"zone_c":643.32,"zone_d":640.52},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":92,"source_schedule_page":82,"raw_rate_tokens":["645.97","646.19","643.32","640.52"],"source_review_note":null,"search_text":"40-470-10 size:1000mmx800mm_ geo-fabric no th.=>3.0mm, Fill Vol: 0.0840cum; wt: 125kg Geo-bag; inner size:1075mmx850mm, outer Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-470-20-P92-SL149(2)","serial_label":"149(2)","item_code":"40-470-20","item_code_raw_ocr":"40-470-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} size:1125mmx900mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:1200mmx950mm, outer","unit":"no","rates":{"zone_a":866.31,"zone_b":866.59,"zone_c":862.61,"zone_d":858.76},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":92,"source_schedule_page":82,"raw_rate_tokens":["866.31","866.59","862.61","858.76"],"source_review_note":null,"search_text":"40-470-20 } size:1125mmx900mm_ geo-fabric th.=>3.0mm, Fill Vol: 0.1164cum; wt: 175kg Geo-bag; inner size:1200mmx950mm, outer no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-470-30-P92-SL149(3)","serial_label":"149(3)","item_code":"40-470-30","item_code_raw_ocr":"40-470-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") size:1250mmx1000mm, geo- fabric th.=>3.0mm, Fill Vol: 0.1664cum; wt: 250kg Supplying , filling and placing of Geo-Tube, making with standard geo-textile (97% Polypropylene Fabric with 3% additives, unit weight : 855 Kg/m3 to 946 Kg/m3, geo-textile thickness > 4.00 mm, mass > 550 gm/m’, EOS<=0.075 mm, Test of service life according to ISO 13438:2018, Test of exposure time according to EN 12224 :2000 ) and sewing in accordance with the detailed drawing and Technical","unit":"no","rates":{"zone_a":1170.36,"zone_b":1170.92,"zone_c":1165.24,"zone_d":1160.58},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":92,"source_schedule_page":82,"raw_rate_tokens":["1,170.36","1,170.92","1,165.24","1,160.58"],"source_review_note":null,"search_text":"40-470-30 ) size:1250mmx1000mm, geo- fabric th.=>3.0mm, Fill Vol: 0.1664cum; wt: 250kg Supplying , filling and placing of Geo-Tube, making with standard geo-textile (97% Polypropylene Fabric with 3% additives, unit weight : 855 Kg/m3 to 946 Kg/m3, geo-textile thickness > 4.00 mm, mass > 550 gm/m’, EOS<=0.075 mm, Test of service life according to ISO 13438:2018, Test of exposure time according to EN 12224 :2000 ) and sewing in accordance with the detailed drawing and Technical no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-480-00-P92-SL150","serial_label":"150","item_code":"40-480-00","item_code_raw_ocr":"40-480-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Tender Document and Schedule of Rates of BWDB, filling hydraulically with Sand (minimum 80% sand must be retained on sieve no 100), sewing along one transverse (top) side after filling, including carrying, placing in possition in the site as per approved design, cost of all materials & equipments and its mobilization, labour, incidental charges ete. complete as per direction of Engineer in Charge. (1) 5,862.30","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":92,"source_schedule_page":82,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"40-480-00 Tender Document and Schedule of Rates of BWDB, filling hydraulically with Sand (minimum 80% sand must be retained on sieve no 100), sewing along one transverse (top) side after filling, including carrying, placing in possition in the site as per approved design, cost of all materials & equipments and its mobilization, labour, incidental charges ete. complete as per direction of Engineer in Charge. (1) 5,862.30 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-485-00-P93-SL151","serial_label":"151","item_code":"40-485-00","item_code_raw_ocr":"40-485-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") render Document and Schedule of ™ ° 7 . . Rates of BWDB, filling hydraulically with Sand (minimum 80% sand must be retained on sieve no 100), sewing along one transverse (top) side after filling, including carrying, placing in possition in the site as per approved design, cost of all materials & equipments and its mobilization, labour, incidental charges etc. complete as per direction of } Engineer in Charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":93,"source_schedule_page":83,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-485-00 ) render Document and Schedule of ™ ° 7 . . Rates of BWDB, filling hydraulically with Sand (minimum 80% sand must be retained on sieve no 100), sewing along one transverse (top) side after filling, including carrying, placing in possition in the site as per approved design, cost of all materials & equipments and its mobilization, labour, incidental charges etc. complete as per direction of } Engineer in Charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-485-10-P93-SL151(1)","serial_label":"151(1)","item_code":"40-485-10","item_code_raw_ocr":"40-485-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Geo-Tube: Diameter= Supplying of Geo-Tube: making with standard geo-textile (Polyestar Fabric, geo-textile thickness >= 4.00 mm, mass >= 550 gm/m? ) and sewing in accordance with the detailed drawing and Technical","unit":"","rates":{"zone_a":6220.74,"zone_b":6250.78,"zone_c":6116.15,"zone_d":6058.62},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":93,"source_schedule_page":83,"raw_rate_tokens":["6,220.74","6,250.78","6,116.15","6,058.62"],"source_review_note":null,"search_text":"40-485-10 Geo-Tube: Diameter= Supplying of Geo-Tube: making with standard geo-textile (Polyestar Fabric, geo-textile thickness >= 4.00 mm, mass >= 550 gm/m? ) and sewing in accordance with the detailed drawing and Technical Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-488-00-P93-SL152","serial_label":"152","item_code":"40-488-00","item_code_raw_ocr":"40-488-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Tender Document and Schedule of Rates of BWDB as per approved design, cost of all materials & equipments and its mobilization, labour, incidental charges etc. complete as per direction of Engineer in Charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":93,"source_schedule_page":83,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"40-488-00 Tender Document and Schedule of Rates of BWDB as per approved design, cost of all materials & equipments and its mobilization, labour, incidental charges etc. complete as per direction of Engineer in Charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-488-30-P93-SL152(1)","serial_label":"152(1)","item_code":"40-488-30","item_code_raw_ocr":"40-488-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Geo-Tube: Diameter=","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":93,"source_schedule_page":83,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-488-30 Geo-Tube: Diameter= Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-488-60-P93","serial_label":null,"item_code":"40-488-60","item_code_raw_ocr":"40-488-60","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Geo-Tube: Diameter= Filling and placing of Geo-Tube (Polyestar Fabric, — geo-textile thickness >= 4.00 mm, mass >= 550 gm/m? ): filling hydraulically with locally available sand free","unit":"","rates":{"zone_a":555.57,"zone_b":555.55,"zone_c":355.55,"zone_d":555.35},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":93,"source_schedule_page":83,"raw_rate_tokens":["555.57","555.55","355.55","555.35"],"source_review_note":null,"search_text":"40-488-60 Geo-Tube: Diameter= Filling and placing of Geo-Tube (Polyestar Fabric, — geo-textile thickness >= 4.00 mm, mass >= 550 gm/m? ): filling hydraulically with locally available sand free Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-489-00-P93-SL153","serial_label":"153","item_code":"40-489-00","item_code_raw_ocr":"40-489-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"from silt and clay, sewing along iy . . . . one transverse (top) side after filling, including carrying, placing in possition in the site as per approved design, cost of all materials & equipments and its mobilization, labour, incidental k&","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":93,"source_schedule_page":83,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-489-00 from silt and clay, sewing along iy . . . . one transverse (top) side after filling, including carrying, placing in possition in the site as per approved design, cost of all materials & equipments and its mobilization, labour, incidental k& Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-489-30-P94-SL153(1)","serial_label":"153(1)","item_code":"40-489-30","item_code_raw_ocr":"40-489-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"with local sand free from silt and m 1,674.30 1,673.28 1,667.73 clay Geo-Tube: Diameter= 1.25 m,","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":94,"source_schedule_page":84,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-489-30 with local sand free from silt and m 1,674.30 1,673.28 1,667.73 clay Geo-Tube: Diameter= 1.25 m, Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-489-60-P94-SL153(2)","serial_label":"153(2)","item_code":"40-489-60","item_code_raw_ocr":"40-489-60","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Filled with local sand free from silt and clay Supplying , filling and placing of Geo-Tube, making with standard geo-textile (Polyestar Fabric, geo- textile thickness > 4.00 mm, mass > 550 gm/m? ) and sewing in accordance with the detailed drawing and Technical Specifications included in the Tender Document and Schedule of Rates of BWDB, filling","unit":"m","rates":{"zone_a":419.63,"zone_b":419.37,"zone_c":419.37,"zone_d":417.97},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":94,"source_schedule_page":84,"raw_rate_tokens":["419.63","419.37","419.37","417.97"],"source_review_note":null,"search_text":"40-489-60 Filled with local sand free from silt and clay Supplying , filling and placing of Geo-Tube, making with standard geo-textile (Polyestar Fabric, geo- textile thickness > 4.00 mm, mass > 550 gm/m? ) and sewing in accordance with the detailed drawing and Technical Specifications included in the Tender Document and Schedule of Rates of BWDB, filling m Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-490-00-P94-SL154","serial_label":"154","item_code":"40-490-00","item_code_raw_ocr":"40-490-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"hydraulically with locally available _™ . ° . . sand free from silt and clay, sewing along one transverse (top) side } after filling, including carrying, placing in possition in the site as per approved design, cost of all materials & equipments and its mobilization, labour, incidental charges etc. complete as per direction of Engineer in Charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":94,"source_schedule_page":84,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-490-00 hydraulically with locally available _™ . ° . . sand free from silt and clay, sewing along one transverse (top) side } after filling, including carrying, placing in possition in the site as per approved design, cost of all materials & equipments and its mobilization, labour, incidental charges etc. complete as per direction of Engineer in Charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-490-10-P94","serial_label":null,"item_code":"40-490-10","item_code_raw_ocr":"40-490-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Geo Tube: Diameter=","unit":"","rates":{"zone_a":2789.24,"zone_b":2788.2,"zone_c":2788.2,"zone_d":2782.46},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":94,"source_schedule_page":84,"raw_rate_tokens":["2,789.24","2,788.20","2,788.20","2,782.46"],"source_review_note":null,"search_text":"40-490-10 Geo Tube: Diameter= Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-490-20-P94-SL154(2)","serial_label":"154(2)","item_code":"40-490-20","item_code_raw_ocr":"40-490-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"] Geo Tube: Diameter= Supplying, filling and placing of Geo-Tube, making with standard geo-textile (Polyester Fabric, geo- textile thickness > 4.50 mm, mass > 600 gm/m?, Tensile Strength > 40kN/m) and sewing in accordance with the detailed drawing and Technical Specifications included in the Tender Document and Schedule of Rates of BWDB,","unit":"","rates":{"zone_a":1250.0,"zone_b":975.2,"zone_c":974.92,"zone_d":973.32},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":94,"source_schedule_page":84,"raw_rate_tokens":["1.25","975.20","974.92","973.32"],"source_review_note":null,"search_text":"40-490-20 ] Geo Tube: Diameter= Supplying, filling and placing of Geo-Tube, making with standard geo-textile (Polyester Fabric, geo- textile thickness > 4.50 mm, mass > 600 gm/m?, Tensile Strength > 40kN/m) and sewing in accordance with the detailed drawing and Technical Specifications included in the Tender Document and Schedule of Rates of BWDB, Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-495-00-P94-SL155","serial_label":"155","item_code":"40-495-00","item_code_raw_ocr":"40-495-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"filling hydraulically with locally ™ ° . . : available sand free from silt and clay, sewing along one transverse (top) side after filling, including carrying, placing in possition in the site as per approved design, cost of all materials & equipments and its mobilization, labour, incidental charges etc. complete as per direction of Engineer in Charge. ve [wore sone Pewee) = [ Geo-Tube_of woven geo-textile_ , ke Ay a","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":94,"source_schedule_page":84,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-495-00 filling hydraulically with locally ™ ° . . : available sand free from silt and clay, sewing along one transverse (top) side after filling, including carrying, placing in possition in the site as per approved design, cost of all materials & equipments and its mobilization, labour, incidental charges etc. complete as per direction of Engineer in Charge. ve [wore sone Pewee) = [ Geo-Tube_of woven geo-textile_ , ke Ay a Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-497-10-P95-SL156(1)","serial_label":"156(1)","item_code":"40-497-10","item_code_raw_ocr":"40-497-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") m, Filled with local sand free from silt and clay Geo-Tube (Woven): Diameter=3.0","unit":"m","rates":{"zone_a":6795.78,"zone_b":6794.76,"zone_c":6794.76,"zone_d":6789.05},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":95,"source_schedule_page":85,"raw_rate_tokens":["6,795.78","6,794.76","6,794.76","6,789.05"],"source_review_note":null,"search_text":"40-497-10 ) m, Filled with local sand free from silt and clay Geo-Tube (Woven): Diameter=3.0 m Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-497-20-P95-SL156(3)","serial_label":"156(3)","item_code":"40-497-20","item_code_raw_ocr":"40-497-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"m, Filled with local sand free from silt and clay Geo-Tube (Woven): Diameter=3.0","unit":"m","rates":{"zone_a":8562.72,"zone_b":8561.26,"zone_c":8561.26,"zone_d":8553.03},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":95,"source_schedule_page":85,"raw_rate_tokens":["8,562.72","8,561.26","8,561.26","8,553.03"],"source_review_note":null,"search_text":"40-497-20 m, Filled with local sand free from silt and clay Geo-Tube (Woven): Diameter=3.0 m Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-497-25-P95-SL156(4)","serial_label":"156(4)","item_code":"40-497-25","item_code_raw_ocr":"40-497-25","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"m, Filled with sand of FM>=0.5 m 10,724.75 10,716.52 Geo-Tube (Woven): Diameter=4.0","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":95,"source_schedule_page":85,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-497-25 m, Filled with sand of FM>=0.5 m 10,724.75 10,716.52 Geo-Tube (Woven): Diameter=4.0 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-497-30-P95-SL156(5)","serial_label":"156(5)","item_code":"40-497-30","item_code_raw_ocr":"40-497-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") m, Filled with local sand free from silt and clay Geo-Tube (Woven): Diameter=4.0 Supplying and placing non-woven needle punched type geotextile fabric (97% Polypropylene Fabric with 3% additives, unit weight : 855 Kg/m3 to 946 Kg/m3, EOS<=0.075 mm, Test of service life according to ISO 13438:2018, Test of exposure time according to EN 12224 :2000) as filter materials of elongation at maximum force machine direction (MD) >=60% and <= 100 % , elongation at : maximum force (CMD) => 40% . 157 40-50-00 and <= 100% ,horizontal and sqm vertical permeability (under 2 kn/m? pressure)=>2x10E-3 m/sec. for effective erosion protection in hydraulic structures/river training works including local handling, placing in position, providing machine seamed joints (with 100% polypropylene or nylon thread) or 35cm lap in dry condition or minimum 100cm lap under water including protecting the geotextile material from UV ray and from any & AL Gd ai","unit":"","rates":{"zone_a":12485.06,"zone_b":12482.46,"zone_c":12482.46,"zone_d":12467.83},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":95,"source_schedule_page":85,"raw_rate_tokens":["12,485.06","12,482.46","12,482.46","12,467.83"],"source_review_note":null,"search_text":"40-497-30 ) m, Filled with local sand free from silt and clay Geo-Tube (Woven): Diameter=4.0 Supplying and placing non-woven needle punched type geotextile fabric (97% Polypropylene Fabric with 3% additives, unit weight : 855 Kg/m3 to 946 Kg/m3, EOS<=0.075 mm, Test of service life according to ISO 13438:2018, Test of exposure time according to EN 12224 :2000) as filter materials of elongation at maximum force machine direction (MD) >=60% and <= 100 % , elongation at : maximum force (CMD) => 40% . 157 40-50-00 and <= 100% ,horizontal and sqm vertical permeability (under 2 kn/m? pressure)=>2x10E-3 m/sec. for effective erosion protection in hydraulic structures/river training works including local handling, placing in position, providing machine seamed joints (with 100% polypropylene or nylon thread) or 35cm lap in dry condition or minimum 100cm lap under water including protecting the geotextile material from UV ray and from any & AL Gd ai Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-500-10-P96-SL157(1)","serial_label":"157(1)","item_code":"40-500-10","item_code_raw_ocr":"40-500-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"tensile strength =>11 kn/m, grab strength =>600 N, CBR puncture resistance =>1600N. Mass =>300 em/m, thickness(Under 2 kpa pressure) =>2.00mm, EoS<=0.11mm, strip","unit":"","rates":{"zone_a":221.76,"zone_b":221.74,"zone_c":221.74,"zone_d":216.71},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":96,"source_schedule_page":86,"raw_rate_tokens":["221.76","221.74","221.74","216.71"],"source_review_note":null,"search_text":"40-500-10 tensile strength =>11 kn/m, grab strength =>600 N, CBR puncture resistance =>1600N. Mass =>300 em/m, thickness(Under 2 kpa pressure) =>2.00mm, EoS<=0.11mm, strip Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-500-20-P96","serial_label":null,"item_code":"40-500-20","item_code_raw_ocr":"40-500-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"tensile strength =>15kn/m, grab strength =>850N, CBR puncture resistance =>2200N. Mass =>350 gm/m’, thickness(Under 2 kpa pressure) =>2.50mm, EoS<=0.09mm, strip","unit":"sqm","rates":{"zone_a":256.54,"zone_b":256.53,"zone_c":256.53,"zone_d":251.49},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":96,"source_schedule_page":86,"raw_rate_tokens":["256.54","256.53","256.53","251.49"],"source_review_note":null,"search_text":"40-500-20 tensile strength =>15kn/m, grab strength =>850N, CBR puncture resistance =>2200N. Mass =>350 gm/m’, thickness(Under 2 kpa pressure) =>2.50mm, EoS<=0.09mm, strip sqm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-500-30-P96-SL157(3)","serial_label":"157(3)","item_code":"40-500-30","item_code_raw_ocr":"40-500-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"tensile strength =>20kn/m, grab strength => 1200N, CBR puncture resistance =>3200 N. Mass =>400 gm/m?, } thickness(Under 2 kpa pressure) =>3.00 mm, EoS<=0.08mm, strip","unit":"sqm","rates":{"zone_a":273.29,"zone_b":273.28,"zone_c":273.28,"zone_d":268.24},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":96,"source_schedule_page":86,"raw_rate_tokens":["273.29","273.28","273.28","268.24"],"source_review_note":null,"search_text":"40-500-30 tensile strength =>20kn/m, grab strength => 1200N, CBR puncture resistance =>3200 N. Mass =>400 gm/m?, } thickness(Under 2 kpa pressure) =>3.00 mm, EoS<=0.08mm, strip sqm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-500-40-P96-SL157(4)","serial_label":"157(4)","item_code":"40-500-40","item_code_raw_ocr":"40-500-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"tensile strength =>23 kn/m, grab strength =>1500 N, CBR puncture comer eistance —73800N. ___ Mass>=550 em/m?; thickness(Under 2 kpa pressure) - >=4.0mm, EoS<=0.06mm,strip","unit":"sqm","rates":{"zone_a":286.17,"zone_b":286.16,"zone_c":286.16,"zone_d":281.13},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":96,"source_schedule_page":86,"raw_rate_tokens":["286.17","286.16","286.16","281.13"],"source_review_note":null,"search_text":"40-500-40 tensile strength =>23 kn/m, grab strength =>1500 N, CBR puncture comer eistance —73800N. ___ Mass>=550 em/m?; thickness(Under 2 kpa pressure) - >=4.0mm, EoS<=0.06mm,strip sqm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-500-50-P96-SL157(5)","serial_label":"157(5)","item_code":"40-500-50","item_code_raw_ocr":"40-500-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"tensile strength>=30KN/m; grab strength>=1850N; CBR puncture resistance>=5 100N. Supplying and placing of non- woven needle punched type Polyester geotextile fabric as filter materials for effective erosion protection in hydraulic structures/river training works with local handling, placing in position, providing machine seamed joints —sys_oq (with polypropylene or nylon . 158 740-505-090 thread) or 35cm lap in dry sqm condition or minimum 100cm lap under water as well as protecting the geotextile material from UV ray and from any other damages including supply of all materials, labours, equipment’s etc. complete as per technical specification and direction of Engineer in charge. Mass => 300 gm/m?,","unit":"sqm","rates":{"zone_a":331.27,"zone_b":331.26,"zone_c":331.26,"zone_d":326.22},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":96,"source_schedule_page":86,"raw_rate_tokens":["331.27","331.26","331.26","326.22"],"source_review_note":null,"search_text":"40-500-50 tensile strength>=30KN/m; grab strength>=1850N; CBR puncture resistance>=5 100N. Supplying and placing of non- woven needle punched type Polyester geotextile fabric as filter materials for effective erosion protection in hydraulic structures/river training works with local handling, placing in position, providing machine seamed joints —sys_oq (with polypropylene or nylon . 158 740-505-090 thread) or 35cm lap in dry sqm condition or minimum 100cm lap under water as well as protecting the geotextile material from UV ray and from any other damages including supply of all materials, labours, equipment’s etc. complete as per technical specification and direction of Engineer in charge. Mass => 300 gm/m?, sqm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-505-10-P96-SL158(1)","serial_label":"158(1)","item_code":"40-505-10","item_code_raw_ocr":"40-505-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} thickness(Under 2 kpa pressure) =>2.0mm","unit":"","rates":{"zone_a":228.34,"zone_b":228.33,"zone_c":228.33,"zone_d":223.29},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":96,"source_schedule_page":86,"raw_rate_tokens":["228.34","228.33","228.33","223.29"],"source_review_note":null,"search_text":"40-505-10 } thickness(Under 2 kpa pressure) =>2.0mm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-505-20-P97-SL158(2)","serial_label":"158(2)","item_code":"40-505-20","item_code_raw_ocr":"40-505-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"thickness(Under 2 kpa pressure) =>3.0mm Mass => 550 gm/m?,","unit":"sqm","rates":{"zone_a":241.22,"zone_b":241.21,"zone_c":241.21,"zone_d":236.17},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":97,"source_schedule_page":87,"raw_rate_tokens":["241.22","241.21","241.21","236.17"],"source_review_note":null,"search_text":"40-505-20 thickness(Under 2 kpa pressure) =>3.0mm Mass => 550 gm/m?, sqm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-505-30-P97-SL158(3)","serial_label":"158(3)","item_code":"40-505-30","item_code_raw_ocr":"40-505-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"thickness(Under 2 kpa pressure) =>4,.0mm Supply & placing of woven type Natural Additive Treated Jute Geo- textile (JGT) for effective erosion protection in hydraulic structures/river training works including local handling, placing in position including protecting","unit":"sqm","rates":{"zone_a":266.99,"zone_b":266.98,"zone_c":266.98,"zone_d":261.94},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":97,"source_schedule_page":87,"raw_rate_tokens":["266.99","266.98","266.98","261.94"],"source_review_note":null,"search_text":"40-505-30 thickness(Under 2 kpa pressure) =>4,.0mm Supply & placing of woven type Natural Additive Treated Jute Geo- textile (JGT) for effective erosion protection in hydraulic structures/river training works including local handling, placing in position including protecting sqm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-510-00-P97-SL159","serial_label":"159","item_code":"40-510-00","item_code_raw_ocr":"40-510-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"from any damages including supply of all materials, labours, equipments etc. following the technical specification and installation method complete as per direction of Engineer in charge. Mass >=627 gm/m?,","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":97,"source_schedule_page":87,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"40-510-00 from any damages including supply of all materials, labours, equipments etc. following the technical specification and installation method complete as per direction of Engineer in charge. Mass >=627 gm/m?, Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-510-10-P97-SL159(1)","serial_label":"159(1)","item_code":"40-510-10","item_code_raw_ocr":"40-510-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"thickness(Under 2 kpa pressure) >=2.00 mm Supplying and laying dry Ist class or pick jhama chips as filter in two layers (top and bottom) as per specific size, range and gradation,","unit":"sqm","rates":{"zone_a":263.73,"zone_b":263.72,"zone_c":263.72,"zone_d":258.68},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":97,"source_schedule_page":87,"raw_rate_tokens":["263.73","263.72","263.72","258.68"],"source_review_note":null,"search_text":"40-510-10 thickness(Under 2 kpa pressure) >=2.00 mm Supplying and laying dry Ist class or pick jhama chips as filter in two layers (top and bottom) as per specific size, range and gradation, sqm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-520-00-P97-SL160","serial_label":"160","item_code":"40-520-00","item_code_raw_ocr":"40-520-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"preparation of surface, compacting each layer etc. complete with supply of all materials and as per direction of Engineer in charge: 20mm size.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":97,"source_schedule_page":87,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-520-00 preparation of surface, compacting each layer etc. complete with supply of all materials and as per direction of Engineer in charge: 20mm size. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-520-20-P97","serial_label":null,"item_code":"40-520-20","item_code_raw_ocr":"40-520-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":", Well graded between 40mm to 5,975.38 5,961.77 5,709.53 20mm size. Well graded between 20mm to Smm size.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":97,"source_schedule_page":87,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-520-20 , Well graded between 40mm to 5,975.38 5,961.77 5,709.53 20mm size. Well graded between 20mm to Smm size. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-520-30-P97-SL160(3)","serial_label":"160(3)","item_code":"40-520-30","item_code_raw_ocr":"40-520-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"(Combination of sub-item 10 & 30 cum or 20 & 30 shall be used) Supplying and laying shingles and peagravels as filter in two layers (top and bottom) as per specific size ranges and gradation including","unit":"","rates":{"zone_a":6479.92,"zone_b":6462.81,"zone_c":6285.92,"zone_d":6186.16},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":97,"source_schedule_page":87,"raw_rate_tokens":["6,479.92","6,462.81","6,285.92","6,186.16"],"source_review_note":null,"search_text":"40-520-30 (Combination of sub-item 10 & 30 cum or 20 & 30 shall be used) Supplying and laying shingles and peagravels as filter in two layers (top and bottom) as per specific size ranges and gradation including Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-530-00-P97-SL161","serial_label":"161","item_code":"40-530-00","item_code_raw_ocr":"40-530-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") grading, preparation of surface, cum compacting each layer etc. complete with supply of all materials and as per direction of Engineer in charge: Omm size. 20mm size.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":97,"source_schedule_page":87,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-530-00 ) grading, preparation of surface, cum compacting each layer etc. complete with supply of all materials and as per direction of Engineer in charge: Omm size. 20mm size. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-530-30-P98-SL161(3)","serial_label":"161(3)","item_code":"40-530-30","item_code_raw_ocr":"40-530-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"™™ size. cum (combination of sub-item 10 and _— _— — ao 30 or 20 and 30 shall be used). Supplying and laying stone chips as filter in two layers (Top and bottom) as per specific size ranges and gradation including","unit":"","rates":{"zone_a":7606.86,"zone_b":8336.51,"zone_c":6495.97,"zone_d":6469.5},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":98,"source_schedule_page":88,"raw_rate_tokens":["7,606.86","8,336.51","6,495.97","6,469.50"],"source_review_note":null,"search_text":"40-530-30 ™™ size. cum (combination of sub-item 10 and _— _— — ao 30 or 20 and 30 shall be used). Supplying and laying stone chips as filter in two layers (Top and bottom) as per specific size ranges and gradation including Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-540-00-P98-SL162","serial_label":"162","item_code":"40-540-00","item_code_raw_ocr":"40-540-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"compacting each layer ete. complete with supply of all materials and as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":98,"source_schedule_page":88,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-540-00 compacting each layer ete. complete with supply of all materials and as per direction of Engineer in charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-540-10-P98-SL162(1)","serial_label":"162(1)","item_code":"40-540-10","item_code_raw_ocr":"40-540-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Well graded between 50mm to} a1, 20mm size.","unit":"","rates":{"zone_a":9570.1,"zone_b":9808.94,"zone_c":9011.37,"zone_d":8555.45},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":98,"source_schedule_page":88,"raw_rate_tokens":["9570.10","9,808.94","9,011.37","8,555.45"],"source_review_note":null,"search_text":"40-540-10 Well graded between 50mm to} a1, 20mm size. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-540-20-P98-SL162(2)","serial_label":"162(2)","item_code":"40-540-20","item_code_raw_ocr":"40-540-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Well graded between 40mm to oi 20mm size. Well graded between 20mm to 5mm size.","unit":"","rates":{"zone_a":9570.1,"zone_b":9808.94,"zone_c":9011.37,"zone_d":8555.45},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":98,"source_schedule_page":88,"raw_rate_tokens":["9,570.10","9,808.94","9,011.37","8,555.45"],"source_review_note":null,"search_text":"40-540-20 Well graded between 40mm to oi 20mm size. Well graded between 20mm to 5mm size. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-540-30-P98-SL162(3)","serial_label":"162(3)","item_code":"40-540-30","item_code_raw_ocr":"40-540-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"(Combination of sub-items 10 & cum 30 or 20 & 30 shall be used). Supplying and laying sand as filter layers as per specific size ranges and gradation including","unit":"","rates":{"zone_a":9815.5,"zone_b":10054.35,"zone_c":9011.37,"zone_d":8555.45},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":98,"source_schedule_page":88,"raw_rate_tokens":["9,815.50","10,054.35","9,011.37","8,555.45"],"source_review_note":null,"search_text":"40-540-30 (Combination of sub-items 10 & cum 30 or 20 & 30 shall be used). Supplying and laying sand as filter layers as per specific size ranges and gradation including Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-550-00-P98-SL163","serial_label":"163","item_code":"40-550-00","item_code_raw_ocr":"40-550-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"in layer etc. complete with supply of all materials and as per direction of Engineer in charge. 7","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":98,"source_schedule_page":88,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-550-00 in layer etc. complete with supply of all materials and as per direction of Engineer in charge. 7 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-550-10-P98-SL163(1)","serial_label":"163(1)","item_code":"40-550-10","item_code_raw_ocr":"40-550-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") FM :","unit":"","rates":{"zone_a":2510.59,"zone_b":2427.69,"zone_c":2458.36,"zone_d":2415.1},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":98,"source_schedule_page":88,"raw_rate_tokens":["2,510.59","2,427.69","2,458.36","2,415.10"],"source_review_note":null,"search_text":"40-550-10 ) FM : Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-550-20-P98-SL163(2)","serial_label":"163(2)","item_code":"40-550-20","item_code_raw_ocr":"40-550-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") FM :","unit":"","rates":{"zone_a":2019.78,"zone_b":1945.46,"zone_c":1976.14,"zone_d":1936.56},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":98,"source_schedule_page":88,"raw_rate_tokens":["2,019.78","1,945.46","1,976.14","1,936.56"],"source_review_note":null,"search_text":"40-550-20 ) FM : Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-550-30-P98-SL163(3)","serial_label":"163(3)","item_code":"40-550-30","item_code_raw_ocr":"40-550-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"FM: Labour charge for salvaging of cement concrete/sand cement/brick blocks of different","unit":"","rates":{"zone_a":1375.59,"zone_b":1344.22,"zone_c":1344.22,"zone_d":1317.52},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":98,"source_schedule_page":88,"raw_rate_tokens":["1,375.59","1,344.22","1,344.22","1,317.52"],"source_review_note":null,"search_text":"40-550-30 FM: Labour charge for salvaging of cement concrete/sand cement/brick blocks of different Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-560-00-P98-SL164","serial_label":"164","item_code":"40-560-00","item_code_raw_ocr":"40-560-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"$1268 including carriage within the o44, site of any protective work with all leads and lifts and stacking in measurable stacks as per direction of Engineer in charge. —_ Labour charge for salvaging of Geo-Bags of different sizes including carriage within the site","unit":"","rates":{"zone_a":1959.67,"zone_b":1035.5,"zone_c":1035.5,"zone_d":974.08},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":98,"source_schedule_page":88,"raw_rate_tokens":["1,959.67","1,035.50","1,035.50","974.08"],"source_review_note":null,"search_text":"40-560-00 $1268 including carriage within the o44, site of any protective work with all leads and lifts and stacking in measurable stacks as per direction of Engineer in charge. —_ Labour charge for salvaging of Geo-Bags of different sizes including carriage within the site Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-570-00-P98-SL165","serial_label":"165","item_code":"40-570-00","item_code_raw_ocr":"40-570-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"leads and lifts and stacking in measurable stacks as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":98,"source_schedule_page":88,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-570-00 leads and lifts and stacking in measurable stacks as per direction of Engineer in charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-570-10-P98-SL165(1)","serial_label":"165(1)","item_code":"40-570-10","item_code_raw_ocr":"40-570-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Salvaging of 250 kg geo-bag","unit":"","rates":{"zone_a":34.8,"zone_b":34.17,"zone_c":34.17,"zone_d":31.7},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":98,"source_schedule_page":88,"raw_rate_tokens":["34.80","34.17","34.17","31.70"],"source_review_note":null,"search_text":"40-570-10 Salvaging of 250 kg geo-bag Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-570-15-P98-SL165(2)","serial_label":"165(2)","item_code":"40-570-15","item_code_raw_ocr":"40-570-15","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Salvaging of 200 kg geo-bag","unit":"","rates":{"zone_a":2900.0,"zone_b":2848.0,"zone_c":2848.0,"zone_d":2642.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":98,"source_schedule_page":88,"raw_rate_tokens":["29.00","2848","2848","26.42"],"source_review_note":null,"search_text":"40-570-15 Salvaging of 200 kg geo-bag Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-570-20-P98-SL165(3)","serial_label":"165(3)","item_code":"40-570-20","item_code_raw_ocr":"40-570-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Salvaging of 175 kg geo-bag","unit":"","rates":{"zone_a":26.06,"zone_b":25.59,"zone_c":25.59,"zone_d":23.74},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":98,"source_schedule_page":88,"raw_rate_tokens":["26.06","2559","25.59","23.74"],"source_review_note":null,"search_text":"40-570-20 Salvaging of 175 kg geo-bag Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-570-30-P98-SL165(4)","serial_label":"165(4)","item_code":"40-570-30","item_code_raw_ocr":"40-570-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Salvaging of 125 kg geo-bag","unit":"","rates":{"zone_a":16.13,"zone_b":15.84,"zone_c":15.84,"zone_d":14.71},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":98,"source_schedule_page":88,"raw_rate_tokens":["16.13","15.84","15.84","14.71"],"source_review_note":null,"search_text":"40-570-30 Salvaging of 125 kg geo-bag Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-570-40-P98-SL165(5)","serial_label":"165(5)","item_code":"40-570-40","item_code_raw_ocr":"40-570-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Salvaging of 110 kg geo-bag","unit":"","rates":{"zone_a":14.64,"zone_b":14.38,"zone_c":14.38,"zone_d":13.35},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":98,"source_schedule_page":88,"raw_rate_tokens":["14.64","14.38","14.38","13.35"],"source_review_note":null,"search_text":"40-570-40 Salvaging of 110 kg geo-bag Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-570-50-P98-SL165(6)","serial_label":"165(6)","item_code":"40-570-50","item_code_raw_ocr":"40-570-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"a Al a ©.","unit":"","rates":{"zone_a":3160.0,"zone_b":1292.0,"zone_c":1292.0,"zone_d":1199.0},"rate_integrity_status":"numeric_outlier_review_required","autofill_eligible":false,"source_pdf_page":98,"source_schedule_page":88,"raw_rate_tokens":["316","1292","1292","1199"],"source_review_note":null,"search_text":"40-570-50 a Al a ©. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-580-00-P99-SL166","serial_label":"166","item_code":"40-580-00","item_code_raw_ocr":"40-580-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"embankment, stacking the same in a measurable stacks within all leads and lifts as per direction of Engineer in charge.","unit":"cum","rates":{"zone_a":916.87,"zone_b":900.2,"zone_c":900.2,"zone_d":833.52},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":99,"source_schedule_page":89,"raw_rate_tokens":["916.87","900.20","900.20","833.52"],"source_review_note":null,"search_text":"40-580-00 embankment, stacking the same in a measurable stacks within all leads and lifts as per direction of Engineer in charge. cum Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-600-00-P99","serial_label":null,"item_code":"40-600-00","item_code_raw_ocr":"40-600-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":99,"source_schedule_page":89,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"40-600-00 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-600-10-P99-SL167(1)","serial_label":"167(1)","item_code":"40-600-10","item_code_raw_ocr":"40-600-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Capacity 50 kg.","unit":"","rates":{"zone_a":55.22,"zone_b":55.22,"zone_c":55.22,"zone_d":55.22},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":99,"source_schedule_page":89,"raw_rate_tokens":["55.22","55.22","55.22","55.22"],"source_review_note":null,"search_text":"40-600-10 Capacity 50 kg. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-600-20-P99-SL167(2)","serial_label":"167(2)","item_code":"40-600-20","item_code_raw_ocr":"40-600-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Capacity 75 kg.","unit":"","rates":{"zone_a":62.58,"zone_b":62.58,"zone_c":62.58,"zone_d":62.58},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":99,"source_schedule_page":89,"raw_rate_tokens":["62.58","62.58","62.58","62.58"],"source_review_note":null,"search_text":"40-600-20 Capacity 75 kg. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-610-00-P99-SL168","serial_label":"168","item_code":"40-610-00","item_code_raw_ocr":"40-610-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Supplying 2nd hand gunny bags in nos . . good condition at site :","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":99,"source_schedule_page":89,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-610-00 Supplying 2nd hand gunny bags in nos . . good condition at site : Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-610-10-P99-SL168(1)","serial_label":"168(1)","item_code":"40-610-10","item_code_raw_ocr":"40-610-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Capacity 50 kg. no","unit":"","rates":{"zone_a":33.74,"zone_b":33.74,"zone_c":33.74,"zone_d":33.74},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":99,"source_schedule_page":89,"raw_rate_tokens":["33.74","33.74","33.74","33.74"],"source_review_note":null,"search_text":"40-610-10 Capacity 50 kg. no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-610-20-P99-SL168(2)","serial_label":"168(2)","item_code":"40-610-20","item_code_raw_ocr":"40-610-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Capacity 75 kg.","unit":"","rates":{"zone_a":43.19,"zone_b":43.19,"zone_c":43.19,"zone_d":43.19},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":99,"source_schedule_page":89,"raw_rate_tokens":["43.19","43.19","43.19","43.19"],"source_review_note":null,"search_text":"40-610-20 Capacity 75 kg. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-620-10-P99-SL169(1)","serial_label":"169(1)","item_code":"40-620-10","item_code_raw_ocr":"40-620-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Capacity 50 kg. / no 2331 23.31 23.31 23.31","unit":"","rates":{"zone_a":23.31,"zone_b":23.31,"zone_c":23.31,"zone_d":23.31},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":99,"source_schedule_page":89,"raw_rate_tokens":["2331","23.31","23.31","23.31"],"source_review_note":null,"search_text":"40-620-10 Capacity 50 kg. / no 2331 23.31 23.31 23.31 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-620-20-P99-SL169(2)","serial_label":"169(2)","item_code":"40-620-20","item_code_raw_ocr":"40-620-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") Capacity 75 kg. Labour charge for filling empty gunny or synthetic bags with sand or earth, sewing the end with sutly,","unit":"no","rates":{"zone_a":29.45,"zone_b":29.45,"zone_c":29.45,"zone_d":29.45},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":99,"source_schedule_page":89,"raw_rate_tokens":["29.45","29.45","29.45","29.45"],"source_review_note":null,"search_text":"40-620-20 ) Capacity 75 kg. Labour charge for filling empty gunny or synthetic bags with sand or earth, sewing the end with sutly, no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-630-00-P99-SL170","serial_label":"170","item_code":"40-630-00","item_code_raw_ocr":"40-630-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"above water position within the site as per direction of .Engineer in charge. = Capacity 50 kg (Fill volume =","unit":"","rates":{"zone_a":30.0,"zone_b":11.47,"zone_c":11.3,"zone_d":11.3},"rate_integrity_status":"numeric_outlier_review_required","autofill_eligible":false,"source_pdf_page":99,"source_schedule_page":89,"raw_rate_tokens":["030","11.47","11.30","11.30"],"source_review_note":null,"search_text":"40-630-00 above water position within the site as per direction of .Engineer in charge. = Capacity 50 kg (Fill volume = Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-630-20-P99-SL170(2)","serial_label":"170(2)","item_code":"40-630-20","item_code_raw_ocr":"40-630-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Capacity 75 ke (Fill volume = 1, 0.040 cum). Labour charge for filling empty gunny or synthetic bags with sand or earth, sewing the end with sutly, NU","unit":"","rates":{"zone_a":19.4,"zone_b":18.11,"zone_c":18.11,"zone_d":16.94},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":99,"source_schedule_page":89,"raw_rate_tokens":["19.40","18.11","18.11","16.94"],"source_review_note":null,"search_text":"40-630-20 Capacity 75 ke (Fill volume = 1, 0.040 cum). Labour charge for filling empty gunny or synthetic bags with sand or earth, sewing the end with sutly, NU Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-640-00-P99-SL171","serial_label":"171","item_code":"40-640-00","item_code_raw_ocr":"40-640-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"under water position within the site as per direction of Engineer -in- Charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":99,"source_schedule_page":89,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"40-640-00 under water position within the site as per direction of Engineer -in- Charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-640-10-P99-SL171(1)","serial_label":"171(1)","item_code":"40-640-10","item_code_raw_ocr":"40-640-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Capacity + 50 kg (Fill Volume = 1. 1471 14.54 14.54 13.84 0.030 cum) _","unit":"","rates":{"zone_a":14.71,"zone_b":14.54,"zone_c":14.54,"zone_d":13.84},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":99,"source_schedule_page":89,"raw_rate_tokens":["1471","14.54","14.54","13.84"],"source_review_note":null,"search_text":"40-640-10 Capacity + 50 kg (Fill Volume = 1. 1471 14.54 14.54 13.84 0.030 cum) _ Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-640-20-P99-SL171(2)","serial_label":"171(2)","item_code":"40-640-20","item_code_raw_ocr":"40-640-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Capacity : 75 kg (Fill Volume = 1, 0.040 cum) _ Supplying and filling empty gunny/synthetic bags as approved in design & drawing with sand/","unit":"","rates":{"zone_a":9.97,"zone_b":22.44,"zone_c":22.44,"zone_d":21.28},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":99,"source_schedule_page":89,"raw_rate_tokens":["99.74","22.44","22.44","21.28"],"source_review_note":null,"search_text":"40-640-20 Capacity : 75 kg (Fill Volume = 1, 0.040 cum) _ Supplying and filling empty gunny/synthetic bags as approved in design & drawing with sand/ Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-650-00-P99-SL172","serial_label":"172","item_code":"40-650-00","item_code_raw_ocr":"40-650-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"earth available at site sewing the nos . . end with sutly, including carrying and placing in position within the site with supply of all materials as = per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":99,"source_schedule_page":89,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-650-00 earth available at site sewing the nos . . end with sutly, including carrying and placing in position within the site with supply of all materials as = per direction of Engineer in charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-650-10-P99-SL172(1)","serial_label":"172(1)","item_code":"40-650-10","item_code_raw_ocr":"40-650-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Capacity : 50 kg (New gunny bags) no _","unit":"","rates":{"zone_a":68.61,"zone_b":68.61,"zone_c":68.61,"zone_d":68.22},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":99,"source_schedule_page":89,"raw_rate_tokens":["68.61","68.61","68.61","68.22"],"source_review_note":null,"search_text":"40-650-10 Capacity : 50 kg (New gunny bags) no _ Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-650-20-P99-SL172(2)","serial_label":"172(2)","item_code":"40-650-20","item_code_raw_ocr":"40-650-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"ban *50- kg 2nd hand gunny 4,","unit":"","rates":{"zone_a":47.13,"zone_b":47.13,"zone_c":47.13,"zone_d":46.75},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":99,"source_schedule_page":89,"raw_rate_tokens":["47.13","47.13","47.13","46.75"],"source_review_note":null,"search_text":"40-650-20 ban *50- kg 2nd hand gunny 4, Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-660-00-P100-SL173","serial_label":"173","item_code":"40-660-00","item_code_raw_ocr":"40-660-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"position and mixing with mixture machine with desined water cement ratio & curing as per specification and direction of the Engineer-in-charge. Sand cement new gunny bag ( 50","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":100,"source_schedule_page":90,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-660-00 position and mixing with mixture machine with desined water cement ratio & curing as per specification and direction of the Engineer-in-charge. Sand cement new gunny bag ( 50 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-660-10-P100-SL173(1)","serial_label":"173(1)","item_code":"40-660-10","item_code_raw_ocr":"40-660-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Kg; sand cement 8:1; Fill vol = 0.026 cum) Sand cement 2nd hand gunny bag","unit":"no","rates":{"zone_a":187.28,"zone_b":186.72,"zone_c":185.99,"zone_d":182.64},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":100,"source_schedule_page":90,"raw_rate_tokens":["187.28","186.72","185.99","182.64"],"source_review_note":null,"search_text":"40-660-10 Kg; sand cement 8:1; Fill vol = 0.026 cum) Sand cement 2nd hand gunny bag no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-660-20-P100-SL173(2)","serial_label":"173(2)","item_code":"40-660-20","item_code_raw_ocr":"40-660-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"(50 Kg; sand cement 8:1; Fill vol.= 0.026 cum) Sand cement new gunny bag ( 75","unit":"","rates":{"zone_a":165.81,"zone_b":165.25,"zone_c":164.52,"zone_d":161.16},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":100,"source_schedule_page":90,"raw_rate_tokens":["165.81","165.25","164.52","161.16"],"source_review_note":null,"search_text":"40-660-20 (50 Kg; sand cement 8:1; Fill vol.= 0.026 cum) Sand cement new gunny bag ( 75 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-660-30-P100-SL173(3)","serial_label":"173(3)","item_code":"40-660-30","item_code_raw_ocr":"40-660-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Kg; sand cement 8:1; Fill vol = 0.031 cum) Sand cement 2nd hand gunny bag (","unit":"no","rates":{"zone_a":255.78,"zone_b":254.94,"zone_c":253.84,"zone_d":248.8},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":100,"source_schedule_page":90,"raw_rate_tokens":["255.78","254.94","253.84","248.80"],"source_review_note":null,"search_text":"40-660-30 Kg; sand cement 8:1; Fill vol = 0.031 cum) Sand cement 2nd hand gunny bag ( no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-660-40-P100-SL173(4)","serial_label":"173(4)","item_code":"40-660-40","item_code_raw_ocr":"40-660-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"75 Kg; sand cement 8:1; Fill vol= 0.031 cum) Protective work with sand cement (6:1 proportion) filled 3/4th in 75Kg gunny~ bags _—_ (sand F.M>=1.00) including supply of all materials and necessary sewing,","unit":"no","rates":{"zone_a":236.4,"zone_b":235.56,"zone_c":234.45,"zone_d":229.41},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":100,"source_schedule_page":90,"raw_rate_tokens":["236.40","235.56","234.45","229.41"],"source_review_note":null,"search_text":"40-660-40 75 Kg; sand cement 8:1; Fill vol= 0.031 cum) Protective work with sand cement (6:1 proportion) filled 3/4th in 75Kg gunny~ bags _—_ (sand F.M>=1.00) including supply of all materials and necessary sewing, no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-670-00-P100-SL174","serial_label":"174","item_code":"40-670-00","item_code_raw_ocr":"40-670-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"position and mixing with mixture machine with designed water cement ratio & curing as per specification and direction of Engineer-in-charge. Sand cement new gunny bag ( 75","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":100,"source_schedule_page":90,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-670-00 position and mixing with mixture machine with designed water cement ratio & curing as per specification and direction of Engineer-in-charge. Sand cement new gunny bag ( 75 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-670-30-P100-SL174(1)","serial_label":"174(1)","item_code":"40-670-30","item_code_raw_ocr":"40-670-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Kg; sand cement 6:1; Fill vol = 0.031 cum) Protective work with sand cement (OPC) (4:1 proportion) filled 3/4th in 75Kg gunny bags (sand F.M>=1.00) including supply of all materials and necessary sewing,","unit":"no","rates":{"zone_a":277.91,"zone_b":277.07,"zone_c":275.99,"zone_d":270.95},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":100,"source_schedule_page":90,"raw_rate_tokens":["277.91","277.07","275.99","270.95"],"source_review_note":null,"search_text":"40-670-30 Kg; sand cement 6:1; Fill vol = 0.031 cum) Protective work with sand cement (OPC) (4:1 proportion) filled 3/4th in 75Kg gunny bags (sand F.M>=1.00) including supply of all materials and necessary sewing, no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-675-00-P100-SL175","serial_label":"175","item_code":"40-675-00","item_code_raw_ocr":"40-675-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"position and mixing with mixture machine with designed water cement ratio & curing as per specification and direction of Engineer-in-charge. b Ob a f- :","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":100,"source_schedule_page":90,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-675-00 position and mixing with mixture machine with designed water cement ratio & curing as per specification and direction of Engineer-in-charge. b Ob a f- : Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-675-30-P101-SL175(1)","serial_label":"175(1)","item_code":"40-675-30","item_code_raw_ocr":"40-675-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Kg; sand cement 4:1; Fill vol = 0.031 cum) Supplying, sizing and placing in position local hard wood bullah such as Sonali gul, Tetul, Jam etc. including all taxes and incidental","unit":"","rates":{"zone_a":319.79,"zone_b":318.92,"zone_c":317.93,"zone_d":312.89},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":["319.79","318.92","317.93","312.89"],"source_review_note":null,"search_text":"40-675-30 Kg; sand cement 4:1; Fill vol = 0.031 cum) Supplying, sizing and placing in position local hard wood bullah such as Sonali gul, Tetul, Jam etc. including all taxes and incidental Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-680-00-P101-SL176","serial_label":"176","item_code":"40-680-00","item_code_raw_ocr":"40-680-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"charges (bullah measured at 1/3rd. m . . length from thick end excluding the bark) etc. complete as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-680-00 charges (bullah measured at 1/3rd. m . . length from thick end excluding the bark) etc. complete as per direction of Engineer in charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-680-10-P101-SL176(1)","serial_label":"176(1)","item_code":"40-680-10","item_code_raw_ocr":"40-680-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"10 cm to 13 em","unit":"","rates":{"zone_a":282.22,"zone_b":257.68,"zone_c":257.68,"zone_d":269.95},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":["282.22","257.68","257.68","269.95"],"source_review_note":null,"search_text":"40-680-10 10 cm to 13 em Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-680-20-P101-SL176(2)","serial_label":"176(2)","item_code":"40-680-20","item_code_raw_ocr":"40-680-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Above 13 cm to 15 cm m","unit":"","rates":{"zone_a":321.48,"zone_b":321.48,"zone_c":321.48,"zone_d":321.48},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":["321.48","321.48","321.48","321.48"],"source_review_note":null,"search_text":"40-680-20 Above 13 cm to 15 cm m Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-680-30-P101-SL176(3)","serial_label":"176(3)","item_code":"40-680-30","item_code_raw_ocr":"40-680-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Above 15 cm to 18 cm 'm 380.38 343.57 343.57 36811","unit":"","rates":{"zone_a":380.38,"zone_b":343.57,"zone_c":343.57,"zone_d":368.11},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":["380.38","343.57","343.57","36811"],"source_review_note":null,"search_text":"40-680-30 Above 15 cm to 18 cm 'm 380.38 343.57 343.57 36811 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-680-40-P101-SL176(4)","serial_label":"176(4)","item_code":"40-680-40","item_code_raw_ocr":"40-680-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Above 18 cm to 20 em m 429.46 38651 386.51 404.92","unit":"","rates":{"zone_a":429.46,"zone_b":386.51,"zone_c":386.51,"zone_d":404.92},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":["429.46","38651","386.51","404.92"],"source_review_note":null,"search_text":"40-680-40 Above 18 cm to 20 em m 429.46 38651 386.51 404.92 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-680-50-P101-SL176(5)","serial_label":"176(5)","item_code":"40-680-50","item_code_raw_ocr":"40-680-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Above 20 cm to 23 cm","unit":"","rates":{"zone_a":527.62,"zone_b":472.41,"zone_c":472.41,"zone_d":503.08},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":["527.62","472.41","472.41","503.08"],"source_review_note":null,"search_text":"40-680-50 Above 20 cm to 23 cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-680-60-P101-SL176(6)","serial_label":"176(6)","item_code":"40-680-60","item_code_raw_ocr":"40-680-60","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Above 23 cm. Labour charge for driving local hard bullah such as Sonali gul, Tetul, Jam etc. bullah piles on dry","unit":"m","rates":{"zone_a":539.89,"zone_b":490.81,"zone_c":490.81,"zone_d":515.35},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":["539.89","490.81","490.81","515.35"],"source_review_note":null,"search_text":"40-680-60 Above 23 cm. Labour charge for driving local hard bullah such as Sonali gul, Tetul, Jam etc. bullah piles on dry m Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-690-00-P101-SL177","serial_label":"177","item_code":"40-690-00","item_code_raw_ocr":"40-690-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"complete including charges for all equipments as per direction of an Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-690-00 complete including charges for all equipments as per direction of an Engineer in charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-690-10-P101","serial_label":null,"item_code":"40-690-10","item_code_raw_ocr":"40-690-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"10 cm to 13 cm me","unit":"","rates":{"zone_a":173.04,"zone_b":169.63,"zone_c":169.63,"zone_d":160.15},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":["173.04","169.63","169.63","160.15"],"source_review_note":null,"search_text":"40-690-10 10 cm to 13 cm me Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-690-20-P101","serial_label":null,"item_code":"40-690-20","item_code_raw_ocr":"40-690-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Above 13 cm to 15 cm ;","unit":"m","rates":{"zone_a":207.63,"zone_b":203.54,"zone_c":203.54,"zone_d":192.17},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":["207.63","203.54","203.54","192.17"],"source_review_note":null,"search_text":"40-690-20 Above 13 cm to 15 cm ; m Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-690-30-P101-SL177(3)","serial_label":"177(3)","item_code":"40-690-30","item_code_raw_ocr":"40-690-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") Above 15 cm to 18 cm im","unit":"","rates":{"zone_a":235.86,"zone_b":231.22,"zone_c":231.22,"zone_d":218.3},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":["235.86","231.22","231.22","218.30"],"source_review_note":null,"search_text":"40-690-30 ) Above 15 cm to 18 cm im Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-690-40-P101-SL177(4)","serial_label":"177(4)","item_code":"40-690-40","item_code_raw_ocr":"40-690-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Above 18 cm to 20 cm m","unit":"","rates":{"zone_a":259.55,"zone_b":254.44,"zone_c":254.44,"zone_d":240.23},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":["259.55","254.44","254.44","240.23"],"source_review_note":null,"search_text":"40-690-40 Above 18 cm to 20 cm m Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-690-50-P101-SL177(5)","serial_label":"177(5)","item_code":"40-690-50","item_code_raw_ocr":"40-690-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Above 20 cm to 23 cm","unit":"m","rates":{"zone_a":288.26,"zone_b":282.58,"zone_c":282.58,"zone_d":266.79},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":["288.26","282.58","282.58","266.79"],"source_review_note":null,"search_text":"40-690-50 Above 20 cm to 23 cm m Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-690-60-P101-SL177(6)","serial_label":"177(6)","item_code":"40-690-60","item_code_raw_ocr":"40-690-60","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Above 23 cm. m Labour charge for driving hard wood bullah, such as Sonali gul, Tetul, Jam etc.bullah piles in water","unit":"","rates":{"zone_a":345.97,"zone_b":339.16,"zone_c":339.16,"zone_d":320.21},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":["345.97","339.16","339.16","320.21"],"source_review_note":null,"search_text":"40-690-60 Above 23 cm. m Labour charge for driving hard wood bullah, such as Sonali gul, Tetul, Jam etc.bullah piles in water Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-700-00-P101-SL178","serial_label":"178","item_code":"40-700-00","item_code_raw_ocr":"40-700-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"by monkey hammer, including 7 . . supplying and erection of all necessary staging boat derricks and other equipments, etc. complete as per direction of Engineer in charge: _","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-700-00 by monkey hammer, including 7 . . supplying and erection of all necessary staging boat derricks and other equipments, etc. complete as per direction of Engineer in charge: _ Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-700-10-P101-SL178(1)","serial_label":"178(1)","item_code":"40-700-10","item_code_raw_ocr":"40-700-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"10 cm to 13 cm 217.02 213.10 21340 202.21","unit":"","rates":{"zone_a":217.02,"zone_b":213.1,"zone_c":213.4,"zone_d":202.21},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":["217.02","213.10","21340","202.21"],"source_review_note":null,"search_text":"40-700-10 10 cm to 13 cm 217.02 213.10 21340 202.21 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-700-20-P101-SL178(2)","serial_label":"178(2)","item_code":"40-700-20","item_code_raw_ocr":"40-700-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Above 13 cm to 15 cm","unit":"","rates":{"zone_a":259.56,"zone_b":254.93,"zone_c":254.93,"zone_d":242.15},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":["259.56","254.93","254.93","242.15"],"source_review_note":null,"search_text":"40-700-20 Above 13 cm to 15 cm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-700-30-P101-SL178(3)","serial_label":"178(3)","item_code":"40-700-30","item_code_raw_ocr":"40-700-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Above 15 cm to 18 cm","unit":"m","rates":{"zone_a":299.49,"zone_b":294.15,"zone_c":294.15,"zone_d":279.29},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":["299.49","294.15","294.15","279.29"],"source_review_note":null,"search_text":"40-700-30 Above 15 cm to 18 cm m Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-700-40-P101-SL178(4)","serial_label":"178(4)","item_code":"40-700-40","item_code_raw_ocr":"40-700-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Above 18 cm to 20 cm","unit":"m","rates":{"zone_a":329.32,"zone_b":323.44,"zone_c":323.44,"zone_d":307.1},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":["329.32","323.44","323.44","307.10"],"source_review_note":null,"search_text":"40-700-40 Above 18 cm to 20 cm m Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-700-50-P101-SL178(5)","serial_label":"178(5)","item_code":"40-700-50","item_code_raw_ocr":"40-700-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Above 20 cm to 23 cm","unit":"m","rates":{"zone_a":366.02,"zone_b":359.49,"zone_c":359.49,"zone_d":341.33},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":["366.02","359.49","359.49","341.33"],"source_review_note":null,"search_text":"40-700-50 Above 20 cm to 23 cm m Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-700-60-P101-SL178(6)","serial_label":"178(6)","item_code":"40-700-60","item_code_raw_ocr":"40-700-60","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Above 23 cm. m 439.17 431.35 431.35 409,55 Supplying, fitting and fixing ofhalf sawn local hard wood walling","unit":"","rates":{"zone_a":439.17,"zone_b":431.35,"zone_c":431.35,"zone_d":409.55},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":["439.17","431.35","431.35","409,55"],"source_review_note":null,"search_text":"40-700-60 Above 23 cm. m 439.17 431.35 431.35 409,55 Supplying, fitting and fixing ofhalf sawn local hard wood walling Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-710-00-P101-SL179","serial_label":"179","item_code":"40-710-00","item_code_raw_ocr":"40-710-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"pieces, fitted with 20mm. dia bolts m . . . and nuts at 1.0m c/c etc. complete as per directoin of Engineer in charge:","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":101,"source_schedule_page":91,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-710-00 pieces, fitted with 20mm. dia bolts m . . . and nuts at 1.0m c/c etc. complete as per directoin of Engineer in charge: Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-710-05-P102-SL179(1)","serial_label":"179(1)","item_code":"40-710-05","item_code_raw_ocr":"40-710-05","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"13 cm to 15 cm dia m","unit":"","rates":{"zone_a":219.32,"zone_b":219.22,"zone_c":219.22,"zone_d":217.72},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":102,"source_schedule_page":92,"raw_rate_tokens":["219.32","219.22","219.22","217.72"],"source_review_note":null,"search_text":"40-710-05 13 cm to 15 cm dia m Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-710-10-P102-SL179(2)","serial_label":"179(2)","item_code":"40-710-10","item_code_raw_ocr":"40-710-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"} 15 cm to 18 cm dia","unit":"m","rates":{"zone_a":253.45,"zone_b":234.92,"zone_c":234.92,"zone_d":245.59},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":102,"source_schedule_page":92,"raw_rate_tokens":["253.45","234.92","234.92","245.59"],"source_review_note":null,"search_text":"40-710-10 } 15 cm to 18 cm dia m Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-710-20-P102-SL179(3)","serial_label":"179(3)","item_code":"40-710-20","item_code_raw_ocr":"40-710-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Above 18 cm dia Supplying, sizing and placing of barrack bamboo pins and stays of","unit":"","rates":{"zone_a":282.84,"zone_b":261.23,"zone_c":261.23,"zone_d":268.72},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":102,"source_schedule_page":92,"raw_rate_tokens":["282.84","261.23","261.23","268.72"],"source_review_note":null,"search_text":"40-710-20 Above 18 cm dia Supplying, sizing and placing of barrack bamboo pins and stays of Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-720-00-P102-SL180","serial_label":"180","item_code":"40-720-00","item_code_raw_ocr":"40-720-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"diameter >= 8.0 cm in position etc. complete as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":102,"source_schedule_page":92,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-720-00 diameter >= 8.0 cm in position etc. complete as per direction of Engineer in charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-720-10-P102-SL180(1)","serial_label":"180(1)","item_code":"40-720-10","item_code_raw_ocr":"40-720-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Length: >=","unit":"","rates":{"zone_a":339.66,"zone_b":308.94,"zone_c":308.94,"zone_d":327.19},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":102,"source_schedule_page":92,"raw_rate_tokens":["339.66","308.94","30894","327.19"],"source_review_note":null,"search_text":"40-720-10 Length: >= Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-720-20-P102-SL180(2)","serial_label":"180(2)","item_code":"40-720-20","item_code_raw_ocr":"40-720-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Length: >= Labour charge for driving barrack bamboo pins of diameter >= 8.0","unit":"","rates":{"zone_a":169.86,"zone_b":154.5,"zone_c":154.5,"zone_d":163.62},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":102,"source_schedule_page":92,"raw_rate_tokens":["169.86","154.50","154.50","163.62"],"source_review_note":null,"search_text":"40-720-20 Length: >= Labour charge for driving barrack bamboo pins of diameter >= 8.0 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-730-00-P102-SL181","serial_label":"181","item_code":"40-730-00","item_code_raw_ocr":"40-730-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"cm, by hammer or monkey m hammer, as per direction of Engineer in charge. = = i","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":102,"source_schedule_page":92,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-730-00 cm, by hammer or monkey m hammer, as per direction of Engineer in charge. = = i Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-730-10-P102","serial_label":null,"item_code":"40-730-10","item_code_raw_ocr":"40-730-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"a >= 1.50 m to <= 2.0 m drive, in","unit":"","rates":{"zone_a":215.2,"zone_b":211.3,"zone_c":211.3,"zone_d":195.71},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":102,"source_schedule_page":92,"raw_rate_tokens":["21520","211.30","211.30","195.71"],"source_review_note":null,"search_text":"40-730-10 a >= 1.50 m to <= 2.0 m drive, in Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-730-20-P102-SL181(2)","serial_label":"181(2)","item_code":"40-730-20","item_code_raw_ocr":"40-730-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"water including necessary staging etc, as required.","unit":"m","rates":{"zone_a":112.93,"zone_b":110.98,"zone_c":110.98,"zone_d":103.19},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":102,"source_schedule_page":92,"raw_rate_tokens":["112.93","110.98","110.98","103.19"],"source_review_note":null,"search_text":"40-730-20 water including necessary staging etc, as required. m Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-730-30-P102-SL181(3)","serial_label":"181(3)","item_code":"40-730-30","item_code_raw_ocr":"40-730-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") >= >= 0.75 m to < 1.50 m, in water","unit":"","rates":{"zone_a":143.73,"zone_b":141.13,"zone_c":141.13,"zone_d":130.74},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":102,"source_schedule_page":92,"raw_rate_tokens":["143.73","141.13","141.13","130.74"],"source_review_note":null,"search_text":"40-730-30 ) >= >= 0.75 m to < 1.50 m, in water Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-730-40-P102-SL181(4)","serial_label":"181(4)","item_code":"40-730-40","item_code_raw_ocr":"40-730-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"including necessary staging etc. as required. Supplying, sizing and fitting in position 8.0 cm and above dia in size full barrack bamboo half split","unit":"m","rates":{"zone_a":77.23,"zone_b":75.93,"zone_c":75.93,"zone_d":70.74},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":102,"source_schedule_page":92,"raw_rate_tokens":["77.23","75.93","75.93","70.74"],"source_review_note":null,"search_text":"40-730-40 including necessary staging etc. as required. Supplying, sizing and fitting in position 8.0 cm and above dia in size full barrack bamboo half split m Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-740-00-P102-SL182","serial_label":"182","item_code":"40-740-00","item_code_raw_ocr":"40-740-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"1.00 m apart including supply of all materials as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":102,"source_schedule_page":92,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-740-00 1.00 m apart including supply of all materials as per direction of Engineer in charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-740-10-P102-SL182(1)","serial_label":"182(1)","item_code":"40-740-10","item_code_raw_ocr":"40-740-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Double Walling. m","unit":"","rates":{"zone_a":91.9,"zone_b":86.38,"zone_c":86.38,"zone_d":88.28},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":102,"source_schedule_page":92,"raw_rate_tokens":["91.90","86.38","86.38","88.28"],"source_review_note":null,"search_text":"40-740-10 Double Walling. m Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-740-20-P102-SL182(2)","serial_label":"182(2)","item_code":"40-740-20","item_code_raw_ocr":"40-740-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Single Walling. m Labour charge for taking out bullah from river bed (measurement for the driven portion to be taken only); or cross ties walling pieces, including cutting and opening out","unit":"","rates":{"zone_a":52.82,"zone_b":50.06,"zone_c":50.06,"zone_d":51.01},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":102,"source_schedule_page":92,"raw_rate_tokens":["52.82","50.06","50.06","51.01"],"source_review_note":null,"search_text":"40-740-20 Single Walling. m Labour charge for taking out bullah from river bed (measurement for the driven portion to be taken only); or cross ties walling pieces, including cutting and opening out Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-750-00-P102","serial_label":null,"item_code":"40-750-00","item_code_raw_ocr":"40-750-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"183 [/ bolts and nuts; or old bamboo . pieces and struts from river bed and stacking the materials on the bank as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":102,"source_schedule_page":92,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-750-00 183 [/ bolts and nuts; or old bamboo . pieces and struts from river bed and stacking the materials on the bank as per direction of Engineer in charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-750-10-P102-SL183(1)","serial_label":"183(1)","item_code":"40-750-10","item_code_raw_ocr":"40-750-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Bullah","unit":"","rates":{"zone_a":64.11,"zone_b":62.95,"zone_c":62.95,"zone_d":58.28},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":102,"source_schedule_page":92,"raw_rate_tokens":["64.11","62.95","62.95","58.28"],"source_review_note":null,"search_text":"40-750-10 Bullah Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-750-20-P102-SL183(2)","serial_label":"183(2)","item_code":"40-750-20","item_code_raw_ocr":"40-750-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Walling pieces","unit":"m","rates":{"zone_a":16.87,"zone_b":16.56,"zone_c":16.56,"zone_d":15.34},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":102,"source_schedule_page":92,"raw_rate_tokens":["16.87","16.56","16.56","15.34"],"source_review_note":null,"search_text":"40-750-20 Walling pieces m Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-750-30-P102-SL183(3)","serial_label":"183(3)","item_code":"40-750-30","item_code_raw_ocr":"40-750-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Old bamboo pieces and struts Supplying and placing in position and fitting, fixing single layer","unit":"no","rates":{"zone_a":13.5,"zone_b":13.25,"zone_c":13.25,"zone_d":12.27},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":102,"source_schedule_page":92,"raw_rate_tokens":["13.50","13.25","13.25","12.27"],"source_review_note":null,"search_text":"40-750-30 Old bamboo pieces and struts Supplying and placing in position and fitting, fixing single layer no Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-760-00-P102-SL184","serial_label":"184","item_code":"40-760-00","item_code_raw_ocr":"40-760-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"‘aah doubly woven matting with 54) / necessary ties including the cost of all materials etc. complete as per direction of Engineer in charge. vA ay @a gd ~~ :","unit":"","rates":{"zone_a":93.35,"zone_b":233.23,"zone_c":233.23,"zone_d":232.35},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":102,"source_schedule_page":92,"raw_rate_tokens":["933.45","233.23","233.23","232.35"],"source_review_note":null,"search_text":"40-760-00 ‘aah doubly woven matting with 54) / necessary ties including the cost of all materials etc. complete as per direction of Engineer in charge. vA ay @a gd ~~ : Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-770-00-P103-SL185","serial_label":"185","item_code":"40-770-00","item_code_raw_ocr":"40-770-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"including carriage of all materials S4™ to work site, as per direction of Engineer in charge. Brick mattressing work, 150 mm thick, with Ist. class bricks, encased in double layers of 12 SWG galvanised wire netting, 100 mm hexagonal mesh, including fixing, spreading and tying both upper and lower layers with 12 SWG galvanised wire at 60cm c/c including anchoring with 1.5m","unit":"","rates":{"zone_a":360.37,"zone_b":359.93,"zone_c":359.93,"zone_d":358.17},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":103,"source_schedule_page":93,"raw_rate_tokens":["360.37","359.93","359.93","358.17"],"source_review_note":null,"search_text":"40-770-00 including carriage of all materials S4™ to work site, as per direction of Engineer in charge. Brick mattressing work, 150 mm thick, with Ist. class bricks, encased in double layers of 12 SWG galvanised wire netting, 100 mm hexagonal mesh, including fixing, spreading and tying both upper and lower layers with 12 SWG galvanised wire at 60cm c/c including anchoring with 1.5m Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-810-00-P103-SL186","serial_label":"186","item_code":"40-810-00","item_code_raw_ocr":"40-810-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"long 75mm to 100mm_ dia sqm wooden/bamboo post at 3.0m c/c both ways (at least 1.2m of the post shall be driven under ground and 0.3m shall be above ground level to facilitate tying), box cutting to required depth, fine dressing of base and supplying of all materials etc. complete and as per direction of Engineer in charge: Labour charge for _ brick mattressing work, 150 mm thick, with Ist class bricks, encased in double layers of 12 SWG galvanised wire netting, 100mm hexagonal mesh, including fixing, spreading and tying both upper and lower layers, with 12 SWG galvanised wire at 60cm c/c, including anchoring with 1.5m long 75mm to 100mm _ dia","unit":"","rates":{"zone_a":2444.21,"zone_b":2438.05,"zone_c":2399.1,"zone_d":2347.47},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":103,"source_schedule_page":93,"raw_rate_tokens":["2,444.21","2,438.05","2,399.10","2,347.47"],"source_review_note":null,"search_text":"40-810-00 long 75mm to 100mm_ dia sqm wooden/bamboo post at 3.0m c/c both ways (at least 1.2m of the post shall be driven under ground and 0.3m shall be above ground level to facilitate tying), box cutting to required depth, fine dressing of base and supplying of all materials etc. complete and as per direction of Engineer in charge: Labour charge for _ brick mattressing work, 150 mm thick, with Ist class bricks, encased in double layers of 12 SWG galvanised wire netting, 100mm hexagonal mesh, including fixing, spreading and tying both upper and lower layers, with 12 SWG galvanised wire at 60cm c/c, including anchoring with 1.5m long 75mm to 100mm _ dia Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-820-00-P103-SL187","serial_label":"187","item_code":"40-820-00","item_code_raw_ocr":"40-820-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"wooden/bamboo posts at both ways (at least 1.2m of the post shall be driven under ground and 0.3m shall be above ground to facilitate tying), box cutting to required depth and fine dressing of base, excluding the cost of bricks, wire net and GJ. wire, but including the cost of bamboo/wooden posts etc. complete and as per direction of Engineer in charge: Labour charge for _ brick mattressing with Ist class bricks, 75mm thick, covered with single layer of 12 SWG galvanised wire","unit":"","rates":{"zone_a":291.38,"zone_b":286.35,"zone_c":286.35,"zone_d":269.36},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":103,"source_schedule_page":93,"raw_rate_tokens":["291.38","286.35","286.35","269.36"],"source_review_note":null,"search_text":"40-820-00 wooden/bamboo posts at both ways (at least 1.2m of the post shall be driven under ground and 0.3m shall be above ground to facilitate tying), box cutting to required depth and fine dressing of base, excluding the cost of bricks, wire net and GJ. wire, but including the cost of bamboo/wooden posts etc. complete and as per direction of Engineer in charge: Labour charge for _ brick mattressing with Ist class bricks, 75mm thick, covered with single layer of 12 SWG galvanised wire Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-830-00-P103-SL188","serial_label":"188","item_code":"40-830-00","item_code_raw_ocr":"40-830-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"\"etting, 100mm hexagonal mesh, som including fixing, spreading and tying with 12 SWG galvanised wire and anchoring with 1.5m long 75mm to 100mm dia bamboo at 3.0m c/c both ways, box cutting to Note: Technical Specitication for Civil Works, Specification of Materials and General Instructions for Exegution of Works kK q@ GG €& :","unit":"","rates":{"zone_a":121.82,"zone_b":118.79,"zone_c":118.79,"zone_d":112.94},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":103,"source_schedule_page":93,"raw_rate_tokens":["121.82","118.79","118.79","112.94"],"source_review_note":null,"search_text":"40-830-00 \"etting, 100mm hexagonal mesh, som including fixing, spreading and tying with 12 SWG galvanised wire and anchoring with 1.5m long 75mm to 100mm dia bamboo at 3.0m c/c both ways, box cutting to Note: Technical Specitication for Civil Works, Specification of Materials and General Instructions for Exegution of Works kK q@ GG €& : Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-840-00-P104-SL189","serial_label":"189","item_code":"40-840-00","item_code_raw_ocr":"40-840-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") itching with 12 SWG galvanised °° ’ . wire, tying the same and laying in position under water in bed or slope of canal/river, with supply of all materials etc. complete and as per direction of Engineer in charge: 0.90mx0.60mx0.45m, with first","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":104,"source_schedule_page":94,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-840-00 ) itching with 12 SWG galvanised °° ’ . wire, tying the same and laying in position under water in bed or slope of canal/river, with supply of all materials etc. complete and as per direction of Engineer in charge: 0.90mx0.60mx0.45m, with first Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-840-10-P104-SL189(1)","serial_label":"189(1)","item_code":"40-840-10","item_code_raw_ocr":"40-840-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"class bricks/brick bats (minimum each 7 1/2 brick).","unit":"","rates":{"zone_a":3203.87,"zone_b":3200.24,"zone_c":3139.5,"zone_d":3085.65},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":104,"source_schedule_page":94,"raw_rate_tokens":["3,203.87","3,200.24","3,139.50","3,085.65"],"source_review_note":null,"search_text":"40-840-10 class bricks/brick bats (minimum each 7 1/2 brick). Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-840-20-P104-SL189(2)","serial_label":"189(2)","item_code":"40-840-20","item_code_raw_ocr":"40-840-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"boulders (minimum size 120mm). each","unit":"","rates":{"zone_a":3154.35,"zone_b":3311.41,"zone_c":2908.88,"zone_d":2853.44},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":104,"source_schedule_page":94,"raw_rate_tokens":["3,154.35","3,311.41","2,908.88","2,853.44"],"source_review_note":null,"search_text":"40-840-20 boulders (minimum size 120mm). each Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-840-30-P104-SL189(3)","serial_label":"189(3)","item_code":"40-840-30","item_code_raw_ocr":"40-840-30","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"first class bricks/brick bats each (minimum 1/2 brick).","unit":"","rates":{"zone_a":2256.79,"zone_b":2254.09,"zone_c":2213.6,"zone_d":2173.67},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":104,"source_schedule_page":94,"raw_rate_tokens":["2,256.79","2,254.09","2,213.60","2,173.67"],"source_review_note":null,"search_text":"40-840-30 first class bricks/brick bats each (minimum 1/2 brick). Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-840-40-P104-SL189(4)","serial_label":"189(4)","item_code":"40-840-40","item_code_raw_ocr":"40-840-40","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"0-60mx : L. boulders (minimum size 120mm) Vf","unit":"","rates":{"zone_a":999.55,"zone_b":2329.86,"zone_c":2061.51,"zone_d":2020.43},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":104,"source_schedule_page":94,"raw_rate_tokens":["9995.45","2,329.86","2,061.51","2,020.43"],"source_review_note":null,"search_text":"40-840-40 0-60mx : L. boulders (minimum size 120mm) Vf Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-840-50-P104-SL189(5)","serial_label":"189(5)","item_code":"40-840-50","item_code_raw_ocr":"40-840-50","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") first class bricks/brick bats each (minimum 1/2 brick). __ $j ——— a","unit":"","rates":{"zone_a":1666.7,"zone_b":1664.67,"zone_c":1636.44,"zone_d":1605.69},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":104,"source_schedule_page":94,"raw_rate_tokens":["1,666.70","1,664.67","1,636.44","1,605.69"],"source_review_note":null,"search_text":"40-840-50 ) first class bricks/brick bats each (minimum 1/2 brick). __ $j ——— a Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-840-60-P104-SL189(6)","serial_label":"189(6)","item_code":"40-840-60","item_code_raw_ocr":"40-840-60","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"0-50mx boulders (minimum size 120mm). Labour charge for untying and removing the wire nets and picking","unit":"","rates":{"zone_a":1642.5,"zone_b":1714.88,"zone_c":1528.44,"zone_d":1496.89},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":104,"source_schedule_page":94,"raw_rate_tokens":["1,642.50","1,714.88","1,528.44","1,496.89"],"source_review_note":null,"search_text":"40-840-60 0-50mx boulders (minimum size 120mm). Labour charge for untying and removing the wire nets and picking Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-850-00-P104-SL190","serial_label":"190","item_code":"40-850-00","item_code_raw_ocr":"40-850-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"the same as per direction of _ Engineer in charge:","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":104,"source_schedule_page":94,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-850-00 the same as per direction of _ Engineer in charge: Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-850-10-P104-SL190(1)","serial_label":"190(1)","item_code":"40-850-10","item_code_raw_ocr":"40-850-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"75mm thick brick mattressing. sqm 2342 23.13 23.13 21.72","unit":"","rates":{"zone_a":23.42,"zone_b":23.13,"zone_c":23.13,"zone_d":21.72},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":104,"source_schedule_page":94,"raw_rate_tokens":["2342","23.13","23.13","21.72"],"source_review_note":null,"search_text":"40-850-10 75mm thick brick mattressing. sqm 2342 23.13 23.13 21.72 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-850-20-P104-SL190(2)","serial_label":"190(2)","item_code":"40-850-20","item_code_raw_ocr":"40-850-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"150mm thick brick mattressing. 4455 44.01 44,01 41.35 Supplying, sizing, fitting and laying in position of different sizes of Bamboo fascines, making the fascines @0.30m c/c both ways to be built up with bundles of one way full size bamboo and other way binder 2 split barrack bamboo be","unit":"","rates":{"zone_a":44.55,"zone_b":44.01,"zone_c":44.01,"zone_d":41.35},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":104,"source_schedule_page":94,"raw_rate_tokens":["4455","44.01","44,01","41.35"],"source_review_note":null,"search_text":"40-850-20 150mm thick brick mattressing. 4455 44.01 44,01 41.35 Supplying, sizing, fitting and laying in position of different sizes of Bamboo fascines, making the fascines @0.30m c/c both ways to be built up with bundles of one way full size bamboo and other way binder 2 split barrack bamboo be Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-855-00-P104-SL191","serial_label":"191","item_code":"40-855-00","item_code_raw_ocr":"40-855-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"made from (80-100) mm dia barrack bamboo with overlapping } at least 1.5 m & fastening them with nylon rope of minimum 6mm dia @0.3 m c/c both ways, laying 4 mm thickness and 550 gm/sqm geo-textile mattress at bottom of the bamboo __fascines _ with","unit":"sqm","rates":{"zone_a":686.1,"zone_b":650.57,"zone_c":650.57,"zone_d":663.2},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":104,"source_schedule_page":94,"raw_rate_tokens":["686.10","650.57","650.57","663.20"],"source_review_note":null,"search_text":"40-855-00 made from (80-100) mm dia barrack bamboo with overlapping } at least 1.5 m & fastening them with nylon rope of minimum 6mm dia @0.3 m c/c both ways, laying 4 mm thickness and 550 gm/sqm geo-textile mattress at bottom of the bamboo __fascines _ with sqm Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-860-00-P105-SL192","serial_label":"192","item_code":"40-860-00","item_code_raw_ocr":"40-860-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"bates(not smaller than 1/2 brick/ boulders (not less than 150mm), as per approved design and placing/ dumping the same in position under water in slope and in bed of the river etc. complete and as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":105,"source_schedule_page":95,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-860-00 bates(not smaller than 1/2 brick/ boulders (not less than 150mm), as per approved design and placing/ dumping the same in position under water in slope and in bed of the river etc. complete and as per direction of Engineer in charge. Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-860-10-P105-SL192(1)","serial_label":"192(1)","item_code":"40-860-10","item_code_raw_ocr":"40-860-10","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Filled with bricks/brickbats. 8,501.31 8,447.32 8,640.45","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":105,"source_schedule_page":95,"raw_rate_tokens":null,"source_review_note":null,"search_text":"40-860-10 Filled with bricks/brickbats. 8,501.31 8,447.32 8,640.45 Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-860-20-P105-SL192(2)","serial_label":"192(2)","item_code":"40-860-20","item_code_raw_ocr":"40-860-20","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":") Filled with boulders. each Construction of double row bamboo spur, with full length barrack bamboo, 60mm to 75mm ~ c/e, 1.5m apart and single row runner with half split bamboo on both sides, of each row, fixing with","unit":"","rates":{"zone_a":8939.16,"zone_b":8576.5,"zone_c":8218.7,"zone_d":8411.83},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":105,"source_schedule_page":95,"raw_rate_tokens":["8,939.16","8,576.50","8,218.70","8,411.83"],"source_review_note":null,"search_text":"40-860-20 ) Filled with boulders. each Construction of double row bamboo spur, with full length barrack bamboo, 60mm to 75mm ~ c/e, 1.5m apart and single row runner with half split bamboo on both sides, of each row, fixing with Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-870-00-P105-SL193","serial_label":"193","item_code":"40-870-00","item_code_raw_ocr":"40-870-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Country nails, and double layers cross tie at 3.0m interval and 1.5m apart, including 2.4m to 3.0m driving of bamboo pins by monkey hammer, necessary staging etc. complete with supply of all materials and as per drawing and direction of Engineer in charge. Construction of double row bamboo spur, with full length barrack bamboo of average 60mm to 75mm dia and 4.5m to 6.0m long, at 0.30m c/c, two rows at 1.5m apart and stays with bamboo at 3.0m apart on D/S side of the “220. spur and single row runner with","unit":"","rates":{"zone_a":939.6,"zone_b":2231.77,"zone_c":2231.77,"zone_d":2273.86},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":105,"source_schedule_page":95,"raw_rate_tokens":["9395.99","2,231.77","2,231.77","2,273.86"],"source_review_note":null,"search_text":"40-870-00 Country nails, and double layers cross tie at 3.0m interval and 1.5m apart, including 2.4m to 3.0m driving of bamboo pins by monkey hammer, necessary staging etc. complete with supply of all materials and as per drawing and direction of Engineer in charge. Construction of double row bamboo spur, with full length barrack bamboo of average 60mm to 75mm dia and 4.5m to 6.0m long, at 0.30m c/c, two rows at 1.5m apart and stays with bamboo at 3.0m apart on D/S side of the “220. spur and single row runner with Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-880-00-P105-SL194","serial_label":"194","item_code":"40-880-00","item_code_raw_ocr":"40-880-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"half split bamboo on both sides of each row and double layers cross tie at 3.0m interval, including 2.4m to 3.0m driving of bamboo pins by monkey hammer, necessary staging etc. complete with supply of all materials including local carriage within 150m and as per","unit":"","rates":{"zone_a":4123.92,"zone_b":3873.9,"zone_c":3873.9,"zone_d":3918.93},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":105,"source_schedule_page":95,"raw_rate_tokens":["4,123.92","3,873.90","3,873.90","3,918.93"],"source_review_note":null,"search_text":"40-880-00 half split bamboo on both sides of each row and double layers cross tie at 3.0m interval, including 2.4m to 3.0m driving of bamboo pins by monkey hammer, necessary staging etc. complete with supply of all materials including local carriage within 150m and as per Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-890-00-P106-SL195","serial_label":"195","item_code":"40-890-00","item_code_raw_ocr":"40-890-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"SPlit bamboo on both sides ofeach 5, 5.93971 5,449.10 5,449.10 5,611.42 row, double layer cross tie at 3.0m interval, including 2.4m to 3.0m driving of bamboo pins by monkey hammer, necessary staging etc. complete with supply of all materials including local carriage within 150m and as per drawing and direction of Engineer in charge. Construction of single row bamboo spur, with full length barrack bamboo of average 60mm _ to 75mm dia and 6.0m to 7.5m long, at 0.3m c/c and stays with bamboo at 3 m apart on the D/S side of the spur, double row runner with half split bamboo on both sides and also","unit":"","rates":{"zone_a":9397.1,"zone_b":5449.1,"zone_c":5449.1,"zone_d":5611.42},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":106,"source_schedule_page":96,"raw_rate_tokens":["93971","5,449.10","5,449.10","5,611.42"],"source_review_note":null,"search_text":"40-890-00 SPlit bamboo on both sides ofeach 5, 5.93971 5,449.10 5,449.10 5,611.42 row, double layer cross tie at 3.0m interval, including 2.4m to 3.0m driving of bamboo pins by monkey hammer, necessary staging etc. complete with supply of all materials including local carriage within 150m and as per drawing and direction of Engineer in charge. Construction of single row bamboo spur, with full length barrack bamboo of average 60mm _ to 75mm dia and 6.0m to 7.5m long, at 0.3m c/c and stays with bamboo at 3 m apart on the D/S side of the spur, double row runner with half split bamboo on both sides and also Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-900-00-P106-SL196","serial_label":"196","item_code":"40-900-00","item_code_raw_ocr":"40-900-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"with double layer cross tie at interval, including 2.4m to 3.0m driving of bamboo pins by monkey hammer, necessary staging etc. complete with supply of all materials including local carriage ! within 150m and as per drawing and direction of Engineer in charge. Supplying of brush wood compacted in bundle not more than 75cm. dia and 180cm. in length","unit":"","rates":{"zone_a":2534.52,"zone_b":2357.17,"zone_c":2357.17,"zone_d":2414.08},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":106,"source_schedule_page":96,"raw_rate_tokens":["2,534.52","2,357.17","2,357.17","2,414.08"],"source_review_note":null,"search_text":"40-900-00 with double layer cross tie at interval, including 2.4m to 3.0m driving of bamboo pins by monkey hammer, necessary staging etc. complete with supply of all materials including local carriage ! within 150m and as per drawing and direction of Engineer in charge. Supplying of brush wood compacted in bundle not more than 75cm. dia and 180cm. in length Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-910-00-P106-SL197","serial_label":"197","item_code":"40-910-00","item_code_raw_ocr":"40-910-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"tied securely with coir string and 1 67569 « 667.51 667.51 634.78 dumping the same in position etc. complete with supply of all materials and as per direction of Engineer in charge. Earth work in cutting and filling of eroded bank of river, channel etc. to design slope, including levelling, dressing and compacting the earth in 150mm layers and","unit":"","rates":{"zone_a":675.69,"zone_b":667.51,"zone_c":667.51,"zone_d":634.78},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":106,"source_schedule_page":96,"raw_rate_tokens":["67569","667.51","667.51","634.78"],"source_review_note":null,"search_text":"40-910-00 tied securely with coir string and 1 67569 « 667.51 667.51 634.78 dumping the same in position etc. complete with supply of all materials and as per direction of Engineer in charge. Earth work in cutting and filling of eroded bank of river, channel etc. to design slope, including levelling, dressing and compacting the earth in 150mm layers and Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-40-920-00-P106-SL198","serial_label":"198","item_code":"40-920-00","item_code_raw_ocr":"40-920-00","item_code_validation_status":"ocr_source_preserved","section_code":"40","section_title":"Protective Work","description":"Preparation of the base for bank gum protection work and use the excess material for filling the ditches on the bank within 50 m or specified in the drawing, if no ditches to be filled then excess material shall be disposed of at least 100 m from the _ t—","unit":"","rates":{"zone_a":253.44,"zone_b":248.87,"zone_c":248.87,"zone_d":230.46},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":106,"source_schedule_page":96,"raw_rate_tokens":["253.44","248.87","248.87","230.46"],"source_review_note":null,"search_text":"40-920-00 Preparation of the base for bank gum protection work and use the excess material for filling the ditches on the bank within 50 m or specified in the drawing, if no ditches to be filled then excess material shall be disposed of at least 100 m from the _ t— Protective Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-130-00-P107-SL199","serial_label":"199","item_code":"44-130-00","item_code_raw_ocr":"44-130-00","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"taxes, incidental charges, fitting and fixing the same in position by making all arrangements etc. complete, as per design, specification and direction of 7 Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":107,"source_schedule_page":97,"raw_rate_tokens":null,"source_review_note":null,"search_text":"44-130-00 taxes, incidental charges, fitting and fixing the same in position by making all arrangements etc. complete, as per design, specification and direction of 7 Engineer in charge."},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-130-10-P107-SL199(1)","serial_label":"199(1)","item_code":"44-130-10","item_code_raw_ocr":"44-130-10","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"400mm dia.","unit":"","rates":{"zone_a":9852.65,"zone_b":9852.65,"zone_c":9852.65,"zone_d":9849.96},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":107,"source_schedule_page":97,"raw_rate_tokens":["9,852.65","9,852.65","9,852.65","9,849.96"],"source_review_note":null,"search_text":"44-130-10 400mm dia."},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-130-20-P107-SL199(2)","serial_label":"199(2)","item_code":"44-130-20","item_code_raw_ocr":"44-130-20","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"500mm dia. m","unit":"","rates":{"zone_a":12240.44,"zone_b":12240.44,"zone_c":12240.44,"zone_d":12237.76},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":107,"source_schedule_page":97,"raw_rate_tokens":["12,240.44","12,240.44","12,240.44","12,237.76"],"source_review_note":null,"search_text":"44-130-20 500mm dia. m"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-130-30-P107","serial_label":null,"item_code":"44-130-30","item_code_raw_ocr":"44-130-30","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"600mm dia. _m_","unit":"","rates":{"zone_a":14668.37,"zone_b":14668.37,"zone_c":14668.37,"zone_d":14665.36},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":107,"source_schedule_page":97,"raw_rate_tokens":["14,668.37","14,668.37","14,668.37","14,665.36"],"source_review_note":null,"search_text":"44-130-30 600mm dia. _m_"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-130-40-P107-SL199(4)","serial_label":"199(4)","item_code":"44-130-40","item_code_raw_ocr":"44-130-40","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"700mm dia. m_","unit":"","rates":{"zone_a":17073.34,"zone_b":17073.34,"zone_c":17073.34,"zone_d":17070.34},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":107,"source_schedule_page":97,"raw_rate_tokens":["17,073.34","17,073.34","17,073.34","17,070.34"],"source_review_note":null,"search_text":"44-130-40 700mm dia. m_"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-130-50-P107-SL199(5)","serial_label":"199(5)","item_code":"44-130-50","item_code_raw_ocr":"44-130-50","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"800mm dia,","unit":"","rates":{"zone_a":19499.18,"zone_b":19499.18,"zone_c":19499.18,"zone_d":19495.95},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":107,"source_schedule_page":97,"raw_rate_tokens":["19,499.18","19,499.18","19,499.18","19,495.95"],"source_review_note":null,"search_text":"44-130-50 800mm dia,"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-130-60-P107-SL199(6)","serial_label":"199(6)","item_code":"44-130-60","item_code_raw_ocr":"44-130-60","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"900mm dia. m_","unit":"","rates":{"zone_a":21904.15,"zone_b":21904.15,"zone_c":21904.15,"zone_d":21900.93},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":107,"source_schedule_page":97,"raw_rate_tokens":["21,904.15","21,904.15","21,904.15","21,900.93"],"source_review_note":null,"search_text":"44-130-60 900mm dia. m_"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-130-70-P107","serial_label":null,"item_code":"44-130-70","item_code_raw_ocr":"44-130-70","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"250 mm dia. m","unit":"","rates":{"zone_a":6205.05,"zone_b":6205.05,"zone_c":6205.05,"zone_d":6202.69},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":107,"source_schedule_page":97,"raw_rate_tokens":["6,205.05","6,205.05","6,205.05","6,202.69"],"source_review_note":null,"search_text":"44-130-70 250 mm dia. m"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-130-80-P107-SL199(8)","serial_label":"199(8)","item_code":"44-130-80","item_code_raw_ocr":"44-130-80","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"200 mm dia. —m ee . Supplying at site U-Type hot rolled steel sheet pile of different section of Phosphorus=0.04%(Maximum), Sulphur = 0.04% (Maximum), Tensile strength=> 490 N/mm2 , Yield strength =>295 N/mmz2, m.to .","unit":"","rates":{"zone_a":3113.0,"zone_b":3113.0,"zone_c":5113.0,"zone_d":5110.63},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":107,"source_schedule_page":97,"raw_rate_tokens":["3,113.00","3,113.00","5,113.00","5,110.63"],"source_review_note":null,"search_text":"44-130-80 200 mm dia. —m ee . Supplying at site U-Type hot rolled steel sheet pile of different section of Phosphorus=0.04%(Maximum), Sulphur = 0.04% (Maximum), Tensile strength=> 490 N/mm2 , Yield strength =>295 N/mmz2, m.to ."},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-240-00-P107-SL200","serial_label":"200","item_code":"44-240-00","item_code_raw_ocr":"44-240-00","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"width= 400mm to 600mm: m.to Elongation =17% (Minimum) n including all taxes, freights, incidental charges etc. complete as per detail technical specification and direction of the Engineer -in- charge. U-Type, hot-rolled steel sheet pile","unit":"","rates":{"zone_a":116567.5,"zone_b":116567.5,"zone_c":116567.5,"zone_d":116567.5},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":107,"source_schedule_page":97,"raw_rate_tokens":["116,567.5","116,567.5","116,567.5","116,567.5"],"source_review_note":null,"search_text":"44-240-00 width= 400mm to 600mm: m.to Elongation =17% (Minimum) n including all taxes, freights, incidental charges etc. complete as per detail technical specification and direction of the Engineer -in- charge. U-Type, hot-rolled steel sheet pile"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-240-10-P107-SL200(1)","serial_label":"200(1)","item_code":"44-240-10","item_code_raw_ocr":"44-240-10","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"width= 400mm to 600mm: m.to ) oi oht=> 100mm, n 6 6 6 6 Thickness>=10.5mm. (£0.50mm) i U-Type, hot-rolled steel sheet pile","unit":"","rates":{"zone_a":6.0,"zone_b":6.0,"zone_c":6.0,"zone_d":6.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":107,"source_schedule_page":97,"raw_rate_tokens":["6","6","6","6"],"source_review_note":null,"search_text":"44-240-10 width= 400mm to 600mm: m.to ) oi oht=> 100mm, n 6 6 6 6 Thickness>=10.5mm. (£0.50mm) i U-Type, hot-rolled steel sheet pile"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-240-20-P107-SL200(2)","serial_label":"200(2)","item_code":"44-240-20","item_code_raw_ocr":"44-240-20","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"width= 400mm to 600mm: m.to height=> 130mm, n 6 6 6 6 Thickness>=13.0mm. (+0.50mm) U-Type, hot-rolled steel sheet pile","unit":"","rates":{"zone_a":6.0,"zone_b":6.0,"zone_c":6.0,"zone_d":6.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":107,"source_schedule_page":97,"raw_rate_tokens":["6","6","6","6"],"source_review_note":null,"search_text":"44-240-20 width= 400mm to 600mm: m.to height=> 130mm, n 6 6 6 6 Thickness>=13.0mm. (+0.50mm) U-Type, hot-rolled steel sheet pile"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-240-30-P107-SL200(3)","serial_label":"200(3)","item_code":"44-240-30","item_code_raw_ocr":"44-240-30","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"height=> 170mm, n 6 6 6 6 Thickness>=15.5mm. (+0.50mm) Supplying at site U-Type Plastic Sheet Piles of different section","unit":"","rates":{"zone_a":6.0,"zone_b":6.0,"zone_c":6.0,"zone_d":6.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":107,"source_schedule_page":97,"raw_rate_tokens":["6","6","6","6"],"source_review_note":null,"search_text":"44-240-30 height=> 170mm, n 6 6 6 6 Thickness>=15.5mm. (+0.50mm) Supplying at site U-Type Plastic Sheet Piles of different section"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-250-00-P107-SL201","serial_label":"201","item_code":"44-250-00","item_code_raw_ocr":"44-250-00","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"and modified with polymer Stabilizers to enhance chemical,","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":107,"source_schedule_page":97,"raw_rate_tokens":null,"source_review_note":null,"search_text":"44-250-00 and modified with polymer Stabilizers to enhance chemical,"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-250-10-P108-SL201(1)","serial_label":"201(1)","item_code":"44-250-10","item_code_raw_ocr":"44-250-10","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"} 400mm to 600mm, height=> sqm 200mm, Thickness>=9.0 mm Driving Plastic Sheet Piles of various sections and weights in any type of soil, installation by vibrator and rig with steel sheet pile guide including handling and placing in position, staging and supplying of all equipments like vibro hammer,","unit":"","rates":{"zone_a":12024.86,"zone_b":12024.86,"zone_c":12024.86,"zone_d":12024.86},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":108,"source_schedule_page":98,"raw_rate_tokens":["12,024.86","12,024.86","12,024.86","12,024.86"],"source_review_note":null,"search_text":"44-250-10 } 400mm to 600mm, height=> sqm 200mm, Thickness>=9.0 mm Driving Plastic Sheet Piles of various sections and weights in any type of soil, installation by vibrator and rig with steel sheet pile guide including handling and placing in position, staging and supplying of all equipments like vibro hammer,"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-260-00-P108-SL202","serial_label":"202","item_code":"44-260-00","item_code_raw_ocr":"44-260-00","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"including correcting _ leaning beyond tolerance & other defects and any other incidental cost etc. complete (measurement will be taken on projected width x height) as per direction of Engineer in charge. Driving steel sheet piles of various sections and weights in any type of soil, by monkey hammer including handling and placing in position, staging and supplying of all equipments like monkey hammer,","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":108,"source_schedule_page":98,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"44-260-00 including correcting _ leaning beyond tolerance & other defects and any other incidental cost etc. complete (measurement will be taken on projected width x height) as per direction of Engineer in charge. Driving steel sheet piles of various sections and weights in any type of soil, by monkey hammer including handling and placing in position, staging and supplying of all equipments like monkey hammer,"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-270-00-P108-SL203","serial_label":"203","item_code":"44-270-00","item_code_raw_ocr":"44-270-00","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"pully, rope, bamboo, bullah etc, sqm . . . including correcting _—_ leaning beyond tolerance & other defects and any other incidental cost etc. complete (measurement will be taken on projected width x height) as per direction of Engineer in charge. 2080) 4427010] Fla Type! UpioAS0mdephh wm 139554 LaTao7 1373.07 13mR09 .50 m depth. Driving steel sheet piles of various sections and weights in any type of soil, by mechanical device including handling and placing in position including supply of all materials and equipments related","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":108,"source_schedule_page":98,"raw_rate_tokens":null,"source_review_note":null,"search_text":"44-270-00 pully, rope, bamboo, bullah etc, sqm . . . including correcting _—_ leaning beyond tolerance & other defects and any other incidental cost etc. complete (measurement will be taken on projected width x height) as per direction of Engineer in charge. 2080) 4427010] Fla Type! UpioAS0mdephh wm 139554 LaTao7 1373.07 13mR09 .50 m depth. Driving steel sheet piles of various sections and weights in any type of soil, by mechanical device including handling and placing in position including supply of all materials and equipments related"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-290-00-P108-SL204","serial_label":"204","item_code":"44-290-00","item_code_raw_ocr":"44-290-00","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"including correcting _ leaning beyond tolerance and other defects etc. complete (measurement will be taken on projected width x height) as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":108,"source_schedule_page":98,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"44-290-00 including correcting _ leaning beyond tolerance and other defects etc. complete (measurement will be taken on projected width x height) as per direction of Engineer in charge."},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-290-10-P109-SL204(1)","serial_label":"204(1)","item_code":"44-290-10","item_code_raw_ocr":"44-290-10","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":") Flat Type : Upto","unit":"","rates":{"zone_a":1226.44,"zone_b":1216.89,"zone_c":1216.89,"zone_d":1199.15},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":109,"source_schedule_page":99,"raw_rate_tokens":["1,226.44","1,216.89","1,216.89","1,199.15"],"source_review_note":null,"search_text":"44-290-10 ) Flat Type : Upto"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-290-30-P109-SL204(3)","serial_label":"204(3)","item_code":"44-290-30","item_code_raw_ocr":"44-290-30","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"UType or any other type : Upto oo, 6.50 m depth. 7 . :","unit":"","rates":{"zone_a":1768.37,"zone_b":1757.08,"zone_c":1757.08,"zone_d":1725.83},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":109,"source_schedule_page":99,"raw_rate_tokens":["1768.37","1,757.08","1,757.08","1,725.83"],"source_review_note":null,"search_text":"44-290-30 UType or any other type : Upto oo, 6.50 m depth. 7 . :"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-290-40-P109-SL204(4)","serial_label":"204(4)","item_code":"44-290-40","item_code_raw_ocr":"44-290-40","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"U-TyPe or any other type : Upto sqm 12.50 m depth. Lifting steel sheet piles of any section and weights from any type of soil by mechanical device including handling and placing in","unit":"","rates":{"zone_a":2390.35,"zone_b":2379.06,"zone_c":2379.06,"zone_d":2349.11},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":109,"source_schedule_page":99,"raw_rate_tokens":["2,390.35","2,379.06","2,379.06","2,349.11"],"source_review_note":null,"search_text":"44-290-40 U-TyPe or any other type : Upto sqm 12.50 m depth. Lifting steel sheet piles of any section and weights from any type of soil by mechanical device including handling and placing in"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-300-00-P109-SL205","serial_label":"205","item_code":"44-300-00","item_code_raw_ocr":"44-300-00","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"stacks etc. complete (measurement sqm will be taken on projected width x height)including supply of all equipments etc. complete as per direction of Engineer in charge. _ a Supplying and placing 20mm thick hessian cloth impregnated with","unit":"","rates":{"zone_a":3714.53,"zone_b":3694.2,"zone_c":3694.2,"zone_d":3682.76},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":109,"source_schedule_page":99,"raw_rate_tokens":["3,714.53","3,694.20","3,694.20","3,682.76"],"source_review_note":null,"search_text":"44-300-00 stacks etc. complete (measurement sqm will be taken on projected width x height)including supply of all equipments etc. complete as per direction of Engineer in charge. _ a Supplying and placing 20mm thick hessian cloth impregnated with"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-310-00-P109","serial_label":null,"item_code":"44-310-00","item_code_raw_ocr":"44-310-00","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"Pitumen in expansion joints or on top of sheet piles as per specification. and direction of Engineer in charge. _L 2 Cutting of steel sheet piles to design length and shape as per","unit":"","rates":{"zone_a":615.42,"zone_b":615.38,"zone_c":615.38,"zone_d":607.58},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":109,"source_schedule_page":99,"raw_rate_tokens":["615.42","615.38","615.38","607.58"],"source_review_note":null,"search_text":"44-310-00 Pitumen in expansion joints or on top of sheet piles as per specification. and direction of Engineer in charge. _L 2 Cutting of steel sheet piles to design length and shape as per"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-320-00-P109-SL207","serial_label":"207","item_code":"44-320-00","item_code_raw_ocr":"44-320-00","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"and as per direction of Engineer in charge. oe _","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":109,"source_schedule_page":99,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"44-320-00 and as per direction of Engineer in charge. oe _"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-320-10-P109-SL207(1)","serial_label":"207(1)","item_code":"44-320-10","item_code_raw_ocr":"44-320-10","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"} Upto 10mm thick.","unit":"m","rates":{"zone_a":50.2,"zone_b":49.94,"zone_c":49.94,"zone_d":47.69},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":109,"source_schedule_page":99,"raw_rate_tokens":["50.20","49.94","49.94","47.69"],"source_review_note":null,"search_text":"44-320-10 } Upto 10mm thick. m"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-320-20-P109-SL207(2)","serial_label":"207(2)","item_code":"44-320-20","item_code_raw_ocr":"44-320-20","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"Above 10mm thick. Jointing steel sheet piles Of different thickness by welding to increase the length of pile as per requirement including necessary","unit":"m","rates":{"zone_a":59.56,"zone_b":59.24,"zone_c":59.24,"zone_d":56.42},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":109,"source_schedule_page":99,"raw_rate_tokens":["59.56","59.24","59.24","56.42"],"source_review_note":null,"search_text":"44-320-20 Above 10mm thick. Jointing steel sheet piles Of different thickness by welding to increase the length of pile as per requirement including necessary m"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-330-00-P109-SL208","serial_label":"208","item_code":"44-330-00","item_code_raw_ocr":"44-330-00","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"modification of the ends to receive the weld, supply of welding materials, equipments and other accessories as per specification and direction of Engineer in charge. __ Fabrication and construction of corner Joints in steel sheet piles including cutting, welding, shaping as per design and specification and","unit":"m","rates":{"zone_a":1003.71,"zone_b":1002.35,"zone_c":1002.35,"zone_d":990.09},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":109,"source_schedule_page":99,"raw_rate_tokens":["1,003.71","1,002.35","1,002.35","990.09"],"source_review_note":null,"search_text":"44-330-00 modification of the ends to receive the weld, supply of welding materials, equipments and other accessories as per specification and direction of Engineer in charge. __ Fabrication and construction of corner Joints in steel sheet piles including cutting, welding, shaping as per design and specification and m"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-340-00-P109-SL209","serial_label":"209","item_code":"44-340-00","item_code_raw_ocr":"44-340-00","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"as per requirement including supply of necessary welding materials, equipments and other accessories as per specification and direction of Engineer in charge. i Sinking open caisson in all kinds of soils by using mechanical or manually operated grabs including use of bentonite or any other","unit":"m","rates":{"zone_a":477.96,"zone_b":476.43,"zone_c":476.43,"zone_d":464.34},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":109,"source_schedule_page":99,"raw_rate_tokens":["477.96","476.43","476.43","464.34"],"source_review_note":null,"search_text":"44-340-00 as per requirement including supply of necessary welding materials, equipments and other accessories as per specification and direction of Engineer in charge. i Sinking open caisson in all kinds of soils by using mechanical or manually operated grabs including use of bentonite or any other m"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-360-00-P109-SL210","serial_label":"210","item_code":"44-360-00","item_code_raw_ocr":"44-360-00","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"driving, additional weight where necessary etc. complete including supply of all equipments, manpower and __ other allied TA TA) _ ,","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":109,"source_schedule_page":99,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"44-360-00 driving, additional weight where necessary etc. complete including supply of all equipments, manpower and __ other allied TA TA) _ ,"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-360-30-P110","serial_label":null,"item_code":"44-360-30","item_code_raw_ocr":"44-360-30","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"210(3). 6.00 m to 9.00 m. sqm 2,057.93 ——>_ SE","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":110,"source_schedule_page":100,"raw_rate_tokens":null,"source_review_note":null,"search_text":"44-360-30 210(3). 6.00 m to 9.00 m. sqm 2,057.93 ——>_ SE"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-360-40-P110-SL210(4)","serial_label":"210(4)","item_code":"44-360-40","item_code_raw_ocr":"44-360-40","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"Above 9.00 m. sqm 3,372.57 3,371.76 Manufacturing and _— supplying 30mm thick pre-cast ferro-cement sheet pile in construction of drain/ sluice/ culvert/ outlet and any other works in leanest mix 1:2 with sand of FM>=2.0 to attain a minimum 28 day cylinder strength of 20.00 N/mm? including __ screening, grading and washing aggregates with clear water, mixing, laying in forms, consolidating, curing,","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":110,"source_schedule_page":100,"raw_rate_tokens":null,"source_review_note":null,"search_text":"44-360-40 Above 9.00 m. sqm 3,372.57 3,371.76 Manufacturing and _— supplying 30mm thick pre-cast ferro-cement sheet pile in construction of drain/ sluice/ culvert/ outlet and any other works in leanest mix 1:2 with sand of FM>=2.0 to attain a minimum 28 day cylinder strength of 20.00 N/mm? including __ screening, grading and washing aggregates with clear water, mixing, laying in forms, consolidating, curing,"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-370-00-P110-SL211","serial_label":"211","item_code":"44-370-00","item_code_raw_ocr":"44-370-00","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"] fsting. Placing wire-mesh in <1. 177897 position, welding, including making grooves and keys as per approved design and drawing including tools, plants, preparation of platform, shuttering (timber shutter with sheet lining and polythene sheet) and stacking in measurable stacks including cost of all materials and labour (excluding the cost of M.S work for reinforcement) etc. complete as per direction of Engineer in charge. Driving pre-cast ferro-cement sheet pile upto 2.0 m depth including layout, _ providing centreline and bench mark pillars, carriage of piles from yard to driving point, placing the same in row and position, staging,","unit":"","rates":{"zone_a":1778.97,"zone_b":1766.35,"zone_c":1766.37,"zone_d":1752.04},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":110,"source_schedule_page":100,"raw_rate_tokens":["177897","1,766.35","1,766.37","1,752.04"],"source_review_note":null,"search_text":"44-370-00 ] fsting. Placing wire-mesh in <1. 177897 position, welding, including making grooves and keys as per approved design and drawing including tools, plants, preparation of platform, shuttering (timber shutter with sheet lining and polythene sheet) and stacking in measurable stacks including cost of all materials and labour (excluding the cost of M.S work for reinforcement) etc. complete as per direction of Engineer in charge. Driving pre-cast ferro-cement sheet pile upto 2.0 m depth including layout, _ providing centreline and bench mark pillars, carriage of piles from yard to driving point, placing the same in row and position, staging,"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-380-00-P110-SL212","serial_label":"212","item_code":"44-380-00","item_code_raw_ocr":"44-380-00","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"Plumbing, providing horizontal .) runners, water jetting where necessary including supply of all equipments like timber dolly, pulley, rope, bamboo, bullah, hammer etc. complete (measurement will be taken on projected width x height) as per direction of Engineer in charge. Execution of sand pile through displacement method by using tripod rig, mechanical winch, special type drop hammer","unit":"","rates":{"zone_a":395.95,"zone_b":388.1,"zone_c":388.1,"zone_d":373.93},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":110,"source_schedule_page":100,"raw_rate_tokens":["395.95","388.10","388.10","373.93"],"source_review_note":null,"search_text":"44-380-00 Plumbing, providing horizontal .) runners, water jetting where necessary including supply of all equipments like timber dolly, pulley, rope, bamboo, bullah, hammer etc. complete (measurement will be taken on projected width x height) as per direction of Engineer in charge. Execution of sand pile through displacement method by using tripod rig, mechanical winch, special type drop hammer"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-400-00-P110-SL213","serial_label":"213","item_code":"44-400-00","item_code_raw_ocr":"44-400-00","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"(weighing minimum casing pipe of inner dia 250mm to 300mm upto a maximum depth of 6.5m, compacting the sand with desired sand force volume and FM oe a a Z AL. @_ f /","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":110,"source_schedule_page":100,"raw_rate_tokens":null,"source_review_note":null,"search_text":"44-400-00 (weighing minimum casing pipe of inner dia 250mm to 300mm upto a maximum depth of 6.5m, compacting the sand with desired sand force volume and FM oe a a Z AL. @_ f /"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-400-05-P111-SL213(1)","serial_label":"213(1)","item_code":"44-400-05","item_code_raw_ocr":"44-400-05","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":") Sand_foree Vol. 0.15 cum/m, 1 aggo 46911 473.71 466.46 FM>=1.5 Sand force Vol. 0.15 cum/m,","unit":"","rates":{"zone_a":1000.0,"zone_b":469.11,"zone_c":473.71,"zone_d":466.46},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":111,"source_schedule_page":101,"raw_rate_tokens":["1","46911","473.71","466.46"],"source_review_note":null,"search_text":"44-400-05 ) Sand_foree Vol. 0.15 cum/m, 1 aggo 46911 473.71 466.46 FM>=1.5 Sand force Vol. 0.15 cum/m,"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-400-10-P111-SL213(2)","serial_label":"213(2)","item_code":"44-400-10","item_code_raw_ocr":"44-400-10","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"Eves 5 g om","unit":"","rates":{"zone_a":607.66,"zone_b":595.37,"zone_c":599.97,"zone_d":591.61},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":111,"source_schedule_page":101,"raw_rate_tokens":["607.66","595.37","599.97","591.61"],"source_review_note":null,"search_text":"44-400-10 Eves 5 g om"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-400-15-P111-SL213(3)","serial_label":"213(3)","item_code":"44-400-15","item_code_raw_ocr":"44-400-15","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"Sand force Vol. FM>=2.5","unit":"","rates":{"zone_a":696.07,"zone_b":613.77,"zone_c":618.37,"zone_d":610.02},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":111,"source_schedule_page":101,"raw_rate_tokens":["696.07","613.77","61837","610.02"],"source_review_note":null,"search_text":"44-400-15 Sand force Vol. FM>=2.5"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-400-20-P111-SL213(4)","serial_label":"213(4)","item_code":"44-400-20","item_code_raw_ocr":"44-400-20","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"Sand_foree Vol. “ FM>=1.5","unit":"","rates":{"zone_a":642.11,"zone_b":629.16,"zone_c":635.29,"zone_d":625.45},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":111,"source_schedule_page":101,"raw_rate_tokens":["642.11","629.16","635.29","625.45"],"source_review_note":null,"search_text":"44-400-20 Sand_foree Vol. “ FM>=1.5"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-400-25-P111-SL213(5)","serial_label":"213(5)","item_code":"44-400-25","item_code_raw_ocr":"44-400-25","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"Sand_ force Vol. FM>=2.0","unit":"","rates":{"zone_a":813.9,"zone_b":797.5,"zone_c":803.64,"zone_d":792.33},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":111,"source_schedule_page":101,"raw_rate_tokens":["813.90","797.50","803.64","792.33"],"source_review_note":null,"search_text":"44-400-25 Sand_ force Vol. FM>=2.0"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-400-30-P111-SL213(6)","serial_label":"213(6)","item_code":"44-400-30","item_code_raw_ocr":"44-400-30","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"Sand_foree Vol. ! FM>=2.5.","unit":"","rates":{"zone_a":838.44,"zone_b":822.04,"zone_c":828.18,"zone_d":816.87},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":111,"source_schedule_page":101,"raw_rate_tokens":["838.44","822.04","82818","816.87"],"source_review_note":null,"search_text":"44-400-30 Sand_foree Vol. ! FM>=2.5."},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-400-35-P111-SL213(7)","serial_label":"213(7)","item_code":"44-400-35","item_code_raw_ocr":"44-400-35","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"Sand_ force Vol 0.25 cum/m, 1, gor64 78644 79411 781.81 FM>=1,5","unit":"","rates":{"zone_a":1.0,"zone_b":78644.0,"zone_c":79411.0,"zone_d":78181.0},"rate_integrity_status":"numeric_outlier_review_required","autofill_eligible":false,"source_pdf_page":111,"source_schedule_page":101,"raw_rate_tokens":["1,","78644","79411","781.81"],"source_review_note":null,"search_text":"44-400-35 Sand_ force Vol 0.25 cum/m, 1, gor64 78644 79411 781.81 FM>=1,5"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-400-40-P111-SL213(8)","serial_label":"213(8)","item_code":"44-400-40","item_code_raw_ocr":"44-400-40","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"Sand force Vol. ! FM>=2.0","unit":"","rates":{"zone_a":1737.0,"zone_b":996.88,"zone_c":1004.55,"zone_d":990.41},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":111,"source_schedule_page":101,"raw_rate_tokens":["1737","996.88","1,004.55","990.41"],"source_review_note":null,"search_text":"44-400-40 Sand force Vol. ! FM>=2.0"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-400-45-P111-SL213(9)","serial_label":"213(9)","item_code":"44-400-45","item_code_raw_ocr":"44-400-45","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"Sand_force Vol. FM>=2.5","unit":"","rates":{"zone_a":1948.05,"zone_b":1027.56,"zone_c":1035.22,"zone_d":1021.08},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":111,"source_schedule_page":101,"raw_rate_tokens":["1948.05","1,027.56","1,035.22","1,021.08"],"source_review_note":null,"search_text":"44-400-45 Sand_force Vol. FM>=2.5"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-400-50-P111-SL213(10)","serial_label":"213(10)","item_code":"44-400-50","item_code_raw_ocr":"44-400-50","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"Samd_ foree Vol. 0.30 cum/m, 5, 95765 93821 947.41 932.91 FM>=1.5","unit":"","rates":{"zone_a":95765.0,"zone_b":93821.0,"zone_c":94741.0,"zone_d":93291.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":111,"source_schedule_page":101,"raw_rate_tokens":["95765","93821","947.41","932.91"],"source_review_note":null,"search_text":"44-400-50 Samd_ foree Vol. 0.30 cum/m, 5, 95765 93821 947.41 932.91 FM>=1.5"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-400-55-P111-SL213(11)","serial_label":"213(11)","item_code":"44-400-55","item_code_raw_ocr":"44-400-55","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"Sand_ force Vol. FM>=2.0","unit":"","rates":{"zone_a":1153.2,"zone_b":1190.73,"zone_c":1199.94,"zone_d":1183.22},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":111,"source_schedule_page":101,"raw_rate_tokens":["11532","1,190.73","1,199.94","1,183.22"],"source_review_note":null,"search_text":"44-400-55 Sand_ force Vol. FM>=2.0"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-400-60-P111-SL213(12)","serial_label":"213(12)","item_code":"44-400-60","item_code_raw_ocr":"44-400-60","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"nae ee Vol. / Sand force Vol. 0.35 cum/m,","unit":"","rates":{"zone_a":1252.13,"zone_b":1227.54,"zone_c":1236.75,"zone_d":1220.04},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":111,"source_schedule_page":101,"raw_rate_tokens":["1,252.13","1,227.54","1,236.75","1,220.04"],"source_review_note":null,"search_text":"44-400-60 nae ee Vol. / Sand force Vol. 0.35 cum/m,"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-400-65-P111-SL213(13)","serial_label":"213(13)","item_code":"44-400-65","item_code_raw_ocr":"44-400-65","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"oars 1 5 m","unit":"","rates":{"zone_a":1123.7,"zone_b":1101.02,"zone_c":1111.76,"zone_d":1094.54},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":111,"source_schedule_page":101,"raw_rate_tokens":["1,123.70","1,101.02","1,111.76","1,094.54"],"source_review_note":null,"search_text":"44-400-65 oars 1 5 m"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-400-70-P111","serial_label":null,"item_code":"44-400-70","item_code_raw_ocr":"44-400-70","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"Sand_ force Vol. FM>=2.0","unit":"","rates":{"zone_a":4474.32,"zone_b":1395.63,"zone_c":1406.37,"zone_d":1386.57},"rate_integrity_status":"numeric_outlier_review_required","autofill_eligible":false,"source_pdf_page":111,"source_schedule_page":101,"raw_rate_tokens":["4474.32","1,395.63","1,406.37","1,386.57"],"source_review_note":null,"search_text":"44-400-70 Sand_ force Vol. FM>=2.0"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-44-400-75-P111-SL213(15)","serial_label":"213(15)","item_code":"44-400-75","item_code_raw_ocr":"44-400-75","item_code_validation_status":"ocr_source_preserved","section_code":"44","section_title":null,"description":"Samd_force Vol. FM>=2.5 48. Turfing and Tree Planting Fine dressing and close turfing of the slopes and the crest of embankment with 75mm. thick, good quality durba or charkanta sods of size 200mm x 200mm, with","unit":"","rates":{"zone_a":467.97,"zone_b":1438.58,"zone_c":1449.31,"zone_d":1429.52},"rate_integrity_status":"numeric_outlier_review_required","autofill_eligible":false,"source_pdf_page":111,"source_schedule_page":101,"raw_rate_tokens":["467.97","1,438.58","1,449.31","1,429.52"],"source_review_note":null,"search_text":"44-400-75 Samd_force Vol. FM>=2.5 48. Turfing and Tree Planting Fine dressing and close turfing of the slopes and the crest of embankment with 75mm. thick, good quality durba or charkanta sods of size 200mm x 200mm, with"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-48-100-00-P111-SL214","serial_label":"214","item_code":"48-100-00","item_code_raw_ocr":"48-100-00","item_code_validation_status":"ocr_source_preserved","section_code":"48","section_title":"Turfing and Tree Planting","description":"} all leads and lifts, including ramming, watering until the turf grows properly, maintaining etc. complete (measurement will be given on well grown grass only). as per direction of Engineer in charge. Plantation of","unit":"sqm","rates":{"zone_a":39.26,"zone_b":38.77,"zone_c":38.77,"zone_d":36.81},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":111,"source_schedule_page":101,"raw_rate_tokens":["39.26","38.77","38.77","36.81"],"source_review_note":null,"search_text":"48-100-00 } all leads and lifts, including ramming, watering until the turf grows properly, maintaining etc. complete (measurement will be given on well grown grass only). as per direction of Engineer in charge. Plantation of sqm Turfing and Tree Planting"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-48-110-00-P111-SL215","serial_label":"215","item_code":"48-110-00","item_code_raw_ocr":"48-110-00","item_code_validation_status":"ocr_source_preserved","section_code":"48","section_title":"Turfing and Tree Planting","description":"Vetiver/Napier/Hogla/Chhon sqm Grass tiller @ 0.2m c/c interval in yA a B_ L- we /","unit":"","rates":{"zone_a":31.6,"zone_b":31.29,"zone_c":31.29,"zone_d":30.06},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":111,"source_schedule_page":101,"raw_rate_tokens":["31.60","31.29","31.29","30.06"],"source_review_note":null,"search_text":"48-110-00 Vetiver/Napier/Hogla/Chhon sqm Grass tiller @ 0.2m c/c interval in yA a B_ L- we / Turfing and Tree Planting"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-48-130-00-P112-SL216","serial_label":"216","item_code":"48-130-00","item_code_raw_ocr":"48-130-00","item_code_validation_status":"ocr_source_preserved","section_code":"48","section_title":"Turfing and Tree Planting","description":"Planting @ not more than 30 cm) apart including supplying, sizing, taping and nursing etc. complete as per direction of the Engineer in charge. Plantation of coconut — plant including cutting earth and supplying at site 75cm to 90cm long plant including putting manure and salt by digging 60cm","unit":"","rates":{"zone_a":7.01,"zone_b":6.9,"zone_c":6.9,"zone_d":6.42},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":112,"source_schedule_page":102,"raw_rate_tokens":["7.01","6.90","6.90","6.42"],"source_review_note":null,"search_text":"48-130-00 Planting @ not more than 30 cm) apart including supplying, sizing, taping and nursing etc. complete as per direction of the Engineer in charge. Plantation of coconut — plant including cutting earth and supplying at site 75cm to 90cm long plant including putting manure and salt by digging 60cm Turfing and Tree Planting"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-48-210-00-P112-SL217","serial_label":"217","item_code":"48-210-00","item_code_raw_ocr":"48-210-00","item_code_validation_status":"ocr_source_preserved","section_code":"48","section_title":"Turfing and Tree Planting","description":"Ji hole to a depth of average each 45cm, supplying 10.0 kg of manure & 1.0 kg. salt and keeping it wet for one month before plantation including guarding and watering the plant for 6 months as per direction of Engineer in Charge. Plantation of all kinds of timber plants and fruit plants such as Mehegany, Teak, Sal, Chamble, Mango, Jack, Lichi, Kul ete including cutting earth and supplying at site average 1.0m height plant, including putting manure by digging 45cm dia hole,","unit":"","rates":{"zone_a":536.09,"zone_b":530.36,"zone_c":530.36,"zone_d":507.44},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":112,"source_schedule_page":102,"raw_rate_tokens":["536.09","530.36","530.36","507.44"],"source_review_note":null,"search_text":"48-210-00 Ji hole to a depth of average each 45cm, supplying 10.0 kg of manure & 1.0 kg. salt and keeping it wet for one month before plantation including guarding and watering the plant for 6 months as per direction of Engineer in Charge. Plantation of all kinds of timber plants and fruit plants such as Mehegany, Teak, Sal, Chamble, Mango, Jack, Lichi, Kul ete including cutting earth and supplying at site average 1.0m height plant, including putting manure by digging 45cm dia hole, Turfing and Tree Planting"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-48-220-00-P112","serial_label":null,"item_code":"48-220-00","item_code_raw_ocr":"48-220-00","item_code_validation_status":"ocr_source_preserved","section_code":"48","section_title":"Turfing and Tree Planting","description":"to a depth of average 30cm, supplying and mixing 7.56 kg of manure, tieing the plant with 1.50m split bamboo post and keeping it wet for one month before plantation _including guarding the plant for 6 months as per direction of Engineer in Charge.","unit":"each","rates":{"zone_a":297.0,"zone_b":291.13,"zone_c":291.13,"zone_d":274.55},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":112,"source_schedule_page":102,"raw_rate_tokens":["297.00","291.13","291.13","274.55"],"source_review_note":null,"search_text":"48-220-00 to a depth of average 30cm, supplying and mixing 7.56 kg of manure, tieing the plant with 1.50m split bamboo post and keeping it wet for one month before plantation _including guarding the plant for 6 months as per direction of Engineer in Charge. each Turfing and Tree Planting"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-48-230-00-P113-SL219","serial_label":"219","item_code":"48-230-00","item_code_raw_ocr":"48-230-00","item_code_validation_status":"ocr_source_preserved","section_code":"48","section_title":"Turfing and Tree Planting","description":"plantation of trees, as per direction kg of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":113,"source_schedule_page":103,"raw_rate_tokens":null,"source_review_note":null,"search_text":"48-230-00 plantation of trees, as per direction kg of Engineer in charge. Turfing and Tree Planting"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-48-230-20-P113-SL219(2)","serial_label":"219(2)","item_code":"48-230-20","item_code_raw_ocr":"48-230-20","item_code_validation_status":"ocr_source_preserved","section_code":"48","section_title":"Turfing and Tree Planting","description":"","unit":"","rates":{"zone_a":42.95,"zone_b":42.95,"zone_c":42.95,"zone_d":42.95},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":113,"source_schedule_page":103,"raw_rate_tokens":["42.95","42.95","42.95","42.95"],"source_review_note":null,"search_text":"48-230-20 Turfing and Tree Planting"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-48-230-30-P113-SL219(3)","serial_label":"219(3)","item_code":"48-230-30","item_code_raw_ocr":"48-230-30","item_code_validation_status":"ocr_source_preserved","section_code":"48","section_title":"Turfing and Tree Planting","description":"30.68 30.68 3068 30.68","unit":"","rates":{"zone_a":30.68,"zone_b":30.68,"zone_c":30.68,"zone_d":30.68},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":113,"source_schedule_page":103,"raw_rate_tokens":["30.68","30.68","3068","30.68"],"source_review_note":null,"search_text":"48-230-30 30.68 30.68 3068 30.68 Turfing and Tree Planting"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-48-230-40-P113-SL219(4)","serial_label":"219(4)","item_code":"48-230-40","item_code_raw_ocr":"48-230-40","item_code_validation_status":"ocr_source_preserved","section_code":"48","section_title":"Turfing and Tree Planting","description":"","unit":"","rates":{"zone_a":368.11,"zone_b":368.11,"zone_c":368.11,"zone_d":368.11},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":113,"source_schedule_page":103,"raw_rate_tokens":["368.11","368.11","368.11","368.11"],"source_review_note":null,"search_text":"48-230-40 Turfing and Tree Planting"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-48-230-50-P113-SL219(5)","serial_label":"219(5)","item_code":"48-230-50","item_code_raw_ocr":"48-230-50","item_code_validation_status":"ocr_source_preserved","section_code":"48","section_title":"Turfing and Tree Planting","description":"Kodal (standard size)","unit":"","rates":{"zone_a":552.16,"zone_b":552.16,"zone_c":552.16,"zone_d":552.16},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":113,"source_schedule_page":103,"raw_rate_tokens":["552.16","552.16","552.16","552.16"],"source_review_note":null,"search_text":"48-230-50 Kodal (standard size) Turfing and Tree Planting"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-48-230-60-P113-SL219(6)","serial_label":"219(6)","item_code":"48-230-60","item_code_raw_ocr":"48-230-60","item_code_validation_status":"ocr_source_preserved","section_code":"48","section_title":"Turfing and Tree Planting","description":"Tukri (standard size) 147.24 147.24 14724 147,24","unit":"","rates":{"zone_a":147.24,"zone_b":147.24,"zone_c":147.24,"zone_d":147.24},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":113,"source_schedule_page":103,"raw_rate_tokens":["147.24","147.24","14724","147,24"],"source_review_note":null,"search_text":"48-230-60 Tukri (standard size) 147.24 147.24 14724 147,24 Turfing and Tree Planting"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-48-230-70-P113-SL219(7)","serial_label":"219(7)","item_code":"48-230-70","item_code_raw_ocr":"48-230-70","item_code_validation_status":"ocr_source_preserved","section_code":"48","section_title":"Turfing and Tree Planting","description":"Nirani (standard size)","unit":"each","rates":{"zone_a":184.05,"zone_b":184.05,"zone_c":184.05,"zone_d":184.05},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":113,"source_schedule_page":103,"raw_rate_tokens":["184.05","184.05","184.05","184.05"],"source_review_note":null,"search_text":"48-230-70 Nirani (standard size) each Turfing and Tree Planting"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-48-230-80-P113-SL219(8)","serial_label":"219(8)","item_code":"48-230-80","item_code_raw_ocr":"48-230-80","item_code_validation_status":"ocr_source_preserved","section_code":"48","section_title":"Turfing and Tree Planting","description":"Bucket (25 cm to 31 cm)","unit":"each","rates":{"zone_a":306.76,"zone_b":306.76,"zone_c":306.76,"zone_d":306.76},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":113,"source_schedule_page":103,"raw_rate_tokens":["306.76","306.76","306.76","306.76"],"source_review_note":null,"search_text":"48-230-80 Bucket (25 cm to 31 cm) each Turfing and Tree Planting"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-48-230-90-P113-SL219(9)","serial_label":"219(9)","item_code":"48-230-90","item_code_raw_ocr":"48-230-90","item_code_validation_status":"ocr_source_preserved","section_code":"48","section_title":"Turfing and Tree Planting","description":"Water sprayer Supplying of bamboo jafry gabion of 1.40m height and 60cm average oo, dia, including fixing by barrack","unit":"each","rates":{"zone_a":220.86,"zone_b":220.86,"zone_c":220.86,"zone_d":220.86},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":113,"source_schedule_page":103,"raw_rate_tokens":["220.86","220.86","220.86","220.86"],"source_review_note":null,"search_text":"48-230-90 Water sprayer Supplying of bamboo jafry gabion of 1.40m height and 60cm average oo, dia, including fixing by barrack each Turfing and Tree Planting"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-48-300-00-P113-SL220","serial_label":"220","item_code":"48-300-00","item_code_raw_ocr":"48-300-00","item_code_validation_status":"ocr_source_preserved","section_code":"48","section_title":"Turfing and Tree Planting","description":"bamboo post of 60mm to 70mm dia including fitting and fixing ete. complete. 60. Drain Construction Construction of masonry surface drain, with 75mm thick brick work with first class brick on one brick flat soling at base, all set in sand (FM>=1.5) cement mortar (1:4), 12mm _ thick sand (FM>=1.3) rounding corners and necessary earth work, ramming and watering etc. complete (average depth 25cm, bottom width 22cm and top width 45cm) including the cost of all materials as per direction of Engineer in charge. Construction of masonry surface drain with 125mm thick brick work with first class brick on one brick flat soling at base, all set in sand (FM>=1.5) cement mortar (1:4), 12mm_ thick sand (FM>=1.3)","unit":"each","rates":{"zone_a":333.36,"zone_b":308.01,"zone_c":308.01,"zone_d":317.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":113,"source_schedule_page":103,"raw_rate_tokens":["333.36","308.01","308.01","317.00"],"source_review_note":null,"search_text":"48-300-00 bamboo post of 60mm to 70mm dia including fitting and fixing ete. complete. 60. Drain Construction Construction of masonry surface drain, with 75mm thick brick work with first class brick on one brick flat soling at base, all set in sand (FM>=1.5) cement mortar (1:4), 12mm _ thick sand (FM>=1.3) rounding corners and necessary earth work, ramming and watering etc. complete (average depth 25cm, bottom width 22cm and top width 45cm) including the cost of all materials as per direction of Engineer in charge. Construction of masonry surface drain with 125mm thick brick work with first class brick on one brick flat soling at base, all set in sand (FM>=1.5) cement mortar (1:4), 12mm_ thick sand (FM>=1.3) each Turfing and Tree Planting"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-110-00-P113-SL222","serial_label":"222","item_code":"60-110-00","item_code_raw_ocr":"60-110-00","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"Cement plaster (1:3), including 1 4 rounding corners and necessary earth work, ramming and watering etc. complete (average depth 25cm bottom width 30cm and top width 30cm) including the cost of all materials as per direction of Engineer in charge. Construction of masonry surface drain with 125mm thick brick work with first class bricks on one brick","unit":"","rates":{"zone_a":959.62,"zone_b":2044.03,"zone_c":1996.09,"zone_d":1962.97},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":113,"source_schedule_page":103,"raw_rate_tokens":["959.62","2,044.03","1,996.09","1,962.97"],"source_review_note":null,"search_text":"60-110-00 Cement plaster (1:3), including 1 4 rounding corners and necessary earth work, ramming and watering etc. complete (average depth 25cm bottom width 30cm and top width 30cm) including the cost of all materials as per direction of Engineer in charge. Construction of masonry surface drain with 125mm thick brick work with first class bricks on one brick Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-120-00-P113-SL223","serial_label":"223","item_code":"60-120-00","item_code_raw_ocr":"60-120-00","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":") flat soling at base, all set in sand (FM>=1.5) cement mortar (1:4), 12mm_ thick sand (FM>=1.3) cement plaster (1:3), including a & Q—- G ,","unit":"m","rates":{"zone_a":2731.22,"zone_b":2719.11,"zone_c":2657.86,"zone_d":2610.56},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":113,"source_schedule_page":103,"raw_rate_tokens":["2,731.22","2,719.11","2,657.86","2,610.56"],"source_review_note":null,"search_text":"60-120-00 ) flat soling at base, all set in sand (FM>=1.5) cement mortar (1:4), 12mm_ thick sand (FM>=1.3) cement plaster (1:3), including a & Q—- G , m Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-130-00-P114-SL224","serial_label":"224","item_code":"60-130-00","item_code_raw_ocr":"60-130-00","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"12mm_ thick sand (FM>= cement plaster (1:3), including rounding comers, necessary earth work, ramming, watering etc. complete (average depth 50cm, bottom width 30cm and top width 30cm) including the cost of all materials as per direction of Engineer in charge. } Construction of masonry surface drain with 250mm thick brick work with Ist class brick, all set in sand (FM>=1.5) cement mortar (1:4) and 10cm thick cement concrete (1:2:4) (sand of FM>=1.5, 20mm down graded brick chips) at bottom } over a brick flat soling, 12mm","unit":"","rates":{"zone_a":2744.16,"zone_b":2731.87,"zone_c":2679.75,"zone_d":2627.72},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":114,"source_schedule_page":104,"raw_rate_tokens":["2,744.16","2,731.87","2,679.75","2,627.72"],"source_review_note":null,"search_text":"60-130-00 12mm_ thick sand (FM>= cement plaster (1:3), including rounding comers, necessary earth work, ramming, watering etc. complete (average depth 50cm, bottom width 30cm and top width 30cm) including the cost of all materials as per direction of Engineer in charge. } Construction of masonry surface drain with 250mm thick brick work with Ist class brick, all set in sand (FM>=1.5) cement mortar (1:4) and 10cm thick cement concrete (1:2:4) (sand of FM>=1.5, 20mm down graded brick chips) at bottom } over a brick flat soling, 12mm Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-140-00-P114-SL225","serial_label":"225","item_code":"60-140-00","item_code_raw_ocr":"60-140-00","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"thick sand (FM>= plaster (1:3), including rounding comers, necessary earth work, ramming, watering etc. complete (average depth 75cm, bottom width 45cm and top width 75cm) including the cost of all materials as per direction of Engineer in charge. Construction of average 30cm wide and 20cm deep \"V\" shaped drain, with 75mm_ thick brick lining, with Ist class bricks, set in cement pointing (1:3) (sand of","unit":"","rates":{"zone_a":6286.56,"zone_b":6259.07,"zone_c":6128.23,"zone_d":6020.6},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":114,"source_schedule_page":104,"raw_rate_tokens":["6,286.56","6,259.07","6,128.23","6,020.60"],"source_review_note":null,"search_text":"60-140-00 thick sand (FM>= plaster (1:3), including rounding comers, necessary earth work, ramming, watering etc. complete (average depth 75cm, bottom width 45cm and top width 75cm) including the cost of all materials as per direction of Engineer in charge. Construction of average 30cm wide and 20cm deep \"V\" shaped drain, with 75mm_ thick brick lining, with Ist class bricks, set in cement pointing (1:3) (sand of Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-150-00-P114-SL226","serial_label":"226","item_code":"60-150-00","item_code_raw_ocr":"60-150-00","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"FM>=13) and * ounding corners ™ 810.14 802.53 791.66 774,33 with cement mortar (1:3) ete. complete including the cost of all materials as per direction of Engineer in charge. Construction of average 30cm wide and 20cm deep wide \"V\" shaped drain with 75mm_ thick","unit":"","rates":{"zone_a":810.14,"zone_b":802.53,"zone_c":791.66,"zone_d":774.33},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":114,"source_schedule_page":104,"raw_rate_tokens":["810.14","802.53","791.66","774,33"],"source_review_note":null,"search_text":"60-150-00 FM>=13) and * ounding corners ™ 810.14 802.53 791.66 774,33 with cement mortar (1:3) ete. complete including the cost of all materials as per direction of Engineer in charge. Construction of average 30cm wide and 20cm deep wide \"V\" shaped drain with 75mm_ thick Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-160-00-P114-SL227","serial_label":"227","item_code":"60-160-00","item_code_raw_ocr":"60-160-00","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":") brick lining with Ist class bricks, set in sand (FM>=1.5) cement mortar (1:3), with 12mm thick sand (FM>=1.3) cement plaster (1:3). k 4) @__ h- wr ,","unit":"m","rates":{"zone_a":785.32,"zone_b":781.15,"zone_c":767.91,"zone_d":752.22},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":114,"source_schedule_page":104,"raw_rate_tokens":["785.32","781.15","767.91","752.22"],"source_review_note":null,"search_text":"60-160-00 ) brick lining with Ist class bricks, set in sand (FM>=1.5) cement mortar (1:3), with 12mm thick sand (FM>=1.3) cement plaster (1:3). k 4) @__ h- wr , m Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-220-00-P115-SL228","serial_label":"228","item_code":"60-220-00","item_code_raw_ocr":"60-220-00","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"} consolidation to levels curing with supply of all materials including the cost of shuttering and forms etc. including preparation of bed and slope by cutting/ filling as per requirement true to level, grade and camber, ramming the bed, slope etc. for proper compaction complete, as per direction of Engineer in charge. In leanest mix. 1:2:4 with picked","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":115,"source_schedule_page":105,"raw_rate_tokens":null,"source_review_note":null,"search_text":"60-220-00 } consolidation to levels curing with supply of all materials including the cost of shuttering and forms etc. including preparation of bed and slope by cutting/ filling as per requirement true to level, grade and camber, ramming the bed, slope etc. for proper compaction complete, as per direction of Engineer in charge. In leanest mix. 1:2:4 with picked Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-220-10-P115-SL228(1)","serial_label":"228(1)","item_code":"60-220-10","item_code_raw_ocr":"60-220-10","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":") jhama/Ist. class brick chips; 50mm thick. In leanest mix. 1:2:4 with picked","unit":"sqm","rates":{"zone_a":675.24,"zone_b":666.73,"zone_c":657.5,"zone_d":649.8},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":115,"source_schedule_page":105,"raw_rate_tokens":["675.24","666.73","657.50","649.80"],"source_review_note":null,"search_text":"60-220-10 ) jhama/Ist. class brick chips; 50mm thick. In leanest mix. 1:2:4 with picked sqm Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-220-20-P115-SL228(2)","serial_label":"228(2)","item_code":"60-220-20","item_code_raw_ocr":"60-220-20","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"jhama/Ist. class brick chips; 75mm sqm thick. In leanest mix. 1:3:6 with picked","unit":"","rates":{"zone_a":1013.28,"zone_b":1000.32,"zone_c":986.48,"zone_d":975.3},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":115,"source_schedule_page":105,"raw_rate_tokens":["1,013.28","1,000.32","986.48","975.30"],"source_review_note":null,"search_text":"60-220-20 jhama/Ist. class brick chips; 75mm sqm thick. In leanest mix. 1:3:6 with picked Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-220-30-P115-SL228(3)","serial_label":"228(3)","item_code":"60-220-30","item_code_raw_ocr":"60-220-30","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"} jhama/Ist. class brick chips; 50mm thick. In leanest mix. 1:3:6 with picked","unit":"sqm","rates":{"zone_a":606.4,"zone_b":597.83,"zone_c":588.64,"zone_d":580.92},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":115,"source_schedule_page":105,"raw_rate_tokens":["606.40","597.83","588.64","580.92"],"source_review_note":null,"search_text":"60-220-30 } jhama/Ist. class brick chips; 50mm thick. In leanest mix. 1:3:6 with picked sqm Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-220-40-P115-SL228(4)","serial_label":"228(4)","item_code":"60-220-40","item_code_raw_ocr":"60-220-40","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":") jhama/Ist. class brick chips; 75mm thick. eR [ae shingles; 75mm thick. shingles; 75mm thick. Brick lining (75mm _ thick) in irrigation canal bed and side slope with 1:4 sand cement mortar including soaking bricks in clean water for 6 hours, cleaning the","unit":"sqm","rates":{"zone_a":913.22,"zone_b":900.16,"zone_c":886.37,"zone_d":875.16},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":115,"source_schedule_page":105,"raw_rate_tokens":["913.22","900.16","886.37","875.16"],"source_review_note":null,"search_text":"60-220-40 ) jhama/Ist. class brick chips; 75mm thick. eR [ae shingles; 75mm thick. shingles; 75mm thick. Brick lining (75mm _ thick) in irrigation canal bed and side slope with 1:4 sand cement mortar including soaking bricks in clean water for 6 hours, cleaning the sqm Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-240-00-P115-SL229","serial_label":"229","item_code":"60-240-00","item_code_raw_ocr":"60-240-00","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"bricks, curing at least for 7 days . 7 with supply of all materials etc. complete as per design specification and direction of Engineer in charge. Le. ’","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":115,"source_schedule_page":105,"raw_rate_tokens":null,"source_review_note":null,"search_text":"60-240-00 bricks, curing at least for 7 days . 7 with supply of all materials etc. complete as per design specification and direction of Engineer in charge. Le. ’ Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-250-00-P116-SL230","serial_label":"230","item_code":"60-250-00","item_code_raw_ocr":"60-250-00","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"fire resistivity properties etc. as per BSTI approved manufacturer standards or ASTM/BS/ISO/IS standards, preperation of alignment and laying in position including butt fusion joint where necessary, all necessary tools, cost of all materials and labours etc. complete as per approved design & drawing, technical specification and direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":116,"source_schedule_page":106,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"60-250-00 fire resistivity properties etc. as per BSTI approved manufacturer standards or ASTM/BS/ISO/IS standards, preperation of alignment and laying in position including butt fusion joint where necessary, all necessary tools, cost of all materials and labours etc. complete as per approved design & drawing, technical specification and direction of Engineer in charge. Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-250-05-P116-SL230(1)","serial_label":"230(1)","item_code":"60-250-05","item_code_raw_ocr":"60-250-05","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"Pipe, HDPE, 100 mm dia m 94257 942.57 94257 940.57","unit":"","rates":{"zone_a":94257.0,"zone_b":94257.0,"zone_c":94257.0,"zone_d":94057.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":116,"source_schedule_page":106,"raw_rate_tokens":["94257","942.57","94257","940.57"],"source_review_note":null,"search_text":"60-250-05 Pipe, HDPE, 100 mm dia m 94257 942.57 94257 940.57 Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-250-10-P116-SL230(2)","serial_label":"230(2)","item_code":"60-250-10","item_code_raw_ocr":"60-250-10","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"Pipe, HDPE, 150 mm dia m 171414 171414 1,714.14 1,710.69","unit":"","rates":{"zone_a":171414.0,"zone_b":171414.0,"zone_c":171414.0,"zone_d":171069.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":116,"source_schedule_page":106,"raw_rate_tokens":["171414","171414","1,714.14","1,710.69"],"source_review_note":null,"search_text":"60-250-10 Pipe, HDPE, 150 mm dia m 171414 171414 1,714.14 1,710.69 Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-250-15-P116-SL230(3)","serial_label":"230(3)","item_code":"60-250-15","item_code_raw_ocr":"60-250-15","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"Pipe, HDPE, 225 mm dia _m","unit":"","rates":{"zone_a":3719.98,"zone_b":3719.98,"zone_c":3719.98,"zone_d":3714.67},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":116,"source_schedule_page":106,"raw_rate_tokens":["3,719.98","3,719.98","3,719.98","3,714.67"],"source_review_note":null,"search_text":"60-250-15 Pipe, HDPE, 225 mm dia _m Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-250-20-P116-SL230(4)","serial_label":"230(4)","item_code":"60-250-20","item_code_raw_ocr":"60-250-20","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"Pipe, HDPE, 300 mm dia m","unit":"","rates":{"zone_a":6710.51,"zone_b":6710.51,"zone_c":6710.51,"zone_d":6703.32},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":116,"source_schedule_page":106,"raw_rate_tokens":["6,710.51","6,710.51","6,710.51","6,703.32"],"source_review_note":null,"search_text":"60-250-20 Pipe, HDPE, 300 mm dia m Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-250-25-P116-SL230(5)","serial_label":"230(5)","item_code":"60-250-25","item_code_raw_ocr":"60-250-25","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"Pipe, HDPE, 450 mm dia","unit":"m","rates":{"zone_a":15261.69,"zone_b":15261.69,"zone_c":15261.69,"zone_d":15251.5},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":116,"source_schedule_page":106,"raw_rate_tokens":["15,261.69","15,261.69","15,261.69","15,251.50"],"source_review_note":null,"search_text":"60-250-25 Pipe, HDPE, 450 mm dia m Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-250-30-P116-SL230(6)","serial_label":"230(6)","item_code":"60-250-30","item_code_raw_ocr":"60-250-30","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"Pipe, HDPE, 500 mm dia","unit":"m","rates":{"zone_a":18758.55,"zone_b":18758.55,"zone_c":18758.55,"zone_d":18746.64},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":116,"source_schedule_page":106,"raw_rate_tokens":["18,758.55","18,758.55","18,758.55","18,746.64"],"source_review_note":null,"search_text":"60-250-30 Pipe, HDPE, 500 mm dia m Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-250-35-P116-SL230(7)","serial_label":"230(7)","item_code":"60-250-35","item_code_raw_ocr":"60-250-35","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"Pipe, HDPE, 600 mm dia m_","unit":"","rates":{"zone_a":26558.09,"zone_b":26558.09,"zone_c":26558.09,"zone_d":26544.39},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":116,"source_schedule_page":106,"raw_rate_tokens":["26,558.09","26,558.09","26,558.09","26,544.39"],"source_review_note":null,"search_text":"60-250-35 Pipe, HDPE, 600 mm dia m_ Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-250-40-P116-SL230(8)","serial_label":"230(8)","item_code":"60-250-40","item_code_raw_ocr":"60-250-40","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"Pipe, HDPE, 750 mm dia m_","unit":"","rates":{"zone_a":40161.71,"zone_b":40161.71,"zone_c":40161.71,"zone_d":40141.36},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":116,"source_schedule_page":106,"raw_rate_tokens":["40,161.71","40,161.71","40,161.71","40,141.36"],"source_review_note":null,"search_text":"60-250-40 Pipe, HDPE, 750 mm dia m_ Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-250-45-P116-SL230(9)","serial_label":"230(9)","item_code":"60-250-45","item_code_raw_ocr":"60-250-45","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"Pipe, HDPE, 900 mm dia m","unit":"","rates":{"zone_a":53460.24,"zone_b":53460.24,"zone_c":53460.24,"zone_d":53434.55},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":116,"source_schedule_page":106,"raw_rate_tokens":["53,460.24","53,460.24","53,460.24","53,434.55"],"source_review_note":null,"search_text":"60-250-45 Pipe, HDPE, 900 mm dia m Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-250-50-P116-SL230(10)","serial_label":"230(10)","item_code":"60-250-50","item_code_raw_ocr":"60-250-50","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"Pipe, HDPE, 1050 mm dia “m","unit":"","rates":{"zone_a":70202.17,"zone_b":70202.17,"zone_c":70202.17,"zone_d":70170.18},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":116,"source_schedule_page":106,"raw_rate_tokens":["70,202.17","70,202.17","70,202.17","70,170.18"],"source_review_note":null,"search_text":"60-250-50 Pipe, HDPE, 1050 mm dia “m Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-250-55-P116-SL230(11)","serial_label":"230(11)","item_code":"60-250-55","item_code_raw_ocr":"60-250-55","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"Pipe, HDPE, 1200 mm dia m__","unit":"","rates":{"zone_a":85286.86,"zone_b":85286.86,"zone_c":85286.86,"zone_d":85247.29},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":116,"source_schedule_page":106,"raw_rate_tokens":["85,286.86","85,286.86","85,286.86","85,247.29"],"source_review_note":null,"search_text":"60-250-55 Pipe, HDPE, 1200 mm dia m__ Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-250-60-P116-SL230(12)","serial_label":"230(12)","item_code":"60-250-60","item_code_raw_ocr":"60-250-60","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"Pipe, HDPE, 1350 mm dia —m_ Manufacturing and Supplying Standard machine made RCC pipe of different diameter, length and . thickness in construction of Drain/ Sluice/ Culvert/ Outlet and any other works in leanest mix. 1:1.5:3 with 12mm/20mm down graded stone chips, sand of FM>=2.0 and admixture (water reducing","unit":"","rates":{"zone_a":99593.46,"zone_b":99593.46,"zone_c":99593.46,"zone_d":99543.36},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":116,"source_schedule_page":106,"raw_rate_tokens":["99,593.46","99,593.46","99,593.46","99,543.36"],"source_review_note":null,"search_text":"60-250-60 Pipe, HDPE, 1350 mm dia —m_ Manufacturing and Supplying Standard machine made RCC pipe of different diameter, length and . thickness in construction of Drain/ Sluice/ Culvert/ Outlet and any other works in leanest mix. 1:1.5:3 with 12mm/20mm down graded stone chips, sand of FM>=2.0 and admixture (water reducing Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-260-00-P116-SL231","serial_label":"231","item_code":"60-260-00","item_code_raw_ocr":"60-260-00","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"! plasticiser) @ meter of concrete to attain a minimum 28 days cylinder strength of 25 N/mm? including breaking, screening, grading and washing aggregates with clear water, mixing, laying in forms, consolidating, curing including the cost of 6mm dia M.S. work for reinforcement _and form works as : 4 Ab","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":116,"source_schedule_page":106,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"60-260-00 ! plasticiser) @ meter of concrete to attain a minimum 28 days cylinder strength of 25 N/mm? including breaking, screening, grading and washing aggregates with clear water, mixing, laying in forms, consolidating, curing including the cost of 6mm dia M.S. work for reinforcement _and form works as : 4 Ab Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-260-05-P117-SL231(1)","serial_label":"231(1)","item_code":"60-260-05","item_code_raw_ocr":"60-260-05","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":") circular reinforcement 100mm c/c and longitudinal reinforcement 75mm c/c. RCC Pipe : 150mm dia, wall thickness not less than 25mm,","unit":"m","rates":{"zone_a":1116.11,"zone_b":1112.34,"zone_c":1108.95,"zone_d":1082.92},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":117,"source_schedule_page":107,"raw_rate_tokens":["1,116.11","1,112.34","1,108.95","1,082.92"],"source_review_note":null,"search_text":"60-260-05 ) circular reinforcement 100mm c/c and longitudinal reinforcement 75mm c/c. RCC Pipe : 150mm dia, wall thickness not less than 25mm, m Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-260-10-P117-SL231(2)","serial_label":"231(2)","item_code":"60-260-10","item_code_raw_ocr":"60-260-10","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"circular reinforcement 100mm c/c and longitudinal reinforcement 110mm c/c. RCC Pipe : 225mm dia, wall thickness not less than 30mm,","unit":"m","rates":{"zone_a":1188.79,"zone_b":1185.09,"zone_c":1180.37,"zone_d":1153.64},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":117,"source_schedule_page":107,"raw_rate_tokens":["1,188.79","1,185.09","1,180.37","1,153.64"],"source_review_note":null,"search_text":"60-260-10 circular reinforcement 100mm c/c and longitudinal reinforcement 110mm c/c. RCC Pipe : 225mm dia, wall thickness not less than 30mm, m Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-260-15-P117-SL231(3)","serial_label":"231(3)","item_code":"60-260-15","item_code_raw_ocr":"60-260-15","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":") circular reinforcement 100mm c/c and longitudinal reinforcement 135mm c/c. RCC Pipe : 300mm dia, wall thickness not less than 45mm,","unit":"m","rates":{"zone_a":1534.92,"zone_b":1529.95,"zone_c":1521.66,"zone_d":1485.35},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":117,"source_schedule_page":107,"raw_rate_tokens":["1,534.92","1,529.95","1,521.66","1,485.35"],"source_review_note":null,"search_text":"60-260-15 ) circular reinforcement 100mm c/c and longitudinal reinforcement 135mm c/c. RCC Pipe : 300mm dia, wall thickness not less than 45mm, m Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-260-20-P117-SL231(4)","serial_label":"231(4)","item_code":"60-260-20","item_code_raw_ocr":"60-260-20","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"circular reinforcement 100mm c/c and longitudinal reinforcement 225mm c/c. RCC Pipe : 450mm dia, wall thickness not less than 50mm,","unit":"m","rates":{"zone_a":1917.07,"zone_b":1912.56,"zone_c":1895.66,"zone_d":1854.74},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":117,"source_schedule_page":107,"raw_rate_tokens":["1,917.07","1,912.56","1,895.66","1,854.74"],"source_review_note":null,"search_text":"60-260-20 circular reinforcement 100mm c/c and longitudinal reinforcement 225mm c/c. RCC Pipe : 450mm dia, wall thickness not less than 50mm, m Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-260-25-P117-SL231(5)","serial_label":"231(5)","item_code":"60-260-25","item_code_raw_ocr":"60-260-25","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"circular reinforcement 100mm c/c and longitudinal reinforcement 225mm c/c. RCC Pipe : 500mm dia, wall thickness not less than 55mm,","unit":"m","rates":{"zone_a":2801.42,"zone_b":2792.94,"zone_c":2765.6,"zone_d":2698.86},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":117,"source_schedule_page":107,"raw_rate_tokens":["2,801.42","2,792.94","2,765.60","2,698.86"],"source_review_note":null,"search_text":"60-260-25 circular reinforcement 100mm c/c and longitudinal reinforcement 225mm c/c. RCC Pipe : 500mm dia, wall thickness not less than 55mm, m Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-260-30-P117-SL231(6)","serial_label":"231(6)","item_code":"60-260-30","item_code_raw_ocr":"60-260-30","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":") circular reinforcement 100mm c/c and longitudinal reinforcement 220mm c/c. RCC Pipe : 600mm dia, wall thickness not less than 60mm,","unit":"m","rates":{"zone_a":3143.51,"zone_b":3135.57,"zone_c":3100.72,"zone_d":3030.04},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":117,"source_schedule_page":107,"raw_rate_tokens":["3,143.51","3,135.57","3,100.72","3,030.04"],"source_review_note":null,"search_text":"60-260-30 ) circular reinforcement 100mm c/c and longitudinal reinforcement 220mm c/c. RCC Pipe : 600mm dia, wall thickness not less than 60mm, m Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-260-35-P117-SL231(7)","serial_label":"231(7)","item_code":"60-260-35","item_code_raw_ocr":"60-260-35","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"circular reinforcement 95mm c/c and longitudinal reinforcement 210mm c/c. RCC Pipe : 750mm dia, wall thickness not less than 70mm,","unit":"","rates":{"zone_a":3653.97,"zone_b":3646.34,"zone_c":3603.1,"zone_d":3527.95},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":117,"source_schedule_page":107,"raw_rate_tokens":["3,653.97","3,646.34","3,603.10","3,527.95"],"source_review_note":null,"search_text":"60-260-35 circular reinforcement 95mm c/c and longitudinal reinforcement 210mm c/c. RCC Pipe : 750mm dia, wall thickness not less than 70mm, Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-260-40-P117-SL231(8)","serial_label":"231(8)","item_code":"60-260-40","item_code_raw_ocr":"60-260-40","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":") circular reinforcement 85mm c/c and ongitudinal reinforcement 200mm c/c. RCC Pipe : 900mm dia, wall thickness not less than 90mm with circular reinforcement for inner","unit":"m","rates":{"zone_a":4760.19,"zone_b":4753.1,"zone_c":4690.41,"zone_d":4601.83},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":117,"source_schedule_page":107,"raw_rate_tokens":["4,760.19","4,753.10","4,690.41","4,601.83"],"source_review_note":null,"search_text":"60-260-40 ) circular reinforcement 85mm c/c and ongitudinal reinforcement 200mm c/c. RCC Pipe : 900mm dia, wall thickness not less than 90mm with circular reinforcement for inner m Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-260-45-P117-SL231(9)","serial_label":"231(9)","item_code":"60-260-45","item_code_raw_ocr":"60-260-45","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"case 90mm c/e, outer case 100mm c/c and longitudinal reinforcement 150mm c/c. RCC Pipe : 1050mm dia, wall","unit":"m","rates":{"zone_a":8471.36,"zone_b":8505.5,"zone_c":8264.01,"zone_d":8084.13},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":117,"source_schedule_page":107,"raw_rate_tokens":["8,471.36","8,505.50","8,264.01","8,084.13"],"source_review_note":null,"search_text":"60-260-45 case 90mm c/e, outer case 100mm c/c and longitudinal reinforcement 150mm c/c. RCC Pipe : 1050mm dia, wall m Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-260-50-P117-SL231(10)","serial_label":"231(10)","item_code":"60-260-50","item_code_raw_ocr":"60-260-50","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"thickness not less than 95mm with 4, 9 circular reinforcement for inner case 80mm c/c, outer case 100mm","unit":"","rates":{"zone_a":9846.8,"zone_b":10029.54,"zone_c":9734.61,"zone_d":9531.72},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":117,"source_schedule_page":107,"raw_rate_tokens":["984.68","10,029.54","9,734.61","9,531.72"],"source_review_note":null,"search_text":"60-260-50 thickness not less than 95mm with 4, 9 circular reinforcement for inner case 80mm c/c, outer case 100mm Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-260-55-P118-SL231(11)","serial_label":"231(11)","item_code":"60-260-55","item_code_raw_ocr":"60-260-55","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"Wt circular reinforcement for 4, 49. inner case 60mm c/c, outer case 100mm c/c_ and __ longitudinal reinforcement 130mm c/c. RCC Pipe : 1350mm dia, wall thickness not less than 115mm","unit":"","rates":{"zone_a":9734.4,"zone_b":12129.85,"zone_c":11777.37,"zone_d":11546.38},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":118,"source_schedule_page":108,"raw_rate_tokens":["973.44","12,129.85","11,777.37","11,546.38"],"source_review_note":null,"search_text":"60-260-55 Wt circular reinforcement for 4, 49. inner case 60mm c/c, outer case 100mm c/c_ and __ longitudinal reinforcement 130mm c/c. RCC Pipe : 1350mm dia, wall thickness not less than 115mm Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-260-60-P118-SL231(12)","serial_label":"231(12)","item_code":"60-260-60","item_code_raw_ocr":"60-260-60","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":") WHR cireular reinforcement for 1, 14 g44.o1 14,921.56 14,464.67 14,188.74 inner case 50mm c/c, outer case 90mm c/c and longitudinal reinforcement 125mm c/c. Manufacturing and — supplying standard machine made RCC Socket of diffrent diameter, 125mm length and 50mm _ wall thickness in construction on Drain/ Sluice/ Culvert/ outley and any other works in leanest mix. 1:1.5:3 with 12mm down graded stone chips, sand of FM>=2.0 and admixture (water —_ reducing plasticiser) @ 1.5 liters per cubic meter of concrete to attain a minimum 28 days cylinder strength","unit":"","rates":{"zone_a":14000.0,"zone_b":14921.56,"zone_c":14464.67,"zone_d":14188.74},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":118,"source_schedule_page":108,"raw_rate_tokens":["14","14,921.56","14,464.67","14,188.74"],"source_review_note":null,"search_text":"60-260-60 ) WHR cireular reinforcement for 1, 14 g44.o1 14,921.56 14,464.67 14,188.74 inner case 50mm c/c, outer case 90mm c/c and longitudinal reinforcement 125mm c/c. Manufacturing and — supplying standard machine made RCC Socket of diffrent diameter, 125mm length and 50mm _ wall thickness in construction on Drain/ Sluice/ Culvert/ outley and any other works in leanest mix. 1:1.5:3 with 12mm down graded stone chips, sand of FM>=2.0 and admixture (water —_ reducing plasticiser) @ 1.5 liters per cubic meter of concrete to attain a minimum 28 days cylinder strength Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-280-00-P118-SL232","serial_label":"232","item_code":"60-280-00","item_code_raw_ocr":"60-280-00","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"Of screening, grading and washing aggregates with clear water, mixing, laying in forms, consolidating, curing including the cost of formwork, 3 Nos circular reinforcement and 5 Nos longitudinal reinforcementof 6mm dia M.S. rod equally spaced as per approved drawing and specification including tools, plants, testing, stacking in measurable stack at etc. complete as per direction of Engineer in charge. RCC Socket : 220mm dia, each RCC Socket : 305mm dia. each 678.77 Laying in position standard machine made R.C.C. pipe of different diameter in construction of drain/ sluice/ culvert/ outlet and","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":118,"source_schedule_page":108,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"60-280-00 Of screening, grading and washing aggregates with clear water, mixing, laying in forms, consolidating, curing including the cost of formwork, 3 Nos circular reinforcement and 5 Nos longitudinal reinforcementof 6mm dia M.S. rod equally spaced as per approved drawing and specification including tools, plants, testing, stacking in measurable stack at etc. complete as per direction of Engineer in charge. RCC Socket : 220mm dia, each RCC Socket : 305mm dia. each 678.77 Laying in position standard machine made R.C.C. pipe of different diameter in construction of drain/ sluice/ culvert/ outlet and Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-300-00-P118-SL233","serial_label":"233","item_code":"60-300-00","item_code_raw_ocr":"60-300-00","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"22Y other work. including fitting, = . fixing the socket where necessary, local handling, cutting, dressing, levelling, plumbing etc. complete as per design, specification and direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":118,"source_schedule_page":108,"raw_rate_tokens":null,"source_review_note":null,"search_text":"60-300-00 22Y other work. including fitting, = . fixing the socket where necessary, local handling, cutting, dressing, levelling, plumbing etc. complete as per design, specification and direction of Engineer in charge. Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-300-10-P119-SL233(2)","serial_label":"233(2)","item_code":"60-300-10","item_code_raw_ocr":"60-300-10","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"150mm dia. _m 8133 80.80 80.86 76.75","unit":"","rates":{"zone_a":81.33,"zone_b":80.8,"zone_c":80.86,"zone_d":76.75},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":119,"source_schedule_page":109,"raw_rate_tokens":["8133","80.80","80.86","76.75"],"source_review_note":null,"search_text":"60-300-10 150mm dia. _m 8133 80.80 80.86 76.75 Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-300-15-P119-SL233(3)","serial_label":"233(3)","item_code":"60-300-15","item_code_raw_ocr":"60-300-15","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"225mm dia.","unit":"m","rates":{"zone_a":82.11,"zone_b":81.57,"zone_c":81.63,"zone_d":77.52},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":119,"source_schedule_page":109,"raw_rate_tokens":["82.11","81.57","81.63","77.52"],"source_review_note":null,"search_text":"60-300-15 225mm dia. m Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-300-20-P119-SL233(4)","serial_label":"233(4)","item_code":"60-300-20","item_code_raw_ocr":"60-300-20","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"300mm dia.","unit":"m","rates":{"zone_a":84.08,"zone_b":83.58,"zone_c":83.58,"zone_d":78.75},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":119,"source_schedule_page":109,"raw_rate_tokens":["84.08","83.58","83.58","78.75"],"source_review_note":null,"search_text":"60-300-20 300mm dia. m Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-300-25-P119-SL233(5)","serial_label":"233(5)","item_code":"60-300-25","item_code_raw_ocr":"60-300-25","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"450mm dia.","unit":"m","rates":{"zone_a":88.47,"zone_b":87.95,"zone_c":87.95,"zone_d":82.87},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":119,"source_schedule_page":109,"raw_rate_tokens":["88.47","87.95","87.95","82.87"],"source_review_note":null,"search_text":"60-300-25 450mm dia. m Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-300-30-P119-SL233(6)","serial_label":"233(6)","item_code":"60-300-30","item_code_raw_ocr":"60-300-30","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"! 500mm dia.","unit":"m","rates":{"zone_a":93.21,"zone_b":92.66,"zone_c":92.66,"zone_d":87.31},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":119,"source_schedule_page":109,"raw_rate_tokens":["93.21","92.66","92.66","87.31"],"source_review_note":null,"search_text":"60-300-30 ! 500mm dia. m Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-300-35-P119-SL233(7)","serial_label":"233(7)","item_code":"60-300-35","item_code_raw_ocr":"60-300-35","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"600mm dia.","unit":"","rates":{"zone_a":98.14,"zone_b":97.56,"zone_c":97.56,"zone_d":91.92},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":119,"source_schedule_page":109,"raw_rate_tokens":["98.14","97.56","97.56","91.92"],"source_review_note":null,"search_text":"60-300-35 600mm dia. Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-300-40-P119-SL233(8)","serial_label":"233(8)","item_code":"60-300-40","item_code_raw_ocr":"60-300-40","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"750mm dia.","unit":"m","rates":{"zone_a":122.63,"zone_b":121.91,"zone_c":121.91,"zone_d":114.86},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":119,"source_schedule_page":109,"raw_rate_tokens":["122.63","121.91","121.91","114.86"],"source_review_note":null,"search_text":"60-300-40 750mm dia. m Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-300-45-P119-SL233(9)","serial_label":"233(9)","item_code":"60-300-45","item_code_raw_ocr":"60-300-45","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"900mm dia.","unit":"m","rates":{"zone_a":147.27,"zone_b":146.4,"zone_c":146.4,"zone_d":137.94},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":119,"source_schedule_page":109,"raw_rate_tokens":["147.27","146.40","146.40","137.94"],"source_review_note":null,"search_text":"60-300-45 900mm dia. m Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-300-50-P119-SL233(10)","serial_label":"233(10)","item_code":"60-300-50","item_code_raw_ocr":"60-300-50","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"1050mm dia.","unit":"","rates":{"zone_a":174.73,"zone_b":173.69,"zone_c":173.69,"zone_d":163.67},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":119,"source_schedule_page":109,"raw_rate_tokens":["174.73","173.69","173.69","163.67"],"source_review_note":null,"search_text":"60-300-50 1050mm dia. Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-300-55-P119-SL233(11)","serial_label":"233(11)","item_code":"60-300-55","item_code_raw_ocr":"60-300-55","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"1200mm dia.","unit":"","rates":{"zone_a":199.64,"zone_b":198.45,"zone_c":198.45,"zone_d":187.01},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":119,"source_schedule_page":109,"raw_rate_tokens":["199.64","198.45","198.45","187.01"],"source_review_note":null,"search_text":"60-300-55 1200mm dia. Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-300-60-P119-SL233(12)","serial_label":"233(12)","item_code":"60-300-60","item_code_raw_ocr":"60-300-60","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"1350mm dia. Manufacturing, supplying and laying in position 25mm thick pre- cast ferrocement sheet in lining of irrigation canal bed and slope in leanest mix 1:2 (cement:sand) with sand of FM>=2.00 to attain a minimum 28 days cylinder strength of 18.0 N/mm?including screening, grading and washing aggregates with clear water, mixing, laying in forms, consolidating, curing, testing, placing wire mesh (20mm","unit":"","rates":{"zone_a":224.56,"zone_b":223.22,"zone_c":223.22,"zone_d":210.34},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":119,"source_schedule_page":109,"raw_rate_tokens":["224.56","223.22","223.22","210.34"],"source_review_note":null,"search_text":"60-300-60 1350mm dia. Manufacturing, supplying and laying in position 25mm thick pre- cast ferrocement sheet in lining of irrigation canal bed and slope in leanest mix 1:2 (cement:sand) with sand of FM>=2.00 to attain a minimum 28 days cylinder strength of 18.0 N/mm?including screening, grading and washing aggregates with clear water, mixing, laying in forms, consolidating, curing, testing, placing wire mesh (20mm Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-60-330-00-P119","serial_label":null,"item_code":"60-330-00","item_code_raw_ocr":"60-330-00","item_code_validation_status":"ocr_source_preserved","section_code":"60","section_title":"Drain Construction","description":"mesh,18 BWG wire, 2 layers) in sqm position as per approved design and drawing including tools, plants, preparation of platforms, shuttering (timber shutter) and staking in measurable stacks including cost of all materials and labours for preparation of bed and slope of canal and placing in position including joining with the adjacent sheet etc complete as per direction of Engineer in charge. 72. Painting Work Painting gauges with black, white and red water proof paint including","unit":"","rates":{"zone_a":1753.98,"zone_b":1733.66,"zone_c":1730.74,"zone_d":1702.02},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":119,"source_schedule_page":109,"raw_rate_tokens":["1,753.98","1,733.66","1,730.74","1,702.02"],"source_review_note":null,"search_text":"60-330-00 mesh,18 BWG wire, 2 layers) in sqm position as per approved design and drawing including tools, plants, preparation of platforms, shuttering (timber shutter) and staking in measurable stacks including cost of all materials and labours for preparation of bed and slope of canal and placing in position including joining with the adjacent sheet etc complete as per direction of Engineer in charge. 72. Painting Work Painting gauges with black, white and red water proof paint including Drain Construction"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-72-110-00-P119-SL235","serial_label":"235","item_code":"72-110-00","item_code_raw_ocr":"72-110-00","item_code_validation_status":"ocr_source_preserved","section_code":"72","section_title":"Painting Work","description":"Printing letters and necessary 4, cleaning and sand papering before printing etc. complete as per direction of Engineer in charge. Synthentic enamel painting to steel surfaces/ gates/ hoists etc. with paint of approved colour (2 coats over a coat of priming) including","unit":"","rates":{"zone_a":65.39,"zone_b":65.13,"zone_c":65.13,"zone_d":62.65},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":119,"source_schedule_page":109,"raw_rate_tokens":["65.39","65.13","65.13","62.65"],"source_review_note":null,"search_text":"72-110-00 Printing letters and necessary 4, cleaning and sand papering before printing etc. complete as per direction of Engineer in charge. Synthentic enamel painting to steel surfaces/ gates/ hoists etc. with paint of approved colour (2 coats over a coat of priming) including Painting Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-72-130-00-P119-SL236","serial_label":"236","item_code":"72-130-00","item_code_raw_ocr":"72-130-00","item_code_validation_status":"ocr_source_preserved","section_code":"72","section_title":"Painting Work","description":"steel brush, emery paper and cleaning etc. complete including the cost of all materials as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":119,"source_schedule_page":109,"raw_rate_tokens":null,"source_review_note":null,"search_text":"72-130-00 steel brush, emery paper and cleaning etc. complete including the cost of all materials as per direction of Engineer in charge. Painting Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-72-130-10-P119-SL236(1)","serial_label":"236(1)","item_code":"72-130-10","item_code_raw_ocr":"72-130-10","item_code_validation_status":"ocr_source_preserved","section_code":"72","section_title":"Painting Work","description":"2 coats over a priming coat.","unit":"sqm","rates":{"zone_a":260.35,"zone_b":259.3,"zone_c":259.3,"zone_d":248.5},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":119,"source_schedule_page":109,"raw_rate_tokens":["260.35","259.30","259.30","248.50"],"source_review_note":null,"search_text":"72-130-10 2 coats over a priming coat. sqm Painting Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-72-130-20-P119-SL236(2)","serial_label":"236(2)","item_code":"72-130-20","item_code_raw_ocr":"72-130-20","item_code_validation_status":"ocr_source_preserved","section_code":"72","section_title":"Painting Work","description":"2 coats over old surface. 249.66 24837 24837 237.08","unit":"","rates":{"zone_a":24966.0,"zone_b":24837.0,"zone_c":24837.0,"zone_d":23708.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":119,"source_schedule_page":109,"raw_rate_tokens":["249.66","24837","24837","237.08"],"source_review_note":null,"search_text":"72-130-20 2 coats over old surface. 249.66 24837 24837 237.08 Painting Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-72-180-00-P120-SL237","serial_label":"237","item_code":"72-180-00","item_code_raw_ocr":"72-180-00","item_code_validation_status":"ocr_source_preserved","section_code":"72","section_title":"Painting Work","description":"with paint of approved colour S4™ etc. complete including the cost of all materials as per direction of Engineer in charge. Snowcem painting of approved quality and colour, to out side wall, including cleaning and sand papering the surface, necessary","unit":"","rates":{"zone_a":292.74,"zone_b":291.51,"zone_c":291.51,"zone_d":280.47},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":120,"source_schedule_page":110,"raw_rate_tokens":["292.74","291.51","291.51","280.47"],"source_review_note":null,"search_text":"72-180-00 with paint of approved colour S4™ etc. complete including the cost of all materials as per direction of Engineer in charge. Snowcem painting of approved quality and colour, to out side wall, including cleaning and sand papering the surface, necessary Painting Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-72-250-00-P120-SL238","serial_label":"238","item_code":"72-250-00","item_code_raw_ocr":"72-250-00","item_code_validation_status":"ocr_source_preserved","section_code":"72","section_title":"Painting Work","description":"least 7 days etc. complete, in all respect, including the cost of all materials as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":120,"source_schedule_page":110,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"72-250-00 least 7 days etc. complete, in all respect, including the cost of all materials as per direction of Engineer in charge. Painting Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-72-250-10-P120-SL238(1)","serial_label":"238(1)","item_code":"72-250-10","item_code_raw_ocr":"72-250-10","item_code_validation_status":"ocr_source_preserved","section_code":"72","section_title":"Painting Work","description":"2 coats over a priming coat.","unit":"sqm","rates":{"zone_a":99.24,"zone_b":96.9,"zone_c":96.31,"zone_d":93.35},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":120,"source_schedule_page":110,"raw_rate_tokens":["99.24","96.90","96.31","93.35"],"source_review_note":null,"search_text":"72-250-10 2 coats over a priming coat. sqm Painting Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-72-250-20-P120-SL238(2)","serial_label":"238(2)","item_code":"72-250-20","item_code_raw_ocr":"72-250-20","item_code_validation_status":"ocr_source_preserved","section_code":"72","section_title":"Painting Work","description":"2 coats over old surface. Epoxy paint 2 coats of approved colour and specification over a priming coat to gate, hoisting device and embedded metal parts","unit":"sqm","rates":{"zone_a":91.23,"zone_b":89.1,"zone_c":88.57,"zone_d":85.87},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":120,"source_schedule_page":110,"raw_rate_tokens":["91.23","89.10","88.57","85.87"],"source_review_note":null,"search_text":"72-250-20 2 coats over old surface. Epoxy paint 2 coats of approved colour and specification over a priming coat to gate, hoisting device and embedded metal parts sqm Painting Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-72-540-00-P120-SL239","serial_label":"239","item_code":"72-540-00","item_code_raw_ocr":"72-540-00","item_code_validation_status":"ocr_source_preserved","section_code":"72","section_title":"Painting Work","description":"cluding scraping out rust and old 5, sigs 510.15 510.15 497.79 paint with chisel, scraper, steel wire brush & emery paper ete. complete in all respect including the cost of all materials as per direction of Engineer in charge. Greasing different types of gear box of hoisting system with best quality grease including deassemble of the gear box, cleaning old grease, removing","unit":"","rates":{"zone_a":500.0,"zone_b":510.15,"zone_c":510.15,"zone_d":497.79},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":120,"source_schedule_page":110,"raw_rate_tokens":["5,","510.15","510.15","497.79"],"source_review_note":null,"search_text":"72-540-00 cluding scraping out rust and old 5, sigs 510.15 510.15 497.79 paint with chisel, scraper, steel wire brush & emery paper ete. complete in all respect including the cost of all materials as per direction of Engineer in charge. Greasing different types of gear box of hoisting system with best quality grease including deassemble of the gear box, cleaning old grease, removing Painting Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-72-550-00-P120-SL240","serial_label":"240","item_code":"72-550-00","item_code_raw_ocr":"72-550-00","item_code_validation_status":"ocr_source_preserved","section_code":"72","section_title":"Painting Work","description":"Sticky materials by scraper, chisel, 4 9 steel wire brush, emery cloth, diesel/kerosine and assembling the same in original level, line, grade etc. complete including the cost of all materials as per direction of Engineer in charge. 76. M.S. Work & Metal Work M.S. Work in plates, angles, channels, flat bars, Tees etc. including fabricating, machining, cutting, bending, welding, forging, drilling, revetting, embedding anchor bars, staging and fitting,","unit":"","rates":{"zone_a":969.97,"zone_b":2069.97,"zone_c":2069.97,"zone_d":1994.51},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":120,"source_schedule_page":110,"raw_rate_tokens":["969.97","2,069.97","2,069.97","1,994.51"],"source_review_note":null,"search_text":"72-550-00 Sticky materials by scraper, chisel, 4 9 steel wire brush, emery cloth, diesel/kerosine and assembling the same in original level, line, grade etc. complete including the cost of all materials as per direction of Engineer in charge. 76. M.S. Work & Metal Work M.S. Work in plates, angles, channels, flat bars, Tees etc. including fabricating, machining, cutting, bending, welding, forging, drilling, revetting, embedding anchor bars, staging and fitting, Painting Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-170-00-P120-SL241","serial_label":"241","item_code":"76-170-00","item_code_raw_ocr":"76-170-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"fixing, local handling etc, comlpete with energy consumption and supply of labours including the cost of materials as per design, specification and direction of Engineer in charge.","unit":"kg","rates":{"zone_a":168.65,"zone_b":168.65,"zone_c":168.65,"zone_d":166.38},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":120,"source_schedule_page":110,"raw_rate_tokens":["168.65","168.65","168.65","166.38"],"source_review_note":null,"search_text":"76-170-00 fixing, local handling etc, comlpete with energy consumption and supply of labours including the cost of materials as per design, specification and direction of Engineer in charge. kg M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-180-00-P120-SL242","serial_label":"242","item_code":"76-180-00","item_code_raw_ocr":"76-180-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"Cleaning corrosion and rust from so the surface of steel with power","unit":"","rates":{"zone_a":99.7,"zone_b":88.77,"zone_c":88.77,"zone_d":86.95},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":120,"source_schedule_page":110,"raw_rate_tokens":["9.97","88.77","88.77","86.95"],"source_review_note":null,"search_text":"76-180-00 Cleaning corrosion and rust from so the surface of steel with power M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-185-00-P121-SL243","serial_label":"243","item_code":"76-185-00","item_code_raw_ocr":"76-185-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"} sand (FM>=3) . etc. Complete including the cost of all materials as per direction of Engineer in charge. Manufacturing, supplying and Installation of Padestal type lifting device for slide gate with 63mm dia threaded steel shaft, 146mm outer dia bronze nut, thrust bearing, steel bevel gear etc. as per","unit":"sqm","rates":{"zone_a":265.35,"zone_b":262.64,"zone_c":263.51,"zone_d":260.32},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":121,"source_schedule_page":111,"raw_rate_tokens":["265.35","262.64","263.51","260.32"],"source_review_note":null,"search_text":"76-185-00 } sand (FM>=3) . etc. Complete including the cost of all materials as per direction of Engineer in charge. Manufacturing, supplying and Installation of Padestal type lifting device for slide gate with 63mm dia threaded steel shaft, 146mm outer dia bronze nut, thrust bearing, steel bevel gear etc. as per sqm M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-190-00-P121-SL244","serial_label":"244","item_code":"76-190-00","item_code_raw_ocr":"76-190-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"approved design including supply each 100.8823 109,834.4 109,834.4 108,839.9 : 4 4 1 of all components, labours with a prime coat of redoxide where necessary etc. complete including the cost of all materials as per specification and direction of Engineer in charge. Manufacturing, supplying and Installation of Hand Wheel type lifting device for slide gate with 63mm dia steel shaft, 108mm outer dia bronze nut taper roller bearing SKF-50216 etc. as per approved","unit":"","rates":{"zone_a":88230.0,"zone_b":109834.4,"zone_c":109834.4,"zone_d":108839.9},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":121,"source_schedule_page":111,"raw_rate_tokens":["8823","109,834.4","109,834.4","108,839.9"],"source_review_note":null,"search_text":"76-190-00 approved design including supply each 100.8823 109,834.4 109,834.4 108,839.9 : 4 4 1 of all components, labours with a prime coat of redoxide where necessary etc. complete including the cost of all materials as per specification and direction of Engineer in charge. Manufacturing, supplying and Installation of Hand Wheel type lifting device for slide gate with 63mm dia steel shaft, 108mm outer dia bronze nut taper roller bearing SKF-50216 etc. as per approved M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-200-00-P121-SL245","serial_label":"245","item_code":"76-200-00","item_code_raw_ocr":"76-200-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"design including supply of all each components, labours with a prime coat of redoxide where necessary etc. complete including the cost of all materials as per specification and direction of Engineer in charge. Manufacturing, supplying, installation and fitting, fixing the vertical steel lift gate/ flap gate as per design and_ specification, including fabricating, _rivetting, welding, fixing rubber _ seal,","unit":"","rates":{"zone_a":60213.88,"zone_b":60102.79,"zone_c":60102.79,"zone_d":59408.89},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":121,"source_schedule_page":111,"raw_rate_tokens":["60,213.88","60,102.79","60,102.79","59,408.89"],"source_review_note":null,"search_text":"76-200-00 design including supply of all each components, labours with a prime coat of redoxide where necessary etc. complete including the cost of all materials as per specification and direction of Engineer in charge. Manufacturing, supplying, installation and fitting, fixing the vertical steel lift gate/ flap gate as per design and_ specification, including fabricating, _rivetting, welding, fixing rubber _ seal, M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-230-00-P121-SL246","serial_label":"246","item_code":"76-230-00","item_code_raw_ocr":"76-230-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"Providing required nuts and bolts 4, 33169 331.66 331.66 327.45 including the cost of all materials ete. complete with a prime coat of redoxide where necessary as per direction of Engineer in charge. (Applicable only for size not specified and smaller than size mentioned in the SoR) Manufacturing & Supplying of M.S. Vertical Lift Gate shutter having 8mm thick M.S. skin plate and stiffener with minimum 75mm","unit":"","rates":{"zone_a":331.69,"zone_b":331.66,"zone_c":331.66,"zone_d":327.45},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":121,"source_schedule_page":111,"raw_rate_tokens":["33169","331.66","331.66","327.45"],"source_review_note":null,"search_text":"76-230-00 Providing required nuts and bolts 4, 33169 331.66 331.66 327.45 including the cost of all materials ete. complete with a prime coat of redoxide where necessary as per direction of Engineer in charge. (Applicable only for size not specified and smaller than size mentioned in the SoR) Manufacturing & Supplying of M.S. Vertical Lift Gate shutter having 8mm thick M.S. skin plate and stiffener with minimum 75mm M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-240-00-P121-SL247","serial_label":"247","item_code":"76-240-00","item_code_raw_ocr":"76-240-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"x 75mm x 9mm MLS. angle (Top & each Bottom beam, Horizontal main beam and End vertical beam) as frame, ()28mm x 53mm x 15mm P- Ko gy eo g —","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":121,"source_schedule_page":111,"raw_rate_tokens":null,"source_review_note":null,"search_text":"76-240-00 x 75mm x 9mm MLS. angle (Top & each Bottom beam, Horizontal main beam and End vertical beam) as frame, ()28mm x 53mm x 15mm P- Ko gy eo g — M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-242-00-P122-SL248","serial_label":"248","item_code":"76-242-00","item_code_raw_ocr":"76-242-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"Flat bottom rubber seal, threaded stem attachment with bottom socket, nut-bolts, cotter pin and washer as per approved design including the cost of all materials of proper grade & brand new with a prime coat of red-oxide and three final coat of coaltar epoxy paint (marine quality) where necessary as per specification and direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":122,"source_schedule_page":112,"raw_rate_tokens":null,"source_review_note":null,"search_text":"76-242-00 Flat bottom rubber seal, threaded stem attachment with bottom socket, nut-bolts, cotter pin and washer as per approved design including the cost of all materials of proper grade & brand new with a prime coat of red-oxide and three final coat of coaltar epoxy paint (marine quality) where necessary as per specification and direction of Engineer in charge. M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-242-20-P122-SL248(2)","serial_label":"248(2)","item_code":"76-242-20","item_code_raw_ocr":"76-242-20","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"Da 1.275m (Vent","unit":"","rates":{"zone_a":69024.0,"zone_b":69022.01,"zone_c":69022.01,"zone_d":68455.68},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":122,"source_schedule_page":112,"raw_rate_tokens":["69,024.00","69,022.01","69,022.01","68,455.68"],"source_review_note":null,"search_text":"76-242-20 Da 1.275m (Vent M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-242-30-P122-SL248(3)","serial_label":"248(3)","item_code":"76-242-30","item_code_raw_ocr":"76-242-30","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"al 1.275m (Vent","unit":"","rates":{"zone_a":90658.82,"zone_b":90655.75,"zone_c":90655.75,"zone_d":89888.24},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":122,"source_schedule_page":112,"raw_rate_tokens":["90,658.82","90,655.75","90,655.75","89,888.24"],"source_review_note":null,"search_text":"76-242-30 al 1.275m (Vent M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-242-40-P122-SL248(4)","serial_label":"248(4)","item_code":"76-242-40","item_code_raw_ocr":"76-242-40","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"iw 1.575m (Vent 1.2mx on 94,280.16 93,509.58 .8m) 0 3 3 1 959.99 Manufacturing & Supplying of Af “ ,","unit":"","rates":{"zone_a":1.0,"zone_b":1.0,"zone_c":94280.16,"zone_d":93509.58},"rate_integrity_status":"numeric_outlier_review_required","autofill_eligible":false,"source_pdf_page":122,"source_schedule_page":112,"raw_rate_tokens":["1","1","94,280.16","93,509.58"],"source_review_note":null,"search_text":"76-242-40 iw 1.575m (Vent 1.2mx on 94,280.16 93,509.58 .8m) 0 3 3 1 959.99 Manufacturing & Supplying of Af “ , M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-250-10-P123","serial_label":null,"item_code":"76-250-10","item_code_raw_ocr":"76-250-10","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"Dom) x Manufacturing & Supplying of M.S. Flap Gate shutter of 10mm thick M.S. skin plate and stiffener with minimum 75mm x 75mm x 9mm M.S. angle as_ frame, horizontal & vertical beam, 28mm x 53mm x 15mm P-type rubber seal, fixed with @10mm x 55mm S.S. counter shank bolts with nuts and 25mm x 6mm S8.8. strip as clamp drilled spaces @ 150mm c/c, hinge assy with gate","unit":"","rates":{"zone_a":0.0,"zone_b":74009.33,"zone_c":74007.35,"zone_d":73441.01},"rate_integrity_status":"numeric_outlier_review_required","autofill_eligible":false,"source_pdf_page":123,"source_schedule_page":113,"raw_rate_tokens":["0","74,009.33","74,007.35","73,441.01"],"source_review_note":null,"search_text":"76-250-10 Dom) x Manufacturing & Supplying of M.S. Flap Gate shutter of 10mm thick M.S. skin plate and stiffener with minimum 75mm x 75mm x 9mm M.S. angle as_ frame, horizontal & vertical beam, 28mm x 53mm x 15mm P-type rubber seal, fixed with @10mm x 55mm S.S. counter shank bolts with nuts and 25mm x 6mm S8.8. strip as clamp drilled spaces @ 150mm c/c, hinge assy with gate M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-252-00-P123","serial_label":null,"item_code":"76-252-00","item_code_raw_ocr":"76-252-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"20)mm thick M.S. plate, 4 nos p(35-50)mm S.S. hinge pin with proper thread, nut-bolts, cotter pin and washer as per approved design including the cost of all materials of proper grade & brand new with a prime coat of red-oxide and three final coat of coaltar epoxy paint (marine quality) where necessary as per specification and direction of Engineer in charge. .2m) 3 6 6 5 ko wy @- GF ~ %","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":123,"source_schedule_page":113,"raw_rate_tokens":null,"source_review_note":null,"search_text":"76-252-00 20)mm thick M.S. plate, 4 nos p(35-50)mm S.S. hinge pin with proper thread, nut-bolts, cotter pin and washer as per approved design including the cost of all materials of proper grade & brand new with a prime coat of red-oxide and three final coat of coaltar epoxy paint (marine quality) where necessary as per specification and direction of Engineer in charge. .2m) 3 6 6 5 ko wy @- GF ~ % M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-260-00-P124-SL251","serial_label":"251","item_code":"76-260-00","item_code_raw_ocr":"76-260-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"fitting the same to regulator/sluice and mending the damages with CC (1:2:4), removing the spoils ete. complete including the cost of all materials as per direction of Engineer in charge. Labour charge for removal of M.S.Gates and Hoists from all types of structures with all leads and lifts including hire charge of","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":124,"source_schedule_page":114,"raw_rate_tokens":null,"source_review_note":null,"search_text":"76-260-00 fitting the same to regulator/sluice and mending the damages with CC (1:2:4), removing the spoils ete. complete including the cost of all materials as per direction of Engineer in charge. Labour charge for removal of M.S.Gates and Hoists from all types of structures with all leads and lifts including hire charge of M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-270-00-P124-SL252","serial_label":"252","item_code":"76-270-00","item_code_raw_ocr":"76-270-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"boat, chain pulley, bamboo, Topes och . . etc. and refixing the same in original level, line and grade after painting (excluding the cost of painting) as per direction of Engineer in charge. mx 135m","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":124,"source_schedule_page":114,"raw_rate_tokens":null,"source_review_note":null,"search_text":"76-270-00 boat, chain pulley, bamboo, Topes och . . etc. and refixing the same in original level, line and grade after painting (excluding the cost of painting) as per direction of Engineer in charge. mx 135m M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-270-20-P124","serial_label":null,"item_code":"76-270-20","item_code_raw_ocr":"76-270-20","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"Small size: mx 1.00 m Manufacturing, supplying and installation of M.S.Embedded parts for flap/ vertical lift gate including fabricating, bending, welding, forging, drilling holes,","unit":"","rates":{"zone_a":1350.0,"zone_b":1000.0,"zone_c":2319.42,"zone_d":2292.92},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":124,"source_schedule_page":114,"raw_rate_tokens":["1.35","1.00","2,319.42","2,292.92"],"source_review_note":null,"search_text":"76-270-20 Small size: mx 1.00 m Manufacturing, supplying and installation of M.S.Embedded parts for flap/ vertical lift gate including fabricating, bending, welding, forging, drilling holes, M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-280-00-P124-SL253","serial_label":"253","item_code":"76-280-00","item_code_raw_ocr":"76-280-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"welding anchor bars, fitting, fixing kg 197.56 197.56 197.56 194,25 etc. complete including the cost of materials with a prime coat of red oxide where necessary as per design, specification and direction of Engineer in charge. Manufacturing, supplying and fitting, fixing of M.S. gratings with 25mmx25mmx6mm M.S, angle frame and 25mmx6mm FI. bar @","unit":"","rates":{"zone_a":197.56,"zone_b":197.56,"zone_c":197.56,"zone_d":194.25},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":124,"source_schedule_page":114,"raw_rate_tokens":["197.56","197.56","197.56","194,25"],"source_review_note":null,"search_text":"76-280-00 welding anchor bars, fitting, fixing kg 197.56 197.56 197.56 194,25 etc. complete including the cost of materials with a prime coat of red oxide where necessary as per design, specification and direction of Engineer in charge. Manufacturing, supplying and fitting, fixing of M.S. gratings with 25mmx25mmx6mm M.S, angle frame and 25mmx6mm FI. bar @ M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-290-00-P124-SL254","serial_label":"254","item_code":"76-290-00","item_code_raw_ocr":"76-290-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":">0mm c/c, lateral stiffener not som more than 600mm apart and embedded frame with M.S. angle (25mmx25mmx6mm), _ including fabrication, welding in accordance with approved design, drawing, kK @ a &« & gn","unit":"","rates":{"zone_a":4200.0,"zone_b":5265.66,"zone_c":5265.66,"zone_d":5201.55},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":124,"source_schedule_page":114,"raw_rate_tokens":["42","5,265.66","5,265.66","5,201.55"],"source_review_note":null,"search_text":"76-290-00 >0mm c/c, lateral stiffener not som more than 600mm apart and embedded frame with M.S. angle (25mmx25mmx6mm), _ including fabrication, welding in accordance with approved design, drawing, kK @ a &« & gn M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-300-00-P125-SL255","serial_label":"255","item_code":"76-300-00","item_code_raw_ocr":"76-300-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"with a prime coat of redoxide °4™ where necessary including making holes in walls or floors where necessary and duly embedded in concrete (1:3:6), mending the damages etc. complete as per approved drawing and direction of Engineer in charge: =x) re RET e silkarai wood or equivalent. 0.910m high M.S. railing with 25mmx6mm vertical F.I. bar, at the rate of 100mm c/c, welded to 25mmx6mm F.I. bar at top and bottom with 40mm dia G.I. pipe hand rail, including fitting and fixing in position with necessary","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":125,"source_schedule_page":115,"raw_rate_tokens":null,"source_review_note":null,"search_text":"76-300-00 with a prime coat of redoxide °4™ where necessary including making holes in walls or floors where necessary and duly embedded in concrete (1:3:6), mending the damages etc. complete as per approved drawing and direction of Engineer in charge: =x) re RET e silkarai wood or equivalent. 0.910m high M.S. railing with 25mmx6mm vertical F.I. bar, at the rate of 100mm c/c, welded to 25mmx6mm F.I. bar at top and bottom with 40mm dia G.I. pipe hand rail, including fitting and fixing in position with necessary M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-310-00-P125-SL256","serial_label":"256","item_code":"76-310-00","item_code_raw_ocr":"76-310-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"clamps with a prime coat of sqm redoxide where necessary including making holes in walls or floors where necessary and duly embedded in concrete (1:3:6) mending good the damages ete. complete as per drawing and direction of Engineer in charge. Supplying and fitting fixing M.S.Grill made of 10mm dia M.S.bar @100mm c/c both ways fitted with M.S.Angles 2 (25mmx25mmx6mm) outer frame","unit":"","rates":{"zone_a":2905.5,"zone_b":2903.0,"zone_c":2903.0,"zone_d":2880.59},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":125,"source_schedule_page":115,"raw_rate_tokens":["2,905.50","2,903.00","2,903.00","2,880.59"],"source_review_note":null,"search_text":"76-310-00 clamps with a prime coat of sqm redoxide where necessary including making holes in walls or floors where necessary and duly embedded in concrete (1:3:6) mending good the damages ete. complete as per drawing and direction of Engineer in charge. Supplying and fitting fixing M.S.Grill made of 10mm dia M.S.bar @100mm c/c both ways fitted with M.S.Angles 2 (25mmx25mmx6mm) outer frame M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-320-00-P125-SL57","serial_label":"57","item_code":"76-320-00","item_code_raw_ocr":"76-320-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"} ; ; aor . . sqm including fabricating, welding in each point with a prime coat of redoxide where necessary as per drawing, design etc. complete, as per direction of Engineer in charge. Supplying, fitting and fixing lead sheet of any size in bearing (hinge or free), including cutting to","unit":"","rates":{"zone_a":3135.74,"zone_b":3133.24,"zone_c":3133.24,"zone_d":3097.07},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":125,"source_schedule_page":115,"raw_rate_tokens":["3,135.74","3,133.24","3,133.24","3,097.07"],"source_review_note":null,"search_text":"76-320-00 } ; ; aor . . sqm including fabricating, welding in each point with a prime coat of redoxide where necessary as per drawing, design etc. complete, as per direction of Engineer in charge. Supplying, fitting and fixing lead sheet of any size in bearing (hinge or free), including cutting to M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-500-00-P125-SL258","serial_label":"258","item_code":"76-500-00","item_code_raw_ocr":"76-500-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"desired shape and placing between top and bottom plate etc. complete as per direction of Engineer in charge. fay. G_","unit":"kg","rates":{"zone_a":981.62,"zone_b":975.49,"zone_c":975.49,"zone_d":929.47},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":125,"source_schedule_page":115,"raw_rate_tokens":["981.62","975.49","975.49","929.47"],"source_review_note":null,"search_text":"76-500-00 desired shape and placing between top and bottom plate etc. complete as per direction of Engineer in charge. fay. G_ kg M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-510-00-P126-SL259","serial_label":"259","item_code":"76-510-00","item_code_raw_ocr":"76-510-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"fixing in abutments/girders/bases etc. complete with supply of all materials as per drawing, specification and direction of Engineer in charge (excluding cost of M.S. bar). Cutting MLS. plate/sheet pile with","unit":"kg","rates":{"zone_a":403.57,"zone_b":403.38,"zone_c":403.38,"zone_d":402.08},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":126,"source_schedule_page":116,"raw_rate_tokens":["403.57","403.38","403.38","402.08"],"source_review_note":null,"search_text":"76-510-00 fixing in abutments/girders/bases etc. complete with supply of all materials as per drawing, specification and direction of Engineer in charge (excluding cost of M.S. bar). Cutting MLS. plate/sheet pile with kg M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-520-00-P126-SL260","serial_label":"260","item_code":"76-520-00","item_code_raw_ocr":"76-520-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"shape and size and as per direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":126,"source_schedule_page":116,"raw_rate_tokens":null,"source_review_note":null,"search_text":"76-520-00 shape and size and as per direction of Engineer in charge. M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-520-10-P126-SL260(1)","serial_label":"260(1)","item_code":"76-520-10","item_code_raw_ocr":"76-520-10","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"3mm thick plate. m 3195 3136 31.36 29.67","unit":"","rates":{"zone_a":3195.0,"zone_b":3136.0,"zone_c":3136.0,"zone_d":2967.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":126,"source_schedule_page":116,"raw_rate_tokens":["3195","3136","31.36","29.67"],"source_review_note":null,"search_text":"76-520-10 3mm thick plate. m 3195 3136 31.36 29.67 M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-520-20-P126-SL260(2)","serial_label":"260(2)","item_code":"76-520-20","item_code_raw_ocr":"76-520-20","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"6mm thick plate.","unit":"","rates":{"zone_a":43.49,"zone_b":43.25,"zone_c":43.25,"zone_d":41.22},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":126,"source_schedule_page":116,"raw_rate_tokens":["43.49","43.25","43.25","41.22"],"source_review_note":null,"search_text":"76-520-20 6mm thick plate. M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-520-30-P126-SL260(3)","serial_label":"260(3)","item_code":"76-520-30","item_code_raw_ocr":"76-520-30","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"9mm thick plate. Lm","unit":"","rates":{"zone_a":49.01,"zone_b":48.75,"zone_c":48.75,"zone_d":46.49},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":126,"source_schedule_page":116,"raw_rate_tokens":["49.01","48.75","48.75","46.49"],"source_review_note":null,"search_text":"76-520-30 9mm thick plate. Lm M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-520-40-P126-SL260(4)","serial_label":"260(4)","item_code":"76-520-40","item_code_raw_ocr":"76-520-40","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"12mm thick plate.","unit":"","rates":{"zone_a":59.67,"zone_b":59.35,"zone_c":59.35,"zone_d":56.53},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":126,"source_schedule_page":116,"raw_rate_tokens":["59.67","59.35","59.35","56.53"],"source_review_note":null,"search_text":"76-520-40 12mm thick plate. M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-520-50-P126-SL260(5)","serial_label":"260(5)","item_code":"76-520-50","item_code_raw_ocr":"76-520-50","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"15mm thick plate. (om","unit":"","rates":{"zone_a":85.11,"zone_b":84.6,"zone_c":84.6,"zone_d":80.08},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":126,"source_schedule_page":116,"raw_rate_tokens":["85.11","84.60","84.60","80.08"],"source_review_note":null,"search_text":"76-520-50 15mm thick plate. (om M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-520-60-P126-SL260(6)","serial_label":"260(6)","item_code":"76-520-60","item_code_raw_ocr":"76-520-60","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"18mm thick plate. m 103.03 10239 10239 96.74","unit":"","rates":{"zone_a":10303.0,"zone_b":10239.0,"zone_c":10239.0,"zone_d":9674.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":126,"source_schedule_page":116,"raw_rate_tokens":["103.03","10239","10239","96.74"],"source_review_note":null,"search_text":"76-520-60 18mm thick plate. m 103.03 10239 10239 96.74 M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-520-70-P126-SL260(7)","serial_label":"260(7)","item_code":"76-520-70","item_code_raw_ocr":"76-520-70","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"20mm thick plate. m unis 11046 11046 104.56","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":126,"source_schedule_page":116,"raw_rate_tokens":null,"source_review_note":null,"search_text":"76-520-70 20mm thick plate. m unis 11046 11046 104.56 M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-520-80-P126-SL260(8)","serial_label":"260(8)","item_code":"76-520-80","item_code_raw_ocr":"76-520-80","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"25mm thick plate. Removal of old rubber seal and supplying, fitting, fixing new P- type rubber seal in vertical lift gate/flap gate including making","unit":"","rates":{"zone_a":127.51,"zone_b":126.73,"zone_c":126.73,"zone_d":119.96},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":126,"source_schedule_page":116,"raw_rate_tokens":["127.51","126.73","126.73","119.96"],"source_review_note":null,"search_text":"76-520-80 25mm thick plate. Removal of old rubber seal and supplying, fitting, fixing new P- type rubber seal in vertical lift gate/flap gate including making M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-610-00-P126-SL261","serial_label":"261","item_code":"76-610-00","item_code_raw_ocr":"76-610-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"demaged nuts & bolts and clamp bars etc. comlpete including the cost of all materials as per direction of Engineer in charge. Size : Width = 75mm, Thickness =","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":126,"source_schedule_page":116,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"76-610-00 demaged nuts & bolts and clamp bars etc. comlpete including the cost of all materials as per direction of Engineer in charge. Size : Width = 75mm, Thickness = M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-610-10-P126-SL261(1)","serial_label":"261(1)","item_code":"76-610-10","item_code_raw_ocr":"76-610-10","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"12mm and Bulb dia = 25mm. mn Size : Width = 100mm, Thickness","unit":"","rates":{"zone_a":1577.96,"zone_b":1571.82,"zone_c":1571.82,"zone_d":1516.61},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":126,"source_schedule_page":116,"raw_rate_tokens":["1,577.96","1,571.82","1,571.82","1,516.61"],"source_review_note":null,"search_text":"76-610-10 12mm and Bulb dia = 25mm. mn Size : Width = 100mm, Thickness M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-610-20-P126","serial_label":null,"item_code":"76-610-20","item_code_raw_ocr":"76-610-20","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"~ 16mm and Bulb dia = 45mm. a Supply and fitting and fixing 23cm wide P.V.C water stops having minimum strength of 13.80 N/mm? at 225% elongation and of approved quality in cntraction and","unit":"","rates":{"zone_a":1634.4,"zone_b":1628.26,"zone_c":1628.26,"zone_d":1573.05},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":126,"source_schedule_page":116,"raw_rate_tokens":["1,634.40","1,628.26","1,628.26","1,573.05"],"source_review_note":null,"search_text":"76-610-20 ~ 16mm and Bulb dia = 45mm. a Supply and fitting and fixing 23cm wide P.V.C water stops having minimum strength of 13.80 N/mm? at 225% elongation and of approved quality in cntraction and M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-630-00-P126-SL262","serial_label":"262","item_code":"76-630-00","item_code_raw_ocr":"76-630-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"arrangments for modification in shuttering and kepping the water stop in position etc. complete as per design, specification and direction of Engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":126,"source_schedule_page":116,"raw_rate_tokens":null,"source_review_note":null,"search_text":"76-630-00 arrangments for modification in shuttering and kepping the water stop in position etc. complete as per design, specification and direction of Engineer in charge. M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-630-10-P126-SL262(1)","serial_label":"262(1)","item_code":"76-630-10","item_code_raw_ocr":"76-630-10","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"3 bulb type.","unit":"","rates":{"zone_a":819.81,"zone_b":819.04,"zone_c":819.04,"zone_d":812.14},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":126,"source_schedule_page":116,"raw_rate_tokens":["819.81","819.04","819.04","812.14"],"source_review_note":null,"search_text":"76-630-10 3 bulb type. M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-630-20-P126-SL262(2)","serial_label":"262(2)","item_code":"76-630-20","item_code_raw_ocr":"76-630-20","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"Corrugated type. : Labour charge for fitting and fixing","unit":"","rates":{"zone_a":819.81,"zone_b":819.04,"zone_c":819.04,"zone_d":812.14},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":126,"source_schedule_page":116,"raw_rate_tokens":["819.81","819.04","819.04","812.14"],"source_review_note":null,"search_text":"76-630-20 Corrugated type. : Labour charge for fitting and fixing M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-640-00-P126-SL263","serial_label":"263","item_code":"76-640-00","item_code_raw_ocr":"76-640-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"the contraction and expansion","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":126,"source_schedule_page":116,"raw_rate_tokens":null,"source_review_note":null,"search_text":"76-640-00 the contraction and expansion M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-76-780-00-P127-SL264","serial_label":"264","item_code":"76-780-00","item_code_raw_ocr":"76-780-00","item_code_validation_status":"ocr_source_preserved","section_code":"76","section_title":"M.S. Work & Metal Work","description":"mm with 40 mm dia 100 mm long each G.L/M.S. pipe closed at one end : and filled with 30 mm_ thick compressible filler, including placing in position, binding with G.I. Wire etc. complete as per direction of Engineer in charge. _ 90. Dredging Work For Contractor Dredger: Dredging work by operating dredger of different diameter with necessary arrangement by Tug boat/Work boat disposing dredged earth up to 1.5 km, positioning the cutter of dredger at designed level by maintaining bathymetric pre work and post work survey; constructing, dismantling and shifting from one line to another line of temporary/permanent Shore pipe line at ground level laying on the ground or on 50 kg gunny bag where necessary or on staging made by bullah of local wood (100 mm dia), lifting manually/by","unit":"","rates":{"zone_a":3468.09,"zone_b":3443.55,"zone_c":3443.71,"zone_d":3321.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":127,"source_schedule_page":117,"raw_rate_tokens":["3,468.09","3,443.55","3,443.71","3,321.00"],"source_review_note":null,"search_text":"76-780-00 mm with 40 mm dia 100 mm long each G.L/M.S. pipe closed at one end : and filled with 30 mm_ thick compressible filler, including placing in position, binding with G.I. Wire etc. complete as per direction of Engineer in charge. _ 90. Dredging Work For Contractor Dredger: Dredging work by operating dredger of different diameter with necessary arrangement by Tug boat/Work boat disposing dredged earth up to 1.5 km, positioning the cutter of dredger at designed level by maintaining bathymetric pre work and post work survey; constructing, dismantling and shifting from one line to another line of temporary/permanent Shore pipe line at ground level laying on the ground or on 50 kg gunny bag where necessary or on staging made by bullah of local wood (100 mm dia), lifting manually/by M.S. Work & Metal Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-100-00-P127-SL265","serial_label":"265","item_code":"90-100-00","item_code_raw_ocr":"90-100-00","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"tipod stand with chain pulley, cum . . fitting/fixing shore pipe with nut- bolt & rubber gasket, levelling & dressing uneven ground below the shore pipe where necessary; lifting shore pipe sunk into the mud below the ground level using tripod stand & chain hoist and cleaning with water, including the cost of mobilization and demobilization of dredger with houseboat by Tug boat/Work boat, fitting/fixing & maintenance of all necessary equipment, supplying of necessary fuels & lubricants, shore pipes & floating pipes, ancillary dredging materials and charges ete. complete as per direction of engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":127,"source_schedule_page":117,"raw_rate_tokens":null,"source_review_note":null,"search_text":"90-100-00 tipod stand with chain pulley, cum . . fitting/fixing shore pipe with nut- bolt & rubber gasket, levelling & dressing uneven ground below the shore pipe where necessary; lifting shore pipe sunk into the mud below the ground level using tripod stand & chain hoist and cleaning with water, including the cost of mobilization and demobilization of dredger with houseboat by Tug boat/Work boat, fitting/fixing & maintenance of all necessary equipment, supplying of necessary fuels & lubricants, shore pipes & floating pipes, ancillary dredging materials and charges ete. complete as per direction of engineer in charge. Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-100-10-P128-SL265(1)","serial_label":"265(1)","item_code":"90-100-10","item_code_raw_ocr":"90-100-10","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"265(3) 194.36 For Contractor Dredger: Extra Rate for booster pump beyond 1.5 km __ including mobilization & installation of booster station, —_ constructing, dismantling and shifting, from one line to another line, of temporary/permanent Shore pipe line at ground level laying on the ground or on 50 kg gunny bag where necessary or on staging made by bullah of local wood (100 mm dia), lifting manually/ by 150.99 tripod stand with chain pulley, cum . . . .","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":128,"source_schedule_page":118,"raw_rate_tokens":null,"source_review_note":null,"search_text":"90-100-10 265(3) 194.36 For Contractor Dredger: Extra Rate for booster pump beyond 1.5 km __ including mobilization & installation of booster station, —_ constructing, dismantling and shifting, from one line to another line, of temporary/permanent Shore pipe line at ground level laying on the ground or on 50 kg gunny bag where necessary or on staging made by bullah of local wood (100 mm dia), lifting manually/ by 150.99 tripod stand with chain pulley, cum . . . . Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-150-00-P128","serial_label":null,"item_code":"90-150-00","item_code_raw_ocr":"90-150-00","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"bolt & rubber gasket, levelling & dressing uneven ground below the shore pipe where necessary; lifting shore pipe sunk into the mud below the ground level using tripod stand & chain hoist and cleaning with water, cost of fitting/fixing & maintenance of all necessary equipment, supplying of necessary fuels & lubricants, shore pipes & floating pipes, ancillary materials and charges etc. complete as per direction of engineer in charge. Extra Rate for booster pump cum Extra Rate for booster pump cum Extra Rate for booster pump cum","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":128,"source_schedule_page":118,"raw_rate_tokens":null,"source_review_note":null,"search_text":"90-150-00 bolt & rubber gasket, levelling & dressing uneven ground below the shore pipe where necessary; lifting shore pipe sunk into the mud below the ground level using tripod stand & chain hoist and cleaning with water, cost of fitting/fixing & maintenance of all necessary equipment, supplying of necessary fuels & lubricants, shore pipes & floating pipes, ancillary materials and charges etc. complete as per direction of engineer in charge. Extra Rate for booster pump cum Extra Rate for booster pump cum Extra Rate for booster pump cum Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-99-150-30-P128-SL266(3)","serial_label":"266(3)","item_code":"99-150-30","item_code_raw_ocr":"99-150-30","item_code_validation_status":"ocr_source_preserved","section_code":"99","section_title":null,"description":"EU Rate for booster 3384 33.7 For BWDB Dredger: Basic dredging by operating dredger with necessary arrangment by Tug boat/Work boat disposing dredged earth upto 1.5 km, positioning the cutter of dredger at designed level by maintaining","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":128,"source_schedule_page":118,"raw_rate_tokens":null,"source_review_note":null,"search_text":"99-150-30 EU Rate for booster 3384 33.7 For BWDB Dredger: Basic dredging by operating dredger with necessary arrangment by Tug boat/Work boat disposing dredged earth upto 1.5 km, positioning the cutter of dredger at designed level by maintaining"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-700-00-P128-SL267","serial_label":"267","item_code":"90-700-00","item_code_raw_ocr":"90-700-00","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"survey including fitting/fixing & maintenance of all necessary equipments, Supplying of necessary fuels & lubricants, shore pipes & floating pipes, anciliary dredging materials etc. complete as per direction of engineer in charge. redger.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":128,"source_schedule_page":118,"raw_rate_tokens":null,"source_review_note":null,"search_text":"90-700-00 survey including fitting/fixing & maintenance of all necessary equipments, Supplying of necessary fuels & lubricants, shore pipes & floating pipes, anciliary dredging materials etc. complete as per direction of engineer in charge. redger. Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-700-30-P129-SL267(3)","serial_label":"267(3)","item_code":"90-700-30","item_code_raw_ocr":"90-700-30","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"dredger. For BWDB Dredger: Mobilization/Demobilization of Dredger, House boat and","unit":"cum","rates":{"zone_a":61.22,"zone_b":61.22,"zone_c":61.22,"zone_d":61.22},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":129,"source_schedule_page":119,"raw_rate_tokens":["61.22","61.22","61.22","61.22"],"source_review_note":null,"search_text":"90-700-30 dredger. For BWDB Dredger: Mobilization/Demobilization of Dredger, House boat and cum Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-710-00-P129-SL268","serial_label":"268","item_code":"90-710-00","item_code_raw_ocr":"90-710-00","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"Workboat by Tugboat of necessary 4, . . . capacity including cost of all necessary fuel, lubricants etc. complete as per direction of enhineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":129,"source_schedule_page":119,"raw_rate_tokens":null,"source_review_note":null,"search_text":"90-710-00 Workboat by Tugboat of necessary 4, . . . capacity including cost of all necessary fuel, lubricants etc. complete as per direction of enhineer in charge. Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-710-10-P129-SL268(1)","serial_label":"268(1)","item_code":"90-710-10","item_code_raw_ocr":"90-710-10","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"For 26\" dredger","unit":"","rates":{"zone_a":4686.17,"zone_b":4686.17,"zone_c":4686.17,"zone_d":4686.17},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":129,"source_schedule_page":119,"raw_rate_tokens":["4,686.17","4,686.17","4,686.17","4,686.17"],"source_review_note":null,"search_text":"90-710-10 For 26\" dredger Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-710-20-P129-SL268(2)","serial_label":"268(2)","item_code":"90-710-20","item_code_raw_ocr":"90-710-20","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"For 20\" dredger km","unit":"","rates":{"zone_a":4137.21,"zone_b":4137.21,"zone_c":4137.21,"zone_d":4137.21},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":129,"source_schedule_page":119,"raw_rate_tokens":["4,137.21","4,137.21","4,137.21","4,137.21"],"source_review_note":null,"search_text":"90-710-20 For 20\" dredger km Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-710-30-P129-SL268(3)","serial_label":"268(3)","item_code":"90-710-30","item_code_raw_ocr":"90-710-30","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":") For 18\" dredger km For BWDB Dredger: Mobilization/Demobilization of Floating pipe by Tugboat of i i i km 2 -715-00 necessary capacity —_including P . . 69 [0-7 loading/unloading and the cost of /m all necessary fuel, luricants etc. complete as per direction of engineer in charge.","unit":"","rates":{"zone_a":2499.38,"zone_b":2499.38,"zone_c":2499.38,"zone_d":2499.38},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":129,"source_schedule_page":119,"raw_rate_tokens":["2,499.38","2,499.38","2,499.38","2,499.38"],"source_review_note":null,"search_text":"90-710-30 ) For 18\" dredger km For BWDB Dredger: Mobilization/Demobilization of Floating pipe by Tugboat of i i i km 2 -715-00 necessary capacity —_including P . . 69 [0-7 loading/unloading and the cost of /m all necessary fuel, luricants etc. complete as per direction of engineer in charge. Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-715-10-P129-SL269(1)","serial_label":"269(1)","item_code":"90-715-10","item_code_raw_ocr":"90-715-10","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"F!oating pipe for 26\" dredger","unit":"","rates":{"zone_a":6.36,"zone_b":6.36,"zone_c":6.36,"zone_d":6.36},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":129,"source_schedule_page":119,"raw_rate_tokens":["6.36","6.36","6.36","6.36"],"source_review_note":null,"search_text":"90-715-10 F!oating pipe for 26\" dredger Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-715-20-P129-SL269(2)","serial_label":"269(2)","item_code":"90-715-20","item_code_raw_ocr":"90-715-20","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"Floating pipe for 20\" dredger pian 4.24 4.24 4.24","unit":"","rates":{"zone_a":2.0,"zone_b":4.24,"zone_c":4.24,"zone_d":4.24},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":129,"source_schedule_page":119,"raw_rate_tokens":["20","4.24","4.24","4.24"],"source_review_note":null,"search_text":"90-715-20 Floating pipe for 20\" dredger pian 4.24 4.24 4.24 Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-715-30-P129-SL269(3)","serial_label":"269(3)","item_code":"90-715-30","item_code_raw_ocr":"90-715-30","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":") Floating pipe for 18\" dredger pan 4.03 4.03 4.03 : For BWDB Dredger: Mobilization/Demobilization of Shore Pipes by Engine boat (40 ton capacity)/ Truck (5 ton capacity) pkm","unit":"","rates":{"zone_a":1.8,"zone_b":4.03,"zone_c":4.03,"zone_d":4.03},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":129,"source_schedule_page":119,"raw_rate_tokens":["18","4.03","4.03","4.03"],"source_review_note":null,"search_text":"90-715-30 ) Floating pipe for 18\" dredger pan 4.03 4.03 4.03 : For BWDB Dredger: Mobilization/Demobilization of Shore Pipes by Engine boat (40 ton capacity)/ Truck (5 ton capacity) pkm Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-720-00-P129-SL270","serial_label":"270","item_code":"90-720-00","item_code_raw_ocr":"90-720-00","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"fuel, lubricants excluding cost of loading/unloading and stacking etc. complete as per direction of engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":129,"source_schedule_page":119,"raw_rate_tokens":null,"source_review_note":null,"search_text":"90-720-00 fuel, lubricants excluding cost of loading/unloading and stacking etc. complete as per direction of engineer in charge. Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-720-15-P129-SL270(3)","serial_label":"270(3)","item_code":"90-720-15","item_code_raw_ocr":"90-720-15","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"By Engine boat: 18\" shore pipe 271 2.71 2.69","unit":"","rates":{"zone_a":18.0,"zone_b":27.1,"zone_c":27.1,"zone_d":26.9},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":129,"source_schedule_page":119,"raw_rate_tokens":["18","271","2.71","2.69"],"source_review_note":null,"search_text":"90-720-15 By Engine boat: 18\" shore pipe 271 2.71 2.69 Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-720-50-P129-SL270(4)","serial_label":"270(4)","item_code":"90-720-50","item_code_raw_ocr":"90-720-50","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"BY Truck: 26\" shore pipe 5.24 5.24 5.23","unit":"","rates":{"zone_a":2.6,"zone_b":5.24,"zone_c":5.24,"zone_d":5.23},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":129,"source_schedule_page":119,"raw_rate_tokens":["26","5.24","5.24","5.23"],"source_review_note":null,"search_text":"90-720-50 BY Truck: 26\" shore pipe 5.24 5.24 5.23 Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-720-55-P129-SL270(5)","serial_label":"270(5)","item_code":"90-720-55","item_code_raw_ocr":"90-720-55","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"BY Truck: 20\" shore pipe pm","unit":"","rates":{"zone_a":3.93,"zone_b":3.93,"zone_c":3.93,"zone_d":3.92},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":129,"source_schedule_page":119,"raw_rate_tokens":["3.93","3.93","3.93","3.92"],"source_review_note":null,"search_text":"90-720-55 BY Truck: 20\" shore pipe pm Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-720-60-P129-SL270(6)","serial_label":"270(6)","item_code":"90-720-60","item_code_raw_ocr":"90-720-60","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"BY Truck: 18\" shore pipe pm 3.14 3.14","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_image_review_required","autofill_eligible":false,"source_pdf_page":129,"source_schedule_page":119,"raw_rate_tokens":null,"source_review_note":null,"search_text":"90-720-60 BY Truck: 18\" shore pipe pm 3.14 3.14 Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-722-00-P129","serial_label":null,"item_code":"90-722-00","item_code_raw_ocr":"90-722-00","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":129,"source_schedule_page":119,"raw_rate_tokens":["-","-","-","-"],"source_review_note":null,"search_text":"90-722-00 Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-722-05-P130-SL271(1)","serial_label":"271(1)","item_code":"90-722-05","item_code_raw_ocr":"90-722-05","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"For 26\" shore pipe m","unit":"","rates":{"zone_a":227.07,"zone_b":227.07,"zone_c":227.07,"zone_d":226.25},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":130,"source_schedule_page":120,"raw_rate_tokens":["227.07","227.07","227.07","226.25"],"source_review_note":null,"search_text":"90-722-05 For 26\" shore pipe m Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-722-10-P130-SL271(2)","serial_label":"271(2)","item_code":"90-722-10","item_code_raw_ocr":"90-722-10","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"For 20\" shore pipe","unit":"m","rates":{"zone_a":160.28,"zone_b":160.28,"zone_c":160.28,"zone_d":159.7},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":130,"source_schedule_page":120,"raw_rate_tokens":["160.28","160.28","160.28","159.70"],"source_review_note":null,"search_text":"90-722-10 For 20\" shore pipe m Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-722-15-P130-SL271(3)","serial_label":"271(3)","item_code":"90-722-15","item_code_raw_ocr":"90-722-15","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"For 18\" shore pipe For BWDB Dredger: Mobilization/Demobilization of materials for Dredging work i.e. Bend Pipe, Short Pipe, Lubricant, Dredger preparing material by trip/","unit":"m","rates":{"zone_a":136.24,"zone_b":136.24,"zone_c":136.24,"zone_d":135.75},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":130,"source_schedule_page":120,"raw_rate_tokens":["136.24","136.24","136.24","135.75"],"source_review_note":null,"search_text":"90-722-15 For 18\" shore pipe For BWDB Dredger: Mobilization/Demobilization of materials for Dredging work i.e. Bend Pipe, Short Pipe, Lubricant, Dredger preparing material by trip/ m Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-725-00-P130-SL272","serial_label":"272","item_code":"90-725-00","item_code_raw_ocr":"90-725-00","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"Truck (5 ton capacity) including loading/unloading and the cost of all necessary fuel, lubricants ete. complete as per direction of engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":130,"source_schedule_page":120,"raw_rate_tokens":null,"source_review_note":null,"search_text":"90-725-00 Truck (5 ton capacity) including loading/unloading and the cost of all necessary fuel, lubricants ete. complete as per direction of engineer in charge. Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-725-10-P130-SL272(1)","serial_label":"272(1)","item_code":"90-725-10","item_code_raw_ocr":"90-725-10","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"BY Engine boat","unit":"","rates":{"zone_a":420.59,"zone_b":419.77,"zone_c":419.77,"zone_d":414.96},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":130,"source_schedule_page":120,"raw_rate_tokens":["420.59","419.77","419.77","414.96"],"source_review_note":null,"search_text":"90-725-10 BY Engine boat Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-725-20-P130-SL272(2)","serial_label":"272(2)","item_code":"90-725-20","item_code_raw_ocr":"90-725-20","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"BY Truck wip’ 277.70 27689 27689 273.31 For BWDB Dredger: Mobilization (round trip)of Fuel i.e Diesel, Lubricants and other necessary lub oils by engine boat 100","unit":"","rates":{"zone_a":27770.0,"zone_b":27689.0,"zone_c":27689.0,"zone_d":27331.0},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":130,"source_schedule_page":120,"raw_rate_tokens":["277.70","27689","27689","273.31"],"source_review_note":null,"search_text":"90-725-20 BY Truck wip’ 277.70 27689 27689 273.31 For BWDB Dredger: Mobilization (round trip)of Fuel i.e Diesel, Lubricants and other necessary lub oils by engine boat 100 Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-730-00-P130-SL273","serial_label":"273","item_code":"90-730-00","item_code_raw_ocr":"90-730-00","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"(40 ton capacity)’ Truck (3 ton 0 . . capacity) including ltr/k loading/unloading and the cost of m all necessary fuel, lubricants etc. complete as per direction of engineer in charge. By Engine boat 100","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":130,"source_schedule_page":120,"raw_rate_tokens":null,"source_review_note":null,"search_text":"90-730-00 (40 ton capacity)’ Truck (3 ton 0 . . capacity) including ltr/k loading/unloading and the cost of m all necessary fuel, lubricants etc. complete as per direction of engineer in charge. By Engine boat 100 Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-730-10-P130-SL273(1)","serial_label":"273(1)","item_code":"90-730-10","item_code_raw_ocr":"90-730-10","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"ltr/k m By Truck 100","unit":"","rates":{"zone_a":41.02,"zone_b":41.02,"zone_c":41.02,"zone_d":40.89},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":130,"source_schedule_page":120,"raw_rate_tokens":["41.02","41.02","41.02","40.89"],"source_review_note":null,"search_text":"90-730-10 ltr/k m By Truck 100 Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-730-20-P130-SL273(2)","serial_label":"273(2)","item_code":"90-730-20","item_code_raw_ocr":"90-730-20","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"ok m For BWDB Dredger: Supply of Engine boat for carrying goods or people around the work","unit":"","rates":{"zone_a":50.42,"zone_b":50.42,"zone_c":50.42,"zone_d":50.21},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":130,"source_schedule_page":120,"raw_rate_tokens":["50.42","50.42","50.42","50.21"],"source_review_note":null,"search_text":"90-730-20 ok m For BWDB Dredger: Supply of Engine boat for carrying goods or people around the work Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-735-00-P130-SL274","serial_label":"274","item_code":"90-735-00","item_code_raw_ocr":"90-735-00","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"Site for a period of 8 hours (one snig shift) including the operator and cost of all fuel, lubricants etc. complete as per direction of engineer in charge. For BWDB Dredger: Supply of security labour for","unit":"","rates":{"zone_a":3687.22,"zone_b":3687.22,"zone_c":3687.22,"zone_d":3625.86},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":130,"source_schedule_page":120,"raw_rate_tokens":["3,687.22","3,687.22","3,687.22","3,625.86"],"source_review_note":null,"search_text":"90-735-00 Site for a period of 8 hours (one snig shift) including the operator and cost of all fuel, lubricants etc. complete as per direction of engineer in charge. For BWDB Dredger: Supply of security labour for Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-740-00-P130-SL275","serial_label":"275","item_code":"90-740-00","item_code_raw_ocr":"90-740-00","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":") guarding the dredger along with day related all equipments providing at least 2 security labour per shift(8 ke Olas @ 6","unit":"","rates":{"zone_a":6748.65,"zone_b":6625.95,"zone_c":6625.95,"zone_d":6135.13},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":130,"source_schedule_page":120,"raw_rate_tokens":["6,748.65","6,625.95","6,625.95","6,135.13"],"source_review_note":null,"search_text":"90-740-00 ) guarding the dredger along with day related all equipments providing at least 2 security labour per shift(8 ke Olas @ 6 Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-745-00-P131-SL276","serial_label":"276","item_code":"90-745-00","item_code_raw_ocr":"90-745-00","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"disconnection of Shore pipe & shift floating pipe, necessary mending including miscellaneous — work around the dredging site etc. as per direction of engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":131,"source_schedule_page":121,"raw_rate_tokens":null,"source_review_note":null,"search_text":"90-745-00 disconnection of Shore pipe & shift floating pipe, necessary mending including miscellaneous — work around the dredging site etc. as per direction of engineer in charge. Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-745-10-P131-SL276(1)","serial_label":"276(1)","item_code":"90-745-10","item_code_raw_ocr":"90-745-10","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"For 26\" dredger","unit":"","rates":{"zone_a":4417.3,"zone_b":4417.3,"zone_c":4417.3,"zone_d":4270.05},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":131,"source_schedule_page":121,"raw_rate_tokens":["4,417.30","4,417.30","4,417.30","4,270.05"],"source_review_note":null,"search_text":"90-745-10 For 26\" dredger Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-745-20-P131-SL276(2)","serial_label":"276(2)","item_code":"90-745-20","item_code_raw_ocr":"90-745-20","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"For 20\" dredger","unit":"","rates":{"zone_a":3681.08,"zone_b":3681.08,"zone_c":3681.08,"zone_d":3558.38},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":131,"source_schedule_page":121,"raw_rate_tokens":["3,681.08","3,681.08","3,681.08","3,558.38"],"source_review_note":null,"search_text":"90-745-20 For 20\" dredger Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-745-30-P131-SL276(3)","serial_label":"276(3)","item_code":"90-745-30","item_code_raw_ocr":"90-745-30","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":", For 18\" dredger For BWDB Dredger: cum","unit":"","rates":{"zone_a":2944.86,"zone_b":2944.86,"zone_c":2944.86,"zone_d":2846.7},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":131,"source_schedule_page":121,"raw_rate_tokens":["2,944.86","2,944.86","2,944.86","2,846.70"],"source_review_note":null,"search_text":"90-745-30 , For 18\" dredger For BWDB Dredger: cum Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-750-00-P131-SL277","serial_label":"277","item_code":"90-750-00","item_code_raw_ocr":"90-750-00","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"beyond 1.5 km Extra Rate for booster pump cum","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":131,"source_schedule_page":121,"raw_rate_tokens":null,"source_review_note":null,"search_text":"90-750-00 beyond 1.5 km Extra Rate for booster pump cum Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-750-10-P131-SL277(1)","serial_label":"277(1)","item_code":"90-750-10","item_code_raw_ocr":"90-750-10","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"beyond Extra Rate for booster pump cum","unit":"","rates":{"zone_a":9.0,"zone_b":9.69,"zone_c":9.69,"zone_d":9.62},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":131,"source_schedule_page":121,"raw_rate_tokens":["90","9.69","9.69","9.62"],"source_review_note":null,"search_text":"90-750-10 beyond Extra Rate for booster pump cum Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-750-20-P131-SL277(2)","serial_label":"277(2)","item_code":"90-750-20","item_code_raw_ocr":"90-750-20","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"beyond Extra Rate for booster pump cum For BWDB Dredger: Construction and dismantelling of temporary/permanent steel shore pipe line including transshipment laying on the ground or on 50 kg gunny bag where necessary, lifting 2 800-00) Manually/by tripod stand with . .","unit":"","rates":{"zone_a":10.21,"zone_b":10.2,"zone_c":10.2,"zone_d":10.12},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":131,"source_schedule_page":121,"raw_rate_tokens":["10.21","10.20","10.20","10.12"],"source_review_note":null,"search_text":"90-750-20 beyond Extra Rate for booster pump cum For BWDB Dredger: Construction and dismantelling of temporary/permanent steel shore pipe line including transshipment laying on the ground or on 50 kg gunny bag where necessary, lifting 2 800-00) Manually/by tripod stand with . . Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-800-00-P131-SL78","serial_label":"78","item_code":"90-800-00","item_code_raw_ocr":"90-800-00","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"chain pully, fitting/fixing shore m pipe with nut-bolt & rubber gasket, levelling & dressing uneven ground where necessary, including the cost of necessary jute string, GI wire, etc. complete as per direction of engineer in charge. Construction and dismantelling of","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":131,"source_schedule_page":121,"raw_rate_tokens":null,"source_review_note":null,"search_text":"90-800-00 chain pully, fitting/fixing shore m pipe with nut-bolt & rubber gasket, levelling & dressing uneven ground where necessary, including the cost of necessary jute string, GI wire, etc. complete as per direction of engineer in charge. Construction and dismantelling of Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-800-10-P131-SL278(1)","serial_label":"278(1)","item_code":"90-800-10","item_code_raw_ocr":"90-800-10","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"] 26\" Steel Shore Pipe Line on Ground Construction and dismantelling of","unit":"m","rates":{"zone_a":1253.22,"zone_b":1253.22,"zone_c":1253.22,"zone_d":1231.28},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":131,"source_schedule_page":121,"raw_rate_tokens":["1,253.22","1,253.22","1,253.22","1,231.28"],"source_review_note":null,"search_text":"90-800-10 ] 26\" Steel Shore Pipe Line on Ground Construction and dismantelling of m Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-800-20-P131-SL278(2)","serial_label":"278(2)","item_code":"90-800-20","item_code_raw_ocr":"90-800-20","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"20\" Steel Shore Pipe Line on Ground Construction and dismantelling of","unit":"m","rates":{"zone_a":880.67,"zone_b":880.67,"zone_c":880.67,"zone_d":864.82},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":131,"source_schedule_page":121,"raw_rate_tokens":["880.67","880.67","880.67","864.82"],"source_review_note":null,"search_text":"90-800-20 20\" Steel Shore Pipe Line on Ground Construction and dismantelling of m Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-800-30-P131-SL278(3)","serial_label":"278(3)","item_code":"90-800-30","item_code_raw_ocr":"90-800-30","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"18\" Steel Shore Pipe Line on Ground For BWDB Dredger:","unit":"","rates":{"zone_a":673.75,"zone_b":673.75,"zone_c":673.75,"zone_d":660.4},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":131,"source_schedule_page":121,"raw_rate_tokens":["673.75","673.75","673.75","660.40"],"source_review_note":null,"search_text":"90-800-30 18\" Steel Shore Pipe Line on Ground For BWDB Dredger: Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-820-00-P131-SL279","serial_label":"279","item_code":"90-820-00","item_code_raw_ocr":"90-820-00","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"Construction and dismantelling of , . temporary/permanent steel shore ipe line including transshipment ke @_— we","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":131,"source_schedule_page":121,"raw_rate_tokens":null,"source_review_note":null,"search_text":"90-820-00 Construction and dismantelling of , . temporary/permanent steel shore ipe line including transshipment ke @_— we Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-820-10-P132-SL279(1)","serial_label":"279(1)","item_code":"90-820-10","item_code_raw_ocr":"90-820-10","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"Construction and dismantelling of 5, 1 g 26\" steel shore pipe line on staging","unit":"","rates":{"zone_a":700.0,"zone_b":1812.64,"zone_c":1812.64,"zone_d":1809.72},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":132,"source_schedule_page":122,"raw_rate_tokens":["70","1,812.64","1,812.64","1,809.72"],"source_review_note":null,"search_text":"90-820-10 Construction and dismantelling of 5, 1 g 26\" steel shore pipe line on staging Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-820-20-P132-SL279(2)","serial_label":"279(2)","item_code":"90-820-20","item_code_raw_ocr":"90-820-20","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"Construction and dismantelling of 4, y 20\" steel shore pipe line on staging","unit":"","rates":{"zone_a":445.21,"zone_b":1397.15,"zone_c":1397.15,"zone_d":1401.85},"rate_integrity_status":"numeric_outlier_review_required","autofill_eligible":false,"source_pdf_page":132,"source_schedule_page":122,"raw_rate_tokens":["445.21","1,397.15","1,397.15","1,401.85"],"source_review_note":null,"search_text":"90-820-20 Construction and dismantelling of 4, y 20\" steel shore pipe line on staging Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-820-30-P132-SL279(3)","serial_label":"279(3)","item_code":"90-820-30","item_code_raw_ocr":"90-820-30","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"Construction and dismantelling of 5, y 18\" steel shore pipe line on staging Construction of mooring for 18\" dredger, making anchorage both side of the dredger by driving hard wood bullah (125 mm dia, 1 m","unit":"","rates":{"zone_a":594.48,"zone_b":1176.42,"zone_c":1176.42,"zone_d":1184.23},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":132,"source_schedule_page":122,"raw_rate_tokens":["594.48","1,176.42","1,176.42","1,184.23"],"source_review_note":null,"search_text":"90-820-30 Construction and dismantelling of 5, y 18\" steel shore pipe line on staging Construction of mooring for 18\" dredger, making anchorage both side of the dredger by driving hard wood bullah (125 mm dia, 1 m Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-840-00-P132-SL280","serial_label":"280","item_code":"90-840-00","item_code_raw_ocr":"90-840-00","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"depth, 8 no of Bullah for two side each achorage) tying with 14/16 BWG GI wire including fitting and fixing etc. cost of all materials as per direction of engineer in charge. For BWDB Dredger: Lifting shore pipe sinked into the mud below the ground lebvel using","unit":"","rates":{"zone_a":5533.89,"zone_b":5337.57,"zone_c":5337.57,"zone_d":5300.76},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":132,"source_schedule_page":122,"raw_rate_tokens":["5,533.89","5,337.57","5,337.57","5,300.76"],"source_review_note":null,"search_text":"90-840-00 depth, 8 no of Bullah for two side each achorage) tying with 14/16 BWG GI wire including fitting and fixing etc. cost of all materials as per direction of engineer in charge. For BWDB Dredger: Lifting shore pipe sinked into the mud below the ground lebvel using Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-850-00-P132-SL281","serial_label":"281","item_code":"90-850-00","item_code_raw_ocr":"90-850-00","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"} tripod stand & chain hoist and m cleaning with water, etc including the cost of all materials as per direction of engineer in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"group_parent_unpriced_inferred_from_hierarchy","autofill_eligible":false,"source_pdf_page":132,"source_schedule_page":122,"raw_rate_tokens":null,"source_review_note":null,"search_text":"90-850-00 } tripod stand & chain hoist and m cleaning with water, etc including the cost of all materials as per direction of engineer in charge. Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-850-10-P132-SL281(1)","serial_label":"281(1)","item_code":"90-850-10","item_code_raw_ocr":"90-850-10","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"Lifting 26\" shore pipe sinked into , 1 the mud below the ground level Lifting 20\" shore pipe sinked into","unit":"","rates":{"zone_a":4098.4,"zone_b":1400.84,"zone_c":1400.84,"zone_d":1364.03},"rate_integrity_status":"numeric_outlier_review_required","autofill_eligible":false,"source_pdf_page":132,"source_schedule_page":122,"raw_rate_tokens":["409.84","1,400.84","1,400.84","1,364.03"],"source_review_note":null,"search_text":"90-850-10 Lifting 26\" shore pipe sinked into , 1 the mud below the ground level Lifting 20\" shore pipe sinked into Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-850-20-P132-SL281(2)","serial_label":"281(2)","item_code":"90-850-20","item_code_raw_ocr":"90-850-20","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"the mud below the ground level Lifting 18\" shore pipe sinked into","unit":"m","rates":{"zone_a":787.33,"zone_b":787.33,"zone_c":787.33,"zone_d":760.75},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":132,"source_schedule_page":122,"raw_rate_tokens":["787.33","787.33","787.33","760.75"],"source_review_note":null,"search_text":"90-850-20 the mud below the ground level Lifting 18\" shore pipe sinked into m Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-850-30-P132-SL281(3)","serial_label":"281(3)","item_code":"90-850-30","item_code_raw_ocr":"90-850-30","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"the mud below the ground level Construction and dismanteling of outlet for dumping and disposal of water from disposal area by shore","unit":"m","rates":{"zone_a":664.63,"zone_b":664.63,"zone_c":664.63,"zone_d":642.13},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":132,"source_schedule_page":122,"raw_rate_tokens":["664.63","664.63","664.63","642.13"],"source_review_note":null,"search_text":"90-850-30 the mud below the ground level Construction and dismanteling of outlet for dumping and disposal of water from disposal area by shore m Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-870-00-P132","serial_label":null,"item_code":"90-870-00","item_code_raw_ocr":"90-870-00","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"bags, rope, wire, polytheen, rubber gasket, nut-bolt etc. complete as per direction of engineering in charge.","unit":"","rates":{"zone_a":null,"zone_b":null,"zone_c":null,"zone_d":null},"rate_integrity_status":"source_unpriced_ocr_evidence","autofill_eligible":false,"source_pdf_page":132,"source_schedule_page":122,"raw_rate_tokens":null,"source_review_note":null,"search_text":"90-870-00 bags, rope, wire, polytheen, rubber gasket, nut-bolt etc. complete as per direction of engineering in charge. Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-870-10-P132-SL282(1)","serial_label":"282(1)","item_code":"90-870-10","item_code_raw_ocr":"90-870-10","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"For 26\" dredger","unit":"","rates":{"zone_a":72756.56,"zone_b":72756.56,"zone_c":72756.56,"zone_d":70989.64},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":132,"source_schedule_page":122,"raw_rate_tokens":["72,756.56","72,756.56","72,756.56","70,989.64"],"source_review_note":null,"search_text":"90-870-10 For 26\" dredger Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-870-20-P132-SL282(2)","serial_label":"282(2)","item_code":"90-870-20","item_code_raw_ocr":"90-870-20","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"For 20\" dredger","unit":"","rates":{"zone_a":51848.02,"zone_b":51848.02,"zone_c":51848.02,"zone_d":50571.92},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":132,"source_schedule_page":122,"raw_rate_tokens":["51,848.02","51,848.02","51,848.02","50,571.92"],"source_review_note":null,"search_text":"90-870-20 For 20\" dredger Dredging Work"},{"record_type":"bwdb_item_rate","record_id":"BWDB-ITEM-90-870-30-P132-SL282(3)","serial_label":"282(3)","item_code":"90-870-30","item_code_raw_ocr":"90-870-30","item_code_validation_status":"ocr_source_preserved","section_code":"90","section_title":"Dredging Work","description":"For 18\" dredger","unit":"","rates":{"zone_a":41923.83,"zone_b":41923.83,"zone_c":41923.83,"zone_d":40844.05},"rate_integrity_status":"machine_extracted_consistent","autofill_eligible":true,"source_pdf_page":132,"source_schedule_page":122,"raw_rate_tokens":["41,923.83","41,923.83","41,923.83","40,844.05"],"source_review_note":null,"search_text":"90-870-30 For 18\" dredger Dredging Work"}],"inaccessible_area_modifiers":{"rule":"Apply the listed Added Rate (%) only when the tender location falls within the corresponding inaccessible-area category.","application_policy":"Keep modifier separate; do not pre-apply it to base rates.","entries":[{"category":"A","difficulty":"Accessibility with moderate difficulty","added_rate_percent":5.0,"district":"Bandarban","upazilla_area":"Bandarban Sadar","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"A","difficulty":"Accessibility with moderate difficulty","added_rate_percent":5.0,"district":"Rangamati","upazilla_area":"Rangamati Sadar","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"A","difficulty":"Accessibility with moderate difficulty","added_rate_percent":5.0,"district":"Rangamati","upazilla_area":"Kaptai","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"A","difficulty":"Accessibility with moderate difficulty","added_rate_percent":5.0,"district":"Rangamati","upazilla_area":"Kaukhali","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"A","difficulty":"Accessibility with moderate difficulty","added_rate_percent":5.0,"district":"Khagrachari","upazilla_area":"Ramgarh","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"A","difficulty":"Accessibility with moderate difficulty","added_rate_percent":5.0,"district":"Khagrachari","upazilla_area":"Guimara","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Bandarban","upazilla_area":"Lama","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Bandarban","upazilla_area":"Alikadam","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Bandarban","upazilla_area":"Naikhyongchari","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Bandarban","upazilla_area":"Ruma","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Bandarban","upazilla_area":"Rowangchhari","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Bandarban","upazilla_area":"Thanchi","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Rangamati","upazilla_area":"Naniarchar","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Rangamati","upazilla_area":"Langadu","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Rangamati","upazilla_area":"Baghaichari","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Rangamati","upazilla_area":"Barkal","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Rangamati","upazilla_area":"Juraichari","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Rangamati","upazilla_area":"Belaichari","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Rangamati","upazilla_area":"Rajsthali","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Khagrachari","upazilla_area":"Khagrachari Sadar","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Khagrachari","upazilla_area":"Dighinala","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Khagrachari","upazilla_area":"Mohalchari","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Khagrachari","upazilla_area":"Panchari","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Noakhali","upazilla_area":"Hatiya","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Noakhali","upazilla_area":"Nijhum Dwip","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Cox's Bazar","upazilla_area":"Moheshkhali","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Cox's Bazar","upazilla_area":"Kutubdia","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Cox's Bazar","upazilla_area":"Ukhia","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Cox's Bazar","upazilla_area":"Teknaf (Except Saint Martin's Island)","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"B","difficulty":"Accessibility with high difficulty","added_rate_percent":10.0,"district":"Chattogram","upazilla_area":"Sandwip","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"},{"category":"C","difficulty":"Accessibility with extreme difficulty","added_rate_percent":15.0,"district":"Cox's Bazar","upazilla_area":"Saint Martin's Island (Teknaf Upazilla)","source_pdf_page":133,"source_schedule_page":123,"validation_status":"source_image_verified"}]},"ai_matching_guidance":{"primary_fields":["item_code","description","unit"],"basic_reference_fields":["basic_element_rates.element_code","basic_element_rates.description","basic_element_rates.unit"],"rate_selection":"Select Zone A/B/C/D according to BWDB jurisdiction and district.","safe_autofill_rule":"Only use an item rate automatically when autofill_eligible == true.","review_required_statuses":["source_image_review_required","numeric_outlier_review_required","source_unpriced_ocr_evidence","group_parent_unpriced_inferred_from_hierarchy"],"final_write_policy":"User review/correction is required before writing Unit Price to a tender."},"validation_summary":{"document":"BWDB Standard Schedule of Rates 2022 [With revised rate of 4 (Four) basic materials]","revision_label":"February-2023","final_dataset_status":"source_preserved_final_with_autofill_safety_gate","production_ready_for_ai_reference_and_matching":true,"production_ready_for_unattended_autofill_for_every_item":false,"phase1_basic_element_rates":{"records":503,"unique_element_codes":503,"production_ready":true},"phase2_item_rates":{"records":979,"unique_item_codes":979,"duplicate_item_codes":[],"autofill_eligible_records":791,"rate_integrity_status_counts":{"machine_extracted_consistent":784,"source_unpriced_ocr_evidence":34,"source_image_manually_verified":7,"group_parent_unpriced_inferred_from_hierarchy":88,"source_image_review_required":54,"numeric_outlier_review_required":12},"source_image_manual_rate_corrections":7,"source_image_manual_item_code_corrections":[{"source_pdf_page":30,"ocr_item_code":"04-210-29","corrected_item_code":"04-210-20"},{"source_pdf_page":35,"ocr_item_code":"08-190-19","corrected_item_code":"08-190-10"},{"source_pdf_page":38,"ocr_item_code":"10-140-09","corrected_item_code":"10-140-00"},{"source_pdf_page":40,"ocr_item_code":"10-160-06","corrected_item_code":"10-160-00"}],"blank_description_records":11,"blank_unit_records":755,"review_gate_policy":"Only records with autofill_eligible=true may supply a proposed rate automatically. All other records remain searchable but require source/user review."},"inaccessible_area_modifiers":{"records":31,"categories":["A","B","C"],"added_rate_percentages":[5.0,10.0,15.0],"source_image_verified":true},"source_integrity_policy":{"no_silent_guessing":true,"printed_dash":"Stored as null when supported by OCR/source hierarchy; never converted to zero.","ocr_uncertain_rate":"Kept null and review-gated.","numeric_outlier":"Preserved and review-gated; not auto-filled.","user_review":"Required before final Unit Price is written to the e-GP BOQ."}}}